B09_Attachment_32_-_06_20_13_-_Exterior_Finish_Carpentry_0007.pdf

PDF 120 KB Posted

Attached to
HAVO 305150 Phase II, Kilauea Visitor Center (KVC)
Solicitation number
140P2024R0114
Issued by

About this file

This document is an exterior finish carpentry specification for the HAVO 305150 Phase II, Kilauea Visitor Center (KVC) project at Hawaii Volcanoes National Park. The specification covers the requirements for exterior siding, trim, casings, and related finish carpentry work. Key details include:

The scope includes siding, trims, casings, and similar exterior finish carpentry. Approved materials include lumber, softwood plywood, cement board, stainless steel fasteners, and sound absorbing panels. The work requires proper storage, handling, and installation of the finish carpentry components to meet tolerances and quality standards. Preparation work includes cleaning substrates, priming, and coordinating with adjacent materials. Installation standards cover alignment, joinery, and protecting installed products from weather and moisture damage.

View the file

Other files

File Type Posted
B08_Attachment_6_HAVO_305150_Wage_Determination_9_6_2024_0009.pdf PDF
Sol_140P2024R0114_Amd_0009.pdf PDF
B09_Attachment_25_-_Amd_08_Solicitation_QA_HAVO_305150_0008.xlsx XLSX spreadsheet
Sol_140P2024R0114_Amd_0008.pdf PDF
B09_Attachment_51_-_A8-A20-A22-A24-A25-A26_REV_0008.pdf PDF
B09_Attachment_48_-_C9_WATER_PLAN_AND_PROFILE_II_REV_0007.pdf PDF
B09_Attachment_36_-_08_31_13_-_ACCESS_DOORS_AND_FRAMES_0007.pdf PDF
B09_Attachment_30_-_08_14_33_-_STILE_AND_RAIL_WOOD_DOORS_0007.pdf PDF
B09_Attachment_41_-_09_29_00_-_GYPSUM_BOARD_0007.pdf PDF
B08_Attachment_6_HAVO_305150_Wage_Determination_7_19_2024_0007.pdf PDF
B09_Attachment_38_-_08_80_00_-_GLAZING_0007.pdf PDF
B09_Attachment_46_-_A22-A28-A51_REV_0007.pdf PDF
B09_Attachment_44_-_10_28_00_-_TOILET_ACCESSORIES_0007.pdf PDF
B09_Attachment_43_-_09_51_13_-_ACOUSTICAL_PANEL_CEILINGS_0007.pdf PDF
B09_Attachment_40_-_08_91_19_-_FIXED_LOUVERS_0007.pdf PDF
B09_Attachment_47_-_C6_C11_C16_REV_0007.pdf PDF
B09_Attachment_49_-_E15_REV_0007.pdf PDF
B09_Attachment_28_-_07_92_00_-_Joint_Sealants_0007.pdf PDF
B09_Attachment_50_-_E25_REV_0007.pdf PDF
B09_Attachment_29_-_08_12_13_-_Hollow_Metal_Frames_0007.pdf PDF
B09_Attachment_37_-_08_71_00_-_Door_Hardware_0007.pdf PDF
B09_Attachment_25_-_Amd_07_Solicitation_QA_HAVO_305150_0007.xlsx XLSX spreadsheet
B09_Attachment_35_-_07_72_00_-_Roof_Accessories_0007.pdf PDF
B09_Attachment_34_-_07_62_00_-_Sheet_Metal_Flashing_and_Trim_0007.pdf PDF
B09_Attachment_33_-_07_21_00_-_Thermal_Insulation_0007.pdf PDF
B09_Attachment_42_-_09_30_13_-_CERAMIC_TILING_0007.pdf PDF
B09_Attachment_31_-_01_77_00A_Closeout-OperationMaintenance-Requirements_0007.pdf PDF
B09_Attachment_39_-_08_83_00_-_MIRRORS_0007.pdf PDF
Sol_140P2024R0114_Amd_0007.pdf PDF
B09_Attachment_45_-_33_14_16___Site_Water_Utility_Distribution_0007.pdf PDF
B09_Attachment_27_-_01_33_23-A_SubmittalList-ReviewEstimate_0007.pdf PDF
B09_Attachment_26_-_00_-_Table_of_Contents_0007.pdf PDF
Attachment_23_-_Pre-proposal_Site_Visit_Sign-in_Roster_7_31_2024_0006.pdf PDF
Attachment_21_-_01_33_23-A_SubmittalList-ReviewEstimate_0006.pdf PDF
Attachment_18_-_R1_A42_CD_HAVO_KVC_0006.pdf PDF
Attachment_24_-_HAVO_305150B_Prebid_Meeting_Notes_7-31-24_0006.pdf PDF
Attachment_17_-_R1_A36_CD_HAVO_KVC_0006.pdf PDF
Sol_140P2024R0114_Amd_0006.pdf PDF
Attachment_25_-_Amd_06_Solicitation_QA_HAVO_305150_0006.xlsx XLSX spreadsheet
Attachment_22_-_01_77_00A_Closeout-OperationMaintenance-Requirements_0006.pdf PDF
Attachment_20_-_SECTION_08_71_00_-_DOOR_HARDWARE_-_REV_2_0006.pdf PDF
Attachment_19_-_R1_A49_CD_HAVO_KVC_0006.pdf PDF
Sol_140P2024R0114_Amd_0005.pdf PDF
B09_Attachment_15_-_Cold_Fluid-Applied_Waterproofing-rev1_07_14_16_0004.pdf PDF
B09_Attachment_16_-_S1_Basement-81_0004.pdf PDF
Sol_140P2024R0114_Amd_0004.pdf PDF
Sol_140P2024R0114_Amd_0003.pdf PDF
B09_Attachment_14_-_Site_Visit_Tri_Fold_HAVO_305150B_-_AMENDMENT_3_0003.pdf PDF
B09_Attachment_13_-_HAVO_305150_Prebid_Site_Visit_Insructions_0003.pdf PDF
B08_Attachment_2_HAVO305150_FinalCDDrawings_0002.pdf PDF
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HAVO – 305150B 06 20 13- 1

081224 EXTERIOR FINISH CARPENTRY

SECTION 06 20 13 – EXTERIOR FINISH CARPENTRY

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Siding

2. Trims, casings and similar finish items

1.2 SUBMITTALS

A. Product data

1. Lumber

2. Softwood Plywood

3. Cement board

4. Fasteners

5. Sound absorbing panels

1.3 DELIVERY, STORAGE, AND HANDLING

A. Stack lumber, plywood, and other panels flat with spacers between each bundle to provide air circulation.

1. Protect materials from weather by covering with waterproof sheeting, securely anchored.

2. Provide for air circulation around stacks and under coverings.

1.4 PROJECT CONDITIONS

A. Weather Limitations: Proceed with installation only when existing and forecast weather conditions permit work to be performed and at least one coat of specified finish can be applied without exposure to rain, snow, or dampness.

B. Do not install finish carpentry materials that are wet, moisture damaged, or mold damaged.

1. Indications that materials are wet or moisture-damaged include, but are not limited to, discoloration, sagging, or irregular shape.

2. Indications that materials are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.

PART 2 - PRODUCTS

danah.palik Cloud

HAVO – 305150B 06 20 13- 2

2.1 MATERIALS

A. Lumber: DOC PS 20 and applicable rules of grading agencies indicated. If no grading agency is indicated, comply with applicable rules of any rules-writing agency certified by the American Lumber Standard Committee's (ALSC) Board of Review. Grade lumber by an agency certified by the ALSC's Board of Review to inspect and grade lumber under the rules indicated.

1. Factory mark each piece of lumber with grade stamp of inspection agency, indicating grade, species, moisture content at time of surfacing, and mill.

2. All decking and railing components shall be smooth surfaced on four sides.

B. Softwood Plywood: DOC PS 1.

C. Cement board: ANSI

D. Fasteners: All fasteners shall be stainless steel, Type 304.

E. Sound absorbing panels: 100% polyester panels approximately ½-inch thick, charcoal color.

Minimum NRC rating: 0.45

2.2 FABRICATION

A. Back out or kerf backs of standing and running trim wider than 5 inches, except members with ends exposed in finished work.

B. Ease edges of lumber less than 1 inch in nominal thickness to 1/16-inch radius and edges of lumber 1 inch or more in nominal thickness to 1/8-inch radius.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

B. Examine finish carpentry materials before installation. Reject materials that are wet, moisture damaged, and mold damaged.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Clean substrates of projections and substances detrimental to application.

B. Prime lumber and moldings to be painted, including both faces and edges, unless factory primed.

1. Cut to required lengths and prime ends.

2. Comply with requirements in Section 099113 "Exterior Painting."

HAVO – 305150B 06 20 13- 3

3.3 INSTALLATION

A. General

1. Do not use materials that are unsound, warped, improperly treated or finished, inadequately seasoned, or too small to fabricate with proper jointing arrangements.

a. Do not use manufactured units with defective surfaces, sizes, or patterns.

2. Install exterior finish carpentry level, plumb, true, and aligned with adjacent materials.

a. Use concealed shims where necessary for alignment.

b. Scribe and cut exterior finish carpentry to fit adjoining work.

c. Refinish and seal cuts as recommended by manufacturer.

d. Install to tolerance of 1/8 inch in 96 inches for level and plumb. Install adjoining exterior finish carpentry with 1/32-inch maximum offset for flush installation and 1/16-inch maximum offset for reveal installation.

e. Coordinate exterior finish carpentry with materials and systems in or adjacent to it.

B. Standing and Running Trim

1. Install flat-grain lumber with bark side exposed to weather.

2. Install trim with minimum number of joints as is practical, using full-length pieces from maximum lengths of lumber available. Do not use pieces less than 24 inches long, except where necessary.

a. Use scarf joints for end-to-end joints.

b. Stagger end joints in adjacent and related members.

3. Fit exterior joints to exclude water.

a. Cope at returns and miter at corners to produce tight-fitting joints, with full- surface contact throughout length of joint.

b. Plane backs of casings to provide uniform thickness across joints, where necessary for alignment.

4. Where face fastening is unavoidable, countersink fasteners, fill surface flush, and sand unless otherwise indicated.

3.4 ADJUSTING

A. Replace exterior finish carpentry that is damaged or does not comply with requirements.

1. Exterior finish carpentry may be repaired or refinished if work complies with requirements and shows no evidence of repair or refinishing.

B. Adjust joinery for uniform appearance.

3.5 CLEANING

HAVO – 305150B 06 20 13- 4

A. Clean exterior finish carpentry on exposed and semi-exposed surfaces.

B. Touch up factory-applied finishes to restore damaged or soiled areas.

3.6 PROTECTION

A. Protect installed products from damage from weather and other causes during construction.

B. Remove and replace finish carpentry materials that are wet, moisture damaged, and mold damaged.

1. Indications that materials are wet or moisture-damaged include, but are not limited to, discoloration, sagging, or irregular shape.

2. Indications that materials are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.

END OF SECTION 06 20 13

PART 1 - GENERAL
1.1 Summary
A. Section Includes:
1. Siding
2. Trims, casings and similar finish items
1.2 SUBMITTALS
A. Product data
1. Lumber
2. Softwood Plywood
3. Cement board
4. Fasteners
5. Sound absorbing panels
1.3 DELIVERY, STORAGE, AND HANDLING
A. Stack lumber, plywood, and other panels flat with spacers between each bundle to provide air circulation.
1. Protect materials from weather by covering with waterproof sheeting, securely anchored.
2. Provide for air circulation around stacks and under coverings.
1.4 PROJECT CONDITIONS
A. Weather Limitations: Proceed with installation only when existing and forecast weather conditions permit work to be performed and at least one coat of specified finish can be applied without exposure to rain, snow, or dampness.
B. Do not install finish carpentry materials that are wet, moisture damaged, or mold damaged.
1. Indications that materials are wet or moisture-damaged include, but are not limited to, discoloration, sagging, or irregular shape.
2. Indications that materials are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Lumber: DOC PS 20 and applicable rules of grading agencies indicated. If no grading agency is indicated, comply with applicable rules of any rules-writing agency certified by the American Lumber Standard Committee's (ALSC) Board of Review. Grade lu...
1. Factory mark each piece of lumber with grade stamp of inspection agency, indicating grade, species, moisture content at time of surfacing, and mill.
2. All decking and railing components shall be smooth surfaced on four sides.
B. Softwood Plywood: DOC PS 1.
C. Cement board: ANSI
D. Fasteners: All fasteners shall be stainless steel, Type 304.
E. Sound absorbing panels: 100% polyester panels approximately ½-inch thick, charcoal color. Minimum NRC rating: 0.45
2.2 Fabrication
A. Back out or kerf backs of standing and running trim wider than 5 inches, except members with ends exposed in finished work.
B. Ease edges of lumber less than 1 inch in nominal thickness to 1/16-inch radius and edges of lumber 1 inch or more in nominal thickness to 1/8-inch radius.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.
B. Examine finish carpentry materials before installation. Reject materials that are wet, moisture damaged, and mold damaged.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Clean substrates of projections and substances detrimental to application.
B. Prime lumber and moldings to be painted, including both faces and edges, unless factory primed.
1. Cut to required lengths and prime ends.
2. Comply with requirements in Section 099113 "Exterior Painting."
3.3 INSTALLATION
A. General
1. Do not use materials that are unsound, warped, improperly treated or finished, inadequately seasoned, or too small to fabricate with proper jointing arrangements.
a. Do not use manufactured units with defective surfaces, sizes, or patterns.
2. Install exterior finish carpentry level, plumb, true, and aligned with adjacent materials.
a. Use concealed shims where necessary for alignment.
b. Scribe and cut exterior finish carpentry to fit adjoining work.
c. Refinish and seal cuts as recommended by manufacturer.
d. Install to tolerance of 1/8 inch in 96 inches for level and plumb. Install adjoining exterior finish carpentry with 1/32-inch maximum offset for flush installation and 1/16-inch maximum offset for reveal installation.
e. Coordinate exterior finish carpentry with materials and systems in or adjacent to it.
B. Standing and Running Trim
1. Install flat-grain lumber with bark side exposed to weather.
2. Install trim with minimum number of joints as is practical, using full-length pieces from maximum lengths of lumber available. Do not use pieces less than 24 inches long, except where necessary.
a. Use scarf joints for end-to-end joints.
b. Stagger end joints in adjacent and related members.
3. Fit exterior joints to exclude water.
a. Cope at returns and miter at corners to produce tight-fitting joints, with full- surface contact throughout length of joint.
b. Plane backs of casings to provide uniform thickness across joints, where necessary for alignment.

4. Where face fastening is unavoidable, countersink fasteners, fill surface flush, and sand unless otherwise indicated.

3.4 Adjusting
A. Replace exterior finish carpentry that is damaged or does not comply with requirements.
1. Exterior finish carpentry may be repaired or refinished if work complies with requirements and shows no evidence of repair or refinishing.

B. Adjust joinery for uniform appearance.

3.5 CLEANING
A. Clean exterior finish carpentry on exposed and semi-exposed surfaces.
B. Touch up factory-applied finishes to restore damaged or soiled areas.
3.6 PROTECTION
A. Protect installed products from damage from weather and other causes during construction.
B. Remove and replace finish carpentry materials that are wet, moisture damaged, and mold damaged.
1. Indications that materials are wet or moisture-damaged include, but are not limited to, discoloration, sagging, or irregular shape.
2. Indications that materials are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.

File details come from the government source that posted it. Updated .