This document is a table of contents for the technical specifications related to the Kilauea Visitor Center (KVC) rehabilitation project at Hawaii Volcanoes National Park. The project aims to repair or replace critical park infrastructure and visitor facilities damaged during a 2018 volcanic event. Phase II of the project includes the rehabilitation of the existing KVC, demolition and replacement of the adjacent 1,350 SF comfort station, and expansion of the existing 3,150 SF lanai to 6,200 SF. The specifications cover a wide range of requirements across 33 divisions, including general requirements, site work, building construction, mechanical, electrical, and other systems. Key details include contractor responsibilities, quality control, safety, commissioning, and closeout procedures. The project is being solicited by the National Park Service National Office under Solicitation Number 140P2024R0114.

View the file

Other files

File Type Posted
B08_Attachment_6_HAVO_305150_Wage_Determination_9_6_2024_0009.pdf PDF
Sol_140P2024R0114_Amd_0009.pdf PDF
B09_Attachment_25_-_Amd_08_Solicitation_QA_HAVO_305150_0008.xlsx XLSX spreadsheet
Sol_140P2024R0114_Amd_0008.pdf PDF
B09_Attachment_51_-_A8-A20-A22-A24-A25-A26_REV_0008.pdf PDF
B09_Attachment_48_-_C9_WATER_PLAN_AND_PROFILE_II_REV_0007.pdf PDF
B09_Attachment_36_-_08_31_13_-_ACCESS_DOORS_AND_FRAMES_0007.pdf PDF
B09_Attachment_30_-_08_14_33_-_STILE_AND_RAIL_WOOD_DOORS_0007.pdf PDF
B09_Attachment_41_-_09_29_00_-_GYPSUM_BOARD_0007.pdf PDF
B08_Attachment_6_HAVO_305150_Wage_Determination_7_19_2024_0007.pdf PDF
B09_Attachment_38_-_08_80_00_-_GLAZING_0007.pdf PDF
B09_Attachment_46_-_A22-A28-A51_REV_0007.pdf PDF
B09_Attachment_44_-_10_28_00_-_TOILET_ACCESSORIES_0007.pdf PDF
B09_Attachment_43_-_09_51_13_-_ACOUSTICAL_PANEL_CEILINGS_0007.pdf PDF
B09_Attachment_32_-_06_20_13_-_Exterior_Finish_Carpentry_0007.pdf PDF
B09_Attachment_40_-_08_91_19_-_FIXED_LOUVERS_0007.pdf PDF
B09_Attachment_47_-_C6_C11_C16_REV_0007.pdf PDF
B09_Attachment_49_-_E15_REV_0007.pdf PDF
B09_Attachment_28_-_07_92_00_-_Joint_Sealants_0007.pdf PDF
B09_Attachment_50_-_E25_REV_0007.pdf PDF
B09_Attachment_29_-_08_12_13_-_Hollow_Metal_Frames_0007.pdf PDF
B09_Attachment_37_-_08_71_00_-_Door_Hardware_0007.pdf PDF
B09_Attachment_25_-_Amd_07_Solicitation_QA_HAVO_305150_0007.xlsx XLSX spreadsheet
B09_Attachment_35_-_07_72_00_-_Roof_Accessories_0007.pdf PDF
B09_Attachment_34_-_07_62_00_-_Sheet_Metal_Flashing_and_Trim_0007.pdf PDF
B09_Attachment_33_-_07_21_00_-_Thermal_Insulation_0007.pdf PDF
B09_Attachment_42_-_09_30_13_-_CERAMIC_TILING_0007.pdf PDF
B09_Attachment_31_-_01_77_00A_Closeout-OperationMaintenance-Requirements_0007.pdf PDF
B09_Attachment_39_-_08_83_00_-_MIRRORS_0007.pdf PDF
Sol_140P2024R0114_Amd_0007.pdf PDF
B09_Attachment_45_-_33_14_16___Site_Water_Utility_Distribution_0007.pdf PDF
B09_Attachment_27_-_01_33_23-A_SubmittalList-ReviewEstimate_0007.pdf PDF
Attachment_23_-_Pre-proposal_Site_Visit_Sign-in_Roster_7_31_2024_0006.pdf PDF
Attachment_21_-_01_33_23-A_SubmittalList-ReviewEstimate_0006.pdf PDF
Attachment_18_-_R1_A42_CD_HAVO_KVC_0006.pdf PDF
Attachment_24_-_HAVO_305150B_Prebid_Meeting_Notes_7-31-24_0006.pdf PDF
Attachment_17_-_R1_A36_CD_HAVO_KVC_0006.pdf PDF
Sol_140P2024R0114_Amd_0006.pdf PDF
Attachment_25_-_Amd_06_Solicitation_QA_HAVO_305150_0006.xlsx XLSX spreadsheet
Attachment_22_-_01_77_00A_Closeout-OperationMaintenance-Requirements_0006.pdf PDF
Attachment_20_-_SECTION_08_71_00_-_DOOR_HARDWARE_-_REV_2_0006.pdf PDF
Attachment_19_-_R1_A49_CD_HAVO_KVC_0006.pdf PDF
Sol_140P2024R0114_Amd_0005.pdf PDF
B09_Attachment_15_-_Cold_Fluid-Applied_Waterproofing-rev1_07_14_16_0004.pdf PDF
B09_Attachment_16_-_S1_Basement-81_0004.pdf PDF
Sol_140P2024R0114_Amd_0004.pdf PDF
Sol_140P2024R0114_Amd_0003.pdf PDF
B09_Attachment_14_-_Site_Visit_Tri_Fold_HAVO_305150B_-_AMENDMENT_3_0003.pdf PDF
B09_Attachment_13_-_HAVO_305150_Prebid_Site_Visit_Insructions_0003.pdf PDF
B08_Attachment_2_HAVO305150_FinalCDDrawings_0002.pdf PDF
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HAVO – 305150B TOC - 1

Table of Contents

Number of Pages

Division 01: General Requirements

01 11 00 Summary of Work 01 11 40 Resource Protection Work Restriction 01 11 40A Working Around Endangered Birds Factsheet 01 26 01 Contract Modification Procedures 01 27 00 Definition of Contract Line Items 01 31 00 Project Management and Coordination 01 32 16 Construction Schedule 01 32 33 Photo Documentation 01 33 23 Submittal Procedures 01 33 23A Submittal List 01 35 13.22 Archeological Protection 01 35 23 Safety Requirements 01 35 91 Historic Preservation Treatment Procedures 01 40 00 Quality Requirements 01 40 00A Accessibility Inspection Report 10 40 00B ABAAS Facilities Accessibility Scoping Form 01 42 00 Reference Standards 01 50 00 Temporary Facilities and Controls 01 50 00A Temporary Road Guide Sign Artwork 01 57 19.11 Indoor Air Quality Management 01 57 19.12 Noise and Acoustics Management 01 57 23 Under-an-Acre Pollution Prevention (UPP) 01 67 00 Product Requirements 01 73 29 Cutting and Patching 01 73 40 Execution 01 74 19 Construction Waste Management and Disposal 01 74 19A Project Waste Management Plan Worksheet Sample 01 77 00 Closeout Procedures 01 77 00A Closeout and Operations & Maintenance Requirements 01 78 23 Operation and Maintenance Data 01 79 00 Demonstration and Training 01 81 13 Sustainable Design Requirements - Non-LEED™ Projects 01 91 13 General Commissioning Requirements 01 91 14 Total Building Commissioning

Division 02: Existing Conditions

02 41 13 Site Selective Demolition 02 82 00 Asbestos Remediation 02 83 00 Lead Remediation 02 84 00 Arsenic Remediation

Number of Pages

HAVO – 305150B TOC - 2

Division 03: Concrete

03 30 00 Cast-In-Place Concrete

Division 04: Masonry

04 43 00 Stone Masonry

Division 05: Metals

05 12 00 Structural Steel Framing 05 52 13 Pipe and Tube Railings 05 55 00 Metal Fabrications

Division 06: Wood, Plastics, and Composites

06 10 00 Rough Carpentry 06 16 00 Sheathing 06 17 53 Shop-Fabricated Wood Trusses 06 18 00 Glue-Laminated Construction 06 20 13 Exterior Finish Carpentry 06 20 23 Interior Finish Carpentry

Division 07: Thermal and Moisture Protection

07 14 16 Cold Fluid-Applied Waterproofing 07 21 00 Thermal Insulation 07 41 13.13 Roofing 07 62 00 Sheet Metal Flashing and Trim 07 72 00 Roof Accessories 07 92 00 Joint Sealants

Division 08: Openings

08 12 13 Hollow Metal Frames 08 14 16 Flush Wood Doors 08 14 33 Stile and Rail Wood Doors 08 31 13 Access Doors and Frames 08 33 26 Overhead Coiling Grilles 08 71 00 Door Hardware 08 80 00 Glazing 08 83 00 Mirrors 08 91 19 Fixed Louvers

Division 09: Finishes

09 29 00 Gypsum Board 09 30 13 Ceramic Tiling 09 51 13 Acoustical Panel Ceilings danah.palik Cloud

HAVO – 305150B TOC - 3

09 65 43 Linoleum Flooring 09 67 23 Resinous Flooring 09 68 20 Carpeting 09 91 13 Painting

Division 10: Specialties

10 21 13.19 Plastic Toilet Compartments 10 28 00 Toilet Accessories 10 44 13 Fire Protection Cabinets 10 44 16 Fire Extinguishers

Division 11 – 20: (Not Used)

Division 21: Fire Suppression

21 00 00 Fire Suppression Basic Requirements 21 05 00 Common Work Results for Fire Suppression 21 13 00 Fire Suppression Sprinkler Systems 21 13 19 Fire Suppression Preaction Sprinkler Systems

Division 22: Plumbing

22 00 00 Plumbing Basic Requirements 22 05 19 Plumbing Devices 22 05 23 General-Duty Valves for Plumbing Piping 22 05 29 Hangers and Supports for Plumbing Piping and Equipment 22 05 48 Vibration and Seismic Controls for Plumbing Piping and Equipment 22 05 53 Identification for Plumbing Piping and Equipment 22 05 93 Testing, Adjusting, and Balancing for Plumbing 22 07 00 Plumbing Insulation 22 08 00 Commissioning of Plumbing 22 10 00 Plumbing Piping 22 40 00 Plumbing Fixtures

Division 23: Heating, Ventilating, and Air Conditioning

23 00 00 Heating, Ventilating and Air Conditioning (HVAC) Basic Requirements 23 05 29 Hangers and Supports for HVAC Piping, Ductwork and Equipment 23 05 48 Vibration and Seismic Controls for HVAC 23 05 53 Identification for HVAC Piping, Ductwork, and Equipment 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 07 00 HVAC Insulation 23 08 00 Commissioning of HVAC 23 09 00 Instrumentation and Control Performance Specifications 23 21 13 HVAC Piping 23 31 00 HVAC Ducts and Casings 23 33 00 Air Duct Accessories

HAVO – 305150B TOC - 4

23 34 00 HVAC Fans 23 36 00 Air Terminal Units 23 37 00 Air Outlets and Inlets 23 40 00 HVAC Air Cleaning Devices 23 73 13 Modular Central Station Air-Handling Units

Division 24 – 25: (Not Used)

Division 26: Electrical

26 00 00 Electrical Basic Requirements 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems and Equipment 26 05 33 Raceways 26 05 53 Identification for Electrical Systems 26 05 73 Electrical Distribution System Studies 26 08 00 Commissioning of Electrical 26 08 05 Electrical Acceptance Testing 26 09 23 Occupancy and Vacancy Sensors 26 09 25 Digital Lighting Controls 26 09 33 Central Dimming Controls 26 24 13 Switchboards 26 24 16 Panelboards 26 27 26 Wiring Devices 26 28 16 Enclosed Switches and Circuit Breakers 26 31 00 Photovoltaic Systems 26 32 13 Engine Generators 26 33 23 Central Battery Equipment 26 36 00 Transfer Switches 26 41 13 Lightning Protection for Structures 26 43 00 Surge Protective Devices 26 51 00 Lighting

Division 27: Communications

27 00 00 Communications Basic Requirements 27 05 28 Pathways for Communications Systems 27 05 28.28 Firestopping for Communications Systems 27 05 33 Conduits, Back Boxes, Pull Boxes, and Ceiling Hatches for Communications Systems ... 6 27 15 00 Communications Horizontal Cabling

Division 28: Electronic Safety and Security

28 00 00 Electronic Safety and Security Basic Requirements 28 08 01 Commissioning and Testing of Security System 28 10 00 Access Control and Intrusion Detection 28 23 00 Video Surveillance 28 31 00 Fire Detection and Alarm danah.palik Cloud

HAVO – 305150B TOC - 5

Divisions 29 – 30: (Not Used)

Division 31: Earthwork

31 10 00 Site Clearing 31 20 00 Earth Moving 31 25 00 Erosion and Sediment Control

Division 32: Exterior Improvements

32 12 16 Asphalt Paving 32 13 20 Site Concrete 32 17 00 Paving Specialties 32 33 00 Site Furnishings 32 92 26 Sprigging

Division 33: Utilities

33 14 16 Site Water Utility Distribution 33 30 00 Sanitary Sewerage 33 40 00 Storm Drainage

Divisions 34 – 49: (Not Used)