This is an Invitation for Bids (IFB) issued by the Greater Orlando Aviation Authority for the Runway 7-25 Rehabilitation and Related Work at Orlando Executive Airport (Project BP-00050). The project involves comprehensive runway rehabilitation, including milling and overlaying the runway, blast pads, and connecting taxiways within the safety area. Specific scope elements include pavement geometric modifications, safety area improvements to meet FAA standards, and rehabilitation of the existing runway lighting system, markings, and signage. The bid includes multiple schedules (Schedule A, Schedule B, and Add Alternatives No. 1-3) with detailed line items covering activities such as mobilization, cold milling at various depths, joint and crack repair, asphalt surface course installation, pavement marking, electrical work, lighting modifications, and sodding.
The solicitation is structured as a federal version construction bid, with electronic submissions required through the OpenGov Procurement Platform. Bidders must complete a vendor questionnaire, provide bid security, and ensure consistent unit pricing across schedules. The project includes several allowances, including a $200,000 drainage pipe rehabilitation allowance, a $25,000 FAA flight inspection allowance, and a $30,000 airfield lighting control system modification allowance. The bid documents specify detailed technical specifications for each line item, with quantities ranging from single lump sum items to thousands of square yards or linear feet of various construction and rehabilitation activities. Bidders are required to follow strict submission guidelines, including creating a free account on the procurement platform and submitting all documents electronically.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BIDS
(FEDERAL VERSION - CONSTRUCTION)
25-597-IFB
ORLANDO EXECUTIVE AIRPORT (ORL)
RUNWAY 7-25 REHABILITATION AND
RELATED WORK (BP-00050)
TABLE OF CONTENTS
1. Introduction
2. Instructions to Bidders
3. Vendor Questionnaire
4. Pricing Table
ATTACHMENTS
A - ORL_BP-00050_IFB_SPECS
B - ORL_BP-00050_IFB_PLANS
C - ORL_BP-00050_IFB_SIGNED AND SEALED TOPOGRAPHIC SURVEY
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
GREATER ORLANDO AVIATION AUTHORITY
Orlando Executive Airport (ORL) Runway 7-25 Rehabilitation and Related Work (BP- 00050)
1. Introduction
1.1. Summary
This project provides the rehabilitation of Runway 7-25 at the Orlando Executive
Airport. The scope of work includes the milling and overlaying of the runway, blast pads, and connecting taxiways within the safety area of the runway. It includes pavement geometric modifications and safety area improvements to meet FAA standards. It will also include rehabilitating the existing runway lighting system, markings, and signage.
Please see the Attachments section for the Division 00, Procurement and
Contracting Requirements (including Bid Documents, Bid Forms), drawings and specifications.
https://procurement.opengov.com/portal/goaa/projects/157577/document?section=1432843
2. Instructions to Bidders
2.1. Important Instructions for Electronic Submittal
The Greater Orlando Aviation Authority is ONLY accepting electronic submissions.
Vendor shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid.
2.2. Solicitation Information / Instructions
a. Sealed electronic responses will be received for this Solicitation through the
Greater Orlando Aviation Authority e-Procurement Platform located at https://procurement.opengov.com/portal/goaa. Once you have completed the free account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic response. By way of the
Platform, Respondents will be locked and digitally encrypted until the submission deadline passes.
b. All Responses must be received by the Aviation Authority as noted in the
Timeline. All Responses timely received will be listed with the name of the
Respondent during the Virtual Opening. The e-Procurement Platform will not allow for late submittals.
c. The time/date stamp clock located in the electronic submittal Platform shall serve as the official authority to determine lateness of any response.
d. The Aviation Authority shall not be responsible for delays caused by any occurrence. This shall include any delay as a result of a technology issue. Any late response shall not be accepted.
e. Responses submitted by hard copy, e-mail, or fax shall not be accepted.
Responses submitted outside of the designated electronic submission Platform shall be rejected as non-responsive regardless of where and when they were received.
f. Respondents shall not be allowed to modify their responses after the opening time and date.
g. Respondents shall submit one Response only. Prime Respondents who also participate in other responses as subcontractors will not be considered.
h. Each Respondent shall complete the Vendor Questionnaire. Please respond to each item individually, as applicable.
https://procurement.opengov.com/signup https://procurement.opengov.com/portal/goaa
i. Unless otherwise directed, all uploaded files must be in PDF format. Do not upload zip files.
j. Once the deadline for receipt of Responses has occurred, no Response may be altered without written approval from the Aviation Authority.
2.3. Submitting Questions and Review of Solicitation
a. Respondents shall submit all inquiries regarding this Solicitation via the e-
Procurement Platform, located at https://procurement.opengov.com/portal/goaa
. Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the Aviation Authority e-Procurement Platform. Respondents may also click “Follow” on this Solicitation to receive an email notification when answers are posted. It is the responsibility of the Respondent to check the website for answers to inquiries.
b. The purpose of any Pre-bid Conference is to review and discuss the solicitation
(and any addenda) as published. Attendance is non-mandatory, but highly encouraged. Respondents are expected to be familiar with the Solicitation
Documents.
c. Questions will be answered through the e-Procurement Platform.
d. If the Aviation Authority determines that it is necessary to change the dates or times prior to the due date, the change will be announced and posted on the e-
Procurement Platform
e. All prospective Respondents shall thoroughly examine and become familiar with the Solicitation package and carefully note the items which must be submitted with the Solicitation as detailed in Section: Vendor Questionnaire.
f. Submission of a Response shall constitute an acknowledgment that the
Respondent has read and understands the Solicitation Documents. The failure or neglect of a Respondent to receive or examine any Solicitation Document shall in no way relieve it from any obligations under its Response or the Contract. No claim for additional compensation will be allowed which is based upon a lack of knowledge or understanding of any of the Contract Documents or the scope of work.
2.4. Communications; Questions Regarding Specifications or Solicitation
Process
a. Any official communication from a Respondent during the Solicitation process should be submitted to the Aviation Authority via the e-Procurement Platform, https://procurement.opengov.com/portal/goaa . A copy of the Administration
Policies (Sections 180.01 and 180.03) are available on the Aviation Authority website.
b. In accordance with the above-referenced policies, any communication directly or indirectly to seek to encourage any specific result in connection with an Aviation
Authority selecting process, including but not limited to, written communications, any and all forms of electronic communications or messaging, including social media, oral communications either in person or by telephone, initiated by a
Respondent or through a lobbyist, agent or third person, to any Aviation
Authority staff and/or Committee/Board member who is a member of any committee constituted for the purposes of ranking Solicitations, making recommendations or making an award, is prohibited from the time that the
Solicitation is released to the time that the award is made.
c. All firms are hereby placed on notice that the Aviation Authority Board and staff shall not be contacted about this solicitation. Firms and their agents shall not contact members of the Aviation Authority staff and/or Committee/Board member (with the exception of designated Procurement Agent and the Small
Business Development Department). An appropriate official or employee of the
Aviation Authority may initiate communication with a Respondent in order to obtain information or clarification needed to develop a proper and accurate evaluation. Any official communication from a Respondent during the solicitation process should be submitted via the e-Procurement Platform as directed during the solicitation process. Failure to adhere to these requirements may result in
Board action to disqualify your firm from consideration of award.
d. Requests for interpretation, clarification or correction of this solicitation, documents, forms or other material in the solicitation should be made in writing via the e-Procurement Platform during the Question-and-Answer period.
Questions or issues raised at the Pre-Bid Conference or during the Question-and-
Answer period, which, in the Aviation Authority's discretion, necessitate changes to the solicitation documents, will be issued via an Addendum at the conclusion of the question period, and will be made available through the e-Procurement
Platform. It is the responsibility of each Respondent to ensure that it has received and reviewed any and all such responses and addenda.
2.5. Appeals
Any Bidder who is adversely affected by a decision or intended decision concerning this competitive solicitation or contract award and who wants to appeal such specifications, decision, or intended decision shall file an appeal within five (5) business days of the date of any decision or intended decision of the Construction Committee and in compliance with the Aviation Authority’s Policy 110.04, Appeal Process. Failure to file an appeal in accordance with the Aviation Authority’s Policy 110.04, shall constitute a waiver of the appeal process.
The intent to award to a Bidder, if any, will be posted on the Aviation Authority’s e-procurement platform website, and will remain posted for a period of five business days: excluding weekends, federal holidays, and Aviation Authority’s holidays. Failure to file an appeal in accordance with the above stated policy shall constitute a waiver of the appeal process.
2.6. Nondiscrimination Legal Notices
a. The Aviation Authority does not discriminate upon the basis of any individual’s disability status. Anyone requiring reasonable accommodations as provided for in the Americans with Disabilities Act or Section 86.26, Florida Statutes, should contact the ADA Coordinator at 407-825-7105 as soon as possible, or at least one full business day prior to any scheduled meeting.
b. In accordance with Section 287.05701, Florida Statutes, the Aviation Authority may not request documentation of or consider a Respondent social, political, or ideological interests when determining if the Respondent is responsible.
2.7. Reservation of Rights
a. The Aviation Authority reserves the right, in its sole discretion, to waive any informalities or irregularities of a Response, except that (i) the Aviation Authority will not waive the requirement that a Response, complete in all material respects, be received by the Aviation Authority by the time and date specified in the Timeline for the receipt thereof, and (ii) the Aviation Authority will not consider any Response which does not conform in all material respects to the terms of this solicitation including a commitment to execute the Contract by the
Respondent, if applicable.
b. The Aviation Authority reserves the right to solicit from available sources relevant information concerning a Respondent’s past performance and may consider such information in its evaluation and selection of Respondents.
c. The Aviation Authority reserves the right to request clarification of information submitted in any Response, to require additional information from any
Respondent, or, in the Aviation Authority's sole discretion, to reject any or all
Respondents for any reason and to re-advertise or not to re-advertise the project.
d. The Aviation Authority reserves the right to reject responses containing any additional terms or conditions not specifically requested in the original special conditions and/or the terms and conditions.
e. The Aviation Authority reserves the right to cancel an award to a Respondent for any reason via written notice.
f. As the best interest of the Aviation Authority may require, the right is reserved to make award(s) by individual items, group of items, all or none, or a combination thereof; or to reject any and all responses. Respondents are cautioned to make no assumptions unless their Response has been determined as meeting the Minimum Requirements and being responsive and responsible. All awards made as a result of this solicitation shall be made in accordance with the applicable policies of the Aviation Authority.
g. The Aviation Authority reserves the right to reject any and all Solicitation, and to re-advertise or elect not to proceed with the services for any reason.
h. The Aviation Authority shall have the right, but not the obligation, to award all or any portion of the services. The extent and scope of the Services, along with the fees for such services, will be subject to final approval by the Aviation Authority.
i. The Aviation Authority reserves its right to award any or all of the advertised services subject to the availability of funding.
j. The terms Bidder, Proposer and Respondent are used interchangeably throughout this Solicitation. The terms Proposal, Response, Bid and Statement of
Qualifications are used interchangeably throughout this Solicitation.
k. Labeling information as “proprietary” or “confidential” or any other designation of restricted use shall not protect information from release if required or deemed appropriate by the Aviation Authority under applicable policies, open meeting laws, or public records laws, see Chapters 119 and 286, Florida Statutes. All materials or documents submitted in response to this Solicitation will become the property of the Aviation Authority. By submitting a Response, Respondents specifically waive all claims against the Aviation Authority related to the disclosure of public records.
2.8. Code of Ethics and Business Conduct Policy
a. The Aviation Authority has adopted a Code of Ethics and Business Conduct Policy
(Section 204.01) which addresses the obligation of the Aviation Authority’s Board members and employees to follow the Florida Statutes in reference to these issues. This includes, but is not limited to, the obligations of the Aviation
Authority’s Board members and employees with respect to having an interest in business entities, outside employment, gratuities, divulgence of information, unauthorized compensation and acceptance of gifts. Please be aware that any violation of this policy by a Respondent and/or any attempt to influence an
Aviation Authority Board member or employee to violate the policy is sufficient cause for the denial of the right of the Respondent to Respond on any Contract or sell any materials, supplies, equipment, or services to the Aviation Authority for a period of time that is determined by the Chief Executive Officer. A copy of this policy is available upon request from the Chief Administrative Officer.
2.9. Public Meetings/Public Records
a. Please be aware that all meetings of the Aviation Authority’s Board are duly noticed public meetings and all documents submitted to the Aviation Authority as a part of or in connection with a Solicitation will constitute public records under
Florida law regardless of any person’s claim that proprietary or trade secret information is contained therein. Public meetings are posted on the Aviation
Authority's website: https://flymco.com/airport-business/sunshine-meetings/
b. Attendance by all interested Parties is encouraged.
https://flymco.com/airport-business/sunshine-meetings/
3. Vendor Questionnaire
3.1. Confirmation of Addenda*
Please confirm that your Bid includes all Addenda that have been posted for this solicitation.
☐ Please confirm
*Response required
3.2. Fully Executed Bid with all forms and documents (without pricing)*
Please Upload your COMPLETE response, including any and all required forms listed in the solicitation and the corresponding attachments.
(Do not upload pricing information in this document. Instead, complete the
Pricing Table.)
*Response required
3.3. Separate Pricing Table*
Confirm that no pricing is included in the above document and that pricing has been submitted on the Opengov pricing table.
*Response required
3.4. Requirement for Consistent Unit Prices*
Respondent confirms it understands that its pricing table may be rejected as non-responsive if the unit rates for the same work in the Schedule B and all alternates are not identical. See Addendum No. 1.
☐ Please confirm
*Response required
3.5. Bid Security
Please upload a copy of the fully executed bid security and deliver the original to the address in the instructions.
4. Pricing Table
BP-00050 ORL RUNWAY 7-25 REHABILITATION & RELATED WORK - BID
SCHEDULE A
Line
Item
Spec Description Unit of
Measure
Quantity Unit Cost Total
A1 C-105-
Mobilization (10% Maximum) LS 1
A2 C-100-
Contractor's Quality Control
Program
LS 1
A3 C-102-
Temporary Air and Water
Pollution, Soil Erosion, and
Siltation Control
LS 1
A4 C-106-
Safety, Security, and
Maintenance of Airport
Operations
LS 1
A5 C-104-
Construction Survey LS 1
A6 P-101-
Cold Milling, 0.5" Nominal
Depth
SY 2,850
A7 P-101-
Cold Milling, 4" Nominal
Depth
SY 125,000
A8 P-101-
Cold Milling, 2" Nominal
Depth
SY 1,850
A9-1 P-101-
Joint and Crack Repair, Greater than 1.5 Inches in
Width
LF 2,500
A9-2 P-101-
Joint and Crack Repair, 1.5
Inches or Less in Width
LF 12,500
A10 P-101-
Full-Depth Pavement
Demolition
SY 4,150
Line
Item
Spec Description Unit of
Measure
Quantity Unit Cost Total
A11 P-152-
Unclassified Excavation CY 1,000
A12 P-152-
Off-Site Borrow Excavation CY 7,200
A13 P-152-
Stripping SY 32,700
A14 P-401-
Asphalt Surface Course, 4"
Nominal Depth
TON 28,500
A15 P-401-
Asphalt Surface Course, 2"
Nominal Depth
TON 250
A16 P-603-
Emulsified Asphalt Tack Coat GAL 24,100
A17 P-620-
Pavement Marking, Temporary, Without
Reflective Media
SF 236,800
A18 P-620-
Pavement Marking, Permanent, Without
Reflective Media
SF 40,600
A19 P-620-
Pavement Marking, Permanent, With Type III
Reflective Media
SF 130,500
A20 P-620-
Pavement Marking Removal SF 1,350
A21 P-621-
Runway Sawcut Grooving SY 96,000
A22 T-904-
Sodding SY 37,000
Item
Spec Description Unit of
Measure
Quantity Unit Cost Total
A23 SP-
104-1
Temporary Power &
Temporary Airfield
Lighting/Signage/Navigational
Facilities
LS 1
A24 SP-
105-1
Electrical Demolition LS 1
A25 SP-
111-1
Short
Circuit/Coordination/Device
Evaluation/Arc Flash Analysis
EA 1
A26 L-107-
L-806(L), Style 1B, Size 1, LED Internally Lighted Wind
Cone, with L-810(L)
Obstruction Light
EA 1
A27 L-108-
1/C L-824-Type C Unshielded
#8 AWG 5 KV Stranded
Copper Cable (Black
Insulation), Installed in Duct or Conduit
LF 30,000
A28 L-108-
1/C L-824-Type C Unshielded
#8 AWG 5 KV Stranded
Copper Cable (Red
Insulation), Installed in Duct or Conduit
LF 25,000
A29 L-108-
1/C #2 AWG Solid Copper
Counterpoise Cable, Installed over Duct or Conduit
LF 22,000
A30 L-108-
3/4" Diameter by 10.00' Long
Copper Clad Steel Sectional
Ground Rod
EA 770
Item
Spec Description Unit of
Measure
Quantity Unit Cost Total
A31 L-109-
Airfield Lighting Control
System Modifications:
Contractor
LS 1
A32 L-109-
Airfield Electrical Vault
Modifications
LS 1
A33 L-109-
4 KW L-829 Constant Current
Regulator - 5 Step - 208V
EA 1
A34 L-109-
10 KW L-829 Constant
Current Regulator - 5 Step -
208V
EA 1
A35 L-110-
1 Way 2" Schedule 40 PVC
Direct Earth Buried Duct
LF 16,000
A36 L-110-
1 Way 2" Schedule 80 PVC
Directional Bored Duct
LF 3,000
A37 L-110-
2 Way 2" Schedule 40 PVC
Direct Earth Buried Duct
LF 1,600
A38 L-110-
2 Way 2" Schedule 80 PVC
Directional Bored Duct
LF 350
A39 L-110-
4 Way 4" Schedule 40 PVC
Direct Earth Buried Duct
LF 30
A40 L-110-
4 Way 4" Schedule 80 PVC
Directional Bored Duct
LF 120
A41 L-110-
1 Way 4" Split Duct LF 50
A42 L-110-
Base Can Drain Well EA 16
A43 L-115-
L-867D Junction Can (T) EA 8
Item
Spec Description Unit of
Measure
Quantity Unit Cost Total
A44 L-115-
Junction Can Plaza – Two L-
867D Cans
EA 7
A45 L-115-
Junction Can Plaza – Four L-
867E Cans
EA 2
A46 L-125-
L-850C(L) Bidirectional, Clear/Clear, LED, Runway
Edge Light (A)
EA 3
A47 L-125-
L-850C(L) Bidirectional, Clear/Yellow, LED, Runway
Edge Light (A)
EA 7
A48 L-125-
L-858(L) Sign –
Single/Double Face, LED, Size
2 - 1 Module
EA 4
A49 L-125-
L-858(L) Sign –
Single/Double Face, LED, Size
2 - 2 Module
EA 13
A50 L-125-
L-858(L) Sign –
Single/Double Face, LED, Size
2 - 3 Module
EA 15
A51 L-125-
L-858B(L) Runway Distance
Remaining Sign, LED, Size 4
EA 5
A52 L-125-
L-861T(L) Omnidirectional, Blue, LED, Taxiway Edge
Light (T)
EA 16
A53 L-125-
L-862(L) Bidirectional, Clear/Clear, LED, Runway
Edge Light (T)
EA 17
Item
Spec Description Unit of
Measure
Quantity Unit Cost Total
A54 L-125-
L-862(L) Bidirectional, Clear/Yellow, LED, Runway
Edge Light (T)
EA 33
A55 L-125-
L-862E(L) Bidirectional, Green/Red, LED, Runway
Threshold Light (T)
EA 3
A56 L-125-
L-862E(L) Bidirectional, Green/Red, LED, Runway
Threshold Light (A)
EA 13
A57 L-125-
L-862E(L) Unidirectional, Red/Obscured, LED, Runway
Threshold Light (T)
EA 6
A58 L-125-
L-867B, 1/2" Galvanized
Steel Blank Cover (NE)
EA 13
A59 L-125-
L-868B, 3/4" Galvanized
Steel Blank Cover (E)
EA 10
A60 L-125-
Field Lightning Arrestor
Assembly
EA 25
A61 SP-
154-1
L-880(L) PAPI Style B - 4 Box
- 2 Lamps/Optical Box
System - New Complete with
Baffles
EA 1
A62 SP-
155-1
L-849I(L) Runway End
Identifier Light
EA 2
A63 SP-
156-1
6 Strand OSP Multi Mode
Fiber Optic Cable
LF 600
A64 SP-
156-2
FAA Rated Underground
Splice Enclosure
EA 2
Item
Spec Description Unit of
Measure
Quantity Unit Cost Total
A65 D-701-
Drainage Pipe Rehabilitation
Allowance
ALLOW 1 $200,000.00
A66 SP-
111-2
FAA Flight Inspection ALLOW 1 $25,000.00
A67 L-109-
Airfield Lighting Control
System Modifications: Vendor
ALLOW 1 $30,000.00
TOTAL
BP-00050 ORL RUNWAY 7-25 REHABILITATION & RELATED WORK - BID
SCHEDULE B - BASE BID
Line
Item
Description Quantity Spec Unit of
Measure
Unit Cost Total
B1 Mobilization (10% Maximum) 1 C-105-
LS
B2 Contractor's Quality Control
Program
1 C-100-
LS
B3 Temporary Air and Water
Pollution, Soil Erosion, and
Siltation Control
1 C-102-
LS
B4 Safety, Security, and
Maintenance of Airport
Operations
1 C-106-
LS
B5 Construction Survey 1 C-104-
LS
B6 Cold Milling, 4" Nominal
Depth
23,000 P-101-
SY
Item
Description Quantity Spec Unit of
Measure
Unit Cost Total
B7 Cold Milling, 2" Nominal
Depth
215 P-101-
SY
B8-1 Joint and Crack Repair, Greater than 1.5 Inches in
Width
500 P-101-
LF
B8-2 Joint and Crack Repair, 1.5
Inches or Less in Width
3,000 P-101-
LF
B9 Stripping 4,920 P-152-
SY
B10 Asphalt Surface Course, 4"
Nominal Depth
5,200 P-401-
TON
B11 Asphalt Surface Course, 2"
Nominal Depth
30 P-401-
TON
B12 Emulsified Asphalt Tack Coat 4,500 P-603-
GAL
B13 Pavement Marking, Temporary, Without
Reflective Media
60,000 P-620-
SF
B14 Pavement Marking, Permanent, Without
Reflective Media
10,500 P-620-
SF
B15 Pavement Marking, Permanent, With Type III
Reflective Media
38,500 P-620-
SF
B16 Runway Sawcut Grooving 17,000 P-621-
SY
B17 Sodding 4,950 T-904-
SY
Item
Description Quantity Spec Unit of
Measure
Unit Cost Total
B18 Temporary Power &
Temporary Airfield
Lighting/Signage/Navigational
Facilities
1 SP-
104-1
LS
B19 Electrical Demolition 1 SP-
105-1
LS
B20 Short
Circuit/Coordination/Device
Evaluation/Arc Flash Analysis
1 SP-
111-1
EA
B21 L-806(L), Style 1B, Size 1, LED Internally Lighted Wind
Cone, with L-810(L)
Obstruction Light
1 L-107-
EA
B22 1/C L-824-Type C Unshielded
#8 AWG 5 KV Stranded
Copper Cable (Black
Insulation), Installed in Duct or Conduit
30,000 L-108-
LF
B23 1/C L-824-Type C Unshielded
#8 AWG 5 KV Stranded
Copper Cable (Red
Insulation), Installed in Duct or Conduit
25,000 L-108-
LF
B24 1/C #2 AWG Solid Copper
Counterpoise Cable, Installed over Duct or Conduit
22,000 L-108-
LF
B25 3/4" Diameter by 10.00' Long
Copper Clad Steel Sectional
Ground Rod
770 L-108-
EA
Item
Description Quantity Spec Unit of
Measure
Unit Cost Total
B26 Airfield Lighting Control
System Modifications:
Contractor
1 L-109-
LS
B27 Airfield Electrical Vault
Modifications
1 L-109-
LS
B28 4 KW L-829 Constant Current
Regulator - 5 Step - 208V
1 L-109-
EA
B29 10 KW L-829 Constant
Current Regulator - 5 Step -
208V
1 L-109-
EA
B30 1 Way 2" Schedule 40 PVC
Direct Earth Buried Duct
16,000 L-110-
LF
B31 1 Way 2" Schedule 80 PVC
Directional Bored Duct
3,000 L-110-
LF
B32 2 Way 2" Schedule 40 PVC
Direct Earth Buried Duct
1,600 L-110-
LF
B33 2 Way 2" Schedule 80 PVC
Directional Bored Duct
350 L-110-
LF
B34 4 Way 4" Schedule 40 PVC
Direct Earth Buried Duct
30 L-110-
LF
B35 4 Way 4" Schedule 80 PVC
Directional Bored Duct
120 L-110-
LF
B36 1 Way 4" Split Duct 50 L-110-
LF
B37 Base Can Drain Well 16 L-110-
EA
B38 L-867D Junction Can (T) 8 L-115-
Item
Description Quantity Spec Unit of
Measure
Unit Cost Total
B39 Junction Can Plaza – Two L-
867D Cans
7 L-115-
EA
B40 Junction Can Plaza – Four L-
867E Cans
2 L-115-
EA
B41 L-850C(L) Bidirectional, Clear/Clear, LED, Runway
Edge Light (A)
3 L-125-
EA
B42 L-850C(L) Bidirectional, Clear/Yellow, LED, Runway
Edge Light (A)
7 L-125-
EA
B43 L-858(L) Sign –
Single/Double Face, LED, Size
2 - 1 Module
4 L-125-
EA
B44 L-858(L) Sign –
Single/Double Face, LED, Size
2 - 2 Module
13 L-125-
EA
B45 L-858(L) Sign –
Single/Double Face, LED, Size
2 - 3 Module
15 L-125-
EA
B46 L-858B(L) Runway Distance
Remaining Sign, LED, Size 4
5 L-125-
EA
B47 L-861T(L) Omnidirectional, Blue, LED, Taxiway Edge
Light (T)
16 L-125-
EA
B48 L-862(L) Bidirectional, Clear/Clear, LED, Runway
Edge Light (T)
17 L-125-
Item
Description Quantity Spec Unit of
Measure
Unit Cost Total
B49 L-862(L) Bidirectional, Clear/Yellow, LED, Runway
Edge Light (T)
33 L-125-
EA
B50 L-862E(L) Bidirectional, Green/Red, LED, Runway
Threshold Light (T)
3 L-125-
EA
B51 L-862E(L) Bidirectional, Green/Red, LED, Runway
Threshold Light (A)
13 L-125-
EA
B52 L-862E(L) Unidirectional, Red/Obscured, LED, Runway
Threshold Light (T)
6 L-125-
EA
B53 L-867B, 1/2" Galvanized
Steel Blank Cover (NE)
13 L-125-
EA
B54 L-868B, 3/4" Galvanized
Steel Blank Cover (E)
10 L-125-
EA
B55 Field Lightning Arrestor
Assembly
25 L-125-
EA
B56 L-880(L) PAPI Style B - 4 Box
- 2 Lamps/Optical Box
System - New Complete with
Baffles
1 SP-
154-1
EA
B57 L-849I(L) Runway End
Identifier Light
2 SP-
155-1
EA
B58 6 Strand OSP Multi Mode
Fiber Optic Cable
600 SP-
156-1
LF
B59 FAA Rated Underground
Splice Enclosure
2 SP-
156-2
Item
Description Quantity Spec Unit of
Measure
Unit Cost Total
B60 Drainage Pipe Rehabilitation
Allowance
1 D-701-
ALLOW $200,000.00
B61 FAA Flight Inspection 1 SP-
111-2
ALLOW $25,000.00
B62 Airfield Lighting Control
System Modifications: Vendor
1 L-109-
ALLOW $30,000.00
SCHEDULE B - ADD ALTERNATIVE NO. 1
Line Item Description Quantity Spec Unit of
Measure
Unit Cost Total
B63 Mobilization (10%
Maximum)
1 C-105-1 LS
B64 Contractor's
Quality Control
Program
1 C-100-1 LS
B65 Temporary Air and
Water Pollution, Soil Erosion, and
Siltation Control
1 C-102-1 LS
B66 Safety, Security, and Maintenance of Airport
Operations
1 C-106-1 LS
B67 Construction
Survey
1 C-104-1 LS
Line Item Description Quantity Spec Unit of
Measure
Unit Cost Total
B68 Cold Milling, 4"
Nominal Depth
20,200 P-101-2 SY
B69 Cold Milling, 2"
Nominal Depth
250 P-101-3 SY
B70-1 Joint and Crack
Repair, Greater than 1.5 Inches in
Width
500 P-101-4 LF
B70-2 Joint and Crack
Repair, 1.5 Inches or Less in Width
2,500 P-101-4 LF
B71 Full-Depth
Pavement
Demolition
4,150 P-101-5 SY
B72 Unclassified
Excavation
800 P-152-1 CY
B73 Off-Site Borrow
Excavation
500 P-152-2 CY
B74 Stripping 12,500 P-152-3 SY
B75 Asphalt Surface
Course, 4"
Nominal Depth
4,700 P-401-1 TON
B76 Asphalt Surface
Course, 2"
Nominal Depth
50 P-401-2 TON
B77 Emulsified Asphalt
Tack Coat
4,000 P-603-1 GAL
Measure
Unit Cost Total
B78 Pavement
Marking, Temporary, Without Reflective
Media
25,000 P-620-1 SF
B79 Pavement
Marking, Permanent, Without Reflective
Media
8,000 P-620-2 SF
B80 Pavement
Marking, Permanent, With
Type III Reflective
Media
15,500 P-620-3 SF
B81 Pavement Marking
Removal
850 P-620-4 SF
B82 Runway Sawcut
Grooving
15,500 P-621-1 SY
B83 Sodding 16,500 T-904-1 SY
SCHEDULE B - ADD ALTERNATIVE NO. 2
Line Item Description Quantity Spec Unit of
Measure
Unit Cost Total
B84 Mobilization (10%
Maximum)
1 C-105-1 LS
Measure
Unit Cost Total
B85 Contractor's
Quality Control
Program
1 C-100-1 LS
B86 Temporary Air and
Water Pollution, Soil Erosion, and
Siltation Control
1 C-102-1 LS
B87 Safety, Security, and Maintenance of Airport
Operations
1 C-106-1 LS
B88 Construction
Survey
1 C-104-1 LS
B89 Cold Milling, 0.5"
Nominal Depth
2,850 P-101-1 SY
B90 Cold Milling, 4"
Nominal Depth
41,150 P-101-2 SY
B91 Cold Milling, 2"
Nominal Depth
800 P-101-3 SY
B92-1 Joint Crack Repair, Greater than 1.5
Inches in Width
750 P-101-4 LF
B92-2 Joint and Crack
Repair, 1.5 Inches or Less in Width
3,500 P-101-4 LF
B93 Unclassified
Excavation
200 P-152-1 CY
B94 Off-Site Borrow
Excavation
6,700 P-152-2 CY
Measure
Unit Cost Total
B95 Stripping 11,500 P-152-3 SY
B96 Asphalt Surface
Course, 4"
Nominal Depth
9,600 P-401-1 TON
B97 Asphalt Surface
Course, 2"
Nominal Depth
125 P-401-2 TON
B98 Emulsified Asphalt
Tack Coat
8,200 P-603-1 GAL
B99 Pavement
Marking, Temporary, Without Reflective
Media
40,000 P-620-1 SF
B100 Pavement
Marking, Permanent, Without Reflective
Media
10,500 P-620-2 SF
B101 Pavement
Marking, Permanent, With
Type III Reflective
Media
23,000 P-620-3 SF
B102 Pavement Marking
Removal
300 P-620-4 SF
B103 Runway Sawcut
Grooving
31,200 P-621-1 SY
B104 Sodding 11,500 T-904-1 SY
Measure
Unit Cost Total
SCHEDULE B - ADD ALTERNATIVE NO. 3
Line Item Description Quantity Spec Unit of
Measure
Unit Cost Total
B105 Mobilization (10%
Maximum)
1 C-105-1 LS
B106 Contractor's
Quality Control
Program
1 C-100-1 LS
B107 Temporary Air and
Water Pollution, Soil Erosion, and
Siltation Control
1 C-102-1 LS
B108 Safety, Security, and Maintenance of Airport
Operations
1 C-106-1 LS
B109 Construction
Survey
1 C-104-1 LS
B110 Cold Milling, 4"
Nominal Depth
41,150 P-101-2 SY
B111 Cold Milling, 2"
Nominal Depth
650 P-101-3 SY
B112-1 Joint and Crack
Repair, Greater than 1.5 Inches in
Width
750 P-104-4 LF
Measure
Unit Cost Total
B112-2 Joint and Crack
Repair, 1.5 Inches or Less in Width
3,500 P-104-4 LF
B113 Stripping 4,200 P-152-3 SY
B114 Asphalt Surface
Course, 4"
Nominal Depth
9,100 P-401-1 TON
B115 Asphalt Surface
Course, 2"
Nominal Depth
100 P-401-2 TON
B116 Emulsified Asphalt
Tack Coat
8,000 P-603-1 GAL
B117 Pavement
Marking, Temporary, Without Reflective
Media
90,000 P-620-1 SF
B118 Pavement
Marking, Permanent, Without Reflective
Media
14,000 P-620-2 SF
B119 Pavement
Marking, Permanent, With
Type III Reflective
Media
54,000 P-620-3 SF
B120 Pavement Marking
Removal
250 P-620-4 SF
Measure
Unit Cost Total
B121 Runway Sawcut
Grooving
30,000 P-620-1 SY
B122 Sodding 4,200 T-904-1 SY