This document is a Closeout and Operation & Maintenance (O&M) Requirements Template from the National Park Service (NPS) - Denver Service Center (DSC). It outlines the required project record drawings, demonstration and training, spare parts, equipment, and reports to be submitted by the contractor at the completion of the project. Key requirements include final record drawings for various systems, equipment instruction to park staff, spare tools and materials, and various reports such as test data, accessibility inspections, and warranties/guarantees. The template covers closeout and O&M requirements across multiple specification sections, including 21 00 00 Fire Suppression, 22 00 00 Plumbing, 23 00 00 HVAC, 26 00 00 Electrical, 27 00 00 Communications, and 28 00 00 Electronic Safety and Security.

View the file

Other files

File Type Posted
B08_Attachment_6_HAVO_305150_Wage_Determination_9_6_2024_0009.pdf PDF
Sol_140P2024R0114_Amd_0009.pdf PDF
B09_Attachment_25_-_Amd_08_Solicitation_QA_HAVO_305150_0008.xlsx XLSX spreadsheet
Sol_140P2024R0114_Amd_0008.pdf PDF
B09_Attachment_51_-_A8-A20-A22-A24-A25-A26_REV_0008.pdf PDF
B09_Attachment_48_-_C9_WATER_PLAN_AND_PROFILE_II_REV_0007.pdf PDF
B09_Attachment_36_-_08_31_13_-_ACCESS_DOORS_AND_FRAMES_0007.pdf PDF
B09_Attachment_30_-_08_14_33_-_STILE_AND_RAIL_WOOD_DOORS_0007.pdf PDF
B09_Attachment_41_-_09_29_00_-_GYPSUM_BOARD_0007.pdf PDF
B08_Attachment_6_HAVO_305150_Wage_Determination_7_19_2024_0007.pdf PDF
B09_Attachment_38_-_08_80_00_-_GLAZING_0007.pdf PDF
B09_Attachment_46_-_A22-A28-A51_REV_0007.pdf PDF
B09_Attachment_44_-_10_28_00_-_TOILET_ACCESSORIES_0007.pdf PDF
B09_Attachment_43_-_09_51_13_-_ACOUSTICAL_PANEL_CEILINGS_0007.pdf PDF
B09_Attachment_32_-_06_20_13_-_Exterior_Finish_Carpentry_0007.pdf PDF
B09_Attachment_40_-_08_91_19_-_FIXED_LOUVERS_0007.pdf PDF
B09_Attachment_47_-_C6_C11_C16_REV_0007.pdf PDF
B09_Attachment_49_-_E15_REV_0007.pdf PDF
B09_Attachment_28_-_07_92_00_-_Joint_Sealants_0007.pdf PDF
B09_Attachment_50_-_E25_REV_0007.pdf PDF
B09_Attachment_29_-_08_12_13_-_Hollow_Metal_Frames_0007.pdf PDF
B09_Attachment_37_-_08_71_00_-_Door_Hardware_0007.pdf PDF
B09_Attachment_25_-_Amd_07_Solicitation_QA_HAVO_305150_0007.xlsx XLSX spreadsheet
B09_Attachment_35_-_07_72_00_-_Roof_Accessories_0007.pdf PDF
B09_Attachment_34_-_07_62_00_-_Sheet_Metal_Flashing_and_Trim_0007.pdf PDF
B09_Attachment_33_-_07_21_00_-_Thermal_Insulation_0007.pdf PDF
B09_Attachment_42_-_09_30_13_-_CERAMIC_TILING_0007.pdf PDF
B09_Attachment_31_-_01_77_00A_Closeout-OperationMaintenance-Requirements_0007.pdf PDF
B09_Attachment_39_-_08_83_00_-_MIRRORS_0007.pdf PDF
Sol_140P2024R0114_Amd_0007.pdf PDF
B09_Attachment_45_-_33_14_16___Site_Water_Utility_Distribution_0007.pdf PDF
B09_Attachment_27_-_01_33_23-A_SubmittalList-ReviewEstimate_0007.pdf PDF
B09_Attachment_26_-_00_-_Table_of_Contents_0007.pdf PDF
Attachment_23_-_Pre-proposal_Site_Visit_Sign-in_Roster_7_31_2024_0006.pdf PDF
Attachment_21_-_01_33_23-A_SubmittalList-ReviewEstimate_0006.pdf PDF
Attachment_18_-_R1_A42_CD_HAVO_KVC_0006.pdf PDF
Attachment_24_-_HAVO_305150B_Prebid_Meeting_Notes_7-31-24_0006.pdf PDF
Attachment_17_-_R1_A36_CD_HAVO_KVC_0006.pdf PDF
Sol_140P2024R0114_Amd_0006.pdf PDF
Attachment_25_-_Amd_06_Solicitation_QA_HAVO_305150_0006.xlsx XLSX spreadsheet
Attachment_20_-_SECTION_08_71_00_-_DOOR_HARDWARE_-_REV_2_0006.pdf PDF
Attachment_19_-_R1_A49_CD_HAVO_KVC_0006.pdf PDF
Sol_140P2024R0114_Amd_0005.pdf PDF
B09_Attachment_15_-_Cold_Fluid-Applied_Waterproofing-rev1_07_14_16_0004.pdf PDF
B09_Attachment_16_-_S1_Basement-81_0004.pdf PDF
Sol_140P2024R0114_Amd_0004.pdf PDF
Sol_140P2024R0114_Amd_0003.pdf PDF
B09_Attachment_14_-_Site_Visit_Tri_Fold_HAVO_305150B_-_AMENDMENT_3_0003.pdf PDF
B09_Attachment_13_-_HAVO_305150_Prebid_Site_Visit_Insructions_0003.pdf PDF
B08_Attachment_2_HAVO305150_FinalCDDrawings_0002.pdf PDF
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Closeout and Operation & Maintenance (O&M) Requirements Template National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21

Topic Specification

Section Requirement

Submittal

Date Completed

Received by Park

01 77 00 Final Project Record Drawings.

01 77 00 Final Project Record Drawings.

Project Record 21 00 00 Record Drawings.

Drawings 22 00 00 Record Drawings.

23 00 00 Record Drawings.

26 00 00 Record Drawings.

27 00 00 Record Drawings.

28 00 00 Record Drawings.

33 30 00 As-builts

System 21 00 00 Instruction to Park Staff in proper operation of equipment and systems.

Demonstration 23 09 00 Mechanical equipment control system DDC (Direct Digital Control) training.

and Training 28 00 00 Instruction to Park Staff in proper operation of equipment and systems.

Tools 21 13 00 Wrenches for each sprinkler type

Spare Parts

Equipment

09 65 43 Linoleum flooring

21 13 00 Spare Sprinklers

Extra Stock 23 05 48 Replacement neoprene inserts for snubbers.

23 40 00 Extra filters: one set of each type and size.

01 74 19 Summary of Project Waste Management Plan worksheet

02 82 00 Final Report

02 83 00 Final Report

02 84 00 Final Report

Reports 05 12 00 Field quality control and special inspection reports

05 52 13 CQC Accessibility Inspection Report

21 00 00 Copy of approved submittal data with submittal review letters.

21 00 00 Water supply flow test used as basis for hydraulic calculations.

21 00 00 Hydraulic calculations and sway brace calculations.

21 00 00 Contractor’s Material and Test Certificates for Aboveground Piping/Underground Piping.

22 00 00 Plumbing test and balance reports.

22 00 00 Pressure, flow, leakage and purity test data

23 05 93 HVAC test and balance reports.

26 05 73 Electrical Distribution studies

27 00 00 Cable Test Reports

28 00 00 Start-up and test reports specific to each piece of equipment.

28 00 00 Certificates of Code Authority Acceptance, Code-Required Acceptance Tests, Test Reports and Certificates.

32 12 16 CQC Accessibility Inspection Report

32 13 00 CQC Accessibility Inspection Report

Keys & Keying 28 31 00 Spare Keys

Closeout and Operation Maintenance (O) Requirements Template | National Park Service (NPS) - Denver Service Center (DSC) page 1 of 2 kevin.kraxberger Cloud

Topic Specification

Section Requirement

Submittal

Date Completed

Received by Park

Schedule

06 20 23 Warranty: sheet material

08 33 26 Warranty: overhead coiling grilles

09 65 43 Maintenance data: linoleum flooring

09 67 23 Care and Maintenance Instruction: resinous floor

09 67 23 Warranty: resinous floor

09 68 20 Maintenance Instructions: carpeting

09 68 20 Warranty: carpeting

10 44 13 Maintenance data: fire extinguisher cabinets

O&M Data 21 00 00 Operation and Maintenance Manuals with the following

Warranties 21 00 00 Copies of certificates of code authority acceptance, code required acceptance tests, test reports and certificates.

Guarantees 21 00 00 Catalog description of each Item of equipment

21 00 00 Record Drawings.

21 00 00 Copy of valve charts and whether normally open or normally closed.

21 00 00 Copy of drain, auxiliary, and low point drains charts.

21 00 00 Copy of approved submittal data along with submittal review letters.

21 00 00 Product certificates of warranties and guarantees

22 00 00 O&M Manual

22 00 00 Warranties and Guarantees

23 00 00 O&M Manual

23 00 00 Warranty

23 05 93 TAB agency provides 90 day warranty period for TAB work.

23 40 00 O&M manual to include instructions for changing and/or cleaning of filters

26 00 00 O&M Manual

27 00 00 Product certificates of warranties and guarantees.

27 00 00 Copy of approved submittal data with submittal review letters.

27 00 00 Copy of manufacturer's standard Operations and Maintenance for equipment.

27 00 00 Warranty.

28 00 00 Product certificates of warranties and guarantees.

28 00 00 Letter of Conformance

28 00 00 Copy of approved submittal data with submittal review letters.

28 00 00 Copy of manufacturer's standard Operations and Maintenance for equipment.

28 00 00 Copy of parts list for equipment.

28 00 00 Warranty.

28 31 00 Manuals containing the documentation required in NFPA 72; Completion Documentation.

28 31 00 Instruction chart.

33 30 00 Warranty