B09_Attachment_25_-_Amd_08_Solicitation_QA_HAVO_305150_0008.xlsx
XLSX spreadsheet 80 KB Posted
- Solicitation number
- 140P2024R0114
About this file
This document is a compilation of questions and answers related to a federal contract opportunity for the HAVO 305150 Phase II, Kilauea Visitor Center (KVC) project at Hawaii Volcanoes National Park. The project involves the rehabilitation of the existing KVC, demolition and replacement of an existing comfort station, and expansion of the KVC lanai. Key details include:
The solicitation has been amended multiple times to address questions and clarify requirements. Amendments include updates to drawings, specifications, and submittal requirements. Notable clarifications cover topics such as fire alarm system, contractor coordination with utilities, septic system design, and allowances for HELCO fees. Several questions address wood species, grade, and treatment requirements for various materials. The agency has stated they will extend the bid due date by 7 days from the release of the final amendment. The solicitation closing date is now August 22, 2024.
View the file
Other files
Show 40 more
Latest 50 of 72 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question | Answer | Addressed in Amendment: | |
| 1 | We are requesting a substitution for the fire alarm for the subject project. Please see attached and let us know if this will be acceptable. | The manufacturer has been accepted. Please note that the substitution request was not reveiwed in depth for specification conformance and as such will still need to be submitted as per the specifications. | 7 |
| 2 | Please assign hardware sets to doors on Door Schedule. 087100 DOOR HARDWARE specs provides hardware sets with room types/locations but the descriptions are not clear. | Attached is the revised specification section 08 71 00 3.7 | 6 |
| 3 | Regarding Past Performance Questionnaire "B08_Attachment_10_Solit_PSP_Vol_I_PastPerf_REQD" could you please verify the section E. contact info on the last page and provide an update? | Contracting Officer is John Fife (john_fife@nps.gov) and Contracting Specialist is Abigail Villareal (abigail_Villareal@nps.gov) | 6 |
| 4 | It appears as though the bid date is a Monday 12:00 MDT which is 8:00 AM Hawaii time. It's challenging to close a bid Monday morning at 8:00 AM with last minute pricing coming it the day of the bid. Is it possible to change the bid due time to 2:00 PM Hawaii time instead and on a Wednesday or Friday would be preferrable? Please advise if this would be acceptable. | Amendment 005 changed the solicitation closing date and time from August 12, 2024 at 12:00PM to August 12, 2024 at 4:00PM Mountain Time. | 6 |
| 5 | Can Key Personnel fulfill dual roles such as Superintendent along with safety and Project Manager along with Quality Control? | The specifications do not prohibit the Site Safety Supervisor from fulfilling duel roles. Note that qualifications will still need to be fulfilled and the expectation that the site safety supervisor will execute and establish the Accident Prevention Plan and a safe working environment for personnel and visitors will not diminish with duel roles. For the Quality Control refer to 01 40 00 1.5.B.2 that allows for duel roles. Qualifications still need to be submitted and refer to the remaining section for job duties required and expected. | 6 |
| 6 | Please identify the Authority Having Jurisdiction (AHJ) for the fire alarm & fire suppression system. | The NPS is the AHJ for the fire alarm and fire suppression system. | 6 |
| 7 | Regarding spec section 01 74 19 Construction Waste Management and Disposal section 1.4 lists submittals not included in the submittal template. Can you confirm submittal items are as identified in the specification and no more? | The submittals listed in section 1.4 of spec section 01 74 19 – Construction Waste Management and Disposal are required. Attached is a revised submittal list and closeout requirements (01 33-23-SubmittalList-ReviewEstimate & 01 77 00A_Closeout-Operation-Maintenance-Requirements). | 6 |
| 8 | Regarding closing documentation, can the final commissioning report, O&M manuals and final contract drawings be submitted in electronic form? | This decision will be made at project closeout. For the purposes of bidding, assume the hard copies specified. | 6 |
| 9 | Regarding spec section 03 30 00 section 1.2 lists submittals not included in the submittal template. Can you confirm submittal items are as identified in the specification and no more? | The submittals listed in section 1.2 of spec section 03 30 00 – Cast-in-Place Concrete are required. See revised submittal list. | 6 |
| 10 | Spec number and submittal information for metal fabrication and pipe and tube railings differ from the submittal template. Please provide clarification. | The only discrepancy identified is the accessibility inspection report is not listed in the submittal log, however it is listed in the closeout requirements. The accessibility inspection report is added to the revised submittal list. Specification number and section numbers listed in the submittal log are identical to what is in the specification section. 05 55 00 – Metal Fabrication: No discrepancy identified. Specification number and section numbers listed in the submittal list are identical to the specification section. | 6 |
| 11 | There appears to be missing wall section details. For example reference is made to wall section 3H on page A8 but this detail does not appear to exist on page A42. Please provide clarification. | It is acknowledged detail 3H is missing. It is the same detail as 3G except the studs can be 2 x 4 instead of 2 x 6 and there is no need for battens on the inside of the concrete wall. See Revised Sheets A36, A42 & A49. | 6 |
| 12 | Can you provide any potential source options for the fixed louvers under section 08 91 19? | Please clarify why sources are needed as the design intent was not for complicated louvers. Sources used by the AE team are: |
RMA Sales 808.487.9041. They are located in Aiea on Oahu.
Island Pacific Distributors 808.955.1126
| Note that the louvers are anticipated to be ordered from the continental US since there are not any known fabricators in HI. | 6 | ||
| 13 | For the PV system the plans only shows information on new system (Option B) No information provided on expanding PV System (Option A). How are we to price out option A? | Bid option A: Expand PV system is included and shown on the halau building |
Bid option B: Replace Existing PV System is the replacement of the existing PV panels on the existing garage building.
| To clarify Option A is only the new PV on the lanai roof, there is no intention of any other expanded PV on the garage roof. | 6 | |||
| 14 | Shall we assume any utility company fees will be the responsibility of NPS? | Drawing Sheet E7, General Note B states: Contractor to include all utility fees/charges associated with this service upgrade. Fees include but not limited to system development charges, design fees, and other costs associated with the service upgrade. | 6 | |
| 15 | Salvaging Tree Ferns - Is the contractor responsible for watering and other care for the salvaged tree ferns for the duration of the project? | The need for the Contractor to water and care for salvaged plants after salvage and stockpiling is not expected. | 7 | |
| 16 | Absorption Bed - Depth on section is 18”, however the invert of the distribution box is 11.25-ft down from finish grade. Please confirm the actual depth to the top of the infiltration chamber is actually 9.67-ft. | The 18" dimension is a minimum dimension. The actual depth of the infiltration chamber is based on the depth of the distribution box shown in the profile on sheet C12. | 7 | |
| 17 | Absorption Bed - Please provide a detail or plan sheet showing the configuration of the piping and infiltration chambers in the absorption beds. Current plans do not include this sheet, and the dimensions given do not add up to an even number of chambers. | Both beds are 43' wide which allows for 14 chambers (running north/south) to be installed with 20" distance from the outer chambers to the edge of the bed. | 7 | |
| 18 | Absorption Bed - Please confirm if the geogrid will still be required when the depth if installation is actually 8.67-ft down from finish grade. | The geogrid will not be required if the depth of installation is actually 8.67-ft down from finish grade. | 7 | |
| 19 | Absorption Bed - Section calls for washed aggregates around infiltration chambers. Washed aggregates are not available on the Big Island. Is there an alternative to this aggregate as it is cost prohibitive to ship from the mainland? | Puna Rock on the Big Island produces 2-1/2" drain rock and 1-1/2" drain rock which Puna Rock also describes as wash or clean rock which meets the requirements for the aggregates around the infiltration chambers. | 7 | |
| 20 | Absorption Bed - Specification Section 33 30 00 Sewerage has 2 different definitions for the infiltration chambers. 2.4.B requires 34-in by 53-in by 8-in chambers, while 2.8.B requires 34-in by 85.4-in by 16-in chambers. Please clarify the requirements? | The Infiltration Chambers in 2.8.B. which also matches the infiltration chamber dimensions shown in Detail 1/ sheet C24 is the required size of infiltration chambers. | 7 | |
| 21 | Septic Tanks - Septic Tank requires more space than is available adjacent to the building for sufficient benching or lay back for a safe excavation. Structural drawings do not indicate a preferred method for underpinning the foundation. Please clarify if this is a contractor means and methods? | Yes, this is a Contractor Means and Methods issue. | 7 | |
| 22 | Septic Tanks - Septic tanks and west manhole structures may be within the zone of influence of the building foundation. What is the preferred method for backfill? | The septic tanks and west manhole structures have been moved out of the zone of influence of the building foundations, see revised plan. | 7 | |
| 23 | Site Water - Specification Section 33 14 16 Site Water appears to be omitted from the Specifications? | See spec section provided. | 7 | |
| 24 | HELCO Coordination - General Sheet Note 2 places the responsibility for "all utility fees/charges associated with this upgrade" on the bidder. However, bidder does not have a contract with HELCO, and has no way to request these fees, nor to require HELCO to honor any proposals after contract. Please advise an alternative for pricing this scope that more fairly distributes this risk. | Assume a $38,000 allowance for all HELCO fees. | 7 | |
| 25 | HELCO Coordination - Note 5, Sheet E7 places all responsibiltiy for HELCO fees to connect new generator to existing system on bidder. Bidder has no contractual relationship with HELCO, therefore we have no ability to compel HELCO to price this work, nor to require a commitment on the price. Please advise an alternative for pricing this scope that fairly distributes this risk. | See response to Question 24. | 7 | |
| 26 | HELCO Coordination - Note 7, Sheet E7 instructs bidder to coordinate Handhole location with HELCO prior to bid. Bidder has no ability to compel HELCO to coordinate, not to commit to any agreement made during the coordination. Please advise a fair way for bidders to price this item. | The location of the handhole on sheet E7 works for HELCO. Continue with the bid with this location. | 7 | |
| 27 | HELCO Coordination - HELCO advised contractor they were under the impression that the projet bid at the end of the month. Can NPS request the HELCO allowance to provide to all contractors in the sake of fairness? | Park staff have been in contact with HELCO requesting pricing and fees for their work. Bid dates will be forwarded to HELCO. | 7 | |
| 28 | Fire Sprinkler - Fire Protection Site Plan indicates backflow preventors to be installed on fire sprinkler piping, however the civil drawings indicate DCDA. Please advise on which type to provide. | Provide backflow on site, per civil drawings. | 7 | |
| 29 | Plumbing - Civil drawings indicate the source for the drinking fountain in the halau is 1" PE piping. However, plumbing drawings show 1/2" piping. Please advise? | The drinking fountain only needs a 1/2" cold water connection. | 7 | |
| 30 | In light of the number and nature of the questions shown, would it be possible to extend the time for offers until Friday, August 16, 2024 at 4:00 PM Mountain Time? We are aware of the time constraints the National Park Service is under for contracting, however the answers to several of these questions can have large implications for the cost of the work. | The solicitation closing date will be extended 7 days from the release of amendment 7 or August 22, 2024. Details will be in amendment 7. | 7 | |
| 31 | There is a general reference to FSC but no specific requirement in any of the other specification section. Please confirm that FSC lumber is not required for this project. If there is an FSC requirement, please identify which areas of work it applies. | FSC Lumber is not required. | 7 | |
| 32 | We see that LEED is not required on the project, are there any other sustainability requirements that we should be aware of? | Formal LEED certification will not be required for this project however sustainable requirements can be found in a variety of specification sections. Some examples include: SECTION 01 57 19.11 INDOOR AIR QUALITY MANAGEMENT, SECTION 01 74 19 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL, SECTION 01 81 13 - SUSTAINABLE DESIGN REQUIREMENTS FOR NON-LEED PROJECTS, SECTION 01 91 14 TOTAL BUILDING COMMISSIONING. | 7 | |
| 33 | Please identify wood species, grade & treatment requirements for exterior siding, trim and soffit materials. | Any vertical grain wood may be used. All wood shall be pressure treated for termite resistance. | 7 | |
| 34 | Can existing salvaged siding materials be re-purposed for the new work? | Yes, as long as the finished appearance of the salvaged siding matches the existing appearance. | 7 | |
| 35 | Please identify wood species, grade & treatment requirements for interior finish carpentry materials. | Any wood species can be used. Any wood used shall be vertical grain and #1 Grade, with only tight knots allowed. All wood shall be pressure treated for termite resistance. | 7 | |
| 36 | Please identify wood species, grade & treatment requirements for fixed wood louver materials. | Any wood species can be used. Any wood used shall be vertical grain and #1 Grade, with only tight knots allowed. All wood shall be pressure treated for termite resistance. | 7 | |
| 37 | Regarding 4x6 T&G Glue Laminated Roof Decking, if we are unable to source this material, can we provide clear 4x6 T&G roof decking that is not laminated instead? | There are glulam beams on the project, but the decking is just T&G (tongue and groove). There is no requirement for glulam decking. (str) | 7 | |
| 38 | Could you provide an allowance for utility company fees for this project? | See response to Question 24. | 7 | |
| 39 | The drawings don’t show area for the sump pump to drain if it overflows. If the sump pump overflows, the basement may flood. Does this need to be added to the drawings? | See Note 1 on Sheet P4. The ejector pump is to connect to the sanitary piping. The drain will typically be used annually, a volume that would flood the sump is not anticipated. | 7 | |
| 40 | There’s only a note for the demo of the existing fire system in the basement. Does this need to be elaborated on? | Refer to Fire Alarm Demo Notes on sheet FA1. Demolish entire fire alarm system inlcuding but not limited to; devices, appliances, raceway, cabling and equipment. Patch and repair damages from resulting demolition of fire alarm system. (mep) | 7 | |
| 41 | Multiple specification sections are not included in the project submittal list? Will the project submittal list be revised to represent the specification sections accurately? | The submittal list will be revised to include missing spec sections. Spec sections that do not require submittals are not included on the submittal list. | 7 | |
| 42 | Sheet C-3 identifies the "Limits of Work". Can you verify that vehicle parking and construction staging may be conducted by the Contractor within these areas? | Vehicle parking and construction staging may be conducted within the Limits of Work. Division 1 resource protection and work restrictions still apply. | 7 | |
| 43 | Regarding the chair lift in the auditorium, there doesn’t appear to be a specification provided. Please provide a basis of design. | The chair lift shall be a pitless design that is fully ADA compliant. The platform lift shall have safety skirting, a electro-hydraulic drive train and have a 750 pound lift capacity. Color shall be black. A basis of design product for the chair lift is included in the Arch section of the Product Files. | 7 | |
| 44 | Our truss designer is asking if the specs for the trusses are correct or if it can be reduced? He’s having trouble designing the girder trusses for this job with the loads provided. Please advise. (See graphic to the right) | Note that the loads are provided in PLF (pounds per linear foot) and are already multiplied by 2 due to the 2-ft truss spacing. (Therefore, the 40-plf roof live load equates to a typical 20-psf loading). | 7 | |
| 45 | The plans and Specs are asking for the Switchboard to be a NEMA 4X rated panel. The manufacture listed in the product index do not offer a switchboard that is NEMA 4X and would like to propose a Stainless Steel 304 NEMA 3R rated enclosure in lieu of the NEMA 4X. | The salient requirement is to be NEMA 4X. Other manufactures will be accepted as long as they meet the salient characteristics in the specs. | 7 | |
| 46 | Can you please clarify what type the light fixture on the exterior of the Generator Building is? | Same as ZL1 except for dark sky compliant: full cut-off fixture, amber light, 2500 Kelvin or less with 560 nm or greater wavelength. | 7 | |
| 47 | We need some clarification on the Gutters & Downspouts for both buildings. |
The profiles on page A28, we have never seen anything like that, is it drawn backward ? is it supposed to be ½ Round?
The profile at C4 could be made in 10’ sections.
| There is a reference to stainless steel gutters which would be pretty unusual, they might mean Stainless fasteners? | The gutter design on A28 is correct as shown. The material for the gutters and downspouts shall be per spec section 07 62 00 2.2 - Type 304 stainless steel, painted per section 09 91 13. | 7 | ||
| 48 | Sheet A-6 identifies the ceiling to be demolished. Part of the office area ceiling remains intact. This will impact the accessibility for fire suppression and potentially other MEP work in this area. Can the ceiling in this area be removed to allow subcontractors access to the truss area to complete their work? | The ceilings in the area of the toilet rooms, break room, lactation room and utility room shall be removed. All other ceilings shall remain. | 7 | |
| 49 | Please provide Type J door information. | See revised sheet A49 for Type J detail. | 7 | |
| 50 | Regarding Lavatory sinks L-2 shown on P2 drawings, please provide a manufacturer and model number. We note a profile also shown on A1/A45 and are assuming this is the L-2 lavatory sink profile that should be provided with plumbing fixtures and not custom fabricated. Please confirm and provide additional information. | This is a custom fabricated sink. See revised sheet A22 for trough lengths. See spec section 06 20 23 for Fabrication of Solid Surfaces. | 7 | |
| 51 | On page A 51, the comfort station lanai ceiling refers to WD 1 which is denoted as 4x wood decking, however detail C2 on A46 shows the ceiling as 1x12 wood with 1/2" gaps between. Please confirm that ceiling is the 1x material and not the 4x material. | At the comfort station the ceiling is the 1 X _ material with a clear finish. The eave soffits are painted 1 x _ material. The rooftop is 4x decking. | 7 | |
| 52 | Regarding detail A1 & A2 on page A40, the soffits are shown as 1x12 with 1/2" gaps between, however, the call out on page A51 foe soffits is W2 shiplap. Please confirm which detail/reference to follow. | The sections on A40 are correct. | 7 | |
| 53 | Please advise on the counter top material type for the breakroom. | Solid surfacing material. | 7 | |
| 54 | Please advise of the new siding/soffit material is to be 3/4" thick material or a full 1" thick? Will the material be smooth or rough sawn? | It can be 3/4" thick, and shall be smooth. | 7 | |
| 55 | Rough carpentry specification 06 10 00 refers to grade stamp each piece of lumber, S4S, AWPA U1 Category UC3B treatment and kiln dry. Species and Grade of Lumber "As indicated on drawings". We do not see a species and grade of lumber indicated on drawings. Please advise on species & grade of of framing lumber. DF #2 and btr. for lumber (not kiln dried), is industry standard, please confirm if this is acceptable. | Framing lumber (2x, 4x) shall be Douglas Fir/Larch #2 (DF-L No. 2) or better. Timber (5x or greater) to be DF-L No. 1 or better. Columns as called out (Select Structural grade; minimum DF-L No. 1). Glulams as called out (24F-V8 or 24F-V4). | 7 | |
| 56 | Regarding spec section 06 16 00 Sheathing, which references wall sheathing, roof sheathing and underlayment. Performance requirements refer to Fire resistance ratings. Are all wall and roof sheathing required to be fire resistant or will CDX Struc 1 HBor Treated (non-kiln dried) be acceptable except where exposed which can be ACX or Rough Sawn T1-11 as currently existing on Generator Shed exterior wall? | Sheathing is not required to be fire resistant. | 7 | |
| 57 | Please identify areas where fire resistant plywood or lumber is required. | Fire resistant plywood or lumber is not required. | 7 | |
| 58 | Per section 06 16 00 2.2 Gypsum Wall Sheathing calls for Exterior Wall Glass Mat Gypsum "Basis of Design Georgia Pacific Corporation: DensGlas Gold. Does this occur at all interior side of exterior walls where work is being performed? Please clarify. | The Exterior Wall Glass Mat Gypsum is not needed on the project. | 7 | |
| 59 | Glulams (24F-V8, 24F-V40) all need to be architectural grade (06 18-002), all need to be douglas fir (06 18-002), all need to be zero camber (06 18-003). Please specify treatment. | Confirmed: Architectural grade, douglas fir, and zero camber. | 7 | |
| 60 | Is Simpson Hardware for framing connections required to be Galvanized, or Stainless Steel. Please clarify. | Galvanized (Zmax) | 7 | |
| 61 | On Sheet P2, Plumbing Fixture Schedule, L-2 is listed as “Lavatory”, but the material (Quartz, Corian, Sloan Stone) and color are not supplied. Please identify material and color. | This is a custom fabricated sink. See revised sheet A22 for trough lengths. See spec section 06 20 23 for Fabrication of Solid Surfaces. | 7 | |
| 62 | Regarding L1 Lavatory called out in P2 Plumbing Fixture Schedule as American Standard 0356.421 which appears to be a standalone wall hung porcelain sink unit. L1 occurs in the unisex bathroom and office restrooms as referenced on the P5 drawings. The interior elevations on A25 however depict these as a different looking profile which may be more similar to the L2 units in the Men’s & Women’s comfort station. Please clarify. | The L1 lavatory should be as shown on the P2 Plumbing Fixture Schedule. See revised sheet A8, A20, A22, A24, A25, and A26 | 8 | |
| 63 | Is the intent to repaint the entire exterior of the existing KVC building or only the portions where new work is occurring? | The intent is to repaint the entire exterior of the existing KVC. | 7 | |
| 64 | Sheet E15 shows a free standing day tank with indication of a pump. (assumes a main supply tank not seen on plans please clarify if an existing main supply tank is on site) | |||
| 26 32 13 para 2.4 C. says that the fuel tank should be sub-base and 48hr capacity. The 48hr base tank will be roughly 550 gallons adding approx. 24” of height to the genset, this doesn’t look like it will fit in the gen room due to overall height estimated at 84”H and I can’t find the dimensions of the existing generator building on the plans. Please clarify if both a day tank and a sub-base tank are required or one or the other. | Remove the day tank from your bid, see revised drawing. Need to provide 48 hours of runtime, subbase tank can exceed the footprint of the generator. Per basis of design (Generac) a subbase tank will fit with 45 hours of runtime. Coordinate with generator representatives for custom solutions. | 7 | ||
| 65 | Sheet E15 shows a MTS generator docking station, but this is not shown on the one line diagram. Can we have the one line revised showing this MTS? | Remove the docking station from your bid. See revised drawing. | 7 | |
| 66 | It appears spec section 33 14 16 is missing from the spec book. We haven’t noticed it added to any of the addenda’s released to date. | See spec section provided. | 7 | |
| 67 | Would it be acceptable to submit alternatives and/or equals for lighting fixtures and lighting controls for this project. | Yes, the salient characteristics are provided in the specs and the manufacture/product is given only as a basis of design. | 7 | |
| 68 | See the following specifications that have been updated per questions received during the bidding process and attached as part of this amendment. | 06 20 13 |
07 21 00 07 62 00 07 72 00 07 92 00 08 12 13 08 14 33 08 31 13 08 71 00 08 80 00 08 83 00 08 91 19 09 29 00 09 30 13 09 51 13 10 28 00 33 14 16 00 - Table of Contents 01 33 23 - SubmittalList 07 77 00 - Closeout- OperationMaintenance - Requirements
| 7 | ||
| 69 | The following sheets have been revised per the questions above | A22 |
A28 A51 C6 C11 C16 E15
| E25 | 7 | |||
| 70 | Sheet C9 has been updated to show current construction progress. Note that the service Tees will be installed prior to bid award | C9 | 7 |
image1.png