S02 - SOW - Att 06 - Drwg - Vol 4 - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf
PDF 28 MB Posted
- Attached to
- Electronic Health Record Modernization Infrastructure Upgrades - Construction - Togus, ME
- Solicitation number
- 36C77626R0062
About this file
This is a Statement of Work and construction drawings document (Volume 4 of electrical and fire protection plans) for the Electronic Health Record Modernization (EHRM) Infrastructure Upgrades project at the VA Maine Healthcare System in Togus, ME (Contract No. 36C77623C0002, Project No. 402-22-700).
The project encompasses infrastructure improvements across 12 buildings and site-wide systems, including electrical panel upgrades, emergency power systems, HVAC assessments and upgrades, space reconfiguration and renovation with demolition and new construction, communication infrastructure upgrades (CAT 6A cabling, data outlets, patch panels), physical security upgrades, fiber backbone infrastructure upgrades campus-wide, and hazardous material abatement. The General Contractor is responsible for coordinating all construction aspects, obtaining all VA permits (HOTWORK, ICRA, weekend/holiday work, shutdown approvals), arranging third-party inspections, and coordinating power, water, and telecommunication outages scheduled one week in advance. Work must minimize disruption to the operating medical center, with many activities requiring night, weekend, or holiday performance at no additional cost. The contractor must provide staff certified for unescorted IT closet access through PIV badging with background investigations. All work must comply with applicable state and local codes, industry standards, and contract specifications. The contractor bears responsibility for site visit verification, condition assessment, coordination among trades, cutting and patching, weather protection, existing property damage repair or replacement at contractor expense, and a one-year warranty on workmanship defects. The construction documents include detailed demolition plans, electrical one-line diagrams, fire sprinkler plans, telecommunications layouts, mechanical HVAC plans, and structural details across multiple building levels and site locations.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA MAINE HEALTHCARE SYSTEM
ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES - TOGUS, ME
PROJECT NO. 402-22-700
CONTRACT NO. 36C77623C0002
100% CONSTRUCTION DOCUMENTS (CD) SUBMITTAL
VA MAINE HEALTHCARE SYSTEM
1 VA CENTER
AUGUSTA, ME 04330
THE SCOPE OF THIS PROJECT INCLUDES BUT NOT LIMITED TO THE FOLLOWING INFRASTRUCTURE IMPROVEMENTS: ELECTRICAL (ELECTRICAL PANEL UPGRADE, POWER (NORMAL, EMERGENCY)), BONDING, UPS, BUILDING MANAGEMENT SYSTEM INTERFACES, ASSESS FOR NEW AND UPGRADES TO EXISTING HVAC, RECONFIGURATION, EXPANSION AND RENOVATION OF EXISTING SPACE (DEMO, NEW CONSTRUCTION, FINISHES), COMMUNICATION INFRASTRUCTURE (NEW DATA OUTLETS, PATCH PANELS, UPGRADE TO CAT 6A CABLE) IN BUILDINGS AS NECESSARY, PHYSICAL SECURITY UPGRADES, ASSESS AND UPGRADE FIBER INFRASTRUCTURE BACKBONE CAMPUS WIDE WITHIN BUILDINGS AND BETWEEN BUILDINGS, HAZARDOUS MATERIAL ABATEMENT. PROJECT BUILDING LOCATIONS INCLUDE: BUILDINGS 141, SADIE, 154A, MADISON, 115, 169, 154, 170, 171, 16, 20 AND SITE.
PROJECT DESCRIPTIONGENERAL PROJECT NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
THE CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATION AND RELATED CONTRACT DOCUMENTS, VISIT SITE OF WORK, AND FULLY INFORM THEMSELVES AS ALL EXISTING CONDITIONS, FACILITIES, RESTRICTIONS AND OTHER MATTERS WHICH CAN AFFECT THE WORK, IN TIMELINE, QUALITY OR COST THEREOF; FAILURE OR OMISSION OF ANY CONTRACTOR TO VISIT THE SITE AND ACQUAINT THEMSELVES WITH THE EXISTING CONDITIONS, SHALL IN NO WAY RELIEVE THEM FROM ANY OBLIGATION WITH RESPECT TO THEIR CONTRACT AND NO EXTRA TIME OR COMPENSATION WILL BE ALLOWED BY REASON OF ANY THING OR MATTER CONCERNING WHICH THE CONTRACTOR COULD HAVE FULLY INFORMED THEMSELVES PRIOR TO BIDDING. GENERAL CONTRACTOR SHALL COORDINATE ALL ASPECTS
OF THE BUILDING CONSTRUCTION.
THE CONTRACTOR SHALL NOT CONSIDER CONSTRUCTION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT AND ASSESS EACH AREA AND TO FULFILL THE INTENT OF THE CONTRACT DOCUMENTS. CONTRACTOR SHALL COORDINATE ARCHITECTURAL CONSTRUCTION DRAWING AND NOTES WITH
CIVIL, STRUCTURAL AND MECHANICAL, ELECTRICAL & PLUMBING NOTES AND DRAWINGS.
THE DRAWINGS SHALL BE WORKED IN CONJUNCTION WITH THE TECHNICAL SPECIFICATIONS AND CONDITIONS OF THE PROJECT INCLUDED IN THE PROJECT MANUAL WHICH FORM A PART OF THE CONTRACT DOCUMENTS AND CONTAINS ADDITIONAL INFORMATION REQUIRED TO CONSTRUCT THE WORK OF THIS CONTRACT. IN THE EVENT OF A CONFLICT BETWEEN THE DRAWINGS AND THE SPECIFICATION NOTIFY THE COR FOR CLARIFICATION SEVEN DAYS BEFORE BEGINNING WORK ON THE
AFFECTED ACTIVITIES.
THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO THE START OF THE WORK. NOTIFY THE COR OF ANY SIGNIFICANT CHANGES IN
DIMENSIONS OR CONDITIONS.
THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, TOOLS, EQUIPMENT AND NECESSARY FACILITIES, AND PERFORM ALL LABOR AND SERVICES OF EVERY DESCRIPTION AS REQUIRED TO COMPLETE THE SCOPE OF WORK DEFINED ON THE DRAWINGS AND SPECIFICATIONS WITHIN THE AGREED TIMELINES.
THE CONTRACTOR SHALL ARRANGE FOR AND OBTAIN ALL VA ISSUED PERMITS (HOTWORK, ICRA, WEEKENDS, HOLIDAYS, SHUTDOWN, ETC), CERTIFICATES, INSPECTIONS, DEPARTMENT APPROVAL, ETC. FOR WORK PERFORMED UNDER THIS CONTRACT. PROVIDE COPIES OF ALL REQUIRED PERMITS, CERTIFICATES, INSPECTIONS AND AGENCY APPROVALS TO THE COR PRIOR TO THE COMMENCEMENT OF THE SCOPE.
FABRICATE AND INSTALL ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, ALL APPLICABLE STATE AND LOCAL CODES, AND THE GENERAL AND
SUPPLEMENTARY CONDITIONS OF THE CONTRACT.
U.L. ASSEMBLIES DESCRIBED ARE FOR REFERENCE ONLY. THE GENERAL CONTRACTOR SHALL COORDINATE AND VERIFY THE INSTALLATION OF THE DESCRIBED
SYSTEM(S) .
ALL CONTRACTORS AND SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR THE PROPER PERFORMANCE OF THEIR WORK, COORDINATING WITH OTHER TRADES, MEANS AND METHODS OF CONSTRUCTION, SAFETY AND SECURITY ON SITE.
CUTTING AND PATCHING SHALL BE PERFORMED BY EACH TRADE AS NECESSARY FOR THE PERFORMANCE AND INSTALLATION OF THE WORK. CUTTING AND PATCHING SHALL BE PERFORMED IN A WORKMANLIKE MANNER CONSISTENT WITH INDUSTRY STANDARDS FOR FINISHES AND SUBSTRATES AFFECTED.
THE CONTRACTOR SHALL PROTECT THE FACILITY FROM WEATHER AND MAINTAIN SECURITY DURING ALL CONSTRUCTION WORK.
PROTECT EXISTING PROPERTY DURING CONSTRUCTION. REPAIR OR REPLACE, AT THE DISCRETION AND TO THE SATISFACTION OF THE COR, WITHOUT ADDITIONAL CHARGE TO THE OWNER, ANY EXISTING WORK DAMAGED DURING THE COURSE OF CONSTRUCTION.
THE WORK SHALL BE COORDINATED IN GOOD FAITH WITH THE COR AND ALL GOVERNMENT EMPLOYEES 14 DAYS IN ADVANCE OF BEGINNING EACH CONSTRUCTION
ACTIVITY.
UNLESS ITEMS OF MATERIAL, EQUIPMENT OR WORK ARE SPECIFICALLY NOTED TO BE PROVIDED OR FURNISHED BY OTHERS, THEY SHALL BE PROVIDED UNDER THIS
CONTRACT BY THE CONTRACTOR.
ALL WORK SHALL BE PERFORMED BY SKILLED WORKERS IN A WORKMANLIKE AND PROFESSIONAL MANNER CONSISTENT WITH INDUSTRY STANDARDS AND OR AS
DIRECTED BY THE COR.
THE CONTRACTOR SHALL LEAVE THE SITE AND ALL BUILDINGS AND STRUCTURES IN PROPER WORKING ORDER AND SHALL, WITHOUT ADDITIONAL CHARGE, REPLACE ANY WORK, MATERIALS, OR EQUIPMENT FURNISHED AND INSTALLED UNDER THE CONTRACT WHICH DEVELOPS DEFECTS, DUE TO A POSSIBLE WORKMANSHIP ISSUE, WITHIN ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER. THIS IS NOT TO LIMIT OR EXCLUDE ANY OTHER WARRANTY OR WARRANTY PERIOD
OTHERWISE DESCRIBED.
CONTRACTOR SHALL SCHEDULE, COORDINATE, AND FACILITATE ALL POWER, WATER, OR TELECOMMUNICATION OUTAGES AND SHUTDOWNS. ALL OUTAGES AND
SHUTDOWNS MUST BE SCHEDULED WITH THE COR ONE (1) WEEK PRIOR TO OUTAGE.
FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO REGULATED MATERIALS ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, EQUIPMENT, AND ALL OTHER EXISTING SYSTEMS. MAKE NECESSARY PROVISIONS TO MAINTAIN THE INTEGRITY OF SAID SYSTEMS PRIOR TO THE COMMENCEMENT OF DEMOLITION, IF ANY. SEE MECHANICAL, ELECTRICAL, TELECOMMUNICATIONS, AND ARCHITECTURAL DRAWINGS FOR ANY SYSTEM OR PORTIONS
THEREOF TO BE REMOVED, RELOCATED, REVISED OR ABANDONED.
ANY CONSTRUCTION INSTALLED IN CONFLICT WITH THE CONTRACT DOCUMENTS SHALL BE CORRECTED AT NO EXPENSE TO THE OWNER.
ALL REQUIRED EXITS FROM OCCUPIED PORTIONS OF THE BUILDING MUST BE MAINTAINED AT ALL TIMES. ESTABLISH PROCEDURES TO MINIMIZE CIRCULATION OF CONSTRUCTION PERSONNEL AND MATERIALS THROUGH OCCUPIED PORTIONS OF THE BUILDING. KEEP ALL AREAS ADJACENT TO THE WORK AREA CLEAN.
PRIOR TO DELIVERY OF MATERIALS TO THE CONSTRUCTION ZONE AND REMOVAL OF WASTE FROM THE SITE, VERIFY WITH THE COR FOR AN ACCEPTABLE ACCESS ROUTE AND TIME. UNDER NO CIRCUMSTANCES SHALL ANY AREA OUTSIDE THE CONSTRUCTION ZONE BE USED WITHOUT PRIOR WRITTEN APPROVAL FROM THE COR.
ALL BUILDING INTERIOR STAGING AREAS SHALL BE PROTECTED WITH FIRE RESISTANT PLYWOOD ENCLOSURES. ALL TRASH SHALL BE REMOVED FROM THE BUILDING DAILY. CONSTRUCTION MATERIALS SHALL NOT BE STORED IN CORRIDORS OR ANY OTHER UNAUTHORIZED LOCATION AT ANY TIME.
FIELD VERIFY ALL EXISTING DIMENSIONS, SERVICES, AND POINTS OF CONNECTION PRIOR TO START OF WORK.
THE DESIGN ADEQUACY, SAFETY, AND ERECTION OF BRACING, SHORING, SCAFFOLDING, AND TEMPORARY SUPPORTS AND RESTRAINS IS THE SOLE RESPONSIBILITY OF
THE CONTRACTOR.
NOTIFY THE FACILITY OF TIMES WHEN THE CONSTRUCTION NOISE WILL EXCEED 80 DECIBELS . RESCHEDULE SUCH WORK IF SO REQUIRED BY THE FACILITY.
NOTIFY THE COR OF ANY DISCREPANCIES DISCOVERED IN THE FIELD THAT REQUIRE CORRECTIVE ACTION PRIOR TO TAKING ANY ACTION.
FOR EXISTING FLOORS, CEILINGS, PARTITIONS, AND SERVICES TO REMAIN, PROTECT ALL FINISHES AND MATERIALS, AND REPAIR OR REPLACE ALL ITEMS THAT ARE DAMAGED OR SOILED DURING THE COURSE OF CONSTRUCTION. ALL FINISHES AND MATERIALS SHALL BE PROPERLY INTEGRATED TO CONSTITUTE A UNIFORM
APPEARANCE AND SEAMLESS TRANSITION.
ALL ITEMS TO BE REMOVED AND REPLACED SHALL BE HANDLED WITH PROPER CARE AND STORED IN SUCH A MANNER AS TO PREVENT DAMAGE; WHEN DAMAGED, REPLACE AT NO EXPENSE TO THE OWNER.
ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED OR BRACED IN ACCORDANCE WITH PROVISIONS OF THE TECHNICAL SPECIFICATIONS.
ALL DRAWINGS, THOUGH NOTED TO SCALE, ARE FOR ILLUSTRATION ONLY. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS. ITEMS WRONGLY LOCATED
BY DRAWINGS SCALING SHALL BE CORRECTED.
SIGNAGE CONSTRUCTION, FONT AND SIZE SHALL BE CONSISTENT WITH THE FACILITY'S EXISTING SIGNAGE SYSTEMS. REFER TO SPECIFICATIONS FOR CODE REQUIRED SIGNAGE. PROVIDE ADDITIONAL SIGNAGE AS MAY BE REQUIRED BY REQUEST OF THE FIRE MARSHAL AND/OR BUILDING CODE OFFICIAL OR COR.
EXERCISE CARE DURING CONSTRUCTION TO MINIMIZE DISRUPTION OF THE MEDICAL CENTER ROUTINE, COORDINATE SEQUENCE OF WORK AND PHASING WITH THE COR TO MINIMIZE DISRUPTION OF THE MEDICAL CENTER. MANY OF THE WORK ITEMS REQUIRE THE WORK TO BE PERFORMED ONLY AT NIGHT, WEEKENDS, OR
HOLIDAYS WITH PRIOR APPROVAL OF THE COR AT NO ADDITIONAL COST TO THE GOVERNMENT.
PRIOR TO DRILLING OR CORING EXISTING CONCRETE, CONTRACTOR SHALL LOCATE EXISTING REINFORCEMENT TO MAINTAIN ADEQUATE CLEARANCES FROM AND AVOID DAMAGE TO EXISTING REINFORCEMENT. CONTRACTOR SHALL USE NON-DESTRUCTIVE TESTING (NDT) TO LOCATE REINFORCEMENT. WHENEVER FEASIBLE, CONTRACTOR SHALL USE GROUND PENETRATING RADAR (GPR) OR MEANS OTHER THAN X-RAY. WHERE X-RAY IS REQUIRED, CONTRACTOR SHALL PROVIDE WRITTEN REQUEST AT LEAST THREE (3) WEEKS PRIOR TO EVENT: WORK MAY BE REQUIRED TO BE PERFORMED OUTSIDE NORMAL WORK HOURS AND SHALL BE DOCUMENTED ON
THE THREE (3) WEEK LOOK-AHEAD SCHEDULE.
PROTECT EXISTING FIRE SUPPRESSION SYSTEMS DURING CONSTRUCTION.
IN THE EVENT THE CONTRACTOR DISCOVERS HAZARDOUS MATERIALS WHICH ARE NOT AVOIDABLE BY REROUTING THE WORK AND HAVE NOT BEEN DESCRIBED IN THE CONTRACT, THE CONTRACTOR IS TO NOTIFY THE COR AND THE A/E FOR DIFFERING SITE CONDITION ACKNOWLEDGEMENT. REMEDIATION WOULD BE COMPENSATED BY
ADDITIONAL MONEY AND ADDITIONAL TIME FOR CRITICAL PATH ACTIVITIES.
CONTRACTOR SHALL PROVIDE STAFF THAT WILL UNDERGO TRAINING AND CERTIFICATION TO ALLOW UN-ESCORTED ACCESS TO IT CLOSETS. THE CONTRACTOR SHALL CERTIFY SUFFICIENT NUMBER OF STAFF TO ACCOMMODATE PROPOSED SCHEDULE WITHOUT RELYING ON VA STAFF TO ACCOMPANY AS ESCORTS. THIS WILL REQUIRE PIV BADGING REQUIREMENT INCLUDING BACKGROUND INVESTIGATIONS. SEE "CONTRACTOR BACKGROUND INVESTIGATIONS REQUEST" FORM. COORDINATE WITH
CO/CS REGARDING SUBMITTING THE FORM.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING ANY REQUIRED THIRD PARTY INSPECTORS.
OWNER
ARCHITECT
TELECOMMUNICATIONS
ENGINEER, PROJECT LEAD
MECHANICAL ENGINEER
ELECTRICAL ENGINEER
A&E ARCHITECTS
608 NORTH 29th STREET
BILLINGS, MT 59101
406.248.2633
TOGUS VA MEDICAL CENTER
1 VA CENTER
AUGUSTA, ME 04330
PROJECT TEAM
STRUCTURAL
KREMER, GHELEN, AND ASSOCIATES
400 COLUMBIA STREET, SUITE 240
VANCOUVER, WA 98660-3413
503.289.2661
CIVIL ENGINEER
GDM - COLUMBIA GORGE DISTRICT OFFICE
1000 W STEUBEN ST, UNIT THREE
BINGEN, WA 98605
541.436.4723
INDUSTRIAL HYGIENEFIRE PROTECTION ENGINEER
GDM - COLUMBIA GORGE DISTRICT OFFICE
1000 W STEUBEN ST, UNIT THREE
BINGEN, WA 98605
541.436.4723
GDM - COLUMBIA GORGE DISTRICT OFFICE
1000 W STEUBEN ST, UNIT THREE
BINGEN, WA 98605
541.436.4723
GDM - SEATTLE DISTRICT OFFICE
1584 MCNEIL STREET, SUITE 200
DUPONT, WA 98327
360.318.7095
GDM - SEATTLE DISTRICT OFFICE
1584 MCNEIL STREET, SUITE 200
DUPONT, WA 98327
360.318.7095
GDM - SEATTLE DISTRICT OFFICE
1584 MCNEIL STREET, SUITE 200
DUPONT, WA 98327
360.318.7095
AMERICAN ENGINEERING TESTING
550 CLEVELAND AVENUE NORTH
ST. PAUL, MN 55114
651.999.1387
"OWNER": THE OWNER IS UNITED STATES GOVERNMENT - DEPT. OF VETERANS AFFAIRS AND IS REFERRED TO THROUGHOUT THE CONTRACT DOCUMENTS AS IF SINGULAR IN NUMBER. THE TERM "OWNER"
MEANS THE OWNER OR THE OWNER'S CONTRACTING OFFICER'S AUTHORIZED REPRESENTATIVE.
"CONTRACTING OFFICER" OR "C.O." : THE OWNER'S AUTHORIZED REPRESENTATIVE RESPONSIBLE FOR ADMINISTRATING THE CONTRACT BETWEEN THE GENERAL CONTRACTOR AND OWNER. THE TERM INCLUDES CERTAIN AUTHORIZED REPRESENTATIVES OF THE CONTRACTING OFFICER ACTING WITHIN THE LIMITS OF
THEIR AUTHORITY AS DELEGATED BY THE CONTRACTING OFFICER.
"CONTRACTING OFFICER'S REPRESENTATIVE", (COR) : MEANS THE CONTRACTING OFFICER'S AUTHORIZED REPRESENTATIVE, IN PART, RESPONSIBLE FOR MONITORING THE CONTRACTOR'S (PLURAL) PERFORMANCE.
"WORK": THE TERM "WORK" MEANS THE CONSTRUCTION AND SERVICES REQUIRED BY THE CONTRACT DOCUMENTS, WHETHER COMPLETED OR PARTIALLY COMPLETED, AND INCLUDES ALL OTHER LABOR, MATERIALS, EQUIPMENT AND SERVICES PROVIDED BY THE CONTRACTOR TO FULFILL THE CONTRACTOR'S
OBLIGATIONS. THE WORK MAY CONSTITUTE THE WHOLE OR A PART OF THE PROJECT.
"PROJECT": THE TOTAL CONSTRUCTION OF WHICH THE WORK PERFORMED UNDER THE CONTRACT
DOCUMENTS
"DRAWINGS", "SHOP DRAWINGS" OR "PLANS" : THE GRAPHIC AND PICTORIAL PORTIONS OF CONTRACT DOCUMENTS, WHENEVER LOCATED AND WHENEVER ISSUED, SHOWING DESIGN, LOCATION AND DIMENSIONS OF THE WORK, GENERALLY INCLUDING PLANS, ELEVATIONS, SECTIONS, DETAILS, SCHEDULES AND DIAGRAMS.
"PROJECT SUPERVISOR" OR "SUPERVISOR" : MEANS THE ON-SITE SUPERVISION REPRESENTATIVE OF THE
PROJECT.
"ARCHITECT" OR "ENGINEER" : MEANS THE VA'S ARCHITECTS, ENGINEERS AND OTHER DESIGN AND ENGINEERS PROFESSIONALS FOR THIS PROJECT, AND REFERRED THROUGHOUT THE DRAWINGS AS IF
SINGULAR IN NUMBER.
"TRADE CONTRACTOR" OR "CONTRACTORS" : MEANS THE ENTITY UNDER CONTRACT AGREEMENT WITH THE GENERAL CONTRACTOR TO PROVIDE THE SPECIFIED GENERAL AND OR SPECIALTY WORK IN CONNECTION
WITH THIS PROJECT.
"FURNISH" OR "FURNISHED" : MEANS PROVIDING ALL MATERIALS, SHOP DRAWINGS, TRANSPORTATION, INSURANCE, FIELD MEASUREMENTS, EXPEDITING, SHIPPING, HANDLING, PACKAGING, STORAGE, TOUCH-UP MATERIALS, OWNER'S MANUALS, TRAINING AND ANY OTHER ACCESSORIES REQUIRED FOR A COMPLETE
INSTALLATION.
"INSTALL" OR "INSTALLED" : MEANS COMPLETING ALL WORK AND COSTS ASSOCIATED WITH UNLOADING, UNPACKING, HOISTING, STORAGE, HANGERS, SUPPORTS,SLEEVES, SCAFFOLDING, COORDINATION, LAYOUT, SHOP DRAWINGS, EXCAVATION, BACKFILL, DEWATERING, INSTALLATION, CUTTING AND PATCHING, FIRESTOPPING, CLEAN-UP, INSPECTION, DOCUMENTATION, PROTECTION OF SCOPE OF WORK AND ALL
ACCESSORIES, SERVICE AND FACILITIES REQUIRED FOR A COMPLETE INSTALLATION.
"PROVIDE" OR "PROVIDED": MEANS TO FURNISH AND INSTALL AND SHALL INCLUDE, WITHOUT LIMITATION, ALL LABOR, MATERIALS, EQUIPMENTS, TRANSPORTATION SERVICES, AND OTHER ITEMS REQUIRED TO
COMPLETE THE REFERENCED TASK.
"BY OWNER"; "BY VAMC" OR "BY VA" : MEANS ITEMS WILL BE ORDERED, PAID FOR, SHIPPED TO THE JOB SITE
AND INSTALLED BY THE OWNER.
"NOT IN CONTRACT" OR "N.I.C." : MEANS MATERIALS OR EQUIPMENT NOT IN THE CONTRACT, BUT MAY REQUIRE PROVISIONS IN THE CONSTRUCTION FOR FUTURE INSTALLATION AS SPECIFIED OR SHOWN.
OTHER DEFINITIONS OF WORDS AND TERMS USED IN THE DRAWINGS AND SPECIFICATIONS CAN BE FOUND IN THE LEGENDS AND SYMBOLS DRAWINGS FOR EACH DISCIPLINE AND IN DIVISION 0 AND 1 OF THE PROJECT
MANUAL.
BASIC DEFINITIONS
TEMPORARY FIRE & SMOKE PROTECTION
IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE WORK SHIFT DUE
TO ANY INCOMPLETE WORK, PROVIDE TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL
SATISFYING FIRE RATING REQUIREMENTS AT PENETRATIONS
IF MULTIPLE CEILING TILES MUST BE REMOVED AND CANNOT BE REPLACED AT THE END OF THE WORK SHIFT, A 1-HOUR FIRE BARRIER WILL NEED TO BE CONSTRUCTED. IF CONTRACTOR IDENTIFIES UPCOMING WORK RESULTING IN A LONG-TERM CEILING REMOVAL, NOTIFY THE COR IMMEDIATELY WHETHER A RATED ENCLOSURE MUST BE CONSTRUCTION OR TEMPORARY UPRIGHT SPRINKLER HEADS INSTALLED. THIS
WORK IS TO BE PART OF THE SUBMITTED SCOPE OF WORK.
IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST FIRE/SMOKE SPREAD
THROUGH THE UNSEALED PENETRATION.
VOLUME 4
ELECTRICAL - FIRE PROTECTION
TYPICAL SHEET VIEW NUMBERING LAYOUTS
WINDOW TAGROOM TAG
DOOR TAG KEYNOTE TAG
ASSEMBLY TAG
MATERIAL TAG
REVISION TAGREVISION CLOUD
XX-XX
CEILING TAG VIEW REFERENCE
BUILDING
SECTION
WALL
SECTION
ELEVATION
GRID LINE
DETAIL
CALL OUT
INTERIOR
ELEVATION
EXTERIOR
ELEVATION
DETAIL
SECTION
POSITION OF VIEW ON SHEET
VIEW SCALE
VIEW NAME
ROOM NAME
101.1
X
X'-X"
XXX
W D
HT
CASEWORK TAG
CABINET DESIGN
SERIES NO.
1 1/8" = 1'-0"
View Name
A4.# 1A6.#
#1
#2
#3
#4
A5.#
A5.#
A5.#
A5.#
EXPLANATION OF SYMBOLS
NUMBERING STARTS IN BOTTOM LEFT
CORNER, MOVING UPWARDS, SKIPPING
NONE
ARCH E1 (30"x42")
3 4 5
8 9 10
12 13 14 15
17 18 19 20
ARCHITECTURAL ABBREVIATIONS
AB ANCHOR BOLT
ABV ABOVE
A/C AIR CONDITIONING
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ARCH ARCHITECT(URAL)
AWN AWNING
B/ BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BM BEAM OR BENCHMARK
BRG BEARING
BTWN BETWEEN
BUR BUILT-UP ROOF
CAB CABINET
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CONST CONSTRUCTION
CG CORNER GUARD
CPT CARPET
CSMT CASEMENT
CT CERAMIC TILE
D DEEP
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DIM(S) DIMENSIONS
DISP DISPENSER
DN DOWN
DR DOOR
DS DOWNSPOUT
DTL DETAIL
DWG DRAWING
E EAST
EA EACH
EC EXISTING COLUMN
EJ EXPANSION JOINT
ELEC ELECTRICAL
EL ELEVATION
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXT EXTERIOR
FACP FIRE ALARM CONTROL PANEL
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
F.F. FINISH FLOOR
FIN FINISH
FIXT FIXTURE
FLR FLOOR
FND FOUNDATION
FP FIRE PROTECTION
FR FRAME
FRMG FRAMING
FT FEET/FOOT OR FIRE TREATED
FTG FOOTING
FTNG FOOTING
FRP FIBERGLASS REINFORCED PANEL
FRT FIRE RETARDANT TREATED
GA GAUGE
GALV GALVANIZED
GB GYPSUM BOARD
GC GENERAL CONTRACTOR
GL GLASS, GLAZING
GWB GYPSUM WALL BOARD
GYP GYPSUM
HC HANDICAP
HDR HEADER
HDW HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
HTD HEATED
HVAC HEATING/VENTILATION & AIR
CONDITIONING
ID INSIDE DIAMETER
INFO INFORMATION
ISO ISOCYANURATE
INSUL INSULATE / INSULATED / INSULATION
INT INTERIOR
INV INVERT
JT JOINT
J-BOX JUNCTION BOX
KIT KITCHEN
L LONG / LENGTH
LAM LAMINATE(D)
LAV LAVATORY
LF LINEAR FEET
LT LIGHT
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MECH MECHANIC(AL)
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER OR OVERFLOW
DRAIN
OPNG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
OVHD OVERHEAD
PL PLATE
PLAM PLASTIC LAMINATE
PLUMB PLUMBING
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
POLY POLYESTER OR POLYOLEFIN
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED OR POINT
PVMT PAVEMENT
QT QUARRY TILE
QTR QUARTER
QTY QUANTITY
R RADIUS
RA RETURN AIR
RB RUBBER BASE
RD ROOF DRAIN
RECY RECYCLE(D)
REF REFERENCE
REFRIG REFRIGERATOR OR
REFRIGERATION
REINF REINFORCE
REQD REQUIRED
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
S SOUTH
SC SOLID CORE
SCH SCHEDULE
SCHED SCHEDULED
SECT SECTION
SF SQUARE FEET
SFRM SPRAY APPLIED FIRE RESISTIVE
MATERIAL
SGL SINGLE
SHT SHEET
SHTG SHEATHING
SIM SIMILAR
SPECS SPECIFICATIONS
SOD SLAB ON DECK
SOG SLAB ON GRADE
SOH SAME OPPOSITE HAND
SS STAINLESS STEEL
ST STONE TILE
STD STANDARD
STND STANDARD
STL STEEL
STRUCT STRUCTURAL
TEMP TEMPERED
THK THICK
THRESH THRESHOLD
T.O. TOP OF
TOBM TOP OF BEAM
T.O.BM. TOP OF BEAM
T.O.P. TOP OF PLATE
T.O.S. TOP OF STEEL
T/ TOP OF
T&G TONGUE AND GROOVE
TEL TELEPHONE
THK THICK
TRANS TRANSOM
TV TELEVISION
TYP TYPICAL
UL UNDERWRITERS LABORATORY
UNO UNLESS NOTED OTHERWISE
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VP VENEER PLASTER
VR VAPOR RETARDER
VT VINYL TILE
VWC VINYL WALL COVERING
W WIDE OR WEST
W/ WITH
WC WATER CLOSET
WD WOOD
WDW WINDOW
WG WALL GUARD
WH WATER HEATER
W/IN WITHIN
W/O WITHOUT
WP WATERPROOF
WR WATER RESISTANT
WT WEIGHT
WWF WELDED WIRE FABRIC
# NUMBER OR POUND
@ AT
PROJECT
LOCATION
IMAGE COURTESY OF GOOGLE MAPS
PROJECT LOCATION MAP
TOGUS VETERANS AFFAIRS - MAINE HEALTH CARE SYSTEM
MVHCS NETWORK
1 VA CENTER | AUGUSTA, ME 04330
NORTH
200E
249 MRI
82 83
Q2
Q1
Q3
Q436
(Flag Pole)
Q27 Q34 Q33 Q32
242 229
T228
T227
T226 T225 T224
247-2
(Gone)
(Gone)
PROJECT KEY PLAN
U.S. Department of Veterans Affairs
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
PHASEARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Au to de sk
D oc s:
//2
_V A
M ed ic al
C en te r -
T og us M
E/
7_
-G en
In fo
_r
.rv t
/1
0/
2:
:2
PM
00-GI-000.V4
COVER SHEET - VOLUME 4
A&E DESIGN
129 NORTH 29th STREET, SUITE 100
BILLINGS, MT 59101
PH: 406.248.2633
PAUL SIDERIUS, AIA
ELECTRONIC HEALTH RECORD MODERNIZATION
(EHRM) INFRASTRUCTURE UPGRADES - TOGUS, ME
TOGUS VA MEDICAL CENTER
402-22-700
GEN INFO
PSSPSSNovember 10, 2025
100% CONSTRUCTION
DOCUMENTSARCHITECT:
FULLY SPRINKLERED
Revisions: Date:
A/E:
GDM-AE INC
1304 NE 134TH STREET, SUITE A
VANCOUVER, WA 98685
PH: 541-436-4723
REISSUED 02-18-2026
INDEX OF DRAWINGS
VOLUME 1
VOLUME 2
VOLUME 4
ARCHITECTURAL
TELECOMMUNICATIONS
SHEET NO. SHEET NAME
00-TG-001 LEGEND, ABBREVIATION LIST, AND GENERAL NOTES
00-TS-000 TELECOMM OVERALL SITE PLAN
00-TS-001 TELECOMM SITE PLAN
00-TS-002 TELECOMM SITE PLAN
00-TS-003 TELECOMM SITE PLAN
00-TS-004 TELECOMM SITE PLAN
00-TS-005 TELECOMM SITE PLAN
200-TD-001 B200 GROUND LEVEL DEMOLITION PLAN
200-TD-011 B200 LEVEL 1 DEMOLITION PLAN
200-TD-012 B200 LEVEL 1 DEMOLITION PLAN - MRI
200-TD-021 B200 LEVEL 2 DEMOLITION PLAN
200-TD-031 B200 LEVEL 3 DEMOLITION PLAN
200-TD-041 B200 LEVEL 4 DEMOLITION PLAN
200-TD-051 B200 LEVEL 5 DEMOLITION PLAN
200-TD-061 B200 LEVEL 6 DEMOLITION PLAN
200-TD-071 B200 LEVEL 7 DEMOLITION PLAN
200-TN-001 B200 GROUND LEVEL TELECOMMUNICATIONS PLAN
200-TN-011 B200 LEVEL 1 TELECOMMUNICATIONS PLAN
200-TN-012 B200 LEVEL 1 TELECOMMUNICATIONS PLAN - MRI
200-TN-021 B200 LEVEL 2 TELECOMMUNICATIONS PLAN
200-TN-031 B200 LEVEL 3 TELECOMMUNICATIONS PLAN
200-TN-041 B200 LEVEL 4 TELECOMMUNICATIONS PLAN
200-TN-051 B200 LEVEL 5 TELECOMMUNICATIONS PLAN
200-TN-061 B200 LEVEL 6 TELECOMMUNICATIONS PLAN
200-TN-071 B200 LEVEL 7 TELECOMMUNICATIONS PLAN
200E-TD-001 B200E GROUND LEVEL DEMOLITION PLAN
200E-TD-011 B200E LEVEL 1 DEMOLITION PLAN
200E-TD-021 B200E LEVEL 2 DEMOLITION PLAN
200E-TD-031 B200E LEVEL 3 DEMOLITION PLAN
200E-TD-041 B200E LEVEL 4 DEMOLITION PLAN
200E-TN-001 B200E GROUND LEVEL TELECOMMUNICATIONS PLAN
200E-TN-011 B200E LEVEL 1 TELECOMMUNICATIONS PLAN
200E-TN-021 B200E LEVEL 2 TELECOMMUNICATIONS PLAN
200E-TN-031 B200E LEVEL 3 TELECOMMUNICATIONS PLAN
200E-TN-041 B200E LEVEL 4 TELECOMMUNICATIONS PLAN
201-TD-011 B201/238/239 BASEMENT & LEVEL 1 DEMOLITION PLAN - BLDG. 201, 238, & 239
201-TN-011 B201/238/239 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN - BLDG. 201,
238, & 239
202-TD-011 B202 LEVEL 1 & 2 DEMOLITION PLAN
202-TN-011 B202 LEVEL 1 & 2 TELECOMMUNICATIONS PLAN
203-TD-011 B203 LEVEL 1 & 2 DEMOLITION PLAN
203-TD-031 B203 LEVEL 3 DEMOLITION PLAN
203-TN-011 B203 LEVEL 1 & 2 DEMOLITION PLAN
203-TN-031 B203 LEVEL 3 TELECOMMUNICATIONS PLAN
204-TD-011 B204 BASEMENT & LEVEL 1 DEMOLITION PLAN
204-TD-021 B204 LEVEL 2 & PENTHOUSE DEMOLITION PLAN
204-TN-011 B204 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN
204-TN-021 B204 LEVEL 2 & PENTHOUSE TELECOMMUNICATIONS PLAN
205-TD-011 B205 LEVEL 1 DEMOLITION PLAN
205-TD-021 B205 LEVEL 2 DEMOLITION PLAN
205-TD-031 B205 LEVEL 3 DEMOLITION PLAN
205-TN-011 B205 LEVEL 1 TELECOMMUNICATIONS PLAN
205-TN-021 B205 LEVEL 2 TELECOMMUNICATIONS PLAN
205-TN-031 B205 LEVEL 3 TELECOMMUNICATIONS PLAN
206-TD-011 B206 LEVEL 1 DEMOLITION PLAN
206-TD-021 B206 LEVEL 2 DEMOLITION PLAN
206-TD-031 B206 LEVEL 3 & PENTHOUSE DEMOLITION PLAN
206-TN-011 B206 LEVEL 1 TELECOMMUNICATIONS PLAN
206-TN-021 B206 LEVEL 2 TELECOMMUNICATIONS PLAN
206-TN-031 B206 LEVEL 3 & PENTHOUSE TELECOMMUNICATIONS PLAN
207-TD-011 B207 LEVEL 1 DEMOLITION PLAN
207-TD-021 B207 LEVEL 2 DEMOLITION PLAN
207-TD-031 B207 LEVEL 3 & PENTHOUSE DEMOLITION PLAN
207-TN-011 B207 LEVEL 1 TELECOMMUNICATIONS PLAN
207-TN-021 B207 LEVEL 2 TELECOMMUNICATIONS PLAN
207-TN-031 B207 LEVEL 3 & PENTHOUSE TELECOMMUNICATIONS PLAN
208-TD-011 B208 BASEMENT & LEVEL 1 DEMOLITION PLAN
208-TN-011 B208 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN
209-TD-011 B209 BASEMENT & LEVEL 1 DEMOLITION PLAN
209-TD-021 B209 LEVEL 2 DEMOLITION PLAN
209-TN-011 B209 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN
209-TN-021 B209 LEVEL 2 TELECOMMUNICATIONS PLAN
210-TD-011 B210 BASEMENT & LEVEL 1 DEMOLITION PLAN
210-TD-021 B210 LEVEL 2 & 3 DEMOLITION PLAN
210-TN-011 B210 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN
210-TN-021 B210 LEVEL 2 & 3 TELECOMMUNICATIONS PLAN
211-TD-011 B211 LEVEL 1 DEMOLITION PLAN
211-TN-011 B211 LEVEL 1 TELECOMMUNICATIONS PLAN
212-TD-011 B212 BASEMENT & LEVEL 1 DEMOLITION PLAN
212-TN-011 B212 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN
221-TD-011 B221 LEVEL 1 & ATTIC DEMOLITION PLAN
221-TN-011 B221 LEVEL 1 & ATTIC TELECOMMUNICATIONS PLAN
232-TD-011 B232 LEVEL 1 DEMOLITION PLAN
232-TD-021 B232 LEVEL 2 DEMOLITION PLAN
232-TN-011 B232 LEVEL 1 TELECOMMUNICATIONS PLAN
232-TN-021 B232 LEVEL 2 TELECOMMUNICATIONS PLAN
235-TD-011 B235 LEVEL 1 DEMOLITION PLAN
235-TN-011 B235 LEVEL 1 TELECOMMUNICATIONS PLAN
240-TD-011 B240 BASEMENT & LEVEL 1 DEMOLITION PLAN
240-TN-011 B240 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN
248-TD-001 B248 BASEMENT DEMOLITION PLAN
248-TN-001 B248 BASEMENT TELECOMMUNICATIONS PLAN
255-TD-011 B255 LEVEL 1 DEMOLITION PLAN
255-TN-011 B255 LEVEL 1 TELECOMMUNICATIONS PLAN
300-TD-011 B300 LEVEL 1 & 2 DEMOLITION PLAN
300-TN-011 B300 LEVEL 1 & 2 TELECOMMUNICATIONS PLAN
Q1-TD-011 BQ1 BASEMENT & LEVEL 1, 2, & 3 DEMOLITION PLAN
Q1-TN-011 BQ1 BASEMENT & LEVEL 1, 2, & 3 TELECOMMUNICATIONS PLAN
Q3-TD-011 BQ3 BASEMENT & LEVEL 1, 2, & 3 DEMOLITION PLAN
Q3-TN-011 BQ3 BASEMENT & LEVEL 1, 2, & 3 TELECOMMUNICATIONS PLAN
Q4-TD-011 BQ4 BASEMENT & LEVEL 1, & 2 DEMOLITION PLAN
Q4-TN-011 BQ4 BASEMENT & LEVEL 1, & 2 TELECOMMUNICATIONS PLAN
Q27-TD-011 BQ27 BASEMENT & LEVEL 1, & 2 DEMOLITION PLAN
Q27-TN-011 BQ27 BASEMENT & LEVEL 1, & 2 TELECOMMUNICATIONS PLAN
Q32-TD-011 BQ32 BASEMENT & LEVEL 1, & 2 DEMOLITION PLAN
Q32-TN-011 BQ32 BASEMENT & LEVEL 1, & 2 TELECOMMUNICATIONS PLAN
069-TD-011 B069 BASEMENT & LEVEL 1, & 2 DEMOLITION PLAN
069-TN-011 B069 BASEMENT & LEVEL 1, & 2 TELECOMMUNICATIONS PLAN
MCR-TN-011 MCR TELECOMMUNICATIONS PLAN
MCR-TN-012 MCR CABLE TRAY & GRID IDENTIFICATION PLAN
Telecommunications
SHEET NO. SHEET NAME
TJ-001 EXISTING TELECOMM RACK ELEVATIONS
TJ-002 EXISTING TELECOMM RACK ELEVATIONS
TJ-003 EXISTING TELECOMM RACK ELEVATIONS
TJ-004 EXISTING TELECOMM RACK ELEVATIONS
TJ-005 EXISTING TELECOMM RACK ELEVATIONS
TJ-006 EXISTING TELECOMM RACK ELEVATIONS
TJ-007 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-008 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-009 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-010 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-011 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-012 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-013 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-014 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-015 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-016 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-017 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-018 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-019 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-020 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-021 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-022 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-023 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-024 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-025 FIBER ONE LINE DIAGRAM
TJ-026 TELECOMM CABINET ELEVATIONS - HDA
TJ-027 TELECOMM CABINET ELEVATIONS - MDA and ER
TJ-028 MCR MDA HDA CABLE ONE LINE
TJ-029 TELECOMM RACK ELEVATIONS
TJ-030 TELECOMM RACK ELEVATIONS
TJ-031 TELECOMM RACK ELEVATIONS
TJ-032 TELECOMM RACK ELEVATIONS
TJ-033 TELECOMM DETAILS
TJ-034 TELECOMM DETAILS
TJ-035 TELECOMM DETAILS
TJ-036 TELECOMM MCR CABINET DETAILS
TJ-037 TELECOMM BONDING DETAILS
TJ-038 TELECOMM BONDING DETAILS
TJ-039 TELECOMM BONDING DETAILS
TJ-040 TELECOMM BONDING DETAILS
TJ-041 TELECOMM BONDING DETAILS
TJ-042 TELECOMM CABLE SCHEDULES
TJ-043 TELECOMM CABLE SCHEDULES
TJ-044 TELECOMM CABLE SCHEDULES
TJ-045 TELECOMM CABLE SCHEDULES
TJ-046 TELECOMM CABLE SCHEDULES
TJ-047 TELECOMM CABLE SCHEDULES
TJ-048 TELECOMM CABLE SCHEDULES
TJ-049 TELECOMM J-HOOK DETAILS
ELECTRICAL
SHEET NO. SHEET NAME
000-EG-001 LEGEND, ABBREVIATION LIST, AND GENERAL NOTES
000-ES-001 OVERALL ELECTRICAL SITE PLAN
000-ES-002 ELECTRICAL SITE PLAN
000-ES-003 ELECTRICAL SITE PLAN
000-ES-004 ELECTRICAL SITE PLAN
000-ES-005 ELECTRICAL SITE PLAN
000-ES-006 ELECTRICAL SITE PLAN
069-ED-011 BUILDING 69 BASEMENT, LEVEL 1, & 2 DEMOLITION PLAN -BLDG. 69
069-EP-011 BUILDING 69 BASEMENT & LEVEL 1, 2 POWER PLAN -BLDG. 69
200-ED-001 BUILDING 200 GROUND LEVEL DEMOLITION PLAN -BLDG 200
200-ED-011 BUILDING 200 LEVEL 1 DEMOLITION PLAN -BLDG. 200
200-ED-021 BUILDING 200 LEVEL 2 DEMOLITION PLAN -BLDG. 200
200-ED-031 BUILDING 200 LEVEL 3 DEMOLITION PLAN -BLDG 200
200-ED-041 BUILDING 200 LEVEL 4 DEMOLITION PLAN -BLDG 200
200-ED-051 BUILDING 200 LEVEL 5 DEMOLITION PLAN -BLDG 200
200-ED-061 BUILDING 200 LEVEL 6 DEMOLITION PLAN -BLDG 200
200-EP-001 BUILDING 200 GROUND LEVEL POWER PLAN -BLDG. 200
200-EP-011 BUILDING 200 LEVEL 1 POWER PLAN -BLDG. 200
200-EP-021 BUILDING 200 LEVEL 2 POWER PLAN -BLDG. 200
200-EP-031 BUILDING 200 LEVEL 3 POWER PLAN -BLDG. 200
200-EP-041 BUILDING 200 LEVEL 4 POWER PLAN -BLDG. 200
200-EP-051 BUILDING 200 LEVEL 5 POWER PLAN -BLDG. 200
200-EP-061 BUILDING 200 LEVEL 6 POWER PLAN -BLDG. 200
200E-ED-001 BUILDING 200E GROUND LEVEL DEMOLITION PLAN -BLDG. 200E
200E-ED-011 BUILDING 200E LEVEL 1 DEMOLITION PLAN -BLDG. 200E
200E-ED-021 BUILDING 200E LEVEL 2 DEMOLITION PLAN -BLDG. 200E
200E-ED-031 BUILDING 200E LEVEL 3 DEMOLITION PLAN -BLDG 200E
200E-EP-001 BUILDING 200E GROUND LEVEL POWER PLAN -BLDG. 200E
200E-EP-011 BUILDING 200E LEVEL 1 POWER PLAN -BLDG. 200E
200E-EP-021 BUILDING 200E LEVEL 2 POWER PLAN -BLDG. 200E
200E-EP-031 BUILDING 200E LEVEL 3 POWER PLAN -BLDG. 200E
201-ED-011 BUILDING 201 & 238 BASEMENT & LEVEL 1 DEMOLITION PLAN -BLDG. 201 & 238
201-EP-011 BUILDING 201 & 238 BASEMENT & LEVEL 1 POWER PLAN -BLDG. 201 & 238
202-ED-011 BUILDING 202 LEVEL 1 DEMOLITION PLAN -BLDG. 202
202-EP-011 BUILDING 202 LEVEL 1, 2, AND ROOF POWER PLAN -BLDG. 202
203-ED-011 BUILDING 203 LEVEL 1 & LEVEL 2 DEMOLITION PLANS -BLDG. 203
203-ED-031 BUILDING 203 LEVEL 3 DEMOLITION PLANS -BLDG. 203
203-EP-011 BUILDING 203 LEVEL 1 & LEVEL 2 POWER PLANS -BLDG. 203
203-EP-031 BUILDING 203 LEVEL 3 POWER PLANS -BLDG. 203
204-ED-011 BUILDING 204 BASEMENT & LEVEL 1 DEMOLITION PLANS -BLDG. 204
204-ED-021 BUILDING 204 LEVEL 2 & PENTHOUSE DEMOLITION PLANS -BLDG. 204
204-EP-011 BUILDING 204 BASEMENT & LEVEL 1 POWER PLANS -BLDG. 204
204-EP-021 BUILDING 204 LEVEL 2 & PENTHOUSE POWER PLANS -BLDG. 204
205-ED-011 BUILDING 205 LEVEL 1 DEMOLITION PLAN -BLDG. 205
205-ED-021 BUILDING 205 LEVEL 2 DEMOLITION PLAN -BLDG. 205
205-ED-031 BUILDING 205 LEVEL 3 DEMOLITION PLAN -BLDG. 205
205-EP-011 BUILDING 205 LEVEL 1 POWER PLAN -BLDG. 205
205-EP-021 BUILDING 205 LEVEL 2 POWER PLAN -BLDG. 205
205-EP-031 BUILDING 205 LEVEL 3 POWER PLAN -BLDG. 205
205-EP-041 BUILDING 205 ROOF POWER PLAN -BLDG. 205
206-ED-011 BUILDING 206 LEVEL 1 DEMOLITION PLAN -BLDG 206
206-ED-021 BUILDING 206 LEVEL 2 DEMOLITION PLAN -BLDG 206
206-ED-031 BUILDING 206 LEVEL 3 & PENTHOUSE DEMOLITION PLAN -BLDG 206
206-EP-011 BUILDING 206 LEVEL 1 POWER PLAN -BLDG. 206
206-EP-021 BUILDING 206 LEVEL 2 POWER PLAN -BLDG. 206
206-EP-031 BUILDING 206 LEVEL 3 POWER PLAN -BLDG. 206
206-EP-041 BUILDING 206 PENTHOUSE POWER PLAN -BLDG. 206
207-ED-011 BUILDING 207 LEVEL 1 DEMOLITION PLAN -BLDG. 207
207-ED-021 BUILDING 207 LEVEL 2 DEMOLITION PLAN -BLDG. 207
207-ED-031 BUILDING 207 LEVEL 3 & PENTHOUSE DEMOLITION PLAN -BLDG. 207
207-EP-011 BUILDING 207 LEVEL 1 POWER PLAN -BLDG. 207
207-EP-021 BUILDING 207 LEVEL 2 POWER PLAN -BLDG. 207
207-EP-031 BUILDING 207 LEVEL 3 POWER PLAN -BLDG. 207
207-EP-041 BUILDING 207 PENTHOUSE POWER PLAN -BLDG. 207
GENERAL INFORMATION
FIRE PROTECTION
SHEET NO. SHEET NAME
000-FP-001 FIRE PROTECTION GENERAL NOTES, DIAGRAM, LEGEND
000-FP-002 FIRE PROTECTION SIGNAGE REQUIREMENTS
000-FP-003 FIRE PROTECTION SITE PLAN - MCR
MCR-FP-100 FIRE BARRIER AND EXTINGUISHER PLAN - MCR
MCR-FP-101 CLEAN AGENT PLAN - MCR
MCR-FA-101 FIRE ALARM PLAN - MCR
MCR-FS-100 FIRE SPRINKLER HAZARD CLASSIFICATION PLAN - MCR
MCR-FS-101 FIRE SPRINKLER PLAN - MCR
MCR-FS-102 FIRE SPRINKLER CALCULATION NODES - MCR
MCR-FS-501 FIRE SPRINKLER DETAILS
200-FS-001 GROUND LEVEL FIRE SPRINKLER PLAN
200-FS-011 BLDG 200 LEVEL 1 FIRE SPRINKLER PLAN
200-FS-021 BLDG 200 LEVEL 2 FIRE SPRINKLER PLAN
200-FS-031 BLDG 200 LEVEL 3 FIRE SPRINKLER PLAN
200-FS-041 BLDG 200 LEVEL 4 FIRE SPRINKLER PLAN
200-FS-051 BLDG 200 LEVEL 5 FIRE SPRINKLER PLAN
200-FS-061 BLDG 200 LEVEL 6 FIRE SPRINKLER PLAN
200E-FS-001 BLDG 200E GROUND LEVEL FIRE SPRINKLER PLAN
200E-FS-011 BLDG 200E LEVEL 1 FIRE SPRINKLER PLAN
200E-FS-021 BLDG 200E LEVEL 2 FIRE SPRINKLER PLAN
200E-FS-031 BLDG 200E LEVEL 3 FIRE SPRINKLER PLAN
201-FS-001 BLDG 201, 238 & 239 BASEMENT & LEVEL 1 FIRE SPRINKLER PLAN
202-FS-012 BLDG 202 LEVEL 2 FIRE SPRINKLER PLAN
203-FS-031 BLDG 203 LEVEL 3 FIRE SPRINKLER PLAN
204-FS-021 BLDG 204 LEVEL 2 FIRE SPRINKLER PLAN
205-FS-011 BLDG 205 LEVEL 1 FIRE SPRINKLER PLAN
205-FS-021 BLDG 205 LEVEL 2 FIRE SPRINKLER PLAN
205-FS-031 BLDG 205 LEVEL 3 FIRE SPRINKLER PLAN
206-FS-011 BLDG 206 LEVEL 1 FIRE SPRINKLER PLAN
206-FS-021 BLDG 206 LEVEL 2 FIRE SPRINKLER PLAN
206-FS-031 BLDG 206 LEVEL 3 FIRE SPRINKLER PLAN
207-FS-011 BLDG 207 LEVEL 1 FIRE SPRINKLER PLAN
207-FS-021 BLDG 207 LEVEL 2 FIRE SPRINKLER PLAN
207-FS-031 BLDG 207 LEVEL 3 FIRE SPRINKLER PLAN
208-FS-011 BLDG 208 LEVEL 1 FIRE SPRINKLER PLAN
209-FS-011 BLDG 209 LEVEL 1 FIRE SPRINKLER PLAN
209-FS-021 BLDG 209 LEVEL 2 FIRE SPRINKLER PLAN
210-FS-011 BLDG 210 LEVEL 1 FIRE SPRINKLER PLAN
212-FS-011 BLDG 212 LEVEL 1 FIRE SPRINKLER PLAN
221-FS-011 BLDG 221 LEVEL 1 FIRE SPRINKLER PLAN
232-FS-021 BLDG 232 LEVEL 2 FIRE SPRINKLER PLAN
240-FS-011 BLDG 240 LEVEL 1 FIRE SPRINKLER PLAN
255-FS-011 BLDG 255 LEVEL 1 FIRE SPRINKLER PLAN
VOLUME 3
GENERAL INFORMATION Electrical
SHEET NO. SHEET NAME
208-ED-011 BUILDING 208 BASEMENT & LEVEL 1 DEMOLITION PLAN -BLDG. 208
208-EP-011 BUILDING 208 BASEMENT & LEVEL 1 POWER PLAN -BLDG. 208
209-ED-011 BUILDING 209 BASEMENT & LEVEL 1 DEMOLITION PLAN -BLDG. 209
209-ED-021 BUILDING 209 LEVEL 2 DEMOLITION PLAN -BLDG. 209
209-EP-011 BUILDING 209 BASEMENT & LEVEL POWER PLAN -BLDG. 209
209-EP-021 BUILDING 209 LEVEL 2 & ROOF POWER PLAN -BLDG. 209
210-ED-011 BUILDING 210 BASEMENT & LEVEL 1 DEMOLITION PLAN -BLDG. 210
210-ED-021 BUILDING 210 LEVEL 2 & 3 DEMOLITION PLAN -BLDG. 210
210-EP-011 BUILDING 210 BASEMENT & LEVEL 1 POWER PLAN -BLDG. 210
210-EP-021 BUILDING 210 LEVEL 2 & LEVEL 3 POWER PLAN -BLDG. 210
211-ED-011 BUILDING 211 LEVEL 1 DEMOLITION PLAN -BLDG. 211
211-EP-011 BUILDING 211 LEVEL 1 POWER PLAN -BLDG. 211
212-ED-011 BUILDING 212 BASEMENT & LEVEL 1 DEMOLITION PLAN -BLDG. 212
212-EP-011 BUILDING 212 BASEMENT & LEVEL 1 POWER PLAN -BLDG. 212
221-ED-011 BUILDING 221 LEVEL 1 & ATTIC DEMOLITION PLAN -BLDG. 221
221-EP-011 BUILDING 221 LEVEL 1 & ATTIC POWER PLAN -BLDG. 221
232-ED-011 BUILDING 232 LEVEL 1 DEMOLITION PLAN -BLDG. 232
232-ED-021 BUILDING 232 LEVEL 2 DEMOLITION PLAN -BLDG. 232
232-EP-011 BUILDING 232 LEVEL 1 POWER PLAN -BLDG. 232
232-EP-021 BUILDING 232 LEVEL 2 POWER PLAN -BLDG. 232
239-EP-011 BUILDING 239 LEVEL 1 POWER PLAN -BLDG. 239
240-ED-011 BUILDING 240 BASEMENT & LEVEL 1 DEMOLITION PLAN -BLDG.240
240-EP-011 BUILDING 240 BASEMENT & LEVEL 1 POWER PLAN -BLDG.240
255-ED-011 BUILDING 255 LEVEL 1 DEMOLITION PLAN -BLDG. 255
255-EP-011 BUILDING 255 LEVEL 1 POWER PLAN -BLDG. 255
Q1-ED-011 BUILDING Q1 BASEMENT & LEVEL 1,2,3 DEMOLITION PLAN -BLDG. Q1
Q1-EP-011 BUILDING Q1 BASEMENT & LEVEL 1,2,3 POWER PLAN -BLDG. Q1
Q3-ED-011 BUILDING Q3 BASEMENT AND LEVEL 1,2,3 DEMOLITION PLAN -BLDG. Q3
Q3-EP-011 BUILDING Q3 BASEMENT & LEVEL 1, 2, 3 POWER PLAN -BLDG. Q3
Q4-ED-011 BUILDING Q4 BASEMENT & LEVEL 1,2,3 DEMOLITION PLAN -BLDG. Q4
Q4-EP-011 BUILDING Q4 BASEMENT & LEVEL 1, 2 POWER PLAN -BLDG. Q4
Q27-ED-011 BUILDING Q27 BASEMENT & LEVEL 1, 2 DEMOLITION PLAN -BLDG. Q27
Q27-EP-011 BUILDING Q27 BASEMENT & LEVEL 1, 2 POWER PLAN -BLDG. Q27
Q32-ED-011 BUILDING Q32 BASEMENT & LEVEL1, 2 DEMOLITION PLAN -BLDG. Q32
Q32-EP-011 BUILDING Q32 BASEMENT & LEVEL 1, 2 POWER PLAN -BLDG. Q32
MCR-EP-011 BUILDING MCR MCR POWER PLAN
MCR-EP-012 BUILDING MCR MCR LIGHTING PLAN
MCR-EP-013 BUILDING MCR MCR ENLARGEMENTS
000-EJ-001 EQUIPMENT GROUNDING DETAILS
069-EJ-001 BLDG 69 PARTIAL ELECTRICAL ONE-LINE & PANEL SCHEDULE
200-EJ-001 BLDG 200 NORMAL ELECTRICAL ONE-LINE DIAGRAM
200-EJ-002 BLDG 200 NORMAL ELECTRICAL ONE-LINE DIAGRAM
200-EJ-003 BLDG 200 EMERGENCY ELECTRICAL ONE-LINE DIAGRAM
200-EJ-004 BLDG 200E ELECTRICAL ONE-LINE DIAGRAM
200-EJ-005 BLDG 200 & 200E ELECTRICAL PANEL SCHEDULES
200-EJ-006 BLDG 200 & 200E ELECTRICAL PANEL SCHEDULES
200-EJ-007 BLDG 200 & 200E ELECTRICAL PANEL SCHEDULES
201-EJ-001 BLDG 201 & 239 ELECTRICAL PANEL SCHEDULES
202-EJ-001 BLDG 202 & 211 NORMAL ELECTRICAL ONE-LINE DIAGRAM
202-EJ-002 BLDG 202 & 211 ELECTRICAL PANEL SCHEDULES
203-EJ-001 BLDG 203 ELECTRICAL DEMOLITION ONE-LINE DIAGRAM
203-EJ-002 BLDG 203 ELECTRICAL ONE-LINE DIAGRAM
203-EJ-003 BLDG 203 ELECTRICAL PANEL SCHEDULES
204-EJ-001 BLDG 204 ELECTRICAL ONE-LINE DIAGRAM
204-EJ-002 BLDG 204 ELECTRICAL PANEL SCHEDULES
205-EJ-001 BLDG 205 ELECTRICAL ONE-LINE DIAGRAM
205-EJ-002 BLDG 205 ELECTRICAL PANEL SCHEDULES
206-EJ-001 BLDG 206 ELECTRICAL ONE-LINE DIAGRAM
206-EJ-002 BLDG 206 & 208 ELECTRICAL PANEL SCHEDULES
207-EJ-001 BLDG 207 PARTIAL ONE-LINE DIAGRAMS
207-EJ-002 BLDG 207 ELECTRICAL PANEL SCHEDULES
209-EJ-002 BLDG 209 ELECTRICAL PANEL SCHEDULES
210-EJ-001 BLDG 210 & 255 ELECTRICAL ONE-LINE DIAGRAM
210-EJ-002 BLDG 210 & 255 ELECTRICAL PANEL SCHEDULES
212-EJ-001 BLDG 212 ELECTRICAL PANEL SCHEDULES
221-EJ-001 BLDG 221 PARTIAL ELECTRICAL ONE-LINE DIAGRAM
221-EJ-002 BLDG 221 ELECTRICAL PANEL SCHEDULES
232-EJ-001 BLDG 232 ELECTRICAL ONE-LINE DIAGRAM
232-EJ-002 BLDG 232 ELECTRICAL PANEL SCHEDULES
238-EJ-001 BLDG 238 PARTIAL ELECTRICAL ONE-LINE DIAGRAMS
238-EJ-002 BLDG 238 ELECTRICAL PANEL SCHEDULES
244-EJ-001 BLDG 244 PARTIAL ELECTRICAL ONE-LINE DIAGRAM
244-EJ-002 BLDG 244 GEN 9 & 10 ELECTRICAL ONE-LINE DIAGRAM
246-EJ-001 CAMPUS MV SYSTEMS ELECTRICAL DEMOLITION ONE-LINE DIAGRAM
246-EJ-002 CAMPUS MV SYSTEMS ELECTRICAL ONE-LINE DIAGRAM
G11-EJ-001 GEN 11 ELECTRICAL ONE-LINE DIAGRAM
MCR-EJ-001 MCR ELECTRICAL ONE-LINE DIAGRAM
MCR-EJ-002 MCR ELECTRICAL PANEL SCHEDULES
MCR-EJ-003 MCR ELECTRICAL PANEL SCHEDULES
Q1-EJ-001 BLDG Q1 PARTIAL ELECTRICAL ONE-LINE DIAGRAM
Q1-EJ-002 BLDG Q1, Q3 & Q4 ELECTRICAL PANEL SCHEDULES
Q32-EJ-001 BLDG Q32 PARTIAL ELECTRICAL ONE-LINE DIAGRAM
Q32-EJ-002 BLDG Q27 & Q32 ELECTRICAL PANEL SCHEDULES
GENERAL INFORMATION
GENERAL INFORMATION
ELECTRICAL
TELECOMMUNICATIONS (Continued) ELECTRICAL (Continued)
TELECOMMUNICATIONS
FIRE PROTECTION
MECHANICAL
SHEET NO. SHEET NAME
MH-001 HVAC GENERAL INFORMATION
MH-002 SCHEDULES
MH-003 SCHEDULES
MH-004 CALCULATIONS
MH-005 DETAILS
MH-006 DETAILS
MH-007 CONTROLS INFORMATION
MH-008 DIAGRAMS
MH-009 DIAGRAMS
69-MH-201 BUILDING 69 HVAC PLANS
200-MH-200 BUILDING 200/200E GROUND HVAC PLAN
200-MH-201 BUILDING 200/200E LEVEL 1 HVAC PLAN
200-MH-202 BUILDING 200/200E LEVEL 2 HVAC PLAN
200-MH-203 BUILDING 200/200E LEVEL 3 HVAC PLAN
200-MH-204 BUILDING 200/200E LEVEL 4 HVAC PLAN
200-MH-205 BUILDING 200/200E LEVEL 5, 6, 7 HVAC PLANS
200-MH-300 BUILDING 200/200E ENLARGED PLANS
200-MH-301 BUILDING 200/200E ENLARGED PLANS
200-MH-302 BUILDING 200/200E ENLARGED PLANS
200-MH-303 BUILDING 200/200E ENLARGED PLANS
200-MH-304 BUILDING 200/200E ENLARGED PLANS
202-MH-201 BUILDING 202 HVAC PLANS
202-MH-202 BUILDING 202 ENLARGED HVAC PLANS
203-MH-201 BUILDING 203 HVAC PLANS
203-MH-301 BUILDING 203 ENLARGED HVAC PLANS
204-MH-201 BUILDING 204 HVAC PLAN
204-MH-301 BUILDING 204 ENLARGED HVAC PLAN
205-MH-201 BUILDING 205 HVAC PLANS
205-MH-301 BUILDING 205 ENLARGED HVAC PLANS
205-MH-302 BUILDING 205 ENLARGED HVAC PLANS
206-MH-201 BUILDING 206 HVAC PLANS
206-MH-301 BUILDING 206 ENLARGED HVAC PLANS
206-MH-302 BUILDING 206 ENLARGED HVAC PLANS
207-MH-201 BUILDING 207 HVAC PLANS
207-MH-301 BUILDING 207 ENLARGED HVAC PLANS
207-MH-302 BUILDING 207 ENLARGED HVAC PLANS
208-MH-201 BUILDING 208 HVAC PLANS
209-MH-201 BUILDING 209 HVAC PLANS
209-MH-301 BUILDING 209 ENLARGED HVAC PLANS
210-MH-201 BUILDING 210 HVAC PLANS
210-MH-301 BUILDING 210 ENLARGED HVAC PLANS
211-MH-201 BUILDING 211 HVAC PLANS
212-MH-201 BUILDING 212 HVAC PLANS
212-MH-301 BUILDING 212 ENLARGED HVAC PLANS
221-MH-201 BUILDING 221 HVAC PLANS
232-MH-201 BUILDING 232 HVAC PLANS
232-MH-301 BUILDING 232 ENLARGED PLANS
238-MH-201 BUILDING 201, 238, AND 239 HVAC PLANS
238-MH-301 BUILDING 201, 238, AND 239 ENLARGED PLANS
240-MH-201 BUILDING 240 HVAC PLANS
255-MH-201 BUILDING 255 HVAC PLANS
MCR-MH-201 BUILDING MCR FOUNDATION HVAC PLAN
MCR-MH-202 BUILDING MCR LEVEL 1 HVAC PLAN
MCR-MH-203 BUILDING MCR LEVEL 1 HVAC PIPING PLAN
MCR-MH-204 BUILDING MCR LEVEL 1 HVAC RCP PLAN
MCR-MH-301 BUILDING MCR SECTIONS
MCR-PP-201 BUILDING MCR FOUNDATION PLUMBING PLAN
MCR-PP-202 BUILDING MCR LEVEL 1 PLUMBING PLAN
MCR-PP-203 BUILDING MCR LOWER ROOF PLUMBING & HVAC PLAN
MCR-PP-204 BUILDING MCR ROOF PLUMBING PLAN
Q1-MH-201 BUILDING Q1 HVAC PLANS
Q3-MH-201 BUILDING Q3 HVAC PLANS
Q4-MH-201 BUILDING Q4 HVAC PLANS
Q27-MH-201 BUILDING Q27 HVAC PLANS
Q32-MH-201 BUILDING Q32 HVAC PLANS
MECHANICAL
ARCHITECTURAL (Continued)
U.S. Department of Veterans Affairs
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
PHASEARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
Au to de sk
D oc s:
//2
_V A
M ed ic al
C en te r -
T og us M
E/
7_
-G en
In fo
_r
.rv t
00-GI-001.V4
INDEX OF DRAWINGS - VOLUME 4
A&E DESIGN
129 NORTH 29th STREET, SUITE 100
BILLINGS, MT 59101
PH: 406.248.2633
PAUL SIDERIUS, AIA
ELECTRONIC HEALTH RECORD MODERNIZATION
(EHRM) INFRASTRUCTURE UPGRADES - TOGUS, ME
TOGUS VA MEDICAL CENTER
402-22-700
GEN INFO
PSSPSSNovember 10, 2025
100% CONSTRUCTION
DOCUMENTSARCHITECT:
FULLY SPRINKLERED
Revisions: Date:
SHEET NO. SHEET NAME
00-GI-000.V1 COVER SHEET - VOLUME 1
00-GI-001.V1 INDEX OF DRAWINGS - VOLUME 1
00-GI-002 PROJECT GENERAL NOTES AND CODE SUMMARY
00-GI-003 ICRA CLASSIFICATION PROCESS MATERIAL ID LIST
00-GI-004 PROJECT LOCATION MAPS AND CAMPUS PLAN
00-GI-005 PROJECT ASSEMBLY TYPES
00-GI-006 UL ASSEMBLIES
00-GI-007 UL ASSEMBLIES
00-GI-008 UL ASSEMBLIES
00-GI-009 DOOR SCHEDULE AND TYPICAL DOOR DETAILS
00-GI-010 CEILING DETAILS
00-GI-011 PARTITION DETAILS
00-GI-012 ROOF AND TYPICAL DETAILS
00-GI-013 INTERIOR FINISH MATERIALS
SHEET NO. SHEET NAME
00-GI-000.V3 COVER SHEET - VOLUME 3
00-GI-001.V3 INDEX OF DRAWINGS - VOLUME 3
SHEET NO. SHEET NAME
00-GI-000.V4 COVER SHEET - VOLUME 4
00-GI-001.V4 INDEX OF DRAWINGS - VOLUME 4
SHEET NO. SHEET NAME
MCR-AE-101 LEVEL 1 CODE PLAN
MCR-AE-200 SLAB FLOOR PLAN
MCR-AE-201 LEVEL 1 DIMENSION FLOOR PLAN
MCR-AE-202 LEVEL 1 FLOOR PLAN
MCR-AE-203 UTILITY YARD FLOOR PLAN
MCR-AE-204 ROOF PLAN AND SITE PLAN
MCR-AE-301 PLAN DETAILS
MCR-AE-302 CAST STONE DETAILS
MCR-AE-401 EXTERIOR ELEVATIONS
MCR-AE-402 EXTERIOR ELEVATIONS
MCR-AE-403 EXTERIOR ELEVATIONS
MCR-AE-404 ENLARGED ELEVATION DETAILS
MCR-AE-501 BUILDING SECTIONS
MCR-AE-511 WALL SECTIONS
MCR-AE-512 WALL SECTIONS
MCR-AE-513 WALL SECTIONS
MCR-AE-521 SECTION DETAILS
MCR-AE-522 SECTION DETAILS
MCR-AE-601 INTERIOR ELEVATIONS
MCR-AE-602 DATA CENTER ELEVATIONS
MCR-AE-701 LEVEL 1 REFLECTED CEILING PLAN
MCR-AE-801 VERTICAL CIRCULATION PLANS
MCR-AE-802 VERTICAL CIRCULATION SECTIONS AND ELEVATIONS
MCR-AE-803 VERTICAL CIRCULATION STAIR AND RAIL DETAILS
Q1-AD-201 LEVEL 1 DEMOLITION PLAN
Q1-AE-101 OVERALL PLAN
Q1-AE-201 PLANS AND ELEVATIONS
Q3-AE-101 OVERALL PLAN
Q3-AE-201 PLANS AND ELEVATIONS
Q4-AE-101 OVERALL FLOOR PLAN
Q4-AE-201 PLANS AND ELEVATIONS
Q27-AE-101 OVERALL PLAN
Q27-AE-201 FLOOR PLANS AND ELEVATIONS
Q32-AE-101 OVERALL PLAN
Q32-AE-201 PLANS AND ELEVATIONS
SHEET NO. SHEET NAME
69-AE-101 OVERALL PLAN
69-AE-201 PLANS
200-AD-200 GROUND LEVEL DEMOLITION PLAN
200-AD-201 LEVEL 1 DEMOLITION PLAN
200-AD-202 LEVEL 2 DEMOLITION PLAN
200-AD-203 LEVEL 3 DEMOLITION PLAN
200-AD-204 LEVEL 4 DEMOLITION PLAN
200-AD-205 LEVELS 5, 6, 7 DEMOLITION FLOOR PLANS
200-AE-101 OVERALL FLOOR PLANS
200-AE-102 OVERALL FLOOR PLANS
200-AE-103 OVERALL FLOOR PLANS
200-AE-104 OVERALL FLOOR PLANS
200-AE-200 GROUND FLOOR PLAN
200-AE-201 LEVEL 1 FLOOR PLAN
200-AE-202 LEVEL 2 FLOOR PLAN
200-AE-203 LEVEL 3 FLOOR PLAN
200-AE-204 LEVEL 4 FLOOR PLAN
200-AE-205 LEVELS 5, 6, 7 FLOOR PLANS
200-AE-206 ROOF PLAN
200-AE-300 GROUND LEVEL TR ENLARGED PLANS AND ELEVATIONS
200-AE-301 LEVEL 1 TR ENLARGED PLANS AND ELEVATIONS
200-AE-302 LEVEL 2 TR ENLARGED PLANS AND ELEVATIONS
200-AE-303 LEVEL 3 TR ENLARGED PLANS AND ELEVATIONS
200-AE-304 LEVEL 4, LEVEL 5 TR ENLARGED PLANS AND ELEVATIONS
200-AE-305 LEVEL 6 TR ENLARGED PLANS AND ELEVATIONS
202-AD-201 DEMOLITION PLANS
202-AE-101 OVERALL PLANS
202-AE-201 PLANS
204-AD-201 DEMOLITION PLANS
204-AE-101 OVERALL FLOOR PLANS
204-AE-201 FLOOR PLANS
204-AE-301 LEVEL 2 TR ENLARGED PLANS AND ELEVATIONS
205-AD-201 LEVEL 1 DEMOLITION PLAN
205-AE-101 OVERALL FLOOR PLAN
205-AE-201 FLOOR PLANS
205-AE-301 LEVEL 1 TR ENLARGED PLANS AND ELEVATIONS
205-AE-302 LEVELS 2 AND 3 TR ENLARGED PLANS AND ELEVATIONS
206-AD-201 DEMOLITION PLANS
206-AE-101 OVERALL FLOOR PLANS
206-AE-201 FLOOR PLANS
206-AE-301 LEVEL 1 TR ENLARGED PLANS AND ELEVATIONS
206-AE-302 LEVEL 2 AND 3 TR ENLARGED PLANS AND ELEVATIONS
207-AD-201 DEMOLITION PLANS
207-AE-101 OVERALL FLOOR PLANS
207-AE-201 FLOOR PLANS
207-AE-301 ENLARGED LEVEL 1 AND 2 TR PLANS
207-AE-302 ENLARGED LEVEL 3 TR PLANS
208-AE-101 OVERALL PLAN
208-AE-201 PLANS AND ELEVATIONS
209-AE-101 OVERALL PLANS
209-AE-201 FLOOR PLANS
209-AE-301 LEVEL 1 AND 2 TR ENLARGED PLANS AND ELEVATIONS
210-AD-201 DEMOLITION PLANS
210-AE-101 OVERALL PLAN
210-AE-201 PLANS AND ELEVATIONS
211-AE-101 OVERALL PLAN
211-AE-201 PLANS AND ELEVATIONS
212-AE-101 OVERALL PLAN
212-AE-201 LEVEL 1 FLOOR PLANS AND ELEVATIONS
221-AE-101 OVERALL PLAN
221-AE-201 LEVEL 1 PLANS AND ELEVATIONS
232-AD-201 LEVEL 1 DEMOLITION PLAN
232-AE-101 OVERALL PLAN
232-AE-201 FLOOR PLANS AND ELEVATIONS
238-AD-201 LEVEL 1 DEMOLITION PLAN
238-AE-101 OVERALL PLAN
238-AE-201 FLOOR PLANS AND ELEVATIONS
240-AD-201 DEMOLITION PLANS
240-AE-101 OVERALL FLOOR PLANS
240-AE-201 FLOOR PLANS
240-AE-301 LEVEL 1 AND 3 TR ENLARGED PLANS AND ELEVATIONS
255-AE-101 OVERALL PLAN
255-AE-201 PLANS AND ELEVATIONS
SHEET NO. SHEET NAME
00-GI-000.V2 COVER SHEET - VOLUME 2
00-GI-001.V2 INDEX OF DRAWINGS - VOLUME 2
A/E:
GDM-AE INC
1304 NE 134TH STREET, SUITE A
VANCOUVER, WA 98685
PH: 541-436-4723
SHEET NO.
MCR-SN-100
MCR-SN-101
MCR-SF-100
MCR-SF-101
MCR-SD-100
MCR-SD-101
MCR-SD-102
MCR-SD-103
MCR-SD-104
MCR-SD-200
MCR-SD-201
STRUCTURAL
SHEET NO.
00-CG-001
00-CS-001
00-CS-002
00-CS-003
00-CS-005
00-CU-101
00-CU-102
00-CU-103
00-CU-104
00-CU-105
00-CU-106
00-CU-107
00-CU-108
00-CU-109
00-CJ-101
00-CJ-102
00-CJ-103
00-CJ-104
00-CJ-105
00-CJ-106
00-CJ-107
SHEET NAME
GENERAL NOTES
OVERALL EXISTING CONDITIONS SITE PLAN
OVERALL A-CIRCUIT FIBER OPTIC SITE PLAN
OVERALL B-CIRCUIT FIBER OPTIC SITE PLAN
OVERALL CIVIL - ELECTRICAL SITE PLAN
A-CIRCUIT FIBER OPTICS SITE PLAN
A-CIRCUIT FIBER OPTICS SITE PLAN
A-CIRCUIT FIBER OPTICS SITE PLAN
A-CIRCUIT FIBER OPTICS SITE PLAN
A-CIRCUIT FIBER OPTICS SITE PLAN
A-CIRCUIT FIBER OPTICS SITE PLAN
A-CIRCUIT FIBER OPTICS SITE PLAN
A-CIRCUIT FIBER OPTICS SITE PLAN
A-CIRCUIT FIBER OPTICS SITE PLAN
A-CIRCUIT FIBER OPTICS PROFILES
A-CIRCUIT FIBER OPTICS PROFILES
A-CIRCUIT FIBER OPTICS PROFILES
A-CIRCUIT FIBER OPTICS PROFILES
A-CIRCUIT FIBER OPTICS PROFILES
A-CIRCUIT FIBER OPTICS PROFILES
A-CIRCUIT FIBER OPTICS PROFILES
00-CJ-108
00-CU-201
A-CIRCUIT FIBER OPTICS PROFILES
B-CIRCUIT FIBER OPTICS SITE PLAN
00-CU-202
00-CU-203
00-CU-204
00-CU-205
00-CU-206
00-CU-207
00-CU-208
00-CJ-201
00-CJ-202
00-CJ-203
00-CJ-204
00-CJ-205
00-CJ-206
00-CJ-207
00-CJ-A101
00-CJ-A102
00-CE-100
00-CE-101
00-CE-102
00-CS-004
00-CG-100
00-CU-301
00-CU-302
00-CU-303
00-CU-304
00-CJ-A201
00-CJ-A202
00-CJ-A203
00-CJ-A204
00-CJ-A205
00-CJ-A206
00-CU-401
00-CU-402
00-CJ-401
00-CJ-402
CIVIL
00-CG-101
B-CIRCUIT FIBER OPTICS SITE PLAN
B-CIRCUIT FIBER OPTICS SITE PLAN
B-CIRCUIT FIBER OPTICS SITE PLAN
B-CIRCUIT FIBER OPTICS SITE PLAN
B-CIRCUIT FIBER OPTICS SITE PLAN
B-CIRCUIT FIBER OPTICS SITE PLAN
B-CIRCUIT FIBER OPTICS SITE PLAN
B-CIRCUIT FIBER OPTICS PROFILES
B-CIRCUIT FIBER OPTICS PROFILES
B-CIRCUIT FIBER OPTICS PROFILES
B-CIRCUIT FIBER OPTICS PROFILES
B-CIRCUIT FIBER OPTICS PROFILES
B-CIRCUIT FIBER OPTICS PROFILES
B-CIRCUIT FIBER OPTICS PROFILES
CIVIL - DETAILS
CIVIL - DETAILS
EROSION CONTROL - NOTED AND DETAILS
EROSION CONTROL - DETAILS
MCR EROSION CONTROL - PLAN
PROPOSED MCR PLAN
PROPOSED MCR GRADING PLAN
PROPOSED MCR MSE WALL PLAN
PROPOSED MCR WATER AND SEWER PLAN
PROPOSED SEWER PROFILE
PROPOSED MCR DRAINAGE PLAN
PROPOSED DRAINAGE PROFILES
PAVING AND DRAINAGE - STANDARD DETAILS
PAVING AND DRAINAGE - STANDARD DETAILS
PAVING AND DRAINAGE - STANDARD DETAILS
PAVING AND DRAINAGE - STANDARD DETAILS
SANITARY SEWER COLLECTION SYSTEM - STANDARD DETAILS
WATER DISTRIBUTION SYSTEM - STANDARD DETAILS
CIVIL ELECTRICAL SITE PLAN
CIVIL ELECTRICAL SITE PLAN
CIVIL ELECTRICAL - PROFILES
CIVIL ELECTRICAL - PROFILES
SHEET NAME
BUILDING MCR STRUCTURAL NOTES
BUILDING MCR STRUCTURAL NOTES
BUILDING MCR FOUNDATION PLAN
BUILDING MCR ROOF FRAMING PLAN
BUILDING MCR FOUNDATION DETAILS
BUILDING MCR FOUNDATION DETAILS
BUILDING MCR RETAINING WALL PLAN & ELEVATION
BUILDING MCR RETAINING WALL DETAILS
BUILDING MCR RETAINING WALL DETAILS
BUILDING MCR ROOF FRAMING DETAILS
BUILDING MCR ROOF FRAMING DETAILS
REISSUED 02-18-2026
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Revisions: Date:
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
PHASEARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
A&E DESIGN
129 NORTH 29th STREET, SUITE 100
BILLINGS, MT 59101
PH: 406.248.2633
PAUL SIDERIUS, AIA
ELECTRONIC HEALTH RECORD MODERNIZATION
(EHRM) INFRASTRUCTURE UPGRADES - TOGUS, ME
TOGUS VA MEDICAL CENTER
402-22-700
NOVEMBER 10, 2025
100% CONSTRUCTION
DOCUMENTSARCHITECT:
FULLY SPRINKLERED
A, AMP AMPERE
ACP ACCESSIBLE CARD PATH
ADA AMERICAN DISABILITY ACT
AF AMP FRAME
AFC AVAILABLE FAULT CURRENT
AFCI ARC FAULT CIRCUIT INTERRUPTER
AFF ABOVE FINISHED FLOOR
AG ABOVE GROUND
AT AMP TRIP
ATS AUTOMATIC TRANSFER SWITCH
AL ALUMINUM
BCT BONDING CONDUCTOR FOR TLECOMMUNICATIONS
BKR BREAKER
C CONDUIT
CKT CIRCUIT
CO CONDUIT AND PULL-ROPE ONLY
COMM COMMUNICATION
CTRL CONTROL
CU COPPER
(E) EXISTING
EC, E.C. ELECTRICAL CONTRACTOR
ELEC ELECTRICAL
EM EMERGENCY
EQPT EQUIPMENT
(F) FUTURE
FA FIRE ALARM
FDR FEEDER
G, GND GROUND
GC, G.C. GENERAL CONTRACTOR
HH HANDHOLE
IDF INTERMEDIATE DISTRIBUTION FRAME
J-BOX JUNCTION BOX
LCP LIGHTING…
This is the start of the file's text. The full file is on GovTribe.