Attachment_17_-_R1_A36_CD_HAVO_KVC_0006.pdf

PDF 241 KB Posted

Attached to
HAVO 305150 Phase II, Kilauea Visitor Center (KVC)
Solicitation number
140P2024R0114
Issued by

About this file

This document appears to be an architectural drawing sheet labeled "A36 WALL SECTIONS" for the Kilauea Visitor Center (KVC) project at Hawaii Volcanoes National Park. The drawing provides detailed sections and details for new concrete stairs, walls, and slabs that are part of the KVC renovation project. The drawing references the overall project solicitation, HAVO 305150 Phase II, and indicates that the structural design of the walls, slabs, and footings is to be provided separately. This drawing is likely one of the attachments or exhibits referenced in the federal contract opportunity for the HAVO 305150 Phase II project, which aims to repair or replace damaged park infrastructure and visitor facilities.

View the file

Other files

File Type Posted
B08_Attachment_6_HAVO_305150_Wage_Determination_9_6_2024_0009.pdf PDF
Sol_140P2024R0114_Amd_0009.pdf PDF
B09_Attachment_25_-_Amd_08_Solicitation_QA_HAVO_305150_0008.xlsx XLSX spreadsheet
Sol_140P2024R0114_Amd_0008.pdf PDF
B09_Attachment_51_-_A8-A20-A22-A24-A25-A26_REV_0008.pdf PDF
B09_Attachment_48_-_C9_WATER_PLAN_AND_PROFILE_II_REV_0007.pdf PDF
B09_Attachment_36_-_08_31_13_-_ACCESS_DOORS_AND_FRAMES_0007.pdf PDF
B09_Attachment_30_-_08_14_33_-_STILE_AND_RAIL_WOOD_DOORS_0007.pdf PDF
B09_Attachment_41_-_09_29_00_-_GYPSUM_BOARD_0007.pdf PDF
B08_Attachment_6_HAVO_305150_Wage_Determination_7_19_2024_0007.pdf PDF
B09_Attachment_38_-_08_80_00_-_GLAZING_0007.pdf PDF
B09_Attachment_46_-_A22-A28-A51_REV_0007.pdf PDF
B09_Attachment_44_-_10_28_00_-_TOILET_ACCESSORIES_0007.pdf PDF
B09_Attachment_43_-_09_51_13_-_ACOUSTICAL_PANEL_CEILINGS_0007.pdf PDF
B09_Attachment_32_-_06_20_13_-_Exterior_Finish_Carpentry_0007.pdf PDF
B09_Attachment_40_-_08_91_19_-_FIXED_LOUVERS_0007.pdf PDF
B09_Attachment_47_-_C6_C11_C16_REV_0007.pdf PDF
B09_Attachment_49_-_E15_REV_0007.pdf PDF
B09_Attachment_28_-_07_92_00_-_Joint_Sealants_0007.pdf PDF
B09_Attachment_50_-_E25_REV_0007.pdf PDF
B09_Attachment_29_-_08_12_13_-_Hollow_Metal_Frames_0007.pdf PDF
B09_Attachment_37_-_08_71_00_-_Door_Hardware_0007.pdf PDF
B09_Attachment_25_-_Amd_07_Solicitation_QA_HAVO_305150_0007.xlsx XLSX spreadsheet
B09_Attachment_35_-_07_72_00_-_Roof_Accessories_0007.pdf PDF
B09_Attachment_34_-_07_62_00_-_Sheet_Metal_Flashing_and_Trim_0007.pdf PDF
B09_Attachment_33_-_07_21_00_-_Thermal_Insulation_0007.pdf PDF
B09_Attachment_42_-_09_30_13_-_CERAMIC_TILING_0007.pdf PDF
B09_Attachment_31_-_01_77_00A_Closeout-OperationMaintenance-Requirements_0007.pdf PDF
B09_Attachment_39_-_08_83_00_-_MIRRORS_0007.pdf PDF
Sol_140P2024R0114_Amd_0007.pdf PDF
B09_Attachment_45_-_33_14_16___Site_Water_Utility_Distribution_0007.pdf PDF
B09_Attachment_27_-_01_33_23-A_SubmittalList-ReviewEstimate_0007.pdf PDF
B09_Attachment_26_-_00_-_Table_of_Contents_0007.pdf PDF
Attachment_23_-_Pre-proposal_Site_Visit_Sign-in_Roster_7_31_2024_0006.pdf PDF
Attachment_21_-_01_33_23-A_SubmittalList-ReviewEstimate_0006.pdf PDF
Attachment_18_-_R1_A42_CD_HAVO_KVC_0006.pdf PDF
Attachment_24_-_HAVO_305150B_Prebid_Meeting_Notes_7-31-24_0006.pdf PDF
Sol_140P2024R0114_Amd_0006.pdf PDF
Attachment_25_-_Amd_06_Solicitation_QA_HAVO_305150_0006.xlsx XLSX spreadsheet
Attachment_22_-_01_77_00A_Closeout-OperationMaintenance-Requirements_0006.pdf PDF
Attachment_20_-_SECTION_08_71_00_-_DOOR_HARDWARE_-_REV_2_0006.pdf PDF
Attachment_19_-_R1_A49_CD_HAVO_KVC_0006.pdf PDF
Sol_140P2024R0114_Amd_0005.pdf PDF
B09_Attachment_15_-_Cold_Fluid-Applied_Waterproofing-rev1_07_14_16_0004.pdf PDF
B09_Attachment_16_-_S1_Basement-81_0004.pdf PDF
Sol_140P2024R0114_Amd_0004.pdf PDF
Sol_140P2024R0114_Amd_0003.pdf PDF
B09_Attachment_14_-_Site_Visit_Tri_Fold_HAVO_305150B_-_AMENDMENT_3_0003.pdf PDF
B09_Attachment_13_-_HAVO_305150_Prebid_Site_Visit_Insructions_0003.pdf PDF
B08_Attachment_2_HAVO305150_FinalCDDrawings_0002.pdf PDF
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST FLOOR

0"

X6

BASEMENT

-8' - 4"

A3

A36

FLUSH TRANSITION

1/4" / 12"

(E) CONC

INSTALL SALVAGED STONE

WP MEMB

4' - 6"

SEE STRUCTURAL

SEE STRUCT

WP MEMB

FIRST FLOOR

0"

XC

BASEMENT

-8' - 4"

A1

A36

3' - 4"

1/4" / 12"

1"

2"

NEW CONC STAIR BEYOND,

SEE STRUCT

SEE STRUCT

SEE STRUCT

A36

A4

WP MEMB

1"

9"

FIN FLR

(E) CONC

SLAB

(E) CONC

WALL

RECONSTRUCT STONE BASE

AFTER CONC WORK DONE

WP MEMB

7'

3"

SL 1/4" / 12"

NEW CONC WALL, 8" THK

SEE STRUCT

WP MEMB

This work was prepared by me or under my supervision.

Signature Expiration Date of License

4/30/2026

No. 4073

W

N

ARCHITECT

PROFESSIONAL

LICENSED

A

H

NEL

G

A

,IIA S.

U.

NO

ME. AS

OF

PMIS/PKG NO.

DRAWING NO.SUB SHEET NO.

HAWAII VOLCANOES NATIONAL PARK

KILAUEA VISITOR CENTER

DESIGNED:

CADD:

TECH REVIEW:

DATE:

187007

SHEET

HAVO 305150B

1/

:4 :2

A

M C U s e r s j s D o c u m e n t s C .A

L T E R N A T E H A V O V C R j e n n a K R T .r v t

A36

WALL SECTIONS

Designer

Author

Checker

4/12/2024

0 1' 2' 3'

3/4" = 1'-0"A36

E-W NEW STAIR SECTIONA1

3/4" = 1'-0"A36

N-S NEW STAIR SECTIONA3

NEW CONCRETE STAIRS, WALLS, AND SLABS,

SEE STRUCTURAL FOR WALL, SLAB, AND FTG DESIGN

0 1' 2' 3'

0 3" 6" 9"

3" = 1'-0"A36

NEW STAIR DETAILA4

NEW CONCRETE STAIRS, WALLS, AND SLABS,

SEE STRUCTURAL FOR WALL, SLAB, AND FTG DESIGN

NEW CONCRETE STAIRS, WALLS, AND SLABS,

SEE STRUCTURAL FOR WALL, SLAB, AND FTG DESIGN

Sheets
A36 - WALL SECTIONS

File details come from the government source that posted it. Updated .