RW7-25_PROJECT_INITIATION_FORM_aka_PIF_(revised_2022-07-13).docx
DOCX document 22 KB Posted
- Solicitation number
- 25-597-IFB
- Issued by
- Orange County, Orlando City, Florida
About this file
This document is a Project Initiation Form (PIF) from the Greater Orlando Aviation Authority (GOAA) for the Orlando Executive Airport's Runway 7-25 Rehabilitation project. The project involves selecting a design consultant for comprehensive runway rehabilitation, including milling and overlaying Runway 7-25, its blast pads, and connecting taxiways within the runway safety area. The scope includes improvements to meet FAA standards for runway geometry, drainage, marking, lighting, and signage. The estimated budget is $32 million, with the primary goal of extending the runway's service life by 20 years. The project will follow a design-bid-build procurement method, with bids due on May 6, 2025, at 2:00 PM Eastern, and a mandatory pre-bid conference scheduled for April 15, 2025, at 3:00 PM.
The project is funded through O&M budget code 716 and requires specification assistance, OAR (Owner's Authorized Representative), and a project manager. It includes a Disadvantaged Business Enterprise (DBE) participation goal of 10% of the total bid price. The engineer's estimated construction cost ranges from $7,083,000 for the base bid to $22,055,000 with alternate scopes. Federal funding necessitates compliance with various regulations, including Buy American provisions, Davis-Bacon wage rates, and Equal Employment Opportunity guidelines. Contractors must provide comprehensive insurance coverage, demonstrate experience with similar airfield projects, and submit a bid security of 10% of the total bid price. The project is anticipated to be completed in three phases over 290 consecutive calendar days, with careful consideration to minimize interference with airport operations.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT INITIATION FORM-PROFESSIONAL SERVICES
| TO: |
| Kevin J. Thibault, Chief Executive Officer |
| FROM: |
| Tuan Nguyen, AVP, Engineering |
| PROJECT TITLE: |
| W-00491 ORL Runway 7-25 Rehabilitation |
| FUNDING SOURCE/BUDGET CODE: |
| O&M/716 |
| ESTIMATED BUDGET: |
| $32M |
BRIEF SCOPE OF WORK: Selection of Design Consultant and Design Services.
The Orlando Executive Airport’s Runway 7-25 pavement rehabilitation is required as identified in the 2022 FDOT Statewide Airfield Pavement Management Program Report. Scope is to mill and overlay the existing asphalt pavement for the runway, its blast pads, its intersection with Runway 13-31 and the connecting taxiways located within the runway safety area, and improvements required for compliance with the FAA current Standards for the runway safety area, geometry, drainage, marking, lighting and signage.
PROJECTED OUTCOME: Extend the runways’ service life for another 20 years
| CCNA or PREDOMINATELY DESIGN OR CONSTRUCTION RELATED? |
| |X| Yes |
| |_| No |
| OAR REQUIRED? |
| |X| Yes |
| |_| No |
| PROJECT MANAGER REQUIRED? |
| |X| Yes |
| |_| No |
| AOA ACCESS REQUIRED? |
| |X| Yes |
| |_| No |
| RECURRING REQUIREMENT? |
| |_| Yes |
| |X| No |
| Base Period: |
| N/A |
| Option Periods: |
| N/A |
| REPLACES AN EXISTING CONTRACT? |
| |_| Yes |
| |X| No |
Contract #:
Expires as of:
| PART OF A BROADER PROJECT / LINKED TO ANOTHER CONTRACT? |
| |_| Yes |
| |X| No |
| Contract #: |
| Project #: |
| Project Type: |
| |_| Design -Build |
| |X| Design-Bid-Build |
| DRAFT SPECIFICATIONS PREPARED? |
| |_| Yes |
| |X| No |
| SPECIFICATION ASSISTANCE WILL BE REQUIRED? |
| |X| Yes |
| |_| No |
| Recommend procurement is done by: |
| |_| Purchasing Department |
| |X| Construction Department |
| Procurement in accordance with: |
| |_| Policy 450 |
| |X| Policy 130.01 or 130.02 |
Tuan Nguyen, AVP, Engineering
10/23/2023
Initiator Name and Title
Date
|_| Concur
Robert Furr, Vice President, Engineering and Architecture
Date
|_| Concur
Max E. Marble, Senior Vice President, Capital Programs
Date
|_| Concur
Kevin J. Thibault, Chief Executive Officer or Designee
Date
WXXX PIF Page 2 of 2