This is a product specification sheet for the D2-M2 Diesel + DEF (Diesel Exhaust Fluid) Duplex Pump manufactured by Earthsafe Systems, Inc. The D2-M2 is a compact, space-saving fuel transfer system designed for critical power applications, specifically engineered to supply both diesel fuel and DEF from storage tanks to generator systems. The system features redundant reliability through duplex pump configuration, ensuring uninterrupted fuel supply for emissions-controlled generator operations.

The system specifications include dimensions of 48" W x 48" H x 12" D with an estimated weight of 200 lbs, welded steel construction with a 3-gallon containment basin, and stainless steel components for DEF handling. Flow capacity ranges from 5-10 GPM for diesel and 1-3 GPM for DEF, with a standard pressure capacity of 100 PSI. The pump utilizes positive displacement technology with 0.75-inch diesel and 0.50-inch DEF inlet/outlet connections. Power requirements are 120-230 VAC, single phase, 50-60 Hz, controlled by a C8 + C2 Controller with a color touch screen interface, four programmable output relays, MAN-OFF-AUTO switches, and optional 4-point level sensor inputs for day tank refill. Standard accessories include ball valves, check valves, strainers, gauges, and leak sensors. Two ordering configurations are available: the D2-M2.05 (5 GPM diesel + 1 GPM DEF) and the D2-M2.10 (10 GPM diesel + 1 GPM DEF). Optional accessories include floor stands, C9 control modules, Modbus/BACnet communication interfaces, and level transmitters.

View the file

Other files

File Type Posted
S30 - SAM - Special Notice - Cancellation - 36C77626R0062_2 - EHRM Infra Upgrades - Togus.pdf PDF
S06 - Amend 0002 - Att 03 - Corrected Agenda - RFP - 07202026 - EHRM Infra - Togus.pdf PDF
S06 - Amend 0002 - 36C77626R0062 - 07202026 - EHRM Infra - Togus.pdf PDF
S06 - Amend 0001 - Att 02 - SV - Attendance SHT - 06292026 - EHRM Infra - Togus.pdf PDF
S06 - Amend 0001 - 36C77626R0062 - 07142026 - EHRM Infra - Togus.pdf PDF
S06 - Amend 0001 - RFIs - 07132026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S06 - Amend 0001 - Att 01 - Rvd Structural Drwg - 06192026 - EHRM Infra - Togus.pdf PDF
S06 - Amend 0001 - Att 03 - SV - Agenda - RFP - 06292026 - EHRM Infra - Togus.pdf PDF
S02 - SOW - Att 05 - Drwg - Vol 3 - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 13 - Const Sch - 02132026 - EHRM Infra Upgrades - Constr Togus.pdf PDF
S02 - SOW - Att 26 - Cut Sheet 04 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - Att 03 -Prj Info Sheet for KTR - EHRM Infra Upgrade - Togus.docx DOCX document
S02 - SOW - Att 03 - Drwg - Vol 1C - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 22 - TS-000 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - Att 07 - 852.219-75 - 06172026 - EHRM Infra Upgrade - Togus.pdf PDF
S02 - Att 04 - Memo - Brand Name - 04092026 - EHRM Infra Upgrade - Togus.pdf PDF
S02 - SOW - Att 35 - Cut Sheet 13 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 17 - Memo - Phy Sec Compliance - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 27 - Cut Sheet 05 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 09 - Specs - Vol 3- 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 30 - Cut Sheet 08 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 24 - Cut Sheet 02 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - Att 05 - Division Cost Breakdown - EHRM Infra Upgrade - Togus.xlsx XLSX spreadsheet
S02 - SOW - Att 29 - Cut Sheet 07 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 37 - Cut Sheet 15 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 16 - Submittal Reg - 02182026 - EHRM Infra - Upgrades - Constr - Togus.xlsx XLSX spreadsheet
S02 - SOW - Att 14 - Design Calcs - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 18 - Memo - Prj Stnd Compliance - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 21 - PCRA 3 - MCR and Trench Work - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 40 - Cut Sheet 18 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 33 - Cut Sheet 11 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 01 - Drwg - Vol 1A - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 38 - Cut Sheet 16 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 06 - Drwg - Vol 4 - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 11 - Haz Mat Report - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 12 - Geotechnical Report - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 32 - Cut Sheet 10 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 08 - Specs - Vol 1 - Div 02-14 - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 20 - PCRA 2 - Cabling and Data Outlets - EHRM Infra Upgrades - Constr - Togus.pdf PDF
RFP - EHRM Infra Upgrade - 36C77626R0062 - 06172026 - Togus.pdf PDF
S02 - SOW - Att 19 - PCRA 1 - TR Constr - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 07 - Specs - Vol 1 - Div 00-01 - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 15 - Design Narrative - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 23 - Cut Sheet 01 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 31 - Cut Sheet 09 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - Att 02 - PPQ - EHRM Infra Upgrade - Togus.docx DOCX document
S02 - SOW - Att 02 - Drwg - Vol 1B - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 34 - Cut Sheet 12 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - Att 01 - SOW - 05112026 - EHRM Infra Upgrades - Togus.pdf PDF
S02 - SOW - Att 10 - Specs - Vol 4 - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dimensions 48” W x 48” H x 12” D (1200W x 1200H x 300D)

Flow Capacity 5-10 GPM (20-100 LPM) Diesel

1-3 GPM (4-12 LPM) DEF

Pressure Capacity Standard 100 PSI (690 kPa)

Pump Type Positive Displacement

Inlet / Outlet

(MNPT)

0.75 IN (38) Diesel

0.50 IN (12) DEF

Weight (Estimate) 200 LB (90 KG)

Standard Accessories)

Ball Valves Check Valves Strainers Gauges Leak Sensor

Construction Welded Steel Construction Containment Basin (3 GAL) Stainless Construction for DEF Standard Open Frame or Weatherproof Enclosure

Power 120-230 VAC, 1P, 50-60 Hz

Controller C8 + C2 Controller

Output Relays (Dry Contact)

4 Programmable

Interface Color Touch Screen MAN-OFF-AUTO Switches Power ON Light Alarm Light

Level Sensor Inputs (Optional)

4-Point for Day Tank Refill

Optional Accessories

Floor Stand C9 Control Modbus / BACnet Level Transmitter for GAL

How to Order D2-M2.05 Duplex Pump 5 GPM Diesel + 1 GPM DEF

D2-M2.10 Duplex Pump 10 GPM Diesel + 1 GPM DEF

D2-M2

Diesel + DEF (Diesel Exhaust Fluid) Duplex Pump

Compact reliable system for transferring diesel and DEF from storage tanks to generators. New generator systems will include emissions control based on reliable supply of DEF along with diesel fuel to run engines.

The D2-M2 is space saving but with redundant reliability for critical applications.