B09_Attachment_41_-_09_29_00_-_GYPSUM_BOARD_0007.pdf

PDF 117 KB Posted

Attached to
HAVO 305150 Phase II, Kilauea Visitor Center (KVC)
Solicitation number
140P2024R0114
Issued by

About this file

This document is a section of technical specifications for the installation of gypsum board as part of the HAVO 305150 Phase II, Kilauea Visitor Center (KVC) project. The key details are:

The specifications outline requirements for the delivery, storage, and handling of gypsum board materials, as well as installation and finishing requirements. It specifies obtaining gypsum panels and finishing materials from a single source, and compliance with ASTM standards for STC-rated assemblies. The specifications also detail procedures for examining substrates, installing panels to minimize joints, isolating perimeter of gypsum board, and protecting installed products. The document includes provisions for repairing damaged or mold-affected gypsum panels. This section is focused on the technical requirements for the gypsum board scope of work for this federal construction project.

View the file

Other files

File Type Posted
B08_Attachment_6_HAVO_305150_Wage_Determination_9_6_2024_0009.pdf PDF
Sol_140P2024R0114_Amd_0009.pdf PDF
B09_Attachment_25_-_Amd_08_Solicitation_QA_HAVO_305150_0008.xlsx XLSX spreadsheet
Sol_140P2024R0114_Amd_0008.pdf PDF
B09_Attachment_51_-_A8-A20-A22-A24-A25-A26_REV_0008.pdf PDF
B09_Attachment_48_-_C9_WATER_PLAN_AND_PROFILE_II_REV_0007.pdf PDF
B09_Attachment_36_-_08_31_13_-_ACCESS_DOORS_AND_FRAMES_0007.pdf PDF
B09_Attachment_30_-_08_14_33_-_STILE_AND_RAIL_WOOD_DOORS_0007.pdf PDF
B08_Attachment_6_HAVO_305150_Wage_Determination_7_19_2024_0007.pdf PDF
B09_Attachment_38_-_08_80_00_-_GLAZING_0007.pdf PDF
B09_Attachment_46_-_A22-A28-A51_REV_0007.pdf PDF
B09_Attachment_44_-_10_28_00_-_TOILET_ACCESSORIES_0007.pdf PDF
B09_Attachment_43_-_09_51_13_-_ACOUSTICAL_PANEL_CEILINGS_0007.pdf PDF
B09_Attachment_32_-_06_20_13_-_Exterior_Finish_Carpentry_0007.pdf PDF
B09_Attachment_40_-_08_91_19_-_FIXED_LOUVERS_0007.pdf PDF
B09_Attachment_47_-_C6_C11_C16_REV_0007.pdf PDF
B09_Attachment_49_-_E15_REV_0007.pdf PDF
B09_Attachment_28_-_07_92_00_-_Joint_Sealants_0007.pdf PDF
B09_Attachment_50_-_E25_REV_0007.pdf PDF
B09_Attachment_29_-_08_12_13_-_Hollow_Metal_Frames_0007.pdf PDF
B09_Attachment_37_-_08_71_00_-_Door_Hardware_0007.pdf PDF
B09_Attachment_25_-_Amd_07_Solicitation_QA_HAVO_305150_0007.xlsx XLSX spreadsheet
B09_Attachment_35_-_07_72_00_-_Roof_Accessories_0007.pdf PDF
B09_Attachment_34_-_07_62_00_-_Sheet_Metal_Flashing_and_Trim_0007.pdf PDF
B09_Attachment_33_-_07_21_00_-_Thermal_Insulation_0007.pdf PDF
B09_Attachment_42_-_09_30_13_-_CERAMIC_TILING_0007.pdf PDF
B09_Attachment_31_-_01_77_00A_Closeout-OperationMaintenance-Requirements_0007.pdf PDF
B09_Attachment_39_-_08_83_00_-_MIRRORS_0007.pdf PDF
Sol_140P2024R0114_Amd_0007.pdf PDF
B09_Attachment_45_-_33_14_16___Site_Water_Utility_Distribution_0007.pdf PDF
B09_Attachment_27_-_01_33_23-A_SubmittalList-ReviewEstimate_0007.pdf PDF
B09_Attachment_26_-_00_-_Table_of_Contents_0007.pdf PDF
Attachment_23_-_Pre-proposal_Site_Visit_Sign-in_Roster_7_31_2024_0006.pdf PDF
Attachment_21_-_01_33_23-A_SubmittalList-ReviewEstimate_0006.pdf PDF
Attachment_18_-_R1_A42_CD_HAVO_KVC_0006.pdf PDF
Attachment_24_-_HAVO_305150B_Prebid_Meeting_Notes_7-31-24_0006.pdf PDF
Attachment_17_-_R1_A36_CD_HAVO_KVC_0006.pdf PDF
Sol_140P2024R0114_Amd_0006.pdf PDF
Attachment_25_-_Amd_06_Solicitation_QA_HAVO_305150_0006.xlsx XLSX spreadsheet
Attachment_22_-_01_77_00A_Closeout-OperationMaintenance-Requirements_0006.pdf PDF
Attachment_20_-_SECTION_08_71_00_-_DOOR_HARDWARE_-_REV_2_0006.pdf PDF
Attachment_19_-_R1_A49_CD_HAVO_KVC_0006.pdf PDF
Sol_140P2024R0114_Amd_0005.pdf PDF
B09_Attachment_15_-_Cold_Fluid-Applied_Waterproofing-rev1_07_14_16_0004.pdf PDF
B09_Attachment_16_-_S1_Basement-81_0004.pdf PDF
Sol_140P2024R0114_Amd_0004.pdf PDF
Sol_140P2024R0114_Amd_0003.pdf PDF
B09_Attachment_14_-_Site_Visit_Tri_Fold_HAVO_305150B_-_AMENDMENT_3_0003.pdf PDF
B09_Attachment_13_-_HAVO_305150_Prebid_Site_Visit_Insructions_0003.pdf PDF
B08_Attachment_2_HAVO305150_FinalCDDrawings_0002.pdf PDF
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HAVO – 305150B 09 29 00

GYPSUM BOARD

SECTION 09 29 00 - GYPSUM BOARD

PART 1 - GENERAL

1.1 DELIVERY, STORAGE AND HANDLING

A. Store materials inside under cover and keep them dry and protected against weather, condensation, direct sunlight, construction traffic, and other potential causes of damage. Stack panels flat and supported on risers on a flat platform to prevent sagging.

1.2 SUBMITTALS

A. Product data

1.3 FIELD CONDITIONS

A. Environmental Limitations: Comply with ASTM C840 requirements or gypsum board manufacturer's written instructions, whichever are more stringent.

B. Do not install paper-faced gypsum panels until installation areas are enclosed and conditioned.

C. Do not install panels that are wet, moisture damaged, and mold damaged.

1. Indications that panels are wet or moisture damaged include, but are not limited to, discoloration, sagging, or irregular shape.

2. Indications that panels are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.

PART 2 - PRODUCTS

2.1 SOURCE LIMITATIONS

A. Obtain each type of gypsum panel and joint finishing material from single source with resources to provide products of consistent quality in appearance and physical properties.

2.2 PERFORMANCE REQUIREMENTS

A. STC-Rated Assemblies: For STC-rated assemblies, provide materials and construction identical to those tested in assembly indicated according to ASTM E90 and classified according to ASTM E413 by an independent testing agency.

danah.palik Cloud

2.3 EXAMINATION

A. Examine areas and substrates including welded hollow-metal frames and support framing, with Installer present, for compliance with requirements and other conditions affecting performance of the Work.

B. Examine panels before installation. Reject panels that are wet, moisture damaged, and mold damaged.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

2.4 INSTALLATION AND FINISHING OF PANELS, GENERAL

A. Comply with ASTM C840.

B. Install ceiling panels across framing to minimize the number of abutting end joints and to avoid abutting end joints in central area of each ceiling. Stagger abutting end joints of adjacent panels not less than one framing member.

C. Install panels with face side out. Butt panels together for a light contact at edges and ends with not more than 1/16 inch of open space between panels. Do not force into place.

D. Locate edge and end joints over supports, except in ceiling applications where intermediate supports or gypsum board back-blocking is provided behind end joints. Do not place tapered edges against cut edges or ends. Stagger vertical joints on opposite sides of partitions. Do not make joints other than control joints at corners of framed openings.

E. Form control and expansion joints with space between edges of adjoining gypsum panels.

F. Cover both faces of support framing with gypsum panels in concealed spaces (above ceilings, etc.), except in chases braced internally.

1. Unless concealed application is indicated or required for sound, fire, air, or smoke ratings, coverage may be accomplished with scraps of not less than 8 sq. ft. in area.

2. Fit gypsum panels around ducts, pipes, and conduits.

3. Where partitions intersect structural members projecting below underside of floor/roof slabs and decks, cut gypsum panels to fit profile formed by structural members; allow 1/4- to 3/8-inch- wide joints to install sealant.

G. Isolate perimeter of gypsum board applied to non-load-bearing partitions at structural abutments. Provide 1/4- to 1/2-inch- wide spaces at these locations and trim edges with edge trim where edges of panels are exposed. Seal joints between edges and abutting structural surfaces with acoustical sealant.

H. Attachment to Steel Framing: Attach panels so leading edge or end of each panel is attached to open (unsupported) edges of stud flanges first.

I. Wood Framing: Install gypsum panels over wood framing, with floating internal corner construction. Do not attach gypsum panels across the flat grain of wide-dimension lumber, including floor joists and headers. Float gypsum panels over these members or provide control joints to counteract wood shrinkage.

J. STC-Rated Assemblies: Seal construction at perimeters, behind control joints, and at openings and penetrations with a continuous bead of acoustical sealant. Install acoustical sealant at both faces of partitions at perimeters and through penetrations. Comply with ASTM C919 and with manufacturer's written instructions for locating edge trim and closing off sound-flanking paths around or through assemblies, including sealing partitions above acoustical ceilings.

K. Install sound attenuation blankets before installing gypsum panels unless blankets are readily installed after panels have been installed on one side.

2.4 FINISHING OF GYPSUM BOARD

A. General: Treat gypsum board joints, interior angles, edge trim, control joints, penetrations, fastener heads, surface defects, and elsewhere as required to prepare gypsum board surfaces for decoration. Promptly remove residual joint compound from adjacent surfaces.

B. Prefill open joints and damaged surface areas.

C. Apply joint tape over gypsum board joints, except for trim products specifically indicated as not intended to receive tape.

D. Protect adjacent surfaces from drywall compound and promptly remove from floors and other non-drywall surfaces. Repair surfaces stained, marred, or otherwise damaged during drywall application.

E. Protect installed products from damage from weather, condensation, direct sunlight, construction, and other causes during remainder of the construction period.

F. Remove and replace panels that are wet, moisture damaged, and mold damaged.

1. Indications that panels are wet or moisture damaged include, but are not limited to, discoloration, sagging, or irregular shape.

2. Indications that panels are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.

END OF SECTION

1.2 SUBMITTALS
A. Product data

File details come from the government source that posted it. Updated .