B09_Attachment_46_-_A22-A28-A51_REV_0007.pdf

PDF 238 KB Posted

Attached to
HAVO 305150 Phase II, Kilauea Visitor Center (KVC)
Solicitation number
140P2024R0114
Issued by

About this file

This document contains the enlarged floor plans, roof details, and finish schedule for the Kilauea Visitor Center (KVC) Comfort Station at Hawaii Volcanoes National Park. The related federal contract opportunity is Solicitation Number 140P2024R0114, which is for the HAVO 305150 Phase II project to repair or replace critical park infrastructure and visitor facilities damaged during a 2018 volcanic event. The project includes the rehabilitation of the existing KVC, demolition and replacement of the existing 1,350 SF comfort station, and expansion of the KVC lanai from 3,150 SF to 6,200 SF. The solicitation incorporates updates to the final construction drawings and clarifies the attachments, which include reports, as-constructed drawings, and a collocated utility plan. The work is being procured by the Department of the Interior National Park Service National Office.

View the file

Other files

File Type Posted
B08_Attachment_6_HAVO_305150_Wage_Determination_9_6_2024_0009.pdf PDF
Sol_140P2024R0114_Amd_0009.pdf PDF
B09_Attachment_25_-_Amd_08_Solicitation_QA_HAVO_305150_0008.xlsx XLSX spreadsheet
Sol_140P2024R0114_Amd_0008.pdf PDF
B09_Attachment_51_-_A8-A20-A22-A24-A25-A26_REV_0008.pdf PDF
B09_Attachment_48_-_C9_WATER_PLAN_AND_PROFILE_II_REV_0007.pdf PDF
B09_Attachment_36_-_08_31_13_-_ACCESS_DOORS_AND_FRAMES_0007.pdf PDF
B09_Attachment_30_-_08_14_33_-_STILE_AND_RAIL_WOOD_DOORS_0007.pdf PDF
B09_Attachment_41_-_09_29_00_-_GYPSUM_BOARD_0007.pdf PDF
B08_Attachment_6_HAVO_305150_Wage_Determination_7_19_2024_0007.pdf PDF
B09_Attachment_38_-_08_80_00_-_GLAZING_0007.pdf PDF
B09_Attachment_44_-_10_28_00_-_TOILET_ACCESSORIES_0007.pdf PDF
B09_Attachment_43_-_09_51_13_-_ACOUSTICAL_PANEL_CEILINGS_0007.pdf PDF
B09_Attachment_32_-_06_20_13_-_Exterior_Finish_Carpentry_0007.pdf PDF
B09_Attachment_40_-_08_91_19_-_FIXED_LOUVERS_0007.pdf PDF
B09_Attachment_47_-_C6_C11_C16_REV_0007.pdf PDF
B09_Attachment_49_-_E15_REV_0007.pdf PDF
B09_Attachment_28_-_07_92_00_-_Joint_Sealants_0007.pdf PDF
B09_Attachment_50_-_E25_REV_0007.pdf PDF
B09_Attachment_29_-_08_12_13_-_Hollow_Metal_Frames_0007.pdf PDF
B09_Attachment_37_-_08_71_00_-_Door_Hardware_0007.pdf PDF
B09_Attachment_25_-_Amd_07_Solicitation_QA_HAVO_305150_0007.xlsx XLSX spreadsheet
B09_Attachment_35_-_07_72_00_-_Roof_Accessories_0007.pdf PDF
B09_Attachment_34_-_07_62_00_-_Sheet_Metal_Flashing_and_Trim_0007.pdf PDF
B09_Attachment_33_-_07_21_00_-_Thermal_Insulation_0007.pdf PDF
B09_Attachment_42_-_09_30_13_-_CERAMIC_TILING_0007.pdf PDF
B09_Attachment_31_-_01_77_00A_Closeout-OperationMaintenance-Requirements_0007.pdf PDF
B09_Attachment_39_-_08_83_00_-_MIRRORS_0007.pdf PDF
Sol_140P2024R0114_Amd_0007.pdf PDF
B09_Attachment_45_-_33_14_16___Site_Water_Utility_Distribution_0007.pdf PDF
B09_Attachment_27_-_01_33_23-A_SubmittalList-ReviewEstimate_0007.pdf PDF
B09_Attachment_26_-_00_-_Table_of_Contents_0007.pdf PDF
Attachment_23_-_Pre-proposal_Site_Visit_Sign-in_Roster_7_31_2024_0006.pdf PDF
Attachment_21_-_01_33_23-A_SubmittalList-ReviewEstimate_0006.pdf PDF
Attachment_18_-_R1_A42_CD_HAVO_KVC_0006.pdf PDF
Attachment_24_-_HAVO_305150B_Prebid_Meeting_Notes_7-31-24_0006.pdf PDF
Attachment_17_-_R1_A36_CD_HAVO_KVC_0006.pdf PDF
Sol_140P2024R0114_Amd_0006.pdf PDF
Attachment_25_-_Amd_06_Solicitation_QA_HAVO_305150_0006.xlsx XLSX spreadsheet
Attachment_22_-_01_77_00A_Closeout-OperationMaintenance-Requirements_0006.pdf PDF
Attachment_20_-_SECTION_08_71_00_-_DOOR_HARDWARE_-_REV_2_0006.pdf PDF
Attachment_19_-_R1_A49_CD_HAVO_KVC_0006.pdf PDF
Sol_140P2024R0114_Amd_0005.pdf PDF
B09_Attachment_15_-_Cold_Fluid-Applied_Waterproofing-rev1_07_14_16_0004.pdf PDF
B09_Attachment_16_-_S1_Basement-81_0004.pdf PDF
Sol_140P2024R0114_Amd_0004.pdf PDF
Sol_140P2024R0114_Amd_0003.pdf PDF
B09_Attachment_14_-_Site_Visit_Tri_Fold_HAVO_305150B_-_AMENDMENT_3_0003.pdf PDF
B09_Attachment_13_-_HAVO_305150_Prebid_Site_Visit_Insructions_0003.pdf PDF
B08_Attachment_2_HAVO305150_FinalCDDrawings_0002.pdf PDF
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X9 R1 R2

RE

RD

RC

RA

1'

/2

/4

/2

11' - 3 3/4" 38' - 8"

15' - 5" 3' - 7" 16' - 1 3/4" 3' - 6 1/4"

3/ 4"

6'

3/ 4"

/4

9'

9' - 5" 5' - 9" 10' - 3 3/4" 13' - 2 1/4"

4' - 5" 5' - 0" 6' - 0"

4' - 6" 8' - 2"

MENS

WOMENS

JANITORIAL

UNISEX

1' - 11 3/4" 1' - 9 1/2"

2'

1/ 2"

FD FD

FD

164 165

1'

/2

6'

1'

/2

1' - 1 1/2"

12' - 5 3/8" 10' - 0" 16' - 2 5/8"

1' - 1 1/2"

1'

/2

1'

/2

1'

/2

1' - 1 1/2"

2'

1/ 2"

DRINKING

FOUNTAIN

& BOTTLE

FILLER

BABY CHANGING

STATION, TYP

FOR 2

SOAP

FAUCET

PTD/WR, TYP

FOR 3

WALL MTD ADULT

CHANGING

STATION

LOUVER

RAINSCREENS

STONE KNEE WALL

CONC SILL

/4

C J

ALIGN

CENTER VENT BTWN WALLS, SEE MECH

1' - 6"

C J C J

C J

C J

C J

5'

5'

C J

C J

C J

C J C J

C JC J

C J C J

C J

WALL MTD

HAND DRYER,

TYP FOR 7

SHELF,

SEE

/C2 A48 /A2 A48

COMFORT STATION LANAI

A32

C4

8'

7"

5' - 6"

7" 8'

2' - 9"

ALL DIMENSIONS FOR NEW WALLS ARE TO FACE OF STUD, UNO.

DIMENSIONS TO EXIST WALLS ARE TO FINISH FACE, UNO.

NON-BEARING INTERIOR PARTITIONS SHALL BE 2 X 4 WD STUDS, AT

16" OC WITH 1/2" GYPBD ON EACH SIDE, UNO.

PROVIDE R-19 INSULATION AT ALL EXTERIOR WALLS THAT

SEPARATE CONDITIONED AND NON CONDITIONED SPACES.

REPLACE SILL TO MATCH EXIST.

1.

2.

3.

4.

WALL SECTION OR

DETAIL SECTION

SHEET NUMBER WHERE DETAIL IS DRAWN

A1

A-501

SHEET NUMBER WHERE SECTION DRAWN

BUILDING SECTIONA1

A-301

101A

A

BA-401

C

D

ROOM NAME & NUMBER

PARTITION TYPE;

SEE A37 TO A44

TYP INT

ELEVATION

REFERENCE

ROOM NAME

WINDOW ID

DOOR ID

A

COLUMN GRID LINE

SHEET NUMBER WHERE

DETAIL IS DRAWN

PLAN DETAIL REFERENCEA1

A-501

NORTH ARROW

A1

A-201

BUILDING ELEVATION

LEGEND

1A

This work was prepared by me or under my supervision.

Signature Expiration Date of License

4/30/2026

No. 4073

W

N

ARCHITECT

PROFESSIONAL

LICENSED

A

H

NEL

G

A

,IIA S.

U.

NO

ME. AS

OF

PMIS/PKG NO.

DRAWING NO.SUB SHEET NO.

HAWAII VOLCANOES NATIONAL PARK

KILAUEA VISITOR CENTER

DESIGNED:

CADD:

TECH REVIEW:

DATE:

187007

SHEET

HAVO 305150B

/1

/2

:2 :3

A

M C

U s e rs

\j s \D o c u m e n ts

\2 C

.A L T

E R

N A

T E

H

A V

O V

C R je n n a K

R

T .r v t

A22

ENLARGED FLOOR PLANS -

COMFORT STATION

GM, AA

JS, AA

GM

4/12/2024

ENLARGED FLOOR PLAN NOTES:

1/4" = 1'-0"A22

ENLARGED PLAN - COMFORT STATIONA1

A

C

BD

INT

ELEV

0 2' 4' 8'

CONT ALUM FLASHING

ALUM

SHINGLE

ROOFING

5/8" PLYWOOD SHEATHING

WPM

1" GAP

RIDGE CAP

8 5/16"

SEE STRUCT

6"

1"

5/

8"

3 3/4" 4 1/8"

1/ 2"

1/2"

3/ 4"

R 4"

1/ 4"

ROOF FRAMING, SEE STRUCT

1X12

SHIPLAP SOFFIT ON 2X4 FRAMING

WPM

1/ 2"

TYPE 304 SST

WELD STL PLATE

TO END OF HSS

2X ON STL PLATE

2X4 FRAMING

CONT ALUM FLASHING

CORR MTL ROOFING

RIDGE CAP

R 4"

11 1/2"

4X DECKING

FOAM FILLER

2X6 NAILER

HSS, SEE STRUCT

WPM

1" GAP

LIGHT TUBE DOME

5/8" PLYWOOD

TOP CHORD

OF TRUSS

WPM

ALUM

SHINGLE

ROOFING

LEAD

FLASHING

GYPBD CEILING

EXTENSION TUBE

LIGHT TUBE

ROOF STRUCT

ABV, SEE STRUCT

1' - 4 3/4"

+/- 1' - 2"

1/ 2"

8"

8"

ALUM FLASHING

HEM

EXPOSED

EDGES

6"

5" 1"

3/4"

3/ 4"

1"

6"

2"FROM 2X8

1X12 BOARDS

1/2" PLYWD SHEATHING

2X6 FRAMING

3/4" 11"

WPM

ALUM SHINGLES

1/ 2"

TYPE 304 SST

HSS TRUSS

BEYOND

2 X 6 NAILER BEYOND

1" GAP

4" DECKING

6"

WPM

CORR MTL ROOFING

CONT ALUM FLASHING

FOAM FILLER

1/2" MIN

STAINLESS STEEL

OR GALV ANCHOR

CONT URETHANE SLNT

PINNACLE 600 SILL

WEEP HOLES @

EACH RAFTER

1/4-14 STAINLESS STEEL HEX

HEAD SCREWS W/ SEALED

WASHERS (2) PER RAFTER

ALUM CLOSURE

WEEP HOLES @

EACH RAFTER

1/4" X 4" RUBBER GLAZING

BUMPER (2 PER BAY)

CONT SILICONE SLNT W/

BACKER ROD

"T" GASKET

ALUM APRON

RAFTER CAP & CLOSURE

1/4-14 STAINLESS

STEEL HEX HEAD

SCREWS W/ SEALED

WASHERS @ 12" O.C.

ALUM CLOSURE SET IN

BEAD OF URETHANE SLNT

W/ POP RIVETS @ 24" O.C.

"T" GASKET

ALUM STANDOFF

ALUMINUM SPACER

WELDED TO HIP

PINNACLE 600

HIP MEMBER

6"

SUPPORT SYSTEM

BY PV INSTALLER

2" X 6" X 1/4"

ALUM PLATE

WELDED TO TUBE

SILICONE PIPE BOOT

SILICONE SLNT

ALL AROUND

WD DECK

6061-T6 ALUM

TUBE (OD 1.9")

4" DIA ALUM PLATE, FASTEN

THRU WP MEMB INTO WD

DECKING W/ FOUR 3 1/2"

LONG SCREWS

WP MEMB

CORRUGATED

ALUM RFG

2" X 6" X 1/4" ALUM PLATE

WELDED TO TUBE

4X DECKING

WP MEMB

6061-T6 ALUM TUBE (OD 1.9")

CORRUGATED ALUM RFG

4" DIA ALUM PLATE WELDED TO

PIPE, FASTEN THRU WP MEMB

INTO WD DECKING W/ FOUR 3 1/2"

LONG SCREWS

SILICONE SLNT ALL AROUND

SILICONE PIPE BOOT

This work was prepared by me or under my supervision.

Signature Expiration Date of License

4/30/2026

No. 4073

W

N

ARCHITECT

PROFESSIONAL

LICENSED

A

H

NEL

G

A

,IIA S.

U.

NO

ME. AS

OF

PMIS/PKG NO.

DRAWING NO.SUB SHEET NO.

HAWAII VOLCANOES NATIONAL PARK

KILAUEA VISITOR CENTER

DESIGNED:

CADD:

TECH REVIEW:

DATE:

187007

SHEET

HAVO 305150B

/1

/2

:2 :3

A

M C

U s e rs

\j s \D o c u m e n ts

\2 C

.A L T

E R

N A

T E

H

A V

O V

C R je n n a K

R

T .r v t

A28

ROOF DETAILS

Designer

Author

Checker

4/12/2024

0 3" 6" 9"3" = 1'-0"A28

COMFORT STATION RIDGEC1

6" = 1'-0"A28

HALAU GUTTERA4

0 3" 6" 9"

3" = 1'-0"A28

HALAU RIDGEC3

3" = 1'-0"A28

LIGHT TUBE SECTIONA3

6" = 1'-0"A28

TYP GUTTER - COMFORT STATIONC4

0 3" 6" 9"3" = 1'-0"A28

RIDGE SKYLIGHT HEAD & SILLA1

0 3" 6" 9"

0 1" 2" 4"3"

0 1" 2" 4"3"6" = 1'-0"A28

PV SUPPORTC2

0 1" 2" 4"3"

3" = 1'-0"A28

PV SUPPORT DTLD1

0 3" 6" 9"

This work was prepared by me or under my supervision.

Signature Expiration Date of License

4/30/2026

No. 4073

W

N

ARCHITECT

PROFESSIONAL

LICENSED

A

H

NEL

G

A

,IIA S.

U.

NO

ME. AS

OF

PMIS/PKG NO.

DRAWING NO.SUB SHEET NO.

HAWAII VOLCANOES NATIONAL PARK

KILAUEA VISITOR CENTER

DESIGNED:

CADD:

TECH REVIEW:

DATE:

187007

SHEET

HAVO 305150B

/1

/2

:2 :3

A

M C

U s e rs

\j s \D o c u m e n ts

\2 C

.A L T

E R

N A

T E

H

A V

O V

C R je n n a K

R

T .r v t

A51

FINISH SCHEDULE

GM, AA

JS, AA

GM

4/12/2024

ROOM FINISH SCHEDULE

NAME

FINISH WALL FINISH

REMARKSFLOOR BASE CEILING WALL-A WALL-B WALL-C WALL-D

PARK STORE LIN WB ACT GYPBD GYPBD GYPBD GYPBD

(E) HALLWAY LIN EXIST / WB GYPBD EXIST /

GYPBD

EXIST /

GYPBD

EXIST /

GYPBD

EXIST /

GYPBD

(E) AUDITORIUM EXIST AUD ACT PT PT PT PT

JANITORIAL CONC OPEN FRP FRP FRP FRP NO WALL FINISH IN PLUMBING CHASE

MENS EPOXY GYPBD GL-TILE / SS GL-TILE / SS GL-TILE / SS GL-TILE / SS

WOMENS EPOXY GYPBD GL-TILE / SS GL-TILE / SS GL-TILE / SS GL-TILE / SS SEE INTERIOR ELEVATIONS FOR

EXTENT OF FINISHES.

UNISEX EPOXY GYPBD SS SS SS SS

BREAKROOM LIN EXIST / WB GYPBD GYPBD GYPBD GYPBD

RR A LIN RB GYPBD GYPBD GYPBD GYPBD GYPBD

RR B LIN RB GYPBD GYPBD GYPBD GYPBD GYPBD

UTILITY LIN GYPBD FRP FRP FRP FRP FRP TO ± 7'-0" A.F.F.

NEW HALLWAY LIN WB /

WDPNL

GYPBD GYPBD GYPBD GYPBD GYPBD

MAIL ROOM EXIST EXIST EXIST EXIST EXIST EXIST EXIST

RANGER ROOM EXIST EXIST EXIST EXIST EXIST EXIST EXIST

OFFICE EXIST EXIST EXIST EXIST EXIST EXIST EXIST

OFFICE EXIST WDPNL EXIST EXIST EXIST EXIST EXIST

(E) A/V EXIST EXIST EXIST EXIST EXIST EXIST EXIST

STORAGE CONC RB EXIST GYPBD GYPBD GYPBD GYPBD

(E) MECH EXIST EXIST EXIST EXIST EXIST EXIST EXIST

LACTATION RM LIN WB GYBD GYPBD GYPBD GYPBD GYPBD

PARK STORE STORAGE LIN RB GYPBD GYPBD GYPBD GYPBD GYPBD

EXHIBITS & LOBBY LIN WB ACT GYPBD GYPBD GYPBD GYPBD

HALAU CONC / TILE NONE WD 1

COMFORT STATION LANAI CONC NONE WD 1 / WD 2 WD 2 @ SOFFIT ONLY.

FINISH LEGEND

LOCATION ABBREVIATION MATERIAL(S)

BASE / WAINSCOT

BASE /

WAINSCOT

AUD SALVAGED BASE AND CHAIR RAIL FROM DEMOLITION, NEW CARPET, NEW PAINT.

BASE /

WAINSCOT

EXIST EXISTING BASE TO REMAIN.

BASE /

WAINSCOT

RB RUBBER BASE.

BASE /

WAINSCOT

WB 1X4 WOOD BASE.

BASE /

WAINSCOT

WDPNL SALVAGED WOOD PANEL WAINSCOT AND CAP FROM DEMOLITION.

CEILING

CEILING ACT 4' x 8' ACOUSTIC CEILING.

CEILING EXIST EXISTING CEILING TO REMAIN.

CEILING FRP FIBERGLASS REINFORCED PANEL.

CEILING GYPBD GYPSUM BOARD CEILING, PAINTED.

CEILING OPEN EXPOSED RAFTERS, NO FIN CLG.

CEILING WD 1 CLEAR FINISH.

CEILING WD 2 PAINTED, UNO.

FLOOR

FLOOR CONC BROOM FINISH CONCRETE

FLOOR CPT-1 BROADLOOM CARPET

FLOOR EPOXY ANTI-SLIP EPOXY

FLOOR LIN LINOLEUM, SHT, ASTM D-2047 >0.6 SCOF

FLOOR TILE TILE INLAY.

WALL

WALL EXIST EXISTING WALL FINISH TO REMAIN.

WALL EXT 1 PAINTED WOOD BOARDS ABOVE STONE BASE.

WALL EXT 2 FULL HEIGHT WOOD BOARD, PAINTED.

WALL FRP FIBERGLASS REINFORCED PANEL TO +/- 7'-0" AFF.GYPSUM BOARD ABOVE.

WALL GL-TILE SEE A414 FOR DECORATIVE TILE BAND LOCATION. MOISTURE RESISTANT GYPSUM BOARD ABOVE.

WALL GYPBD 1/2" GYPSUM BOARD, PAINTED.

WALL PLYWD 1/2" PLYWOOD, UNPAINTED.

WALL PT NEW PAINT @ EXIST WALL W/ NEW CARPET BELOW.

WALL SS SOLID SURFACE TO +/- 8'-0" AFF.

WALL ST STONE PARTIAL HEIGHT WALL.

Sheets
A22 - ENLARGED FLOOR PLANS - COMFORT STATION
A28 - ROOF DETAILS
A51 - FINISH SCHEDULE

File details come from the government source that posted it. Updated .