RW7-25_PROJECT_INITIATION_FORM_aka_PIF_(revised_2022-07-13).docx

DOCX document 22 KB Posted

Attached to
Orlando Executive Airport (ORL) Runway 7-25 Rehabilitation and Related Work (BP-00050)
Solicitation number
25-597-IFB
Issued by
Orange County, Orlando City, Florida

About this file

This Project Initiation Form (PIF) involves the Greater Orlando Aviation Authority's Runway 7-25 Rehabilitation project at Orlando Executive Airport in Florida. The project aims to select a design consultant for comprehensive runway rehabilitation services, focusing on milling and overlaying existing asphalt pavement for Runway 7-25, its blast pads, intersection with Runway 13-31, and connecting taxiways. The scope includes improvements to meet current FAA standards for runway safety area, geometry, drainage, marking, lighting, and signage, with a projected outcome of extending the runway's service life by 20 years.

The project is funded through Operations & Maintenance (O&M) budget code 716 with an estimated budget of $32 million. The procurement will be managed by the Construction Department in accordance with Policy 130.01 or 130.02, and requires On-Airport Representative (OAR) oversight, project management, and AOA access. The contract is structured as a Design-Bid-Build procurement, and specification assistance will be needed. This is not a recurring requirement, nor does it replace an existing contract, and it is not part of a broader project or linked to another contract.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT INITIATION FORM-PROFESSIONAL SERVICES

TO:
Kevin J. Thibault, Chief Executive Officer
FROM:
Tuan Nguyen, AVP, Engineering
PROJECT TITLE:
W-00491 ORL Runway 7-25 Rehabilitation
FUNDING SOURCE/BUDGET CODE:
O&M/716
ESTIMATED BUDGET:
$32M

BRIEF SCOPE OF WORK: Selection of Design Consultant and Design Services.

The Orlando Executive Airport’s Runway 7-25 pavement rehabilitation is required as identified in the 2022 FDOT Statewide Airfield Pavement Management Program Report. Scope is to mill and overlay the existing asphalt pavement for the runway, its blast pads, its intersection with Runway 13-31 and the connecting taxiways located within the runway safety area, and improvements required for compliance with the FAA current Standards for the runway safety area, geometry, drainage, marking, lighting and signage.

PROJECTED OUTCOME: Extend the runways’ service life for another 20 years

CCNA or PREDOMINATELY DESIGN OR CONSTRUCTION RELATED?
|X| Yes
|_| No
OAR REQUIRED?
|X| Yes
|_| No
PROJECT MANAGER REQUIRED?
|X| Yes
|_| No
AOA ACCESS REQUIRED?
|X| Yes
|_| No
RECURRING REQUIREMENT?
|_| Yes
|X| No
Base Period:
N/A
Option Periods:
N/A
REPLACES AN EXISTING CONTRACT?
|_| Yes
|X| No

Contract #:

Expires as of:

PART OF A BROADER PROJECT / LINKED TO ANOTHER CONTRACT?
|_| Yes
|X| No
Contract #:
Project #:
Project Type:
|_| Design -Build
|X| Design-Bid-Build
DRAFT SPECIFICATIONS PREPARED?
|_| Yes
|X| No
SPECIFICATION ASSISTANCE WILL BE REQUIRED?
|X| Yes
|_| No
Recommend procurement is done by:
|_| Purchasing Department
|X| Construction Department
Procurement in accordance with:
|_| Policy 450
|X| Policy 130.01 or 130.02

Tuan Nguyen, AVP, Engineering

10/23/2023

Initiator Name and Title

Date

|_| Concur

Robert Furr, Vice President, Engineering and Architecture

Date

|_| Concur

Max E. Marble, Senior Vice President, Capital Programs

Date

|_| Concur

Kevin J. Thibault, Chief Executive Officer or Designee

Date

WXXX PIF Page 2 of 2