Orlando Executive Airport (ORL) Runway 7-25 Rehabilitation and Related Work (BP-00050)
Closed State & local contract opportunity
- Solicitation number
- 25-597-IFB
- State
- Florida
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- UNSPSC codes
- 72141101 Airport runway construction service
- 95111500 Limited traffic thoroughfares
- 95111600 Open traffic thoroughfares
- 95111503 Access roads
- 95111601 Street or avenue or road or boulevard
- 95111611 Trunk road
- 25201602 Aircraft navigation beacons
- 95121614 Runway
- 72141002 Highway and road sign or guardrail construction and repair service
- 72141004 Highway reflector installation service
Show all 29
- 72141509 Trenching service
- 95111614 Single carriageway
- 95111502 Right of way
- 95121647 Elevated roadway or highway
- 72141000 Highway and road construction services
- 72141100 Infrastructure building and surfacing and paving services
- 72141106 Gravel or dirt road construction service
- 72141001 Highway and road new construction service
- 95111504 Highway ramp or slip road
- 95111612 Secondary road
- 95111613 Dual carriageway
- 95111602 Intrastate highway or freeway or turnpike
- 95121613 Airfield
- 95110000 Thoroughfares
- 95111615 Road junction
- 95111609 Crossroad
- 95111501 Easement
- 95111603 Interstate highway or freeway or turnpike
- 95111610 Ring road
- Point of contact
-
- Yanique Reddick yanique.reddick@goaa.org (407) 825-6428
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The Greater Orlando Aviation Authority (GOAA) is seeking sealed bids for the Runway 7-25 Rehabilitation project at Orlando Executive Airport, located in Orange County, Florida. The project involves comprehensive runway rehabilitation, including milling and overlaying Runway 7-25, its blast pads, and connecting taxiways within the runway's safety area. Key deliverables include pavement geometric modifications, safety area improvements to meet FAA standards, and rehabilitation of the existing runway lighting system, markings, and signage. The project aims to extend the runway's service life by 20 years and upgrade airport infrastructure to comply with current aviation standards. Electronic sealed bids are due on May 6, 2025, at 2:00 PM Eastern, with a bid opening at 3:30 PM via Microsoft Teams. A mandatory pre-bid conference is scheduled for April 15, 2025, at 3:00 PM at the Orlando Executive Airport. The contract time is anticipated to be 270 calendar days to achieve Substantial Completion, with final completion expected within 60 calendar days after Substantial Completion.
The procurement includes a Disadvantaged Business Enterprise (DBE) participation goal of 10% of the total bid price, with bidders required to demonstrate compliance through detailed documentation. Contractors must successfully have completed at least one similar airfield project within the last five years and provide a bid security of 10% of the total bid price. The project involves federal funding, requiring compliance with various federal regulations, including Buy American provisions, Davis-Bacon wage rates, and Equal Employment Opportunity regulations. The engineer's estimated construction cost ranges from $7,083,000 for the base bid to $22,055,000 when including all alternate scopes. Contractors must provide comprehensive insurance coverage and comply with specific airport operational safety guidelines, including maintaining airport navigation and communication systems during construction. The project will be completed in three phases over 290 consecutive calendar days, with specific work areas carefully defined to minimize interference with airport operations.
Opportunity text
This project provides the rehabilitation of Runway 7-25 at the Orlando Executive Airport. The scope of work includes the milling and overlaying of the runway, blast pads, and connecting taxiways within the safety area of the runway. It includes pavement geometric modifications and safety area improvements to meet FAA standards. It will also include rehabilitating the existing runway lighting system, markings, and signage.
Please see the Attachments section for the Division 00, Procurement and Contracting Requirements (including Bid Documents, Bid Forms), drawings and specifications.
Files
Show all 26
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity