S02 - SOW - Att 06 - Drwg - Vol 4 - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf

PDF 28 MB Posted

Attached to
Electronic Health Record Modernization Infrastructure Upgrades - Construction - Togus, ME
Solicitation number
36C77626R0062
Issued by

About this file

This is a Statement of Work and construction drawings document (Volume 4 of electrical and fire protection plans) for the Electronic Health Record Modernization (EHRM) Infrastructure Upgrades project at the VA Maine Healthcare System in Togus, ME (Contract No. 36C77623C0002, Project No. 402-22-700).

The project encompasses infrastructure improvements across 12 buildings and site-wide systems, including electrical panel upgrades, emergency power systems, HVAC assessments and upgrades, space reconfiguration and renovation with demolition and new construction, communication infrastructure upgrades (CAT 6A cabling, data outlets, patch panels), physical security upgrades, fiber backbone infrastructure upgrades campus-wide, and hazardous material abatement. The General Contractor is responsible for coordinating all construction aspects, obtaining all VA permits (HOTWORK, ICRA, weekend/holiday work, shutdown approvals), arranging third-party inspections, and coordinating power, water, and telecommunication outages scheduled one week in advance. Work must minimize disruption to the operating medical center, with many activities requiring night, weekend, or holiday performance at no additional cost. The contractor must provide staff certified for unescorted IT closet access through PIV badging with background investigations. All work must comply with applicable state and local codes, industry standards, and contract specifications. The contractor bears responsibility for site visit verification, condition assessment, coordination among trades, cutting and patching, weather protection, existing property damage repair or replacement at contractor expense, and a one-year warranty on workmanship defects. The construction documents include detailed demolition plans, electrical one-line diagrams, fire sprinkler plans, telecommunications layouts, mechanical HVAC plans, and structural details across multiple building levels and site locations.

View the file

Other files

File Type Posted
S30 - SAM - Special Notice - Cancellation - 36C77626R0062_2 - EHRM Infra Upgrades - Togus.pdf PDF
S06 - Amend 0002 - Att 03 - Corrected Agenda - RFP - 07202026 - EHRM Infra - Togus.pdf PDF
S06 - Amend 0002 - 36C77626R0062 - 07202026 - EHRM Infra - Togus.pdf PDF
S06 - Amend 0001 - Att 02 - SV - Attendance SHT - 06292026 - EHRM Infra - Togus.pdf PDF
S06 - Amend 0001 - 36C77626R0062 - 07142026 - EHRM Infra - Togus.pdf PDF
S06 - Amend 0001 - RFIs - 07132026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S06 - Amend 0001 - Att 01 - Rvd Structural Drwg - 06192026 - EHRM Infra - Togus.pdf PDF
S06 - Amend 0001 - Att 03 - SV - Agenda - RFP - 06292026 - EHRM Infra - Togus.pdf PDF
S02 - SOW - Att 05 - Drwg - Vol 3 - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 13 - Const Sch - 02132026 - EHRM Infra Upgrades - Constr Togus.pdf PDF
S02 - SOW - Att 26 - Cut Sheet 04 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - Att 03 -Prj Info Sheet for KTR - EHRM Infra Upgrade - Togus.docx DOCX document
S02 - SOW - Att 03 - Drwg - Vol 1C - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 22 - TS-000 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - Att 07 - 852.219-75 - 06172026 - EHRM Infra Upgrade - Togus.pdf PDF
S02 - Att 04 - Memo - Brand Name - 04092026 - EHRM Infra Upgrade - Togus.pdf PDF
S02 - SOW - Att 35 - Cut Sheet 13 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 17 - Memo - Phy Sec Compliance - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 27 - Cut Sheet 05 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 09 - Specs - Vol 3- 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 30 - Cut Sheet 08 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 24 - Cut Sheet 02 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - Att 05 - Division Cost Breakdown - EHRM Infra Upgrade - Togus.xlsx XLSX spreadsheet
S02 - SOW - Att 29 - Cut Sheet 07 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 37 - Cut Sheet 15 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 16 - Submittal Reg - 02182026 - EHRM Infra - Upgrades - Constr - Togus.xlsx XLSX spreadsheet
S02 - SOW - Att 14 - Design Calcs - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 18 - Memo - Prj Stnd Compliance - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 21 - PCRA 3 - MCR and Trench Work - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 40 - Cut Sheet 18 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 33 - Cut Sheet 11 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 01 - Drwg - Vol 1A - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 38 - Cut Sheet 16 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 11 - Haz Mat Report - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 12 - Geotechnical Report - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 32 - Cut Sheet 10 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 08 - Specs - Vol 1 - Div 02-14 - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 20 - PCRA 2 - Cabling and Data Outlets - EHRM Infra Upgrades - Constr - Togus.pdf PDF
RFP - EHRM Infra Upgrade - 36C77626R0062 - 06172026 - Togus.pdf PDF
S02 - SOW - Att 19 - PCRA 1 - TR Constr - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 07 - Specs - Vol 1 - Div 00-01 - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 15 - Design Narrative - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 23 - Cut Sheet 01 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 31 - Cut Sheet 09 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - Att 02 - PPQ - EHRM Infra Upgrade - Togus.docx DOCX document
S02 - SOW - Att 02 - Drwg - Vol 1B - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 34 - Cut Sheet 12 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - Att 01 - SOW - 05112026 - EHRM Infra Upgrades - Togus.pdf PDF
S02 - SOW - Att 10 - Specs - Vol 4 - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 36 - Cut Sheet 14 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA MAINE HEALTHCARE SYSTEM

ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES - TOGUS, ME

PROJECT NO. 402-22-700

CONTRACT NO. 36C77623C0002

100% CONSTRUCTION DOCUMENTS (CD) SUBMITTAL

VA MAINE HEALTHCARE SYSTEM

1 VA CENTER

AUGUSTA, ME 04330

THE SCOPE OF THIS PROJECT INCLUDES BUT NOT LIMITED TO THE FOLLOWING INFRASTRUCTURE IMPROVEMENTS: ELECTRICAL (ELECTRICAL PANEL UPGRADE, POWER (NORMAL, EMERGENCY)), BONDING, UPS, BUILDING MANAGEMENT SYSTEM INTERFACES, ASSESS FOR NEW AND UPGRADES TO EXISTING HVAC, RECONFIGURATION, EXPANSION AND RENOVATION OF EXISTING SPACE (DEMO, NEW CONSTRUCTION, FINISHES), COMMUNICATION INFRASTRUCTURE (NEW DATA OUTLETS, PATCH PANELS, UPGRADE TO CAT 6A CABLE) IN BUILDINGS AS NECESSARY, PHYSICAL SECURITY UPGRADES, ASSESS AND UPGRADE FIBER INFRASTRUCTURE BACKBONE CAMPUS WIDE WITHIN BUILDINGS AND BETWEEN BUILDINGS, HAZARDOUS MATERIAL ABATEMENT. PROJECT BUILDING LOCATIONS INCLUDE: BUILDINGS 141, SADIE, 154A, MADISON, 115, 169, 154, 170, 171, 16, 20 AND SITE.

PROJECT DESCRIPTIONGENERAL PROJECT NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

32.

33.

34.

35.

36.

THE CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATION AND RELATED CONTRACT DOCUMENTS, VISIT SITE OF WORK, AND FULLY INFORM THEMSELVES AS ALL EXISTING CONDITIONS, FACILITIES, RESTRICTIONS AND OTHER MATTERS WHICH CAN AFFECT THE WORK, IN TIMELINE, QUALITY OR COST THEREOF; FAILURE OR OMISSION OF ANY CONTRACTOR TO VISIT THE SITE AND ACQUAINT THEMSELVES WITH THE EXISTING CONDITIONS, SHALL IN NO WAY RELIEVE THEM FROM ANY OBLIGATION WITH RESPECT TO THEIR CONTRACT AND NO EXTRA TIME OR COMPENSATION WILL BE ALLOWED BY REASON OF ANY THING OR MATTER CONCERNING WHICH THE CONTRACTOR COULD HAVE FULLY INFORMED THEMSELVES PRIOR TO BIDDING. GENERAL CONTRACTOR SHALL COORDINATE ALL ASPECTS

OF THE BUILDING CONSTRUCTION.

THE CONTRACTOR SHALL NOT CONSIDER CONSTRUCTION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT AND ASSESS EACH AREA AND TO FULFILL THE INTENT OF THE CONTRACT DOCUMENTS. CONTRACTOR SHALL COORDINATE ARCHITECTURAL CONSTRUCTION DRAWING AND NOTES WITH

CIVIL, STRUCTURAL AND MECHANICAL, ELECTRICAL & PLUMBING NOTES AND DRAWINGS.

THE DRAWINGS SHALL BE WORKED IN CONJUNCTION WITH THE TECHNICAL SPECIFICATIONS AND CONDITIONS OF THE PROJECT INCLUDED IN THE PROJECT MANUAL WHICH FORM A PART OF THE CONTRACT DOCUMENTS AND CONTAINS ADDITIONAL INFORMATION REQUIRED TO CONSTRUCT THE WORK OF THIS CONTRACT. IN THE EVENT OF A CONFLICT BETWEEN THE DRAWINGS AND THE SPECIFICATION NOTIFY THE COR FOR CLARIFICATION SEVEN DAYS BEFORE BEGINNING WORK ON THE

AFFECTED ACTIVITIES.

THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO THE START OF THE WORK. NOTIFY THE COR OF ANY SIGNIFICANT CHANGES IN

DIMENSIONS OR CONDITIONS.

THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, TOOLS, EQUIPMENT AND NECESSARY FACILITIES, AND PERFORM ALL LABOR AND SERVICES OF EVERY DESCRIPTION AS REQUIRED TO COMPLETE THE SCOPE OF WORK DEFINED ON THE DRAWINGS AND SPECIFICATIONS WITHIN THE AGREED TIMELINES.

THE CONTRACTOR SHALL ARRANGE FOR AND OBTAIN ALL VA ISSUED PERMITS (HOTWORK, ICRA, WEEKENDS, HOLIDAYS, SHUTDOWN, ETC), CERTIFICATES, INSPECTIONS, DEPARTMENT APPROVAL, ETC. FOR WORK PERFORMED UNDER THIS CONTRACT. PROVIDE COPIES OF ALL REQUIRED PERMITS, CERTIFICATES, INSPECTIONS AND AGENCY APPROVALS TO THE COR PRIOR TO THE COMMENCEMENT OF THE SCOPE.

FABRICATE AND INSTALL ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, ALL APPLICABLE STATE AND LOCAL CODES, AND THE GENERAL AND

SUPPLEMENTARY CONDITIONS OF THE CONTRACT.

U.L. ASSEMBLIES DESCRIBED ARE FOR REFERENCE ONLY. THE GENERAL CONTRACTOR SHALL COORDINATE AND VERIFY THE INSTALLATION OF THE DESCRIBED

SYSTEM(S) .

ALL CONTRACTORS AND SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR THE PROPER PERFORMANCE OF THEIR WORK, COORDINATING WITH OTHER TRADES, MEANS AND METHODS OF CONSTRUCTION, SAFETY AND SECURITY ON SITE.

CUTTING AND PATCHING SHALL BE PERFORMED BY EACH TRADE AS NECESSARY FOR THE PERFORMANCE AND INSTALLATION OF THE WORK. CUTTING AND PATCHING SHALL BE PERFORMED IN A WORKMANLIKE MANNER CONSISTENT WITH INDUSTRY STANDARDS FOR FINISHES AND SUBSTRATES AFFECTED.

THE CONTRACTOR SHALL PROTECT THE FACILITY FROM WEATHER AND MAINTAIN SECURITY DURING ALL CONSTRUCTION WORK.

PROTECT EXISTING PROPERTY DURING CONSTRUCTION. REPAIR OR REPLACE, AT THE DISCRETION AND TO THE SATISFACTION OF THE COR, WITHOUT ADDITIONAL CHARGE TO THE OWNER, ANY EXISTING WORK DAMAGED DURING THE COURSE OF CONSTRUCTION.

THE WORK SHALL BE COORDINATED IN GOOD FAITH WITH THE COR AND ALL GOVERNMENT EMPLOYEES 14 DAYS IN ADVANCE OF BEGINNING EACH CONSTRUCTION

ACTIVITY.

UNLESS ITEMS OF MATERIAL, EQUIPMENT OR WORK ARE SPECIFICALLY NOTED TO BE PROVIDED OR FURNISHED BY OTHERS, THEY SHALL BE PROVIDED UNDER THIS

CONTRACT BY THE CONTRACTOR.

ALL WORK SHALL BE PERFORMED BY SKILLED WORKERS IN A WORKMANLIKE AND PROFESSIONAL MANNER CONSISTENT WITH INDUSTRY STANDARDS AND OR AS

DIRECTED BY THE COR.

THE CONTRACTOR SHALL LEAVE THE SITE AND ALL BUILDINGS AND STRUCTURES IN PROPER WORKING ORDER AND SHALL, WITHOUT ADDITIONAL CHARGE, REPLACE ANY WORK, MATERIALS, OR EQUIPMENT FURNISHED AND INSTALLED UNDER THE CONTRACT WHICH DEVELOPS DEFECTS, DUE TO A POSSIBLE WORKMANSHIP ISSUE, WITHIN ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER. THIS IS NOT TO LIMIT OR EXCLUDE ANY OTHER WARRANTY OR WARRANTY PERIOD

OTHERWISE DESCRIBED.

CONTRACTOR SHALL SCHEDULE, COORDINATE, AND FACILITATE ALL POWER, WATER, OR TELECOMMUNICATION OUTAGES AND SHUTDOWNS. ALL OUTAGES AND

SHUTDOWNS MUST BE SCHEDULED WITH THE COR ONE (1) WEEK PRIOR TO OUTAGE.

FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO REGULATED MATERIALS ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, EQUIPMENT, AND ALL OTHER EXISTING SYSTEMS. MAKE NECESSARY PROVISIONS TO MAINTAIN THE INTEGRITY OF SAID SYSTEMS PRIOR TO THE COMMENCEMENT OF DEMOLITION, IF ANY. SEE MECHANICAL, ELECTRICAL, TELECOMMUNICATIONS, AND ARCHITECTURAL DRAWINGS FOR ANY SYSTEM OR PORTIONS

THEREOF TO BE REMOVED, RELOCATED, REVISED OR ABANDONED.

ANY CONSTRUCTION INSTALLED IN CONFLICT WITH THE CONTRACT DOCUMENTS SHALL BE CORRECTED AT NO EXPENSE TO THE OWNER.

ALL REQUIRED EXITS FROM OCCUPIED PORTIONS OF THE BUILDING MUST BE MAINTAINED AT ALL TIMES. ESTABLISH PROCEDURES TO MINIMIZE CIRCULATION OF CONSTRUCTION PERSONNEL AND MATERIALS THROUGH OCCUPIED PORTIONS OF THE BUILDING. KEEP ALL AREAS ADJACENT TO THE WORK AREA CLEAN.

PRIOR TO DELIVERY OF MATERIALS TO THE CONSTRUCTION ZONE AND REMOVAL OF WASTE FROM THE SITE, VERIFY WITH THE COR FOR AN ACCEPTABLE ACCESS ROUTE AND TIME. UNDER NO CIRCUMSTANCES SHALL ANY AREA OUTSIDE THE CONSTRUCTION ZONE BE USED WITHOUT PRIOR WRITTEN APPROVAL FROM THE COR.

ALL BUILDING INTERIOR STAGING AREAS SHALL BE PROTECTED WITH FIRE RESISTANT PLYWOOD ENCLOSURES. ALL TRASH SHALL BE REMOVED FROM THE BUILDING DAILY. CONSTRUCTION MATERIALS SHALL NOT BE STORED IN CORRIDORS OR ANY OTHER UNAUTHORIZED LOCATION AT ANY TIME.

FIELD VERIFY ALL EXISTING DIMENSIONS, SERVICES, AND POINTS OF CONNECTION PRIOR TO START OF WORK.

THE DESIGN ADEQUACY, SAFETY, AND ERECTION OF BRACING, SHORING, SCAFFOLDING, AND TEMPORARY SUPPORTS AND RESTRAINS IS THE SOLE RESPONSIBILITY OF

THE CONTRACTOR.

NOTIFY THE FACILITY OF TIMES WHEN THE CONSTRUCTION NOISE WILL EXCEED 80 DECIBELS . RESCHEDULE SUCH WORK IF SO REQUIRED BY THE FACILITY.

NOTIFY THE COR OF ANY DISCREPANCIES DISCOVERED IN THE FIELD THAT REQUIRE CORRECTIVE ACTION PRIOR TO TAKING ANY ACTION.

FOR EXISTING FLOORS, CEILINGS, PARTITIONS, AND SERVICES TO REMAIN, PROTECT ALL FINISHES AND MATERIALS, AND REPAIR OR REPLACE ALL ITEMS THAT ARE DAMAGED OR SOILED DURING THE COURSE OF CONSTRUCTION. ALL FINISHES AND MATERIALS SHALL BE PROPERLY INTEGRATED TO CONSTITUTE A UNIFORM

APPEARANCE AND SEAMLESS TRANSITION.

ALL ITEMS TO BE REMOVED AND REPLACED SHALL BE HANDLED WITH PROPER CARE AND STORED IN SUCH A MANNER AS TO PREVENT DAMAGE; WHEN DAMAGED, REPLACE AT NO EXPENSE TO THE OWNER.

ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED OR BRACED IN ACCORDANCE WITH PROVISIONS OF THE TECHNICAL SPECIFICATIONS.

ALL DRAWINGS, THOUGH NOTED TO SCALE, ARE FOR ILLUSTRATION ONLY. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS. ITEMS WRONGLY LOCATED

BY DRAWINGS SCALING SHALL BE CORRECTED.

SIGNAGE CONSTRUCTION, FONT AND SIZE SHALL BE CONSISTENT WITH THE FACILITY'S EXISTING SIGNAGE SYSTEMS. REFER TO SPECIFICATIONS FOR CODE REQUIRED SIGNAGE. PROVIDE ADDITIONAL SIGNAGE AS MAY BE REQUIRED BY REQUEST OF THE FIRE MARSHAL AND/OR BUILDING CODE OFFICIAL OR COR.

EXERCISE CARE DURING CONSTRUCTION TO MINIMIZE DISRUPTION OF THE MEDICAL CENTER ROUTINE, COORDINATE SEQUENCE OF WORK AND PHASING WITH THE COR TO MINIMIZE DISRUPTION OF THE MEDICAL CENTER. MANY OF THE WORK ITEMS REQUIRE THE WORK TO BE PERFORMED ONLY AT NIGHT, WEEKENDS, OR

HOLIDAYS WITH PRIOR APPROVAL OF THE COR AT NO ADDITIONAL COST TO THE GOVERNMENT.

PRIOR TO DRILLING OR CORING EXISTING CONCRETE, CONTRACTOR SHALL LOCATE EXISTING REINFORCEMENT TO MAINTAIN ADEQUATE CLEARANCES FROM AND AVOID DAMAGE TO EXISTING REINFORCEMENT. CONTRACTOR SHALL USE NON-DESTRUCTIVE TESTING (NDT) TO LOCATE REINFORCEMENT. WHENEVER FEASIBLE, CONTRACTOR SHALL USE GROUND PENETRATING RADAR (GPR) OR MEANS OTHER THAN X-RAY. WHERE X-RAY IS REQUIRED, CONTRACTOR SHALL PROVIDE WRITTEN REQUEST AT LEAST THREE (3) WEEKS PRIOR TO EVENT: WORK MAY BE REQUIRED TO BE PERFORMED OUTSIDE NORMAL WORK HOURS AND SHALL BE DOCUMENTED ON

THE THREE (3) WEEK LOOK-AHEAD SCHEDULE.

PROTECT EXISTING FIRE SUPPRESSION SYSTEMS DURING CONSTRUCTION.

IN THE EVENT THE CONTRACTOR DISCOVERS HAZARDOUS MATERIALS WHICH ARE NOT AVOIDABLE BY REROUTING THE WORK AND HAVE NOT BEEN DESCRIBED IN THE CONTRACT, THE CONTRACTOR IS TO NOTIFY THE COR AND THE A/E FOR DIFFERING SITE CONDITION ACKNOWLEDGEMENT. REMEDIATION WOULD BE COMPENSATED BY

ADDITIONAL MONEY AND ADDITIONAL TIME FOR CRITICAL PATH ACTIVITIES.

CONTRACTOR SHALL PROVIDE STAFF THAT WILL UNDERGO TRAINING AND CERTIFICATION TO ALLOW UN-ESCORTED ACCESS TO IT CLOSETS. THE CONTRACTOR SHALL CERTIFY SUFFICIENT NUMBER OF STAFF TO ACCOMMODATE PROPOSED SCHEDULE WITHOUT RELYING ON VA STAFF TO ACCOMPANY AS ESCORTS. THIS WILL REQUIRE PIV BADGING REQUIREMENT INCLUDING BACKGROUND INVESTIGATIONS. SEE "CONTRACTOR BACKGROUND INVESTIGATIONS REQUEST" FORM. COORDINATE WITH

CO/CS REGARDING SUBMITTING THE FORM.

CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING ANY REQUIRED THIRD PARTY INSPECTORS.

OWNER

ARCHITECT

TELECOMMUNICATIONS

ENGINEER, PROJECT LEAD

MECHANICAL ENGINEER

ELECTRICAL ENGINEER

A&E ARCHITECTS

608 NORTH 29th STREET

BILLINGS, MT 59101

406.248.2633

TOGUS VA MEDICAL CENTER

1 VA CENTER

AUGUSTA, ME 04330

PROJECT TEAM

STRUCTURAL

KREMER, GHELEN, AND ASSOCIATES

400 COLUMBIA STREET, SUITE 240

VANCOUVER, WA 98660-3413

503.289.2661

CIVIL ENGINEER

GDM - COLUMBIA GORGE DISTRICT OFFICE

1000 W STEUBEN ST, UNIT THREE

BINGEN, WA 98605

541.436.4723

INDUSTRIAL HYGIENEFIRE PROTECTION ENGINEER

GDM - COLUMBIA GORGE DISTRICT OFFICE

1000 W STEUBEN ST, UNIT THREE

BINGEN, WA 98605

541.436.4723

GDM - COLUMBIA GORGE DISTRICT OFFICE

1000 W STEUBEN ST, UNIT THREE

BINGEN, WA 98605

541.436.4723

GDM - SEATTLE DISTRICT OFFICE

1584 MCNEIL STREET, SUITE 200

DUPONT, WA 98327

360.318.7095

GDM - SEATTLE DISTRICT OFFICE

1584 MCNEIL STREET, SUITE 200

DUPONT, WA 98327

360.318.7095

GDM - SEATTLE DISTRICT OFFICE

1584 MCNEIL STREET, SUITE 200

DUPONT, WA 98327

360.318.7095

AMERICAN ENGINEERING TESTING

550 CLEVELAND AVENUE NORTH

ST. PAUL, MN 55114

651.999.1387

"OWNER": THE OWNER IS UNITED STATES GOVERNMENT - DEPT. OF VETERANS AFFAIRS AND IS REFERRED TO THROUGHOUT THE CONTRACT DOCUMENTS AS IF SINGULAR IN NUMBER. THE TERM "OWNER"

MEANS THE OWNER OR THE OWNER'S CONTRACTING OFFICER'S AUTHORIZED REPRESENTATIVE.

"CONTRACTING OFFICER" OR "C.O." : THE OWNER'S AUTHORIZED REPRESENTATIVE RESPONSIBLE FOR ADMINISTRATING THE CONTRACT BETWEEN THE GENERAL CONTRACTOR AND OWNER. THE TERM INCLUDES CERTAIN AUTHORIZED REPRESENTATIVES OF THE CONTRACTING OFFICER ACTING WITHIN THE LIMITS OF

THEIR AUTHORITY AS DELEGATED BY THE CONTRACTING OFFICER.

"CONTRACTING OFFICER'S REPRESENTATIVE", (COR) : MEANS THE CONTRACTING OFFICER'S AUTHORIZED REPRESENTATIVE, IN PART, RESPONSIBLE FOR MONITORING THE CONTRACTOR'S (PLURAL) PERFORMANCE.

"WORK": THE TERM "WORK" MEANS THE CONSTRUCTION AND SERVICES REQUIRED BY THE CONTRACT DOCUMENTS, WHETHER COMPLETED OR PARTIALLY COMPLETED, AND INCLUDES ALL OTHER LABOR, MATERIALS, EQUIPMENT AND SERVICES PROVIDED BY THE CONTRACTOR TO FULFILL THE CONTRACTOR'S

OBLIGATIONS. THE WORK MAY CONSTITUTE THE WHOLE OR A PART OF THE PROJECT.

"PROJECT": THE TOTAL CONSTRUCTION OF WHICH THE WORK PERFORMED UNDER THE CONTRACT

DOCUMENTS

"DRAWINGS", "SHOP DRAWINGS" OR "PLANS" : THE GRAPHIC AND PICTORIAL PORTIONS OF CONTRACT DOCUMENTS, WHENEVER LOCATED AND WHENEVER ISSUED, SHOWING DESIGN, LOCATION AND DIMENSIONS OF THE WORK, GENERALLY INCLUDING PLANS, ELEVATIONS, SECTIONS, DETAILS, SCHEDULES AND DIAGRAMS.

"PROJECT SUPERVISOR" OR "SUPERVISOR" : MEANS THE ON-SITE SUPERVISION REPRESENTATIVE OF THE

PROJECT.

"ARCHITECT" OR "ENGINEER" : MEANS THE VA'S ARCHITECTS, ENGINEERS AND OTHER DESIGN AND ENGINEERS PROFESSIONALS FOR THIS PROJECT, AND REFERRED THROUGHOUT THE DRAWINGS AS IF

SINGULAR IN NUMBER.

"TRADE CONTRACTOR" OR "CONTRACTORS" : MEANS THE ENTITY UNDER CONTRACT AGREEMENT WITH THE GENERAL CONTRACTOR TO PROVIDE THE SPECIFIED GENERAL AND OR SPECIALTY WORK IN CONNECTION

WITH THIS PROJECT.

"FURNISH" OR "FURNISHED" : MEANS PROVIDING ALL MATERIALS, SHOP DRAWINGS, TRANSPORTATION, INSURANCE, FIELD MEASUREMENTS, EXPEDITING, SHIPPING, HANDLING, PACKAGING, STORAGE, TOUCH-UP MATERIALS, OWNER'S MANUALS, TRAINING AND ANY OTHER ACCESSORIES REQUIRED FOR A COMPLETE

INSTALLATION.

"INSTALL" OR "INSTALLED" : MEANS COMPLETING ALL WORK AND COSTS ASSOCIATED WITH UNLOADING, UNPACKING, HOISTING, STORAGE, HANGERS, SUPPORTS,SLEEVES, SCAFFOLDING, COORDINATION, LAYOUT, SHOP DRAWINGS, EXCAVATION, BACKFILL, DEWATERING, INSTALLATION, CUTTING AND PATCHING, FIRESTOPPING, CLEAN-UP, INSPECTION, DOCUMENTATION, PROTECTION OF SCOPE OF WORK AND ALL

ACCESSORIES, SERVICE AND FACILITIES REQUIRED FOR A COMPLETE INSTALLATION.

"PROVIDE" OR "PROVIDED": MEANS TO FURNISH AND INSTALL AND SHALL INCLUDE, WITHOUT LIMITATION, ALL LABOR, MATERIALS, EQUIPMENTS, TRANSPORTATION SERVICES, AND OTHER ITEMS REQUIRED TO

COMPLETE THE REFERENCED TASK.

"BY OWNER"; "BY VAMC" OR "BY VA" : MEANS ITEMS WILL BE ORDERED, PAID FOR, SHIPPED TO THE JOB SITE

AND INSTALLED BY THE OWNER.

"NOT IN CONTRACT" OR "N.I.C." : MEANS MATERIALS OR EQUIPMENT NOT IN THE CONTRACT, BUT MAY REQUIRE PROVISIONS IN THE CONSTRUCTION FOR FUTURE INSTALLATION AS SPECIFIED OR SHOWN.

OTHER DEFINITIONS OF WORDS AND TERMS USED IN THE DRAWINGS AND SPECIFICATIONS CAN BE FOUND IN THE LEGENDS AND SYMBOLS DRAWINGS FOR EACH DISCIPLINE AND IN DIVISION 0 AND 1 OF THE PROJECT

MANUAL.

BASIC DEFINITIONS

TEMPORARY FIRE & SMOKE PROTECTION

IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE WORK SHIFT DUE

TO ANY INCOMPLETE WORK, PROVIDE TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL

SATISFYING FIRE RATING REQUIREMENTS AT PENETRATIONS

IF MULTIPLE CEILING TILES MUST BE REMOVED AND CANNOT BE REPLACED AT THE END OF THE WORK SHIFT, A 1-HOUR FIRE BARRIER WILL NEED TO BE CONSTRUCTED. IF CONTRACTOR IDENTIFIES UPCOMING WORK RESULTING IN A LONG-TERM CEILING REMOVAL, NOTIFY THE COR IMMEDIATELY WHETHER A RATED ENCLOSURE MUST BE CONSTRUCTION OR TEMPORARY UPRIGHT SPRINKLER HEADS INSTALLED. THIS

WORK IS TO BE PART OF THE SUBMITTED SCOPE OF WORK.

IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST FIRE/SMOKE SPREAD

THROUGH THE UNSEALED PENETRATION.

VOLUME 4

ELECTRICAL - FIRE PROTECTION

TYPICAL SHEET VIEW NUMBERING LAYOUTS

WINDOW TAGROOM TAG

DOOR TAG KEYNOTE TAG

ASSEMBLY TAG

MATERIAL TAG

REVISION TAGREVISION CLOUD

XX-XX

CEILING TAG VIEW REFERENCE

BUILDING

SECTION

WALL

SECTION

ELEVATION

GRID LINE

DETAIL

CALL OUT

INTERIOR

ELEVATION

EXTERIOR

ELEVATION

DETAIL

SECTION

POSITION OF VIEW ON SHEET

VIEW SCALE

VIEW NAME

ROOM NAME

101.1

X

X'-X"

XXX

W D

HT

CASEWORK TAG

CABINET DESIGN

SERIES NO.

1 1/8" = 1'-0"

View Name

A4.# 1A6.#

#1

#2

#3

#4

A5.#

A5.#

A5.#

A5.#

EXPLANATION OF SYMBOLS

NUMBERING STARTS IN BOTTOM LEFT

CORNER, MOVING UPWARDS, SKIPPING

NONE

ARCH E1 (30"x42")

3 4 5

8 9 10

12 13 14 15

17 18 19 20

ARCHITECTURAL ABBREVIATIONS

AB ANCHOR BOLT

ABV ABOVE

A/C AIR CONDITIONING

ACT ACOUSTICAL CEILING TILE

ADDL ADDITIONAL

ADJ ADJUSTABLE

AFF ABOVE FINISH FLOOR

ALT ALTERNATE

ALUM ALUMINUM

ARCH ARCHITECT(URAL)

AWN AWNING

B/ BOTTOM OF

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BM BEAM OR BENCHMARK

BRG BEARING

BTWN BETWEEN

BUR BUILT-UP ROOF

CAB CABINET

CJ CONTROL JOINT

CL CENTERLINE

CLG CEILING

CMU CONCRETE MASONRY UNIT

CO CLEAN OUT

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

CONST CONSTRUCTION

CG CORNER GUARD

CPT CARPET

CSMT CASEMENT

CT CERAMIC TILE

D DEEP

DF DRINKING FOUNTAIN

DH DOUBLE HUNG

DIM(S) DIMENSIONS

DISP DISPENSER

DN DOWN

DR DOOR

DS DOWNSPOUT

DTL DETAIL

DWG DRAWING

E EAST

EA EACH

EC EXISTING COLUMN

EJ EXPANSION JOINT

ELEC ELECTRICAL

EL ELEVATION

ELEV ELEVATOR

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR EXPOSED

EXT EXTERIOR

FACP FIRE ALARM CONTROL PANEL

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

F.F. FINISH FLOOR

FIN FINISH

FIXT FIXTURE

FLR FLOOR

FND FOUNDATION

FP FIRE PROTECTION

FR FRAME

FRMG FRAMING

FT FEET/FOOT OR FIRE TREATED

FTG FOOTING

FTNG FOOTING

FRP FIBERGLASS REINFORCED PANEL

FRT FIRE RETARDANT TREATED

GA GAUGE

GALV GALVANIZED

GB GYPSUM BOARD

GC GENERAL CONTRACTOR

GL GLASS, GLAZING

GWB GYPSUM WALL BOARD

GYP GYPSUM

HC HANDICAP

HDR HEADER

HDW HARDWARE

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HOUR

HT HEIGHT

HTD HEATED

HVAC HEATING/VENTILATION & AIR

CONDITIONING

ID INSIDE DIAMETER

INFO INFORMATION

ISO ISOCYANURATE

INSUL INSULATE / INSULATED / INSULATION

INT INTERIOR

INV INVERT

JT JOINT

J-BOX JUNCTION BOX

KIT KITCHEN

L LONG / LENGTH

LAM LAMINATE(D)

LAV LAVATORY

LF LINEAR FEET

LT LIGHT

MAS MASONRY

MATL MATERIAL

MAX MAXIMUM

MECH MECHANIC(AL)

MEZZ MEZZANINE

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MTL METAL

N NORTH

NIC NOT IN CONTRACT

NOM NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER OR OVERFLOW

DRAIN

OPNG OPENING

OPP OPPOSITE

OSB ORIENTED STRAND BOARD

OVHD OVERHEAD

PL PLATE

PLAM PLASTIC LAMINATE

PLUMB PLUMBING

PLYWD PLYWOOD

PNL PANEL

PNT PAINT

POLY POLYESTER OR POLYOLEFIN

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED OR POINT

PVMT PAVEMENT

QT QUARRY TILE

QTR QUARTER

QTY QUANTITY

R RADIUS

RA RETURN AIR

RB RUBBER BASE

RD ROOF DRAIN

RECY RECYCLE(D)

REF REFERENCE

REFRIG REFRIGERATOR OR

REFRIGERATION

REINF REINFORCE

REQD REQUIRED

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

S SOUTH

SC SOLID CORE

SCH SCHEDULE

SCHED SCHEDULED

SECT SECTION

SF SQUARE FEET

SFRM SPRAY APPLIED FIRE RESISTIVE

MATERIAL

SGL SINGLE

SHT SHEET

SHTG SHEATHING

SIM SIMILAR

SPECS SPECIFICATIONS

SOD SLAB ON DECK

SOG SLAB ON GRADE

SOH SAME OPPOSITE HAND

SS STAINLESS STEEL

ST STONE TILE

STD STANDARD

STND STANDARD

STL STEEL

STRUCT STRUCTURAL

TEMP TEMPERED

THK THICK

THRESH THRESHOLD

T.O. TOP OF

TOBM TOP OF BEAM

T.O.BM. TOP OF BEAM

T.O.P. TOP OF PLATE

T.O.S. TOP OF STEEL

T/ TOP OF

T&G TONGUE AND GROOVE

TEL TELEPHONE

THK THICK

TRANS TRANSOM

TV TELEVISION

TYP TYPICAL

UL UNDERWRITERS LABORATORY

UNO UNLESS NOTED OTHERWISE

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

VP VENEER PLASTER

VR VAPOR RETARDER

VT VINYL TILE

VWC VINYL WALL COVERING

W WIDE OR WEST

W/ WITH

WC WATER CLOSET

WD WOOD

WDW WINDOW

WG WALL GUARD

WH WATER HEATER

W/IN WITHIN

W/O WITHOUT

WP WATERPROOF

WR WATER RESISTANT

WT WEIGHT

WWF WELDED WIRE FABRIC

# NUMBER OR POUND

@ AT

PROJECT

LOCATION

IMAGE COURTESY OF GOOGLE MAPS

PROJECT LOCATION MAP

TOGUS VETERANS AFFAIRS - MAINE HEALTH CARE SYSTEM

MVHCS NETWORK

1 VA CENTER | AUGUSTA, ME 04330

NORTH

200E

249 MRI

82 83

Q2

Q1

Q3

Q436

(Flag Pole)

Q27 Q34 Q33 Q32

242 229

T228

T227

T226 T225 T224

247-2

(Gone)

(Gone)

PROJECT KEY PLAN

U.S. Department of Veterans Affairs

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

PHASEARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

Au to de sk

D oc s:

//2

_V A

M ed ic al

C en te r -

T og us M

E/

7_

-G en

In fo

_r

.rv t

/1

0/

2:

:2

PM

00-GI-000.V4

COVER SHEET - VOLUME 4

A&E DESIGN

129 NORTH 29th STREET, SUITE 100

BILLINGS, MT 59101

PH: 406.248.2633

PAUL SIDERIUS, AIA

ELECTRONIC HEALTH RECORD MODERNIZATION

(EHRM) INFRASTRUCTURE UPGRADES - TOGUS, ME

TOGUS VA MEDICAL CENTER

402-22-700

GEN INFO

PSSPSSNovember 10, 2025

100% CONSTRUCTION

DOCUMENTSARCHITECT:

FULLY SPRINKLERED

Revisions: Date:

A/E:

GDM-AE INC

1304 NE 134TH STREET, SUITE A

VANCOUVER, WA 98685

PH: 541-436-4723

REISSUED 02-18-2026

INDEX OF DRAWINGS

VOLUME 1

VOLUME 2

VOLUME 4

ARCHITECTURAL

TELECOMMUNICATIONS

SHEET NO. SHEET NAME

00-TG-001 LEGEND, ABBREVIATION LIST, AND GENERAL NOTES

00-TS-000 TELECOMM OVERALL SITE PLAN

00-TS-001 TELECOMM SITE PLAN

00-TS-002 TELECOMM SITE PLAN

00-TS-003 TELECOMM SITE PLAN

00-TS-004 TELECOMM SITE PLAN

00-TS-005 TELECOMM SITE PLAN

200-TD-001 B200 GROUND LEVEL DEMOLITION PLAN

200-TD-011 B200 LEVEL 1 DEMOLITION PLAN

200-TD-012 B200 LEVEL 1 DEMOLITION PLAN - MRI

200-TD-021 B200 LEVEL 2 DEMOLITION PLAN

200-TD-031 B200 LEVEL 3 DEMOLITION PLAN

200-TD-041 B200 LEVEL 4 DEMOLITION PLAN

200-TD-051 B200 LEVEL 5 DEMOLITION PLAN

200-TD-061 B200 LEVEL 6 DEMOLITION PLAN

200-TD-071 B200 LEVEL 7 DEMOLITION PLAN

200-TN-001 B200 GROUND LEVEL TELECOMMUNICATIONS PLAN

200-TN-011 B200 LEVEL 1 TELECOMMUNICATIONS PLAN

200-TN-012 B200 LEVEL 1 TELECOMMUNICATIONS PLAN - MRI

200-TN-021 B200 LEVEL 2 TELECOMMUNICATIONS PLAN

200-TN-031 B200 LEVEL 3 TELECOMMUNICATIONS PLAN

200-TN-041 B200 LEVEL 4 TELECOMMUNICATIONS PLAN

200-TN-051 B200 LEVEL 5 TELECOMMUNICATIONS PLAN

200-TN-061 B200 LEVEL 6 TELECOMMUNICATIONS PLAN

200-TN-071 B200 LEVEL 7 TELECOMMUNICATIONS PLAN

200E-TD-001 B200E GROUND LEVEL DEMOLITION PLAN

200E-TD-011 B200E LEVEL 1 DEMOLITION PLAN

200E-TD-021 B200E LEVEL 2 DEMOLITION PLAN

200E-TD-031 B200E LEVEL 3 DEMOLITION PLAN

200E-TD-041 B200E LEVEL 4 DEMOLITION PLAN

200E-TN-001 B200E GROUND LEVEL TELECOMMUNICATIONS PLAN

200E-TN-011 B200E LEVEL 1 TELECOMMUNICATIONS PLAN

200E-TN-021 B200E LEVEL 2 TELECOMMUNICATIONS PLAN

200E-TN-031 B200E LEVEL 3 TELECOMMUNICATIONS PLAN

200E-TN-041 B200E LEVEL 4 TELECOMMUNICATIONS PLAN

201-TD-011 B201/238/239 BASEMENT & LEVEL 1 DEMOLITION PLAN - BLDG. 201, 238, & 239

201-TN-011 B201/238/239 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN - BLDG. 201,

238, & 239

202-TD-011 B202 LEVEL 1 & 2 DEMOLITION PLAN

202-TN-011 B202 LEVEL 1 & 2 TELECOMMUNICATIONS PLAN

203-TD-011 B203 LEVEL 1 & 2 DEMOLITION PLAN

203-TD-031 B203 LEVEL 3 DEMOLITION PLAN

203-TN-011 B203 LEVEL 1 & 2 DEMOLITION PLAN

203-TN-031 B203 LEVEL 3 TELECOMMUNICATIONS PLAN

204-TD-011 B204 BASEMENT & LEVEL 1 DEMOLITION PLAN

204-TD-021 B204 LEVEL 2 & PENTHOUSE DEMOLITION PLAN

204-TN-011 B204 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN

204-TN-021 B204 LEVEL 2 & PENTHOUSE TELECOMMUNICATIONS PLAN

205-TD-011 B205 LEVEL 1 DEMOLITION PLAN

205-TD-021 B205 LEVEL 2 DEMOLITION PLAN

205-TD-031 B205 LEVEL 3 DEMOLITION PLAN

205-TN-011 B205 LEVEL 1 TELECOMMUNICATIONS PLAN

205-TN-021 B205 LEVEL 2 TELECOMMUNICATIONS PLAN

205-TN-031 B205 LEVEL 3 TELECOMMUNICATIONS PLAN

206-TD-011 B206 LEVEL 1 DEMOLITION PLAN

206-TD-021 B206 LEVEL 2 DEMOLITION PLAN

206-TD-031 B206 LEVEL 3 & PENTHOUSE DEMOLITION PLAN

206-TN-011 B206 LEVEL 1 TELECOMMUNICATIONS PLAN

206-TN-021 B206 LEVEL 2 TELECOMMUNICATIONS PLAN

206-TN-031 B206 LEVEL 3 & PENTHOUSE TELECOMMUNICATIONS PLAN

207-TD-011 B207 LEVEL 1 DEMOLITION PLAN

207-TD-021 B207 LEVEL 2 DEMOLITION PLAN

207-TD-031 B207 LEVEL 3 & PENTHOUSE DEMOLITION PLAN

207-TN-011 B207 LEVEL 1 TELECOMMUNICATIONS PLAN

207-TN-021 B207 LEVEL 2 TELECOMMUNICATIONS PLAN

207-TN-031 B207 LEVEL 3 & PENTHOUSE TELECOMMUNICATIONS PLAN

208-TD-011 B208 BASEMENT & LEVEL 1 DEMOLITION PLAN

208-TN-011 B208 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN

209-TD-011 B209 BASEMENT & LEVEL 1 DEMOLITION PLAN

209-TD-021 B209 LEVEL 2 DEMOLITION PLAN

209-TN-011 B209 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN

209-TN-021 B209 LEVEL 2 TELECOMMUNICATIONS PLAN

210-TD-011 B210 BASEMENT & LEVEL 1 DEMOLITION PLAN

210-TD-021 B210 LEVEL 2 & 3 DEMOLITION PLAN

210-TN-011 B210 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN

210-TN-021 B210 LEVEL 2 & 3 TELECOMMUNICATIONS PLAN

211-TD-011 B211 LEVEL 1 DEMOLITION PLAN

211-TN-011 B211 LEVEL 1 TELECOMMUNICATIONS PLAN

212-TD-011 B212 BASEMENT & LEVEL 1 DEMOLITION PLAN

212-TN-011 B212 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN

221-TD-011 B221 LEVEL 1 & ATTIC DEMOLITION PLAN

221-TN-011 B221 LEVEL 1 & ATTIC TELECOMMUNICATIONS PLAN

232-TD-011 B232 LEVEL 1 DEMOLITION PLAN

232-TD-021 B232 LEVEL 2 DEMOLITION PLAN

232-TN-011 B232 LEVEL 1 TELECOMMUNICATIONS PLAN

232-TN-021 B232 LEVEL 2 TELECOMMUNICATIONS PLAN

235-TD-011 B235 LEVEL 1 DEMOLITION PLAN

235-TN-011 B235 LEVEL 1 TELECOMMUNICATIONS PLAN

240-TD-011 B240 BASEMENT & LEVEL 1 DEMOLITION PLAN

240-TN-011 B240 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN

248-TD-001 B248 BASEMENT DEMOLITION PLAN

248-TN-001 B248 BASEMENT TELECOMMUNICATIONS PLAN

255-TD-011 B255 LEVEL 1 DEMOLITION PLAN

255-TN-011 B255 LEVEL 1 TELECOMMUNICATIONS PLAN

300-TD-011 B300 LEVEL 1 & 2 DEMOLITION PLAN

300-TN-011 B300 LEVEL 1 & 2 TELECOMMUNICATIONS PLAN

Q1-TD-011 BQ1 BASEMENT & LEVEL 1, 2, & 3 DEMOLITION PLAN

Q1-TN-011 BQ1 BASEMENT & LEVEL 1, 2, & 3 TELECOMMUNICATIONS PLAN

Q3-TD-011 BQ3 BASEMENT & LEVEL 1, 2, & 3 DEMOLITION PLAN

Q3-TN-011 BQ3 BASEMENT & LEVEL 1, 2, & 3 TELECOMMUNICATIONS PLAN

Q4-TD-011 BQ4 BASEMENT & LEVEL 1, & 2 DEMOLITION PLAN

Q4-TN-011 BQ4 BASEMENT & LEVEL 1, & 2 TELECOMMUNICATIONS PLAN

Q27-TD-011 BQ27 BASEMENT & LEVEL 1, & 2 DEMOLITION PLAN

Q27-TN-011 BQ27 BASEMENT & LEVEL 1, & 2 TELECOMMUNICATIONS PLAN

Q32-TD-011 BQ32 BASEMENT & LEVEL 1, & 2 DEMOLITION PLAN

Q32-TN-011 BQ32 BASEMENT & LEVEL 1, & 2 TELECOMMUNICATIONS PLAN

069-TD-011 B069 BASEMENT & LEVEL 1, & 2 DEMOLITION PLAN

069-TN-011 B069 BASEMENT & LEVEL 1, & 2 TELECOMMUNICATIONS PLAN

MCR-TN-011 MCR TELECOMMUNICATIONS PLAN

MCR-TN-012 MCR CABLE TRAY & GRID IDENTIFICATION PLAN

Telecommunications

SHEET NO. SHEET NAME

TJ-001 EXISTING TELECOMM RACK ELEVATIONS

TJ-002 EXISTING TELECOMM RACK ELEVATIONS

TJ-003 EXISTING TELECOMM RACK ELEVATIONS

TJ-004 EXISTING TELECOMM RACK ELEVATIONS

TJ-005 EXISTING TELECOMM RACK ELEVATIONS

TJ-006 EXISTING TELECOMM RACK ELEVATIONS

TJ-007 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-008 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-009 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-010 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-011 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-012 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-013 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-014 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-015 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-016 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-017 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-018 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-019 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-020 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-021 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-022 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-023 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-024 TELECOMM CABLE DEMOLITION SCHEDULES

TJ-025 FIBER ONE LINE DIAGRAM

TJ-026 TELECOMM CABINET ELEVATIONS - HDA

TJ-027 TELECOMM CABINET ELEVATIONS - MDA and ER

TJ-028 MCR MDA HDA CABLE ONE LINE

TJ-029 TELECOMM RACK ELEVATIONS

TJ-030 TELECOMM RACK ELEVATIONS

TJ-031 TELECOMM RACK ELEVATIONS

TJ-032 TELECOMM RACK ELEVATIONS

TJ-033 TELECOMM DETAILS

TJ-034 TELECOMM DETAILS

TJ-035 TELECOMM DETAILS

TJ-036 TELECOMM MCR CABINET DETAILS

TJ-037 TELECOMM BONDING DETAILS

TJ-038 TELECOMM BONDING DETAILS

TJ-039 TELECOMM BONDING DETAILS

TJ-040 TELECOMM BONDING DETAILS

TJ-041 TELECOMM BONDING DETAILS

TJ-042 TELECOMM CABLE SCHEDULES

TJ-043 TELECOMM CABLE SCHEDULES

TJ-044 TELECOMM CABLE SCHEDULES

TJ-045 TELECOMM CABLE SCHEDULES

TJ-046 TELECOMM CABLE SCHEDULES

TJ-047 TELECOMM CABLE SCHEDULES

TJ-048 TELECOMM CABLE SCHEDULES

TJ-049 TELECOMM J-HOOK DETAILS

ELECTRICAL

SHEET NO. SHEET NAME

000-EG-001 LEGEND, ABBREVIATION LIST, AND GENERAL NOTES

000-ES-001 OVERALL ELECTRICAL SITE PLAN

000-ES-002 ELECTRICAL SITE PLAN

000-ES-003 ELECTRICAL SITE PLAN

000-ES-004 ELECTRICAL SITE PLAN

000-ES-005 ELECTRICAL SITE PLAN

000-ES-006 ELECTRICAL SITE PLAN

069-ED-011 BUILDING 69 BASEMENT, LEVEL 1, & 2 DEMOLITION PLAN -BLDG. 69

069-EP-011 BUILDING 69 BASEMENT & LEVEL 1, 2 POWER PLAN -BLDG. 69

200-ED-001 BUILDING 200 GROUND LEVEL DEMOLITION PLAN -BLDG 200

200-ED-011 BUILDING 200 LEVEL 1 DEMOLITION PLAN -BLDG. 200

200-ED-021 BUILDING 200 LEVEL 2 DEMOLITION PLAN -BLDG. 200

200-ED-031 BUILDING 200 LEVEL 3 DEMOLITION PLAN -BLDG 200

200-ED-041 BUILDING 200 LEVEL 4 DEMOLITION PLAN -BLDG 200

200-ED-051 BUILDING 200 LEVEL 5 DEMOLITION PLAN -BLDG 200

200-ED-061 BUILDING 200 LEVEL 6 DEMOLITION PLAN -BLDG 200

200-EP-001 BUILDING 200 GROUND LEVEL POWER PLAN -BLDG. 200

200-EP-011 BUILDING 200 LEVEL 1 POWER PLAN -BLDG. 200

200-EP-021 BUILDING 200 LEVEL 2 POWER PLAN -BLDG. 200

200-EP-031 BUILDING 200 LEVEL 3 POWER PLAN -BLDG. 200

200-EP-041 BUILDING 200 LEVEL 4 POWER PLAN -BLDG. 200

200-EP-051 BUILDING 200 LEVEL 5 POWER PLAN -BLDG. 200

200-EP-061 BUILDING 200 LEVEL 6 POWER PLAN -BLDG. 200

200E-ED-001 BUILDING 200E GROUND LEVEL DEMOLITION PLAN -BLDG. 200E

200E-ED-011 BUILDING 200E LEVEL 1 DEMOLITION PLAN -BLDG. 200E

200E-ED-021 BUILDING 200E LEVEL 2 DEMOLITION PLAN -BLDG. 200E

200E-ED-031 BUILDING 200E LEVEL 3 DEMOLITION PLAN -BLDG 200E

200E-EP-001 BUILDING 200E GROUND LEVEL POWER PLAN -BLDG. 200E

200E-EP-011 BUILDING 200E LEVEL 1 POWER PLAN -BLDG. 200E

200E-EP-021 BUILDING 200E LEVEL 2 POWER PLAN -BLDG. 200E

200E-EP-031 BUILDING 200E LEVEL 3 POWER PLAN -BLDG. 200E

201-ED-011 BUILDING 201 & 238 BASEMENT & LEVEL 1 DEMOLITION PLAN -BLDG. 201 & 238

201-EP-011 BUILDING 201 & 238 BASEMENT & LEVEL 1 POWER PLAN -BLDG. 201 & 238

202-ED-011 BUILDING 202 LEVEL 1 DEMOLITION PLAN -BLDG. 202

202-EP-011 BUILDING 202 LEVEL 1, 2, AND ROOF POWER PLAN -BLDG. 202

203-ED-011 BUILDING 203 LEVEL 1 & LEVEL 2 DEMOLITION PLANS -BLDG. 203

203-ED-031 BUILDING 203 LEVEL 3 DEMOLITION PLANS -BLDG. 203

203-EP-011 BUILDING 203 LEVEL 1 & LEVEL 2 POWER PLANS -BLDG. 203

203-EP-031 BUILDING 203 LEVEL 3 POWER PLANS -BLDG. 203

204-ED-011 BUILDING 204 BASEMENT & LEVEL 1 DEMOLITION PLANS -BLDG. 204

204-ED-021 BUILDING 204 LEVEL 2 & PENTHOUSE DEMOLITION PLANS -BLDG. 204

204-EP-011 BUILDING 204 BASEMENT & LEVEL 1 POWER PLANS -BLDG. 204

204-EP-021 BUILDING 204 LEVEL 2 & PENTHOUSE POWER PLANS -BLDG. 204

205-ED-011 BUILDING 205 LEVEL 1 DEMOLITION PLAN -BLDG. 205

205-ED-021 BUILDING 205 LEVEL 2 DEMOLITION PLAN -BLDG. 205

205-ED-031 BUILDING 205 LEVEL 3 DEMOLITION PLAN -BLDG. 205

205-EP-011 BUILDING 205 LEVEL 1 POWER PLAN -BLDG. 205

205-EP-021 BUILDING 205 LEVEL 2 POWER PLAN -BLDG. 205

205-EP-031 BUILDING 205 LEVEL 3 POWER PLAN -BLDG. 205

205-EP-041 BUILDING 205 ROOF POWER PLAN -BLDG. 205

206-ED-011 BUILDING 206 LEVEL 1 DEMOLITION PLAN -BLDG 206

206-ED-021 BUILDING 206 LEVEL 2 DEMOLITION PLAN -BLDG 206

206-ED-031 BUILDING 206 LEVEL 3 & PENTHOUSE DEMOLITION PLAN -BLDG 206

206-EP-011 BUILDING 206 LEVEL 1 POWER PLAN -BLDG. 206

206-EP-021 BUILDING 206 LEVEL 2 POWER PLAN -BLDG. 206

206-EP-031 BUILDING 206 LEVEL 3 POWER PLAN -BLDG. 206

206-EP-041 BUILDING 206 PENTHOUSE POWER PLAN -BLDG. 206

207-ED-011 BUILDING 207 LEVEL 1 DEMOLITION PLAN -BLDG. 207

207-ED-021 BUILDING 207 LEVEL 2 DEMOLITION PLAN -BLDG. 207

207-ED-031 BUILDING 207 LEVEL 3 & PENTHOUSE DEMOLITION PLAN -BLDG. 207

207-EP-011 BUILDING 207 LEVEL 1 POWER PLAN -BLDG. 207

207-EP-021 BUILDING 207 LEVEL 2 POWER PLAN -BLDG. 207

207-EP-031 BUILDING 207 LEVEL 3 POWER PLAN -BLDG. 207

207-EP-041 BUILDING 207 PENTHOUSE POWER PLAN -BLDG. 207

GENERAL INFORMATION

FIRE PROTECTION

SHEET NO. SHEET NAME

000-FP-001 FIRE PROTECTION GENERAL NOTES, DIAGRAM, LEGEND

000-FP-002 FIRE PROTECTION SIGNAGE REQUIREMENTS

000-FP-003 FIRE PROTECTION SITE PLAN - MCR

MCR-FP-100 FIRE BARRIER AND EXTINGUISHER PLAN - MCR

MCR-FP-101 CLEAN AGENT PLAN - MCR

MCR-FA-101 FIRE ALARM PLAN - MCR

MCR-FS-100 FIRE SPRINKLER HAZARD CLASSIFICATION PLAN - MCR

MCR-FS-101 FIRE SPRINKLER PLAN - MCR

MCR-FS-102 FIRE SPRINKLER CALCULATION NODES - MCR

MCR-FS-501 FIRE SPRINKLER DETAILS

200-FS-001 GROUND LEVEL FIRE SPRINKLER PLAN

200-FS-011 BLDG 200 LEVEL 1 FIRE SPRINKLER PLAN

200-FS-021 BLDG 200 LEVEL 2 FIRE SPRINKLER PLAN

200-FS-031 BLDG 200 LEVEL 3 FIRE SPRINKLER PLAN

200-FS-041 BLDG 200 LEVEL 4 FIRE SPRINKLER PLAN

200-FS-051 BLDG 200 LEVEL 5 FIRE SPRINKLER PLAN

200-FS-061 BLDG 200 LEVEL 6 FIRE SPRINKLER PLAN

200E-FS-001 BLDG 200E GROUND LEVEL FIRE SPRINKLER PLAN

200E-FS-011 BLDG 200E LEVEL 1 FIRE SPRINKLER PLAN

200E-FS-021 BLDG 200E LEVEL 2 FIRE SPRINKLER PLAN

200E-FS-031 BLDG 200E LEVEL 3 FIRE SPRINKLER PLAN

201-FS-001 BLDG 201, 238 & 239 BASEMENT & LEVEL 1 FIRE SPRINKLER PLAN

202-FS-012 BLDG 202 LEVEL 2 FIRE SPRINKLER PLAN

203-FS-031 BLDG 203 LEVEL 3 FIRE SPRINKLER PLAN

204-FS-021 BLDG 204 LEVEL 2 FIRE SPRINKLER PLAN

205-FS-011 BLDG 205 LEVEL 1 FIRE SPRINKLER PLAN

205-FS-021 BLDG 205 LEVEL 2 FIRE SPRINKLER PLAN

205-FS-031 BLDG 205 LEVEL 3 FIRE SPRINKLER PLAN

206-FS-011 BLDG 206 LEVEL 1 FIRE SPRINKLER PLAN

206-FS-021 BLDG 206 LEVEL 2 FIRE SPRINKLER PLAN

206-FS-031 BLDG 206 LEVEL 3 FIRE SPRINKLER PLAN

207-FS-011 BLDG 207 LEVEL 1 FIRE SPRINKLER PLAN

207-FS-021 BLDG 207 LEVEL 2 FIRE SPRINKLER PLAN

207-FS-031 BLDG 207 LEVEL 3 FIRE SPRINKLER PLAN

208-FS-011 BLDG 208 LEVEL 1 FIRE SPRINKLER PLAN

209-FS-011 BLDG 209 LEVEL 1 FIRE SPRINKLER PLAN

209-FS-021 BLDG 209 LEVEL 2 FIRE SPRINKLER PLAN

210-FS-011 BLDG 210 LEVEL 1 FIRE SPRINKLER PLAN

212-FS-011 BLDG 212 LEVEL 1 FIRE SPRINKLER PLAN

221-FS-011 BLDG 221 LEVEL 1 FIRE SPRINKLER PLAN

232-FS-021 BLDG 232 LEVEL 2 FIRE SPRINKLER PLAN

240-FS-011 BLDG 240 LEVEL 1 FIRE SPRINKLER PLAN

255-FS-011 BLDG 255 LEVEL 1 FIRE SPRINKLER PLAN

VOLUME 3

GENERAL INFORMATION Electrical

SHEET NO. SHEET NAME

208-ED-011 BUILDING 208 BASEMENT & LEVEL 1 DEMOLITION PLAN -BLDG. 208

208-EP-011 BUILDING 208 BASEMENT & LEVEL 1 POWER PLAN -BLDG. 208

209-ED-011 BUILDING 209 BASEMENT & LEVEL 1 DEMOLITION PLAN -BLDG. 209

209-ED-021 BUILDING 209 LEVEL 2 DEMOLITION PLAN -BLDG. 209

209-EP-011 BUILDING 209 BASEMENT & LEVEL POWER PLAN -BLDG. 209

209-EP-021 BUILDING 209 LEVEL 2 & ROOF POWER PLAN -BLDG. 209

210-ED-011 BUILDING 210 BASEMENT & LEVEL 1 DEMOLITION PLAN -BLDG. 210

210-ED-021 BUILDING 210 LEVEL 2 & 3 DEMOLITION PLAN -BLDG. 210

210-EP-011 BUILDING 210 BASEMENT & LEVEL 1 POWER PLAN -BLDG. 210

210-EP-021 BUILDING 210 LEVEL 2 & LEVEL 3 POWER PLAN -BLDG. 210

211-ED-011 BUILDING 211 LEVEL 1 DEMOLITION PLAN -BLDG. 211

211-EP-011 BUILDING 211 LEVEL 1 POWER PLAN -BLDG. 211

212-ED-011 BUILDING 212 BASEMENT & LEVEL 1 DEMOLITION PLAN -BLDG. 212

212-EP-011 BUILDING 212 BASEMENT & LEVEL 1 POWER PLAN -BLDG. 212

221-ED-011 BUILDING 221 LEVEL 1 & ATTIC DEMOLITION PLAN -BLDG. 221

221-EP-011 BUILDING 221 LEVEL 1 & ATTIC POWER PLAN -BLDG. 221

232-ED-011 BUILDING 232 LEVEL 1 DEMOLITION PLAN -BLDG. 232

232-ED-021 BUILDING 232 LEVEL 2 DEMOLITION PLAN -BLDG. 232

232-EP-011 BUILDING 232 LEVEL 1 POWER PLAN -BLDG. 232

232-EP-021 BUILDING 232 LEVEL 2 POWER PLAN -BLDG. 232

239-EP-011 BUILDING 239 LEVEL 1 POWER PLAN -BLDG. 239

240-ED-011 BUILDING 240 BASEMENT & LEVEL 1 DEMOLITION PLAN -BLDG.240

240-EP-011 BUILDING 240 BASEMENT & LEVEL 1 POWER PLAN -BLDG.240

255-ED-011 BUILDING 255 LEVEL 1 DEMOLITION PLAN -BLDG. 255

255-EP-011 BUILDING 255 LEVEL 1 POWER PLAN -BLDG. 255

Q1-ED-011 BUILDING Q1 BASEMENT & LEVEL 1,2,3 DEMOLITION PLAN -BLDG. Q1

Q1-EP-011 BUILDING Q1 BASEMENT & LEVEL 1,2,3 POWER PLAN -BLDG. Q1

Q3-ED-011 BUILDING Q3 BASEMENT AND LEVEL 1,2,3 DEMOLITION PLAN -BLDG. Q3

Q3-EP-011 BUILDING Q3 BASEMENT & LEVEL 1, 2, 3 POWER PLAN -BLDG. Q3

Q4-ED-011 BUILDING Q4 BASEMENT & LEVEL 1,2,3 DEMOLITION PLAN -BLDG. Q4

Q4-EP-011 BUILDING Q4 BASEMENT & LEVEL 1, 2 POWER PLAN -BLDG. Q4

Q27-ED-011 BUILDING Q27 BASEMENT & LEVEL 1, 2 DEMOLITION PLAN -BLDG. Q27

Q27-EP-011 BUILDING Q27 BASEMENT & LEVEL 1, 2 POWER PLAN -BLDG. Q27

Q32-ED-011 BUILDING Q32 BASEMENT & LEVEL1, 2 DEMOLITION PLAN -BLDG. Q32

Q32-EP-011 BUILDING Q32 BASEMENT & LEVEL 1, 2 POWER PLAN -BLDG. Q32

MCR-EP-011 BUILDING MCR MCR POWER PLAN

MCR-EP-012 BUILDING MCR MCR LIGHTING PLAN

MCR-EP-013 BUILDING MCR MCR ENLARGEMENTS

000-EJ-001 EQUIPMENT GROUNDING DETAILS

069-EJ-001 BLDG 69 PARTIAL ELECTRICAL ONE-LINE & PANEL SCHEDULE

200-EJ-001 BLDG 200 NORMAL ELECTRICAL ONE-LINE DIAGRAM

200-EJ-002 BLDG 200 NORMAL ELECTRICAL ONE-LINE DIAGRAM

200-EJ-003 BLDG 200 EMERGENCY ELECTRICAL ONE-LINE DIAGRAM

200-EJ-004 BLDG 200E ELECTRICAL ONE-LINE DIAGRAM

200-EJ-005 BLDG 200 & 200E ELECTRICAL PANEL SCHEDULES

200-EJ-006 BLDG 200 & 200E ELECTRICAL PANEL SCHEDULES

200-EJ-007 BLDG 200 & 200E ELECTRICAL PANEL SCHEDULES

201-EJ-001 BLDG 201 & 239 ELECTRICAL PANEL SCHEDULES

202-EJ-001 BLDG 202 & 211 NORMAL ELECTRICAL ONE-LINE DIAGRAM

202-EJ-002 BLDG 202 & 211 ELECTRICAL PANEL SCHEDULES

203-EJ-001 BLDG 203 ELECTRICAL DEMOLITION ONE-LINE DIAGRAM

203-EJ-002 BLDG 203 ELECTRICAL ONE-LINE DIAGRAM

203-EJ-003 BLDG 203 ELECTRICAL PANEL SCHEDULES

204-EJ-001 BLDG 204 ELECTRICAL ONE-LINE DIAGRAM

204-EJ-002 BLDG 204 ELECTRICAL PANEL SCHEDULES

205-EJ-001 BLDG 205 ELECTRICAL ONE-LINE DIAGRAM

205-EJ-002 BLDG 205 ELECTRICAL PANEL SCHEDULES

206-EJ-001 BLDG 206 ELECTRICAL ONE-LINE DIAGRAM

206-EJ-002 BLDG 206 & 208 ELECTRICAL PANEL SCHEDULES

207-EJ-001 BLDG 207 PARTIAL ONE-LINE DIAGRAMS

207-EJ-002 BLDG 207 ELECTRICAL PANEL SCHEDULES

209-EJ-002 BLDG 209 ELECTRICAL PANEL SCHEDULES

210-EJ-001 BLDG 210 & 255 ELECTRICAL ONE-LINE DIAGRAM

210-EJ-002 BLDG 210 & 255 ELECTRICAL PANEL SCHEDULES

212-EJ-001 BLDG 212 ELECTRICAL PANEL SCHEDULES

221-EJ-001 BLDG 221 PARTIAL ELECTRICAL ONE-LINE DIAGRAM

221-EJ-002 BLDG 221 ELECTRICAL PANEL SCHEDULES

232-EJ-001 BLDG 232 ELECTRICAL ONE-LINE DIAGRAM

232-EJ-002 BLDG 232 ELECTRICAL PANEL SCHEDULES

238-EJ-001 BLDG 238 PARTIAL ELECTRICAL ONE-LINE DIAGRAMS

238-EJ-002 BLDG 238 ELECTRICAL PANEL SCHEDULES

244-EJ-001 BLDG 244 PARTIAL ELECTRICAL ONE-LINE DIAGRAM

244-EJ-002 BLDG 244 GEN 9 & 10 ELECTRICAL ONE-LINE DIAGRAM

246-EJ-001 CAMPUS MV SYSTEMS ELECTRICAL DEMOLITION ONE-LINE DIAGRAM

246-EJ-002 CAMPUS MV SYSTEMS ELECTRICAL ONE-LINE DIAGRAM

G11-EJ-001 GEN 11 ELECTRICAL ONE-LINE DIAGRAM

MCR-EJ-001 MCR ELECTRICAL ONE-LINE DIAGRAM

MCR-EJ-002 MCR ELECTRICAL PANEL SCHEDULES

MCR-EJ-003 MCR ELECTRICAL PANEL SCHEDULES

Q1-EJ-001 BLDG Q1 PARTIAL ELECTRICAL ONE-LINE DIAGRAM

Q1-EJ-002 BLDG Q1, Q3 & Q4 ELECTRICAL PANEL SCHEDULES

Q32-EJ-001 BLDG Q32 PARTIAL ELECTRICAL ONE-LINE DIAGRAM

Q32-EJ-002 BLDG Q27 & Q32 ELECTRICAL PANEL SCHEDULES

GENERAL INFORMATION

GENERAL INFORMATION

ELECTRICAL

TELECOMMUNICATIONS (Continued) ELECTRICAL (Continued)

TELECOMMUNICATIONS

FIRE PROTECTION

MECHANICAL

SHEET NO. SHEET NAME

MH-001 HVAC GENERAL INFORMATION

MH-002 SCHEDULES

MH-003 SCHEDULES

MH-004 CALCULATIONS

MH-005 DETAILS

MH-006 DETAILS

MH-007 CONTROLS INFORMATION

MH-008 DIAGRAMS

MH-009 DIAGRAMS

69-MH-201 BUILDING 69 HVAC PLANS

200-MH-200 BUILDING 200/200E GROUND HVAC PLAN

200-MH-201 BUILDING 200/200E LEVEL 1 HVAC PLAN

200-MH-202 BUILDING 200/200E LEVEL 2 HVAC PLAN

200-MH-203 BUILDING 200/200E LEVEL 3 HVAC PLAN

200-MH-204 BUILDING 200/200E LEVEL 4 HVAC PLAN

200-MH-205 BUILDING 200/200E LEVEL 5, 6, 7 HVAC PLANS

200-MH-300 BUILDING 200/200E ENLARGED PLANS

200-MH-301 BUILDING 200/200E ENLARGED PLANS

200-MH-302 BUILDING 200/200E ENLARGED PLANS

200-MH-303 BUILDING 200/200E ENLARGED PLANS

200-MH-304 BUILDING 200/200E ENLARGED PLANS

202-MH-201 BUILDING 202 HVAC PLANS

202-MH-202 BUILDING 202 ENLARGED HVAC PLANS

203-MH-201 BUILDING 203 HVAC PLANS

203-MH-301 BUILDING 203 ENLARGED HVAC PLANS

204-MH-201 BUILDING 204 HVAC PLAN

204-MH-301 BUILDING 204 ENLARGED HVAC PLAN

205-MH-201 BUILDING 205 HVAC PLANS

205-MH-301 BUILDING 205 ENLARGED HVAC PLANS

205-MH-302 BUILDING 205 ENLARGED HVAC PLANS

206-MH-201 BUILDING 206 HVAC PLANS

206-MH-301 BUILDING 206 ENLARGED HVAC PLANS

206-MH-302 BUILDING 206 ENLARGED HVAC PLANS

207-MH-201 BUILDING 207 HVAC PLANS

207-MH-301 BUILDING 207 ENLARGED HVAC PLANS

207-MH-302 BUILDING 207 ENLARGED HVAC PLANS

208-MH-201 BUILDING 208 HVAC PLANS

209-MH-201 BUILDING 209 HVAC PLANS

209-MH-301 BUILDING 209 ENLARGED HVAC PLANS

210-MH-201 BUILDING 210 HVAC PLANS

210-MH-301 BUILDING 210 ENLARGED HVAC PLANS

211-MH-201 BUILDING 211 HVAC PLANS

212-MH-201 BUILDING 212 HVAC PLANS

212-MH-301 BUILDING 212 ENLARGED HVAC PLANS

221-MH-201 BUILDING 221 HVAC PLANS

232-MH-201 BUILDING 232 HVAC PLANS

232-MH-301 BUILDING 232 ENLARGED PLANS

238-MH-201 BUILDING 201, 238, AND 239 HVAC PLANS

238-MH-301 BUILDING 201, 238, AND 239 ENLARGED PLANS

240-MH-201 BUILDING 240 HVAC PLANS

255-MH-201 BUILDING 255 HVAC PLANS

MCR-MH-201 BUILDING MCR FOUNDATION HVAC PLAN

MCR-MH-202 BUILDING MCR LEVEL 1 HVAC PLAN

MCR-MH-203 BUILDING MCR LEVEL 1 HVAC PIPING PLAN

MCR-MH-204 BUILDING MCR LEVEL 1 HVAC RCP PLAN

MCR-MH-301 BUILDING MCR SECTIONS

MCR-PP-201 BUILDING MCR FOUNDATION PLUMBING PLAN

MCR-PP-202 BUILDING MCR LEVEL 1 PLUMBING PLAN

MCR-PP-203 BUILDING MCR LOWER ROOF PLUMBING & HVAC PLAN

MCR-PP-204 BUILDING MCR ROOF PLUMBING PLAN

Q1-MH-201 BUILDING Q1 HVAC PLANS

Q3-MH-201 BUILDING Q3 HVAC PLANS

Q4-MH-201 BUILDING Q4 HVAC PLANS

Q27-MH-201 BUILDING Q27 HVAC PLANS

Q32-MH-201 BUILDING Q32 HVAC PLANS

MECHANICAL

ARCHITECTURAL (Continued)

U.S. Department of Veterans Affairs

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

PHASEARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

Au to de sk

D oc s:

//2

_V A

M ed ic al

C en te r -

T og us M

E/

7_

-G en

In fo

_r

.rv t

00-GI-001.V4

INDEX OF DRAWINGS - VOLUME 4

A&E DESIGN

129 NORTH 29th STREET, SUITE 100

BILLINGS, MT 59101

PH: 406.248.2633

PAUL SIDERIUS, AIA

ELECTRONIC HEALTH RECORD MODERNIZATION

(EHRM) INFRASTRUCTURE UPGRADES - TOGUS, ME

TOGUS VA MEDICAL CENTER

402-22-700

GEN INFO

PSSPSSNovember 10, 2025

100% CONSTRUCTION

DOCUMENTSARCHITECT:

FULLY SPRINKLERED

Revisions: Date:

SHEET NO. SHEET NAME

00-GI-000.V1 COVER SHEET - VOLUME 1

00-GI-001.V1 INDEX OF DRAWINGS - VOLUME 1

00-GI-002 PROJECT GENERAL NOTES AND CODE SUMMARY

00-GI-003 ICRA CLASSIFICATION PROCESS MATERIAL ID LIST

00-GI-004 PROJECT LOCATION MAPS AND CAMPUS PLAN

00-GI-005 PROJECT ASSEMBLY TYPES

00-GI-006 UL ASSEMBLIES

00-GI-007 UL ASSEMBLIES

00-GI-008 UL ASSEMBLIES

00-GI-009 DOOR SCHEDULE AND TYPICAL DOOR DETAILS

00-GI-010 CEILING DETAILS

00-GI-011 PARTITION DETAILS

00-GI-012 ROOF AND TYPICAL DETAILS

00-GI-013 INTERIOR FINISH MATERIALS

SHEET NO. SHEET NAME

00-GI-000.V3 COVER SHEET - VOLUME 3

00-GI-001.V3 INDEX OF DRAWINGS - VOLUME 3

SHEET NO. SHEET NAME

00-GI-000.V4 COVER SHEET - VOLUME 4

00-GI-001.V4 INDEX OF DRAWINGS - VOLUME 4

SHEET NO. SHEET NAME

MCR-AE-101 LEVEL 1 CODE PLAN

MCR-AE-200 SLAB FLOOR PLAN

MCR-AE-201 LEVEL 1 DIMENSION FLOOR PLAN

MCR-AE-202 LEVEL 1 FLOOR PLAN

MCR-AE-203 UTILITY YARD FLOOR PLAN

MCR-AE-204 ROOF PLAN AND SITE PLAN

MCR-AE-301 PLAN DETAILS

MCR-AE-302 CAST STONE DETAILS

MCR-AE-401 EXTERIOR ELEVATIONS

MCR-AE-402 EXTERIOR ELEVATIONS

MCR-AE-403 EXTERIOR ELEVATIONS

MCR-AE-404 ENLARGED ELEVATION DETAILS

MCR-AE-501 BUILDING SECTIONS

MCR-AE-511 WALL SECTIONS

MCR-AE-512 WALL SECTIONS

MCR-AE-513 WALL SECTIONS

MCR-AE-521 SECTION DETAILS

MCR-AE-522 SECTION DETAILS

MCR-AE-601 INTERIOR ELEVATIONS

MCR-AE-602 DATA CENTER ELEVATIONS

MCR-AE-701 LEVEL 1 REFLECTED CEILING PLAN

MCR-AE-801 VERTICAL CIRCULATION PLANS

MCR-AE-802 VERTICAL CIRCULATION SECTIONS AND ELEVATIONS

MCR-AE-803 VERTICAL CIRCULATION STAIR AND RAIL DETAILS

Q1-AD-201 LEVEL 1 DEMOLITION PLAN

Q1-AE-101 OVERALL PLAN

Q1-AE-201 PLANS AND ELEVATIONS

Q3-AE-101 OVERALL PLAN

Q3-AE-201 PLANS AND ELEVATIONS

Q4-AE-101 OVERALL FLOOR PLAN

Q4-AE-201 PLANS AND ELEVATIONS

Q27-AE-101 OVERALL PLAN

Q27-AE-201 FLOOR PLANS AND ELEVATIONS

Q32-AE-101 OVERALL PLAN

Q32-AE-201 PLANS AND ELEVATIONS

SHEET NO. SHEET NAME

69-AE-101 OVERALL PLAN

69-AE-201 PLANS

200-AD-200 GROUND LEVEL DEMOLITION PLAN

200-AD-201 LEVEL 1 DEMOLITION PLAN

200-AD-202 LEVEL 2 DEMOLITION PLAN

200-AD-203 LEVEL 3 DEMOLITION PLAN

200-AD-204 LEVEL 4 DEMOLITION PLAN

200-AD-205 LEVELS 5, 6, 7 DEMOLITION FLOOR PLANS

200-AE-101 OVERALL FLOOR PLANS

200-AE-102 OVERALL FLOOR PLANS

200-AE-103 OVERALL FLOOR PLANS

200-AE-104 OVERALL FLOOR PLANS

200-AE-200 GROUND FLOOR PLAN

200-AE-201 LEVEL 1 FLOOR PLAN

200-AE-202 LEVEL 2 FLOOR PLAN

200-AE-203 LEVEL 3 FLOOR PLAN

200-AE-204 LEVEL 4 FLOOR PLAN

200-AE-205 LEVELS 5, 6, 7 FLOOR PLANS

200-AE-206 ROOF PLAN

200-AE-300 GROUND LEVEL TR ENLARGED PLANS AND ELEVATIONS

200-AE-301 LEVEL 1 TR ENLARGED PLANS AND ELEVATIONS

200-AE-302 LEVEL 2 TR ENLARGED PLANS AND ELEVATIONS

200-AE-303 LEVEL 3 TR ENLARGED PLANS AND ELEVATIONS

200-AE-304 LEVEL 4, LEVEL 5 TR ENLARGED PLANS AND ELEVATIONS

200-AE-305 LEVEL 6 TR ENLARGED PLANS AND ELEVATIONS

202-AD-201 DEMOLITION PLANS

202-AE-101 OVERALL PLANS

202-AE-201 PLANS

204-AD-201 DEMOLITION PLANS

204-AE-101 OVERALL FLOOR PLANS

204-AE-201 FLOOR PLANS

204-AE-301 LEVEL 2 TR ENLARGED PLANS AND ELEVATIONS

205-AD-201 LEVEL 1 DEMOLITION PLAN

205-AE-101 OVERALL FLOOR PLAN

205-AE-201 FLOOR PLANS

205-AE-301 LEVEL 1 TR ENLARGED PLANS AND ELEVATIONS

205-AE-302 LEVELS 2 AND 3 TR ENLARGED PLANS AND ELEVATIONS

206-AD-201 DEMOLITION PLANS

206-AE-101 OVERALL FLOOR PLANS

206-AE-201 FLOOR PLANS

206-AE-301 LEVEL 1 TR ENLARGED PLANS AND ELEVATIONS

206-AE-302 LEVEL 2 AND 3 TR ENLARGED PLANS AND ELEVATIONS

207-AD-201 DEMOLITION PLANS

207-AE-101 OVERALL FLOOR PLANS

207-AE-201 FLOOR PLANS

207-AE-301 ENLARGED LEVEL 1 AND 2 TR PLANS

207-AE-302 ENLARGED LEVEL 3 TR PLANS

208-AE-101 OVERALL PLAN

208-AE-201 PLANS AND ELEVATIONS

209-AE-101 OVERALL PLANS

209-AE-201 FLOOR PLANS

209-AE-301 LEVEL 1 AND 2 TR ENLARGED PLANS AND ELEVATIONS

210-AD-201 DEMOLITION PLANS

210-AE-101 OVERALL PLAN

210-AE-201 PLANS AND ELEVATIONS

211-AE-101 OVERALL PLAN

211-AE-201 PLANS AND ELEVATIONS

212-AE-101 OVERALL PLAN

212-AE-201 LEVEL 1 FLOOR PLANS AND ELEVATIONS

221-AE-101 OVERALL PLAN

221-AE-201 LEVEL 1 PLANS AND ELEVATIONS

232-AD-201 LEVEL 1 DEMOLITION PLAN

232-AE-101 OVERALL PLAN

232-AE-201 FLOOR PLANS AND ELEVATIONS

238-AD-201 LEVEL 1 DEMOLITION PLAN

238-AE-101 OVERALL PLAN

238-AE-201 FLOOR PLANS AND ELEVATIONS

240-AD-201 DEMOLITION PLANS

240-AE-101 OVERALL FLOOR PLANS

240-AE-201 FLOOR PLANS

240-AE-301 LEVEL 1 AND 3 TR ENLARGED PLANS AND ELEVATIONS

255-AE-101 OVERALL PLAN

255-AE-201 PLANS AND ELEVATIONS

SHEET NO. SHEET NAME

00-GI-000.V2 COVER SHEET - VOLUME 2

00-GI-001.V2 INDEX OF DRAWINGS - VOLUME 2

A/E:

GDM-AE INC

1304 NE 134TH STREET, SUITE A

VANCOUVER, WA 98685

PH: 541-436-4723

SHEET NO.

MCR-SN-100

MCR-SN-101

MCR-SF-100

MCR-SF-101

MCR-SD-100

MCR-SD-101

MCR-SD-102

MCR-SD-103

MCR-SD-104

MCR-SD-200

MCR-SD-201

STRUCTURAL

SHEET NO.

00-CG-001

00-CS-001

00-CS-002

00-CS-003

00-CS-005

00-CU-101

00-CU-102

00-CU-103

00-CU-104

00-CU-105

00-CU-106

00-CU-107

00-CU-108

00-CU-109

00-CJ-101

00-CJ-102

00-CJ-103

00-CJ-104

00-CJ-105

00-CJ-106

00-CJ-107

SHEET NAME

GENERAL NOTES

OVERALL EXISTING CONDITIONS SITE PLAN

OVERALL A-CIRCUIT FIBER OPTIC SITE PLAN

OVERALL B-CIRCUIT FIBER OPTIC SITE PLAN

OVERALL CIVIL - ELECTRICAL SITE PLAN

A-CIRCUIT FIBER OPTICS SITE PLAN

A-CIRCUIT FIBER OPTICS SITE PLAN

A-CIRCUIT FIBER OPTICS SITE PLAN

A-CIRCUIT FIBER OPTICS SITE PLAN

A-CIRCUIT FIBER OPTICS SITE PLAN

A-CIRCUIT FIBER OPTICS SITE PLAN

A-CIRCUIT FIBER OPTICS SITE PLAN

A-CIRCUIT FIBER OPTICS SITE PLAN

A-CIRCUIT FIBER OPTICS SITE PLAN

A-CIRCUIT FIBER OPTICS PROFILES

A-CIRCUIT FIBER OPTICS PROFILES

A-CIRCUIT FIBER OPTICS PROFILES

A-CIRCUIT FIBER OPTICS PROFILES

A-CIRCUIT FIBER OPTICS PROFILES

A-CIRCUIT FIBER OPTICS PROFILES

A-CIRCUIT FIBER OPTICS PROFILES

00-CJ-108

00-CU-201

A-CIRCUIT FIBER OPTICS PROFILES

B-CIRCUIT FIBER OPTICS SITE PLAN

00-CU-202

00-CU-203

00-CU-204

00-CU-205

00-CU-206

00-CU-207

00-CU-208

00-CJ-201

00-CJ-202

00-CJ-203

00-CJ-204

00-CJ-205

00-CJ-206

00-CJ-207

00-CJ-A101

00-CJ-A102

00-CE-100

00-CE-101

00-CE-102

00-CS-004

00-CG-100

00-CU-301

00-CU-302

00-CU-303

00-CU-304

00-CJ-A201

00-CJ-A202

00-CJ-A203

00-CJ-A204

00-CJ-A205

00-CJ-A206

00-CU-401

00-CU-402

00-CJ-401

00-CJ-402

CIVIL

00-CG-101

B-CIRCUIT FIBER OPTICS SITE PLAN

B-CIRCUIT FIBER OPTICS SITE PLAN

B-CIRCUIT FIBER OPTICS SITE PLAN

B-CIRCUIT FIBER OPTICS SITE PLAN

B-CIRCUIT FIBER OPTICS SITE PLAN

B-CIRCUIT FIBER OPTICS SITE PLAN

B-CIRCUIT FIBER OPTICS SITE PLAN

B-CIRCUIT FIBER OPTICS PROFILES

B-CIRCUIT FIBER OPTICS PROFILES

B-CIRCUIT FIBER OPTICS PROFILES

B-CIRCUIT FIBER OPTICS PROFILES

B-CIRCUIT FIBER OPTICS PROFILES

B-CIRCUIT FIBER OPTICS PROFILES

B-CIRCUIT FIBER OPTICS PROFILES

CIVIL - DETAILS

CIVIL - DETAILS

EROSION CONTROL - NOTED AND DETAILS

EROSION CONTROL - DETAILS

MCR EROSION CONTROL - PLAN

PROPOSED MCR PLAN

PROPOSED MCR GRADING PLAN

PROPOSED MCR MSE WALL PLAN

PROPOSED MCR WATER AND SEWER PLAN

PROPOSED SEWER PROFILE

PROPOSED MCR DRAINAGE PLAN

PROPOSED DRAINAGE PROFILES

PAVING AND DRAINAGE - STANDARD DETAILS

PAVING AND DRAINAGE - STANDARD DETAILS

PAVING AND DRAINAGE - STANDARD DETAILS

PAVING AND DRAINAGE - STANDARD DETAILS

SANITARY SEWER COLLECTION SYSTEM - STANDARD DETAILS

WATER DISTRIBUTION SYSTEM - STANDARD DETAILS

CIVIL ELECTRICAL SITE PLAN

CIVIL ELECTRICAL SITE PLAN

CIVIL ELECTRICAL - PROFILES

CIVIL ELECTRICAL - PROFILES

SHEET NAME

BUILDING MCR STRUCTURAL NOTES

BUILDING MCR STRUCTURAL NOTES

BUILDING MCR FOUNDATION PLAN

BUILDING MCR ROOF FRAMING PLAN

BUILDING MCR FOUNDATION DETAILS

BUILDING MCR FOUNDATION DETAILS

BUILDING MCR RETAINING WALL PLAN & ELEVATION

BUILDING MCR RETAINING WALL DETAILS

BUILDING MCR RETAINING WALL DETAILS

BUILDING MCR ROOF FRAMING DETAILS

BUILDING MCR ROOF FRAMING DETAILS

REISSUED 02-18-2026

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Revisions: Date:

U.S. Department of Veterans Affairs

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

PHASEARCHITECT/ENGINEER OF RECORDSTAMPCONSULTANT

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

A&E DESIGN

129 NORTH 29th STREET, SUITE 100

BILLINGS, MT 59101

PH: 406.248.2633

PAUL SIDERIUS, AIA

ELECTRONIC HEALTH RECORD MODERNIZATION

(EHRM) INFRASTRUCTURE UPGRADES - TOGUS, ME

TOGUS VA MEDICAL CENTER

402-22-700

NOVEMBER 10, 2025

100% CONSTRUCTION

DOCUMENTSARCHITECT:

FULLY SPRINKLERED

A, AMP AMPERE

ACP ACCESSIBLE CARD PATH

ADA AMERICAN DISABILITY ACT

AF AMP FRAME

AFC AVAILABLE FAULT CURRENT

AFCI ARC FAULT CIRCUIT INTERRUPTER

AFF ABOVE FINISHED FLOOR

AG ABOVE GROUND

AT AMP TRIP

ATS AUTOMATIC TRANSFER SWITCH

AL ALUMINUM

BCT BONDING CONDUCTOR FOR TLECOMMUNICATIONS

BKR BREAKER

C CONDUIT

CKT CIRCUIT

CO CONDUIT AND PULL-ROPE ONLY

COMM COMMUNICATION

CTRL CONTROL

CU COPPER

(E) EXISTING

EC, E.C. ELECTRICAL CONTRACTOR

ELEC ELECTRICAL

EM EMERGENCY

EQPT EQUIPMENT

(F) FUTURE

FA FIRE ALARM

FDR FEEDER

G, GND GROUND

GC, G.C. GENERAL CONTRACTOR

HH HANDHOLE

IDF INTERMEDIATE DISTRIBUTION FRAME

J-BOX JUNCTION BOX

LCP LIGHTING…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .