This document is a technical specification for access doors and frames required for the Kilauea Visitor Center (KVC) Phase II project at Hawaii Volcanoes National Park. The specification outlines the performance requirements, including that the access doors must have an exposed flange, stainless steel construction with a brushed finish, and fully concealed hinges. The doors and frames must be fabricated as integral units ready for installation, with smooth, flat metal surfaces. The hardware requirements include providing multiple latches and locks with two keys per lock, keyed alike. The document also includes installation instructions and requirements to examine the substrate and correct any unsatisfactory conditions prior to installation.

View the file

Other files

File Type Posted
B08_Attachment_6_HAVO_305150_Wage_Determination_9_6_2024_0009.pdf PDF
Sol_140P2024R0114_Amd_0009.pdf PDF
B09_Attachment_25_-_Amd_08_Solicitation_QA_HAVO_305150_0008.xlsx XLSX spreadsheet
Sol_140P2024R0114_Amd_0008.pdf PDF
B09_Attachment_51_-_A8-A20-A22-A24-A25-A26_REV_0008.pdf PDF
B09_Attachment_48_-_C9_WATER_PLAN_AND_PROFILE_II_REV_0007.pdf PDF
B09_Attachment_30_-_08_14_33_-_STILE_AND_RAIL_WOOD_DOORS_0007.pdf PDF
B09_Attachment_41_-_09_29_00_-_GYPSUM_BOARD_0007.pdf PDF
B08_Attachment_6_HAVO_305150_Wage_Determination_7_19_2024_0007.pdf PDF
B09_Attachment_38_-_08_80_00_-_GLAZING_0007.pdf PDF
B09_Attachment_46_-_A22-A28-A51_REV_0007.pdf PDF
B09_Attachment_44_-_10_28_00_-_TOILET_ACCESSORIES_0007.pdf PDF
B09_Attachment_43_-_09_51_13_-_ACOUSTICAL_PANEL_CEILINGS_0007.pdf PDF
B09_Attachment_32_-_06_20_13_-_Exterior_Finish_Carpentry_0007.pdf PDF
B09_Attachment_40_-_08_91_19_-_FIXED_LOUVERS_0007.pdf PDF
B09_Attachment_47_-_C6_C11_C16_REV_0007.pdf PDF
B09_Attachment_49_-_E15_REV_0007.pdf PDF
B09_Attachment_28_-_07_92_00_-_Joint_Sealants_0007.pdf PDF
B09_Attachment_50_-_E25_REV_0007.pdf PDF
B09_Attachment_29_-_08_12_13_-_Hollow_Metal_Frames_0007.pdf PDF
B09_Attachment_37_-_08_71_00_-_Door_Hardware_0007.pdf PDF
B09_Attachment_25_-_Amd_07_Solicitation_QA_HAVO_305150_0007.xlsx XLSX spreadsheet
B09_Attachment_35_-_07_72_00_-_Roof_Accessories_0007.pdf PDF
B09_Attachment_34_-_07_62_00_-_Sheet_Metal_Flashing_and_Trim_0007.pdf PDF
B09_Attachment_33_-_07_21_00_-_Thermal_Insulation_0007.pdf PDF
B09_Attachment_42_-_09_30_13_-_CERAMIC_TILING_0007.pdf PDF
B09_Attachment_31_-_01_77_00A_Closeout-OperationMaintenance-Requirements_0007.pdf PDF
B09_Attachment_39_-_08_83_00_-_MIRRORS_0007.pdf PDF
Sol_140P2024R0114_Amd_0007.pdf PDF
B09_Attachment_45_-_33_14_16___Site_Water_Utility_Distribution_0007.pdf PDF
B09_Attachment_27_-_01_33_23-A_SubmittalList-ReviewEstimate_0007.pdf PDF
B09_Attachment_26_-_00_-_Table_of_Contents_0007.pdf PDF
Attachment_23_-_Pre-proposal_Site_Visit_Sign-in_Roster_7_31_2024_0006.pdf PDF
Attachment_21_-_01_33_23-A_SubmittalList-ReviewEstimate_0006.pdf PDF
Attachment_18_-_R1_A42_CD_HAVO_KVC_0006.pdf PDF
Attachment_24_-_HAVO_305150B_Prebid_Meeting_Notes_7-31-24_0006.pdf PDF
Attachment_17_-_R1_A36_CD_HAVO_KVC_0006.pdf PDF
Sol_140P2024R0114_Amd_0006.pdf PDF
Attachment_25_-_Amd_06_Solicitation_QA_HAVO_305150_0006.xlsx XLSX spreadsheet
Attachment_22_-_01_77_00A_Closeout-OperationMaintenance-Requirements_0006.pdf PDF
Attachment_20_-_SECTION_08_71_00_-_DOOR_HARDWARE_-_REV_2_0006.pdf PDF
Attachment_19_-_R1_A49_CD_HAVO_KVC_0006.pdf PDF
Sol_140P2024R0114_Amd_0005.pdf PDF
B09_Attachment_15_-_Cold_Fluid-Applied_Waterproofing-rev1_07_14_16_0004.pdf PDF
B09_Attachment_16_-_S1_Basement-81_0004.pdf PDF
Sol_140P2024R0114_Amd_0004.pdf PDF
Sol_140P2024R0114_Amd_0003.pdf PDF
B09_Attachment_14_-_Site_Visit_Tri_Fold_HAVO_305150B_-_AMENDMENT_3_0003.pdf PDF
B09_Attachment_13_-_HAVO_305150_Prebid_Site_Visit_Insructions_0003.pdf PDF
B08_Attachment_2_HAVO305150_FinalCDDrawings_0002.pdf PDF
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HAVO - 305150 08 31 13

ACCESS DOORS AND FRAMES

SECTION 08 31 13 - ACCESS DOORS AND FRAMES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes doors required to provide access for servicing mechanical equipment.

1.2 SUBMITTALS

A. Product data

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Exposed flange

B. Stainless steel for all exposed surfaces, with brushed finish. Door shall be 14 gauge. Frame and trim shall be 16 gauge.

C. Hinges shall be fully concealed.

2.2 FABRICATION

A. General: Provide access door and frame assemblies manufactured as integral units ready for installation.

B. Metal Surfaces: For metal surfaces exposed to view in the completed Work, provide materials with smooth, flat surfaces without blemishes. Do not use materials with exposed pitting, seam marks, roller marks, rolled trade names, or roughness.

C. Doors and Frames: Grind exposed welds smooth and flush with adjacent surfaces. Furnish mounting holes, attachment devices and fasteners of type required to secure access doors to types of supports indicated.

D. Latch and Lock Hardware:

1. Quantity: Furnish number of latches and locks required to hold doors tightly closed.

2. Keys: Furnish two keys per lock and key all locks alike.

danah.palik Cloud

HAVO - 305150 08 31 13

ACCESS DOORS AND FRAMES

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION

A. Comply with manufacturer's written instructions for installing access doors and frames.

3.3 ADJUSTING

A. Adjust doors and hardware, after installation, for proper operation.

END OF SECTION