This document is a technical specification for Section 07 92 00 - Joint Sealants. It provides requirements for the installation of joint sealants, including submittals, project conditions, product sourcing, surface preparation, sealant application, cleaning, and a schedule of acceptable sealant types.
The key details are: Joint sealants must be obtained from a single manufacturer and installed according to the manufacturer's instructions and ASTM C1193. Joints must be properly prepared by cleaning and priming as needed. Sealants must be tooled to produce a uniform appearance and ensure proper adhesion. A schedule is provided specifying the use of silicone modified acrylic sealants for non-moving joints less than 1/8" wide and one-part polyurethane sealants for all other joints. The sealants must be protected from contamination and damage until substantial completion.
View the file
Other files
Show 40 more
Latest 50 of 72 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HAVO – 305150B 07 92 00- 1
081324 JOINT SEALANTS
SECTION 07 92 00 – JOINT SEALANTS
PART 1 - GENERAL
1.1 SUBMITTALS
A. Product data
1.2 PROJECT CONDITIONS
A. Do not proceed with installation of joint sealants under the following conditions:
1. When ambient and substrate temperature conditions are outside limits permitted by joint-sealant manufacturer.
2. When joint substrates are wet.
3. Where joint widths are less than those allowed by joint-sealant manufacturer for applications indicated.
4. Where contaminants capable of interfering with adhesion have not yet been removed from joint substrates.
PART 2 - PRODUCTS
2.1 SOURCE QUALITY CONTROL
A. Obtain joint sealants from single manufacturer.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine joints indicated to receive joint sealants, with Installer present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting performance of the Work.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with joint-sealant manufacturer's written instructions and the following requirements:
1. Remove all foreign material from joint substrates that could interfere with adhesion of joint sealant, including dust, paints (except for permanent, protective coatings tested and danah.palik Cloud
HAVO – 305150B 07 92 00- 2
approved for sealant adhesion and compatibility by sealant manufacturer), old joint sealants, oil, grease, waterproofing, water repellents, water, surface dirt, and frost.
2. Clean porous joint substrate surfaces by brushing, grinding, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealants. Remove loose particles remaining after cleaning operations above by vacuuming or blowing out joints with oil-free compressed air. Porous joint substrates include the following:
a. Concrete.
b. Masonry.
3. Remove laitance and form-release agents from concrete.
4. Clean nonporous joint substrate surfaces with chemical cleaners or other means that do not stain, harm substrates, or leave residues capable of interfering with adhesion of joint sealants. Nonporous joint substrates include the following:
a. Metal.
b. Glass.
c. Fiber reinforced plastic
d. Solid surfacing materials
B. Joint Priming: Prime joint substrates where recommended by joint-sealant manufacturer or as indicated by preconstruction joint-sealant-substrate tests or prior experience. Apply primer to comply with joint-sealant manufacturer's written instructions. Confine primers to areas of joint-sealant bond; do not allow spillage or migration onto adjoining surfaces.
C. Masking Tape: Use masking tape where required to prevent contact of sealant or primer with adjoining surfaces that otherwise would be permanently stained or damaged by such contact or by cleaning methods required to remove sealant smears. Remove tape immediately after tooling without disturbing joint seal.
3.3 INSTALLATION
A. General: Comply with joint-sealant manufacturer's written installation instructions for products and applications indicated, unless more stringent requirements apply.
B. Sealant Installation Standard: Comply with recommendations in ASTM C1193 for use of joint sealants as applicable to materials, applications, and conditions indicated.
C. Install sealant backings of type indicated to support sealants during application and at position required to produce cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability.
1. Do not leave gaps between ends of sealant backings.
2. Do not stretch, twist, puncture, or tear sealant backings.
3. Remove absorbent sealant backings that have become wet before sealant application, and replace them with dry materials.
D. Install bond-breaker tape behind sealants where sealant backings are not used between sealants and backs of joints.
HAVO – 305150B 07 92 00- 3
E. Install sealants using proven techniques that comply with the following and at the same time backings are installed:
1. Place sealants so they directly contact and fully wet joint substrates.
2. Completely fill recesses in each joint configuration.
3. Produce uniform, cross-sectional shapes and depths relative to joint widths that allow optimum sealant movement capability.
F. Tooling of Nonsag Sealants: Immediately after sealant application and before skinning or curing begins, tool sealants according to requirements specified in subparagraphs below to form smooth, uniform beads of configuration indicated; to eliminate air pockets; and to ensure contact and adhesion of sealant with sides of joint.
1. Remove excess sealant from surfaces adjacent to joints.
2. Use tooling agents that are approved in writing by sealant manufacturer and that do not discolor sealants or adjacent surfaces.
3. Provide concave joint profile in accordance with Figure 8A in ASTM C1193 unless otherwise indicated.
a. Use masking tape to protect surfaces adjacent to recessed tooled joints.
3.4 CLEANING
A. Clean off excess sealant or sealant smears adjacent to joints as the Work progresses by methods and with cleaning materials approved in writing by manufacturers of joint sealants and of products in which joints occur.
3.5 SCHEDULE OF SEALANTS
A. For all joints that are less than 1/8” in width, are non-moving and are to be painted: Silicon modified acrylic.
B. For all other joints: one-part polyurethane.
3.6 PROTECTION
A. Protect joint sealants during and after curing period from contact with contaminating substances and from damage resulting from construction operations or other causes so sealants are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out, remove, and repair damaged or deteriorated joint sealants immediately so installations with repaired areas are indistinguishable from original work.
END OF SECTION 07 92 00
| PART 1 - GENERAL |
| 1.1 Submittals |
| A. Product data |
| 1.2 PROJECT CONDITIONS |
| A. Do not proceed with installation of joint sealants under the following conditions: |
| 1. When ambient and substrate temperature conditions are outside limits permitted by joint-sealant manufacturer. |
| 2. When joint substrates are wet. |
| 3. Where joint widths are less than those allowed by joint-sealant manufacturer for applications indicated. |
| 4. Where contaminants capable of interfering with adhesion have not yet been removed from joint substrates. |
| PART 2 - PRODUCTS |
| 2.1 SOURCE QUALITY CONTROL |
| A. Obtain joint sealants from single manufacturer. |
| PART 3 - EXECUTION |
| 3.1 EXAMINATION |
| A. Examine joints indicated to receive joint sealants, with Installer present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting performance of the Work. |
| B. Proceed with installation only after unsatisfactory conditions have been corrected. |
| 3.2 PREPARATION |
| A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with joint-sealant manufacturer's written instructions and the following requirements: |
| 1. Remove all foreign material from joint substrates that could interfere with adhesion of joint sealant, including dust, paints (except for permanent, protective coatings tested and approved for sealant adhesion and compatibility by sealant manufactu... |
| 2. Clean porous joint substrate surfaces by brushing, grinding, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealants. Remove loose particles remaining after c... |
| a. Concrete. |
| b. Masonry. |
| 3. Remove laitance and form-release agents from concrete. |
| 4. Clean nonporous joint substrate surfaces with chemical cleaners or other means that do not stain, harm substrates, or leave residues capable of interfering with adhesion of joint sealants. Nonporous joint substrates include the following: |
| a. Metal. |
| b. Glass. |
| c. Fiber reinforced plastic |
| d. Solid surfacing materials |
| B. Joint Priming: Prime joint substrates where recommended by joint-sealant manufacturer or as indicated by preconstruction joint-sealant-substrate tests or prior experience. Apply primer to comply with joint-sealant manufacturer's written instruction... |
| C. Masking Tape: Use masking tape where required to prevent contact of sealant or primer with adjoining surfaces that otherwise would be permanently stained or damaged by such contact or by cleaning methods required to remove sealant smears. Remove ta... |
| 3.3 INSTALLATION |
| A. General: Comply with joint-sealant manufacturer's written installation instructions for products and applications indicated, unless more stringent requirements apply. |
| B. Sealant Installation Standard: Comply with recommendations in ASTM C1193 for use of joint sealants as applicable to materials, applications, and conditions indicated. |
| C. Install sealant backings of type indicated to support sealants during application and at position required to produce cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability. |
| 1. Do not leave gaps between ends of sealant backings. |
| 2. Do not stretch, twist, puncture, or tear sealant backings. |
| 3. Remove absorbent sealant backings that have become wet before sealant application, and replace them with dry materials. |
| D. Install bond-breaker tape behind sealants where sealant backings are not used between sealants and backs of joints. |
| E. Install sealants using proven techniques that comply with the following and at the same time backings are installed: |
| 1. Place sealants so they directly contact and fully wet joint substrates. |
| 2. Completely fill recesses in each joint configuration. |
| 3. Produce uniform, cross-sectional shapes and depths relative to joint widths that allow optimum sealant movement capability. |
| F. Tooling of Nonsag Sealants: Immediately after sealant application and before skinning or curing begins, tool sealants according to requirements specified in subparagraphs below to form smooth, uniform beads of configuration indicated; to eliminate ... |
| 1. Remove excess sealant from surfaces adjacent to joints. |
| 2. Use tooling agents that are approved in writing by sealant manufacturer and that do not discolor sealants or adjacent surfaces. |
| 3. Provide concave joint profile in accordance with Figure 8A in ASTM C1193 unless otherwise indicated. |
| a. Use masking tape to protect surfaces adjacent to recessed tooled joints. |
| 3.4 CLEANING |
| A. Clean off excess sealant or sealant smears adjacent to joints as the Work progresses by methods and with cleaning materials approved in writing by manufacturers of joint sealants and of products in which joints occur. |
| 3.5 Schedule of Sealants |
| A. For all joints that are less than 1/8” in width, are non-moving and are to be painted: Silicon modified acrylic. |
| B. For all other joints: one-part polyurethane. |
| 3.6 PROTECTION |
| A. Protect joint sealants during and after curing period from contact with contaminating substances and from damage resulting from construction operations or other causes so sealants are without deterioration or damage at time of Substantial Completio... |