This document appears to be a set of wall section drawings for the Kilauea Visitor Center (KVC) project at Hawaii Volcanoes National Park. The drawings provide details on the construction of the exterior walls, including specifications for the concrete slab, roof framing, wood siding, and wall finishes.

The related federal contract opportunity is for the HAVO 305150 Phase II project, which includes the rehabilitation of the existing KVC, demolition and replacement of the existing comfort station, and expansion of the KVC lanai. The solicitation number is 140P2024R0114, and the agency is the Department of the Interior National Park Service. Amendment 2 to this opportunity incorporates updates to the final contract drawings and clarifies the attachments included.

View the file

Other files

File Type Posted
B08_Attachment_6_HAVO_305150_Wage_Determination_9_6_2024_0009.pdf PDF
Sol_140P2024R0114_Amd_0009.pdf PDF
B09_Attachment_25_-_Amd_08_Solicitation_QA_HAVO_305150_0008.xlsx XLSX spreadsheet
Sol_140P2024R0114_Amd_0008.pdf PDF
B09_Attachment_51_-_A8-A20-A22-A24-A25-A26_REV_0008.pdf PDF
B09_Attachment_48_-_C9_WATER_PLAN_AND_PROFILE_II_REV_0007.pdf PDF
B09_Attachment_36_-_08_31_13_-_ACCESS_DOORS_AND_FRAMES_0007.pdf PDF
B09_Attachment_30_-_08_14_33_-_STILE_AND_RAIL_WOOD_DOORS_0007.pdf PDF
B09_Attachment_41_-_09_29_00_-_GYPSUM_BOARD_0007.pdf PDF
B08_Attachment_6_HAVO_305150_Wage_Determination_7_19_2024_0007.pdf PDF
B09_Attachment_38_-_08_80_00_-_GLAZING_0007.pdf PDF
B09_Attachment_46_-_A22-A28-A51_REV_0007.pdf PDF
B09_Attachment_44_-_10_28_00_-_TOILET_ACCESSORIES_0007.pdf PDF
B09_Attachment_43_-_09_51_13_-_ACOUSTICAL_PANEL_CEILINGS_0007.pdf PDF
B09_Attachment_32_-_06_20_13_-_Exterior_Finish_Carpentry_0007.pdf PDF
B09_Attachment_40_-_08_91_19_-_FIXED_LOUVERS_0007.pdf PDF
B09_Attachment_47_-_C6_C11_C16_REV_0007.pdf PDF
B09_Attachment_49_-_E15_REV_0007.pdf PDF
B09_Attachment_28_-_07_92_00_-_Joint_Sealants_0007.pdf PDF
B09_Attachment_50_-_E25_REV_0007.pdf PDF
B09_Attachment_29_-_08_12_13_-_Hollow_Metal_Frames_0007.pdf PDF
B09_Attachment_37_-_08_71_00_-_Door_Hardware_0007.pdf PDF
B09_Attachment_25_-_Amd_07_Solicitation_QA_HAVO_305150_0007.xlsx XLSX spreadsheet
B09_Attachment_35_-_07_72_00_-_Roof_Accessories_0007.pdf PDF
B09_Attachment_34_-_07_62_00_-_Sheet_Metal_Flashing_and_Trim_0007.pdf PDF
B09_Attachment_33_-_07_21_00_-_Thermal_Insulation_0007.pdf PDF
B09_Attachment_42_-_09_30_13_-_CERAMIC_TILING_0007.pdf PDF
B09_Attachment_31_-_01_77_00A_Closeout-OperationMaintenance-Requirements_0007.pdf PDF
B09_Attachment_39_-_08_83_00_-_MIRRORS_0007.pdf PDF
Sol_140P2024R0114_Amd_0007.pdf PDF
B09_Attachment_45_-_33_14_16___Site_Water_Utility_Distribution_0007.pdf PDF
B09_Attachment_27_-_01_33_23-A_SubmittalList-ReviewEstimate_0007.pdf PDF
B09_Attachment_26_-_00_-_Table_of_Contents_0007.pdf PDF
Attachment_23_-_Pre-proposal_Site_Visit_Sign-in_Roster_7_31_2024_0006.pdf PDF
Attachment_21_-_01_33_23-A_SubmittalList-ReviewEstimate_0006.pdf PDF
Attachment_24_-_HAVO_305150B_Prebid_Meeting_Notes_7-31-24_0006.pdf PDF
Attachment_17_-_R1_A36_CD_HAVO_KVC_0006.pdf PDF
Sol_140P2024R0114_Amd_0006.pdf PDF
Attachment_25_-_Amd_06_Solicitation_QA_HAVO_305150_0006.xlsx XLSX spreadsheet
Attachment_22_-_01_77_00A_Closeout-OperationMaintenance-Requirements_0006.pdf PDF
Attachment_20_-_SECTION_08_71_00_-_DOOR_HARDWARE_-_REV_2_0006.pdf PDF
Attachment_19_-_R1_A49_CD_HAVO_KVC_0006.pdf PDF
Sol_140P2024R0114_Amd_0005.pdf PDF
B09_Attachment_15_-_Cold_Fluid-Applied_Waterproofing-rev1_07_14_16_0004.pdf PDF
B09_Attachment_16_-_S1_Basement-81_0004.pdf PDF
Sol_140P2024R0114_Amd_0004.pdf PDF
Sol_140P2024R0114_Amd_0003.pdf PDF
B09_Attachment_14_-_Site_Visit_Tri_Fold_HAVO_305150B_-_AMENDMENT_3_0003.pdf PDF
B09_Attachment_13_-_HAVO_305150_Prebid_Site_Visit_Insructions_0003.pdf PDF
B08_Attachment_2_HAVO305150_FinalCDDrawings_0002.pdf PDF
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXTINT

STONE

CONC SLAB & WALL, SEE STRUCT

2'

H

E

IG

H E

S T

P O

IN

T

O F

S

LA

B , S

E E

C

IV

IL

ROOF FRAMING, SEE STRUCT

NO WALL FIN

2 6

2 6

2 6

SEE

FOR WOOD SIDING

/A5 A31

NAILING STRIP

1/2" PLYWD

CLG OPEN TO

STRUCT ABV

SEE

FOR EAVE

/A1 A30

WPM

CEM FIN W/

1/8" / 12" SLOPE

EXTINT

CONC SLAB, SEE STRUCT

1/ 2"

ROOF FRAMING, SEE STRUCT

A

LI

G N

W / C

O U

N T

E R

E D

G E

2'

A F

F

+/- 5" TO

MATCH HT OF

COUNTER

EDGE. SEE

INT ELEV FOR

LOC & HT

1/2" SOLID

SURFACE

ON 1/2"

CEM BD

2 6

2 6

2 6

SEE

FOR WD SIDING

/A5 A31

NAILING STRIP

1/2" PLYWD

5/8" GYPBD

CLG SEE

FOR COMFORT

STATION CEILING

WPM

/C2 A46

EXTINT

CONC SLAB, SEE STRUCT

1/ 2"

ROOF FRAMING, SEE STRUCT

1/2" SOLID

SURFACE ON

1/2" CEM BD

2 6

2 6

2 6

SEE

FOR WD SIDING

/A5 A31

NAILING STRIP

1/2" PLYWD

5/8" GYPBD

CLG SEE

FOR COMFORT

STATION CEILING

WPM

/C2 A46

EXTINT

CONC SLAB, SEE STRUCT

1/ 2"

ROOF FRAMING, SEE STRUCT

FRP ON 1/2"

GYPBD

2 6

2 6

2 6

SEE

FOR WD SIDING

/A5 A31

NAILING STRIP

1/2" PLYWD

CLG OPEN TO

STRUCT ABV SEE

FOR COMFORT

STATION CEILING

WPM

/C2 A46

EXTINT

STONE

CONC SLAB & WALL, SEE STRUCT

S E

E C

IV

IL

2'

H

E

IG

H E

S T

P O

IN

T

O F

S

LA

B

ROOF FRAMING, SEE STRUCT

NO WALL FIN

2 4

2 4

2 4

SEE

FOR WOOD SIDING

/A5 A31

NAILING STRIP

1/2" PLYWD

CLG OPEN TO

STRUCT ABV

SEE

FOR EAVE

/A1 A30

WPM

CEM FIN W/

1/8" / 12" SLOPE

This work was prepared by me or under my supervision.

Signature Expiration Date of License

4/30/2026

No. 4073

W

N

ARCHITECT

PROFESSIONAL

LICENSED

A

H

NEL

G

A

,IIA S.

U.

NO

ME. AS

OF

PMIS/PKG NO.

DRAWING NO.SUB SHEET NO.

HAWAII VOLCANOES NATIONAL PARK

KILAUEA VISITOR CENTER

DESIGNED:

CADD:

TECH REVIEW:

DATE:

187007

SHEET

HAVO 305150B

1/

:4 :1 A

M C U s e r s j s D o c u m e n t s C .A

L T E R N A T E H A V O V C R j e n n a K R T .r v t

A42

WALL SECTIONS

Designer

Author

Checker

4/12/2024

3" = 1'-0"A42

WALL SECTION 3GA1

0 3" 6" 9"

3" = 1'-0"A42

WALL SECTION 4AC2

3" = 1'-0"A42

WALL SECTION 4BC3

3" = 1'-0"A42

WALL SECTION 4CC5

0 3" 6" 9" 0 3" 6" 9" 0 3" 6" 9"

3" = 1'-0"A42

WALL SECTION 3HA2

0 3" 6" 9"

Sheets
A42 - WALL SECTIONS