B09_Attachment_49_-_E15_REV_0007.pdf

PDF 89 KB Posted

Attached to
HAVO 305150 Phase II, Kilauea Visitor Center (KVC)
Solicitation number
140P2024R0114
Issued by

About this file

This document appears to be an enlarged electrical plan and section for the Kilauea Visitor Center (KVC) project at Hawaii Volcanoes National Park. The key details are:

The project involves replacing the existing single-phase warehouse building PV panel, inverters, and wireway with a new three-phase system. This includes replacing the existing generator building panel, adding a new PV rapid shut down, expanding the generator building, installing a new standby automatic transfer switch, diesel generator, and main service switchboard. The existing single-phase switchboard will be removed and replaced with a new three-phase switchboard. New PV inverters and wireway will also be installed. Additionally, the project calls for modifying the existing shop building electrical system to connect to the new main distribution panel. The document provides detailed electrical plans and specifications for these upgrades and replacements.

View the file

Other files

File Type Posted
B08_Attachment_6_HAVO_305150_Wage_Determination_9_6_2024_0009.pdf PDF
Sol_140P2024R0114_Amd_0009.pdf PDF
B09_Attachment_25_-_Amd_08_Solicitation_QA_HAVO_305150_0008.xlsx XLSX spreadsheet
Sol_140P2024R0114_Amd_0008.pdf PDF
B09_Attachment_51_-_A8-A20-A22-A24-A25-A26_REV_0008.pdf PDF
B09_Attachment_48_-_C9_WATER_PLAN_AND_PROFILE_II_REV_0007.pdf PDF
B09_Attachment_36_-_08_31_13_-_ACCESS_DOORS_AND_FRAMES_0007.pdf PDF
B09_Attachment_30_-_08_14_33_-_STILE_AND_RAIL_WOOD_DOORS_0007.pdf PDF
B09_Attachment_41_-_09_29_00_-_GYPSUM_BOARD_0007.pdf PDF
B08_Attachment_6_HAVO_305150_Wage_Determination_7_19_2024_0007.pdf PDF
B09_Attachment_38_-_08_80_00_-_GLAZING_0007.pdf PDF
B09_Attachment_46_-_A22-A28-A51_REV_0007.pdf PDF
B09_Attachment_44_-_10_28_00_-_TOILET_ACCESSORIES_0007.pdf PDF
B09_Attachment_43_-_09_51_13_-_ACOUSTICAL_PANEL_CEILINGS_0007.pdf PDF
B09_Attachment_32_-_06_20_13_-_Exterior_Finish_Carpentry_0007.pdf PDF
B09_Attachment_40_-_08_91_19_-_FIXED_LOUVERS_0007.pdf PDF
B09_Attachment_47_-_C6_C11_C16_REV_0007.pdf PDF
B09_Attachment_28_-_07_92_00_-_Joint_Sealants_0007.pdf PDF
B09_Attachment_50_-_E25_REV_0007.pdf PDF
B09_Attachment_29_-_08_12_13_-_Hollow_Metal_Frames_0007.pdf PDF
B09_Attachment_37_-_08_71_00_-_Door_Hardware_0007.pdf PDF
B09_Attachment_25_-_Amd_07_Solicitation_QA_HAVO_305150_0007.xlsx XLSX spreadsheet
B09_Attachment_35_-_07_72_00_-_Roof_Accessories_0007.pdf PDF
B09_Attachment_34_-_07_62_00_-_Sheet_Metal_Flashing_and_Trim_0007.pdf PDF
B09_Attachment_33_-_07_21_00_-_Thermal_Insulation_0007.pdf PDF
B09_Attachment_42_-_09_30_13_-_CERAMIC_TILING_0007.pdf PDF
B09_Attachment_31_-_01_77_00A_Closeout-OperationMaintenance-Requirements_0007.pdf PDF
B09_Attachment_39_-_08_83_00_-_MIRRORS_0007.pdf PDF
Sol_140P2024R0114_Amd_0007.pdf PDF
B09_Attachment_45_-_33_14_16___Site_Water_Utility_Distribution_0007.pdf PDF
B09_Attachment_27_-_01_33_23-A_SubmittalList-ReviewEstimate_0007.pdf PDF
B09_Attachment_26_-_00_-_Table_of_Contents_0007.pdf PDF
Attachment_23_-_Pre-proposal_Site_Visit_Sign-in_Roster_7_31_2024_0006.pdf PDF
Attachment_21_-_01_33_23-A_SubmittalList-ReviewEstimate_0006.pdf PDF
Attachment_18_-_R1_A42_CD_HAVO_KVC_0006.pdf PDF
Attachment_24_-_HAVO_305150B_Prebid_Meeting_Notes_7-31-24_0006.pdf PDF
Attachment_17_-_R1_A36_CD_HAVO_KVC_0006.pdf PDF
Sol_140P2024R0114_Amd_0006.pdf PDF
Attachment_25_-_Amd_06_Solicitation_QA_HAVO_305150_0006.xlsx XLSX spreadsheet
Attachment_22_-_01_77_00A_Closeout-OperationMaintenance-Requirements_0006.pdf PDF
Attachment_20_-_SECTION_08_71_00_-_DOOR_HARDWARE_-_REV_2_0006.pdf PDF
Attachment_19_-_R1_A49_CD_HAVO_KVC_0006.pdf PDF
Sol_140P2024R0114_Amd_0005.pdf PDF
B09_Attachment_15_-_Cold_Fluid-Applied_Waterproofing-rev1_07_14_16_0004.pdf PDF
B09_Attachment_16_-_S1_Basement-81_0004.pdf PDF
Sol_140P2024R0114_Amd_0004.pdf PDF
Sol_140P2024R0114_Amd_0003.pdf PDF
B09_Attachment_14_-_Site_Visit_Tri_Fold_HAVO_305150B_-_AMENDMENT_3_0003.pdf PDF
B09_Attachment_13_-_HAVO_305150_Prebid_Site_Visit_Insructions_0003.pdf PDF
B08_Attachment_2_HAVO305150_FinalCDDrawings_0002.pdf PDF
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A T

S

JJJ

J

J J

J

J

J

F

REMOVE EXISTING SINGLE PHASE

WAREHOUSE BUILDING PV PANEL,

INVERTERS AND WIREWAY,

REPLACE WITH NEW THREE PHASE

EXISTING

SHOPS

BUILDING

EXISTING

GENERATOR

BUILDING

PANEL 'PVS'

F

NEW PV RAPID SHUT DOWN

13' GENERATOR

BLDG. EXPANSION NEW STANDBY AUTOMATIC

TRANSFER SWITCH

NEW DIESEL

GENERATOR

NEW MAIN SERVICE

SWITCHBOARD 'MDP'.

REMOVE EXISTING

SWITCHBOARD

NEW PV INVERTERS

AND WIREWAY

BATTERY CHARGER

WATER JACKET HEATER

FUEL COOLER

MOTORIZED

LOUVERS

PANEL 'GEN'

GEN-6.

GEN-8.

GEN-5.

G E

N -7

G E

N -2

,4

G E

N -1

GEN-3. GEN-11.

GEN-13.

G E

N -1

GEN-10.

G E

N -1

(E) LG UNIT

NEW EF-3

NEW UNDERGROUND

SERVICE, SEE SITE

ELECTRICAL PLAN

F

NEW PV RAPID SHUT-

DOWN SWITCH

G G

GEN-10.

G E

N -1

.W

GENERATOR

EMERGENCY

SHUT-DOWN

PUSH-BUTTON

(E)

(E)

GEN-10.

G G

GEN-10.

EXISTING AM RADIO, RECONNECT

TO NEW PANEL 'GEN'

GEN-14.

'ZL1''ZL1''ZL1'

'ZL1' 'ZL1' 'ZL1' 'ZL1'

'ZL1'

EM

EM

EM

EM

EM

EM

'ZL_', INTEGRAL

OCCUPANCY

SENSOR

EMLV$

L V

L V

'ZL_'

INTEGRAL

OCCUPANCY

SENSOR

7 7

OF

PMIS/PKG NO.

DRAWING NO.SUB SHEET NO.

HAWAII VOLCANOES NATIONAL PARK

KILAUEA VISITOR CENTER

DESIGNED:

CADD:

TECH REVIEW:

DATE:

187007

SHEET

HAVO 305150B

SCALE IN FEET

/1 /2

:4 :2 P M

C R e v it P r o je c t s \M

E P H A V O K V C R r a y m o n d c 1.

r v t

E15E15E15E15

ENLARGED PLANS ANDENLARGED PLANS ANDENLARGED PLANS ANDENLARGED PLANS AND

SECTIONS SECTIONS SECTIONS SECTIONS −−−− ELECTRICALELECTRICALELECTRICALELECTRICAL

MJ,DO

HN, DO

MO

05/24/2024

SCALE: 1/4" = 1'-0"E15

1 EXISTING GENERATOR & WAREHOUSE BLDG MODIFICATIONS - POWER

0 2' 4' 8'

SHEET KEYNOTES

1. REPLACEMENT PANELBOARD. REMOVE

EXISTING PANELBOARD AND INSTALL

NEW PANELBOARD IN ITS PLACE.

NOTE - NEW PANELBOARD IS LARGER

THAN THE EXISTING PANELBOARD, SO

MODIFICATIONS FOR THE NEW

PANELBOARD TO FIT WILL BE

REQUIRED.

2. REPLACEMENT PV INVERTER. REMOVE

EXISTING INVERTER AND INSTALL NEW

INVERTER IN ITS PLACE. NOTE - NEW

INVERTER IS LARGER THAN THE

EXISTING INVERTER, SO

MODIFICATIONS FIR THE NEW

INVERTER TO FIT WILL BE REQUIRED.

3. ADJUST LOCATION OF EXISTING

RECEPTACLE IF NEEDED, RECONNECT

TO EXISTING SHOP PANEL. REPLACE

EXISTING SURGE SUPPRESSOR WITH

NEW THREE PHASE SURGE

SUPPRESSOR.

4. REMOVE EXISTING SINGLE PHASE

MAIN SWITCHBOARD AND REPLACE

WITH NEW 3 PHASE SWITCHBOARD

'MDP'.

5. REMOVE EXISTING SINGLE PHASE

GENERATOR LOAD CENTER AND

AUTOMATIC TRANSFER SWITCH

REPLACE IN PLACE WITH NEW 3

PHASE PANEL 'GEN' (LOCATE TO

MAINTAIN CODE CLEARANCE IN FRONT

OF NEW PANEL).

6. EXISTING SHOP BUILDING TO REMAIN.

SEE ONE-LINE DIAGRAM FOR

CONNECTION TO NEW MAIN

DISTRIBUTION PANEL.

7. PROVIDE INTEGRAL EMERGENCY

BATTERY BALLAST. IOTA ILB CP10

SERIES OR EQUAL.

8. PROVIDE ENGRAVED LABEL FOR SHUT

DOWN SWITCH.

9. GFCI PROTECTION PROVIDED BY

BREAKER. SEE SPECIFICATIONS FOR

RECEPTACLE TYPE.

SCALE: 1/4" = 1'-0"E15

2 GENERATOR BLDG - LIGHTING

markj Cloud markj Cloud

Sheets
E15 - ENLARGED PLANS AND SECTIONS - ELECTRICAL

File details come from the government source that posted it. Updated .