This is a Specifications document (100% Construction Documents submittal) for the Electronic Health Record Modernization (EHRM) Infrastructure Upgrades project at Togus VA Medical Center in Augusta, Maine, issued February 18, 2026 under VA Project No. 402-22-700 and Contract No. 36C77623C0002.
The construction scope encompasses a comprehensive infrastructure modernization including: (1) construction of a new free-standing Main Computer Room (MCR) serving as the primary data hub with site-wide fiber distribution; (2) selective demolition, site grading, and structural improvements across multiple existing buildings (Buildings 69, 200, 200E, 201-212, 221, 232, 238-240, 255, Q1, Q3, Q4, Q27, Q32); (3) mechanical system upgrades featuring new Computer Room Air Conditioning (CRAC) units with N+1 redundancy, variable refrigerant flow (VRF) systems, and Building Automation and Control (BACnet) integration with Data Center Cooling Optimization controls; (4) electrical system work including new power distribution with redundant A/B circuits, automatic transfer switches, Uninterruptible Power Supply (UPS) systems, grounding and bonding infrastructure (Primary/Secondary Bonding Busbars, Rack Bonding Busbars, Telecommunication Bonding Backbone), and LED lighting with occupancy sensors; and (5) telecommunications infrastructure featuring fiber optic backbone cabling (A-side and B-side redundancy), Category 6A horizontal cabling, cable management systems, security integration with access control and IP cameras, and fire alarm systems. The work includes 33 divisions of specifications structured to CSI format covering concrete, masonry, metals, thermal protection, openings, finishes, fire suppression, plumbing, HVAC, electrical, communications, electronic safety/security, earthwork, site utilities, and related construction requirements. The document establishes mandatory contractor responsibilities for security compliance, phasing coordination with ongoing medical center operations (24/7 facility), utility service protection, as-built documentation, and warranty management, with normal working hours from 7:00 AM to 4:30 PM Monday through Friday and work outside these hours requiring Contracting Officer approval.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construction Documents – 100% CD Submittal: Specifications
Volume 1 – Division 00-01 Reissued February 18th, 2026
Department of Veterans Health Administration
Electronic Health Record Modernization (EHRM) Infrastructure Upgrades – Togus, ME Project No. 402-22-700
Contract No. 36C77623C0002
Togus VA Medical Center
1 VA Center, Augusta, ME 04330
US Department of Veterans Affairs
Program Contracting Activity Central (PCAC)
6150 Oak Tree Blvd., Suite 490
Independence, OH 44131
Prepared by:
GDM-AE, Inc.
1308 NE 134th St Suite A Vancouver, WA 98685
REISSUED 02-18-2026
VA Togus Medical Center 100% CONSTRUCTION DOCUMENTS Augusta,ME 02/18/2026
Electronic Health Records Modernization 00 01 10 -1 (EHRM) Infrastructure Upgrades, Togus, ME TABLE OF CONTENTS VA Project No. 402-22-700
SECTION 00 01 00
TABLE OF CONTENTS – 100% CONSTRUCTION DOCUMENTS
The following listed documents comprise the Project Manual for Electronic Health Record Modernization (EHRM) Infrastructure Upgrades at the Togus VA Medical Center in Augusta, Maine. Numbering of Divisions conforms to CSI Format for Building Specifications; Divisions and Sections not appearing are not applicable.
The following listed documents comprise the Project Manual for Electronic Health Record Modernization (EHRM) Infrastructure Upgrades at the Togus VA Medical Center in Augusta, Maine. Numbering of Divisions conforms to CSI Format for Building Specifications; Divisions and Sections not appearing are not applicable.
VOLUME ONE
00 01 00 Table of Contents
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 List of Drawing Sheets
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 01 14 00 Project Phasing 01 32 16.15 Project Schedule 01 33 23 Shop Drawings, Product Data, and Samples 01 35 26 Safety Requirements 01 42 19 Reference Standards 01 45 00 Quality Control 01 45 29 Testing Laboratory Services 01 56 00 Temporary Barriers and Enclosures 01 57 19 Temporary Environmental Controls 01 74 19 Construction Waste Management 01 81 11 Sustainable Construction Requirements 01 91 00 General Commissioning Requirements
END VOLUME ONE
VOLUME TWO
00 01 00 Table of Contents
DIVISION 02 – EXISTING CONDITIONS
02 41 19 Selective Demolition 02 81 00 Transportation and Disposal of Hazardous Materials 02 82 00 Asbestos Remediation 02 83 00 Lead Remediation
DIVISION 03 – CONCRETE
03 30 00 Cast-In-Place Concrete
DIVISION 04 – MASONRY
04 20 00 Unit Masonry 04 26 13 Masonry Veneer 04 72 00 Cast Stone Masonry
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 05 21 00 Steel Joist Framing 05 31 00 Steel Decking 05 40 00 Cold-Formed Metal Framing
Electronic Health Records Modernization 00 01 10 -2
VA Project No. 402-22-700
05 50 00 Metal Fabrications
05 52 13 PIPE AND TUBE RAILINGS
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 53 Miscellaneous Rough Carpentry 06 16 00 Sheathing 06 41 16 Plastic-Laminate-Clad Architectural Cabinets 06 64 00 Plastic Paneling
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 13 26 Self-Adhering Sheet Waterproofing 07 19 00 Water Repellents 07 21 00 Thermal Insulation 07 21 19 Foamed-In-Place Insulation 07 26 50 Underslab Vapor Barrier 07 27 26 Fluid-Applied Membrane Air Barriers 07 42 93 Soffit Panels 07 52 00 Modified Bitumen Membrane Roofing 07 62 00 Sheet Metal Flashing And Trim 07 72 00 Roof Accessories 07 84 00 Firestopping General Requirements 07 84 43 Joint Firestopping 07 92 00 Joint Sealants 07 92 19 Acoustic Joint Sealants
DIVISION 08 – OPENINGS
08 11 13 Hollow Metal Doors And Frames 08 31 13 Access Doors And Frames 08 33 23 Overhead Coiling Doors 08 34 00 Hot Aisle Containment System 08 41 13 Aluminum-Framed Entrances And Storefronts 08 41 23 Fire-Rated Aluminum Framed Entrances And Storefronts 08 71 00 Door Hardware 08 71 00A Door Hardware Groups 08 80 00 Glazing 08 88 13 Fire-Rated Glass 08 90 00 Louvers And Vents
DIVISION 09 – FINISHES
09 22 16 Non-Structural Metal Framing 09 29 00 Gypsum Board 09 30 13 Ceramic Tiling 09 51 13 Acoustic Panel Ceilings 09 65 13 Resilient Base And Accessories 09 65 36 Static-Control Resilient Flooring 09 68 13 Tile Carpeting 09 91 14 Exterior Painting 09 91 24 Interior Painting
DIVISION 10 – SPECIALTIES
10 26 00 Wall And Door Protection 10 28 00 Toilet, Bath And Laundry Accessories 10 44 13 Fire Protection Cabinets 10 44 19 Fire Extinguishers
DIVISION 11 – EQUIPMENT
11 13 19 Stationary Loading Dock Equipment
DIVISION 12 – FURNISHINGS
12 36 23.13 Plastic-Laminate-Clad Countertops
DIVISION 13 – SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements For Non-Structural Components
Electronic Health Records Modernization 00 01 10 -3
DIVISION 14 – CONVEYING EQUIPMENT - NA
END OF VOLUME TWO
VOLUME THREE
00 01 00 Table Of Contents
DIVISION 21 – FIRE SUPPRESSION
21 08 00 Commissioning Of Fire Suppression Systems 21 13 13 Wet-Pipe Sprinkler Systems 21 13 45 Sprinkler Guards 21 22 00 Clean Agent Fire Suppression Systems
DIVISION 22 – PLUMBING
22 05 11 Common Work Results For Plumbing 22 05 12 General Motor Requirements For Plumbing Equipment 22 05 19 Meters And Gages For Plumbing Piping 22 05 23 General-Duty Valves For Plumbing Piping 22 05 33 Heat Tracing For Plumbing Piping 22 07 11 Plumbing Insulation 22 08 00 Commissioning Of Plumbing Systems 22 11 00 Facility Water Distribution 22 11 23 Domestic Water Pumps 22 13 00 Facility Sanitary And Vent Piping 22 14 00 Facility Storm Drainage 22 40 00 Plumbing Fixtures 22 62 00 Vacuum Systems For Laboratory And Healthcare Facilities 22 63 00 Gas Systems For Laboratory And Healthcare Facilities
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 05 11 Common Work Results For Hvac 23 05 12 General Motor Requirements For Hvac And Steam Generation Equipment 23 05 41 Noise And Vibration Control For Hvac Piping And Equipment 23 05 93 Testing, Adjusting, And Balancing For Hvac 23 07 11 Hvac And Boiler Plant Insulation 23 08 00 Commissioning Of Hvac Systems 23 09 23 Direct-Digital Control System For Hvac 23 09 27 Data Center Cooling Optimization System 23 10 00 Facility Fuel Oil Systems 23 21 13 Hydronic Piping 23 22 13 Steam And Condensate Heating Piping 23 23 00 Refrigerant Piping 23 25 00 Hvac Water Treatment 23 31 00 Hvac Ducts And Casings 23 34 00 Hvac Fans 23 37 00 Air Outlets And Inlets 23 81 00 Decentralized Unitary Hvac Equipment 23 81 23 Computer-Room Air-Conditioners 23 81 45 Variable Refrigerant Flow Systems 23 82 00 Convection Heating And Cooling Units 23 85 00 Radon Mitigation Systems
DIVISION 26 – ELECTRICAL
26 05 11 - Requirements for Electrical Installations 26 05 13 - Medium-Voltage Cables 26 05 19 - Low-Voltage Electrical Power Conductors and Cables 26 05 26 - Grounding and Bonding for Electrical Systems 26 05 33 - Raceways and Boxes for Electrical Systems 26 05 41 - Underground Electrical Construction 26 05 73 - Overcurrent Protective Device Coordination Study 26 08 00 - Commissioning of Electrical Systems
Electronic Health Records Modernization 00 01 10 -4
VA Project No. 402-22-700
26 09 23 - Lighting Controls 26 12 19 - Pad-Mounted Liquid-Filled Medium-Voltage Transformers 26 13 16 - Medium-Voltage Fusible Interrupter Switches 26 22 00 - Low-Voltage Transformers 26 24 13 - Distribution Switchboards 26 24 16 - Panelboards 26 27 26 - Wiring Devices 26 29 21 - Enclosed Switches and Circuit Breakers 26 32 13 - Engine Generators 26 33 53 - Static Uninterruptible Power Supply 26 36 23 - Automatic Transfer Switches 26 41 00 - Facility Lightning Protection 26 43 13 - Surge Protective Devices 26 51 00 - Interior Lighting 26 56 00 - Exterior Lighting
VOLUME FOUR
DIVISION 27 – COMMUNICATIONS
270511 - Requirements for Communications Installations 270526 - Grounding and Bonding for Communications Systems 270533 - Conduits and Backboxes for Communications Systems 270536 - Cable Trays for Communications Systems 270553 - Identification for Communications Systems 270800 - Commissioning of Communications Systems 271000 - Structured Cabling 271116 - Communications Cabinets, Racks, Frames, and Enclosures 271119 - Communications Termination Blocks and Patch Panels 271126 - Communications Rack Mounted Power Protection and Power Strips 271313 - Communications Copper Backbone Cabling
271313.13 - Communications Copper Cable Splicing and Terminations 271323 - Communications Optical Fiber Backbone Cabling
271323.13 - Communications Optical Fiber Cable Splicing and Terminations 271513 - Communications Copper Horizontal Cabling 271619 - Communications Patch Cords, Station Cords, and Cross Connect Wire 275116 - Public Address and Mass Notification Systems
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
280500 - Common Work Results for Electronic Safety and Security 280513 - Conductors and Cables for Electronic Safety and Security 280526 - Grounding and Bonding for Electronic Safety and Security
280528.33 - Conduits and Backboxes for Electronic Safety and Security 280800 - Commissioning of Electronic Safety and Security Systems 281300 - Physical Access Control System 281353 - Security Access Detection 281600 - Intrusion Detection System 282300 - Video Surveillance 28 31 00 - Fire Detection And Alarm
DIVISION 31 – EARTHWORK
31 20 00 Earthwork 31 23 19 Dewatering 31 32 19 Mechanically Stabilized Earth (MSE) Segmental Retaining Wall
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement And Concrete For Exterior Improvements 32 12 16 Asphalt Paving 32 17 13 Pavement Markings 32 90 00 Planting
DIVISION 33 – SITE UTILITIES
33 08 00 Commissioning Of Site Utilities 33 10 00 Water Utilities 33 30 00 Sanitary Sewer Utilities
Electronic Health Records Modernization 00 01 10 -5
VA Project No. 402-22-700
33 40 00 Storm Sewer Utilities
APPENDIX
40 00 00 Geotechnical Engineering Report
Electronic Health Records Modernization 00 01 15 -1 (EHRM) Infrastructure Upgrades, Togus, ME LIST OF DRAWING SHEETS
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
VOLUME 1
GENERAL INFORMATION
SHEET NO. SHEET NAME
00-GI-000.V1 COVER SHEET - VOLUME 1
00-GI-001.V1 INDEX OF DRAWINGS - VOLUME 1
00-GI-002 PROJECT GENERAL NOTES AND CODE SUMMARY
00-GI-003 ICRA CLASSIFICATION PROCESS MATERIAL ID LIST
00-GI-004 PROJECT LOCATION MAPS AND CAMPUS PLAN
00-GI-005 PROJECT ASSEMBLY TYPES
00-GI-006 UL ASSEMBLIES
00-GI-007 UL ASSEMBLIES
00-GI-008 UL ASSEMBLIES
00-GI-009 DOOR SCHEDULE AND TYPICAL DOOR DETAILS
00-GI-010 CEILING DETAILS
00-GI-011 PARTITION DETAILS
00-GI-012 ROOF AND TYPICAL DETAILS
00-GI-013 INTERIOR FINISH MATERIALS
CIVIL
SHEET NO. SHEET NAME
00-CG-001 GENERAL NOTES
00-CS-001 OVERALL EXISTING CONDITIONS SITE PLAN
00-CS-002 OVERALL A-CIRCUIT FIBER OPTIC SITE PLAN
00-CS-003 OVERALL B-CIRCUIT FIBER OPTIC SITE PLAN
00-CS-005 OVERALL CIVIL - ELECTRICAL SITE PLAN
00-CU-101 A-CIRCUIT FIBER OPTICS SITE PLAN
00-CU-102 A-CIRCUIT FIBER OPTICS SITE PLAN
00-CU-103 A-CIRCUIT FIBER OPTICS SITE PLAN
00-CU-104 A-CIRCUIT FIBER OPTICS SITE PLAN
00-CU-105 A-CIRCUIT FIBER OPTICS SITE PLAN
00-CU-106 A-CIRCUIT FIBER OPTICS SITE PLAN
00-CU-107 A-CIRCUIT FIBER OPTICS SITE PLAN
00-CU-108 A-CIRCUIT FIBER OPTICS SITE PLAN
00-CU-109 A-CIRCUIT FIBER OPTICS SITE PLAN
00-CJ-101 A-CIRCUIT FIBER OPTICS PROFILES
00-CJ-102 A-CIRCUIT FIBER OPTICS PROFILES
Electronic Health Records Modernization 00 01 15 -2
00-CJ-103 A-CIRCUIT FIBER OPTICS PROFILES
00-CJ-104 A-CIRCUIT FIBER OPTICS PROFILES
00-CJ-105 A-CIRCUIT FIBER OPTICS PROFILES
00-CJ-106 A-CIRCUIT FIBER OPTICS PROFILES
00-CJ-107 A-CIRCUIT FIBER OPTICS PROFILES
00-CJ-108 A-CIRCUIT FIBER OPTICS PROFILES
00-CU-201 B-CIRCUIT FIBER OPTICS SITE PLAN
00-CU-202 B-CIRCUIT FIBER OPTICS SITE PLAN
00-CU-203 B-CIRCUIT FIBER OPTICS SITE PLAN
00-CU-204 B-CIRCUIT FIBER OPTICS SITE PLAN
00-CU-205 B-CIRCUIT FIBER OPTICS SITE PLAN
00-CU-206 B-CIRCUIT FIBER OPTICS SITE PLAN
00-CU-207 B-CIRCUIT FIBER OPTICS SITE PLAN
00-CU-208 B-CIRCUIT FIBER OPTICS SITE PLAN
00-CJ-201 B-CIRCUIT FIBER OPTICS PROFILES
00-CJ-202 B-CIRCUIT FIBER OPTICS PROFILES
00-CJ-203 B-CIRCUIT FIBER OPTICS PROFILES
00-CJ-204 B-CIRCUIT FIBER OPTICS PROFILES
00-CJ-205 B-CIRCUIT FIBER OPTICS PROFILES
00-CJ-206 B-CIRCUIT FIBER OPTICS PROFILES
00-CJ-207 B-CIRCUIT FIBER OPTICS PROFILES
00-CJ-A101 CIVIL - DETAILS
00-CJ-A102 CIVIL - DETAILS
00-CE-100 EROSION CONTROL - NOTED AND DETAILS
00-CE-101 EROSION CONTROL - DETAILS
00-CE-102 MCR EROSION CONTROL - PLAN
00-CS-004 PROPOSED MCR PLAN
00-CG-100 PROPOSED MCR GRADING PLAN
00-CG-101 PROPOSED MCR MSE WALL PLAN
00-CU-301 PROPOSED MCR WATER AND SEWER PLAN
00-CU-302 PROPOSED SEWER PROFILE
00-CU-303 PROPOSED MCR DRAINAGE PLAN
00-CU-304 PROPOSED DRAINAGE PROFILES
00-CJ-A201 PAVING AND DRAINAGE - STANDARD DETAILS
00-CJ-A202 PAVING AND DRAINAGE - STANDARD DETAILS
00-CJ-A203 PAVING AND DRAINAGE - STANDARD DETAILS
00-CJ-A204 PAVING AND DRAINAGE - STANDARD DETAILS
Electronic Health Records Modernization 00 01 15 -3
00-CJ-A205 SANITARY SEWER COLLECTION SYSTEM - STANDARD DETAILS
00-CJ-A206 WATER DISCTRIBUTION SYSTEM - STANDARD DETAILS
00-CU-401 CIVIL ELECTRICAL SITE PLAN
00-CU-402 CIVIL ELECTRICAL SITE PLAN
00-CJ-401 CIVIL ELECTRICAL - PROFILES
00-CJ-402 CIVIL ELECTRICAL - PROFILES
STRUCTURAL
SHEET NO. SHEET NAME
MCR-SN-100 BUILDING MCR STRUCTURAL NOTES
MCR-SN-101 BUILDING MCR STRUCTURAL NOTES
MCR-SF-100 BUILDING MCR FOUNDATION PLAN
MCR-SF-101 BUILDING MCR ROOF FRAMING PLAN
MCR-SD-100 BUILDING MCR FOUNDATION DETAILS
MCR-SD-101 BUILDING MCR FOUNDATION DETAILS
MCR-SD-102 BUILDING MCR RETAINING WALL PLAN & ELEVATION
MCR-SD-103 BUILDING MCR RETAINING WALL DETAILS
MCR-SD-104 BUILDING MCR RETAINING WALL DETAILS
MCR-SD-200 BUILDING MCR ROOF FRAMING DETAILS
MCR-SD-201 BUILDING MCR ROOF FRAMING DETAILS
ARCHITECTURAL
SHEET NO. SHEET NAME
69-AE-101 OVERALL PLAN
69-AE-201 PLANS
200-AD-200 GROUND LEVEL DEMOLITION PLAN
200-AD-201 LEVEL 1 DEMOLITION PLAN
200-AD-202 LEVEL 2 DEMOLITION PLAN
200-AD-203 LEVEL 3 DEMOLITION PLAN
200-AD-204 LEVEL 4 DEMOLITION PLAN
200-AD-205 LEVELS 5, 6, 7 DEMOLITION FLOOR PLANS
200-AE-101 OVERALL FLOOR PLANS
200-AE-102 OVERALL FLOOR PLANS
200-AE-103 OVERALL FLOOR PLANS
200-AE-104 OVERALL FLOOR PLANS
200-AE-200 GROUND FLOOR PLAN
200-AE-201 LEVEL 1 FLOOR PLAN
200-AE-202 LEVEL 2 FLOOR PLAN
200-AE-203 LEVEL 3 FLOOR PLAN
Electronic Health Records Modernization 00 01 15 -4
200-AE-204 LEVEL 4 FLOOR PLAN
200-AE-205 LEVELS 5, 6, 7 FLOOR PLANS
200-AE-206 ROOF PLAN
200-AE-300 GROUND LEVEL TR ENLARGED PLANS AND EL
200-AE-301 LEVEL 1 TR ENLARGED PLANS AND ELEVATION
200-AE-302 LEVEL 2 TR ENLARGED PLANS AND ELEVATION
200-AE-303 LEVEL 3 TR ENLARGED PLANS AND ELEVATION
200-AE-304 LEVEL 4, LEVEL 5 TR ENLARGED PLANS AND E
200-AE-305 LEVEL 6 TR ENLARGED PLANS AND ELEVATION
202-AD-201 DEMOLITION PLANS
202-AE-101 OVERALL PLANS
202-AE-201 PLANS
204-AD-201 DEMOLITION PLANS
204-AE-101 OVERALL FLOOR PLANS
204-AE-201 FLOOR PLANS
204-AE-301 LEVEL 2 TR ENLARGED PLANS AND ELEVATION
205-AE-101 OVERALL FLOOR PLAN
205-AE-201 FLOOR PLANS
205-AE-301 LEVEL 1 TR ENLARGED PLANS AND ELEVATION
205-AE-302 LEVELS 2 AND 3 TR ENLARGED PLANS AND EL
206-AD-201 DEMOLITION PLANS
206-AE-101 OVERALL FLOOR PLANS
206-AE-201 FLOOR PLANS
206-AE-301 LEVEL 1 TR ENLARGED PLANS AND ELEVATION
206-AE-302 LEVEL 2 AND 3 TR ENLARGED PLANS AND ELE
207-AD-201 DEMOLITION PLANS
207-AE-101 OVERALL FLOOR PLANS
207-AE-201 FLOOR PLANS
207-AE-301 ENLARGED LEVEL 1 AND 2 TR PLANS
207-AE-302 ENLARGED LEVEL 3 TR PLANS
208-AE-101 OVERALL PLAN
208-AE-201 PLANS AND ELEVATIONS
209-AE-101 OVERALL PLANS
209-AE-201 FLOOR PLANS
209-AE-301 LEVEL 1 AND 2 TR ENLARGED PLANS AND ELE
210-AD-201 DEMOLITION PLANS
210-AE-101 OVERALL PLAN
Electronic Health Records Modernization 00 01 15 -5
210-AE-201 PLANS AND ELEVATIONS
211-AE-101 OVERALL PLAN
211-AE-201 PLANS AND ELEVATIONS
212-AE-101 OVERALL PLAN
212-AE-201 LEVEL 1 FLOOR PLANS AND ELEVATIONS
221-AE-101 OVERALL PLAN
221-AE-201 LEVEL 1 PLANS AND ELEVATIONS
232-AD-201 LEVEL 1 DEMOLITION PLAN
232-AE-101 OVERALL PLAN
232-AE-201 FLOOR PLANS AND ELEVATIONS
238-AD-201 LEVEL 1 DEMOLITION PLAN
238-AE-101 OVERALL PLAN
238-AE-201 FLOOR PLANS AND ELEVATIONS
240-AD-201 DEMOLITION PLANS
240-AE-101 OVERALL FLOOR PLANS
240-AE-201 FLOOR PLANS
240-AE-301 LEVEL 1 AND 3 TR ENLARGED PLANS AND ELE
255-AE-101 OVERALL PLAN
255-AE-201 PLANS AND ELEVATIONS
MCR-AE-101 LEVEL 1 CODE PLAN
MCR-AE-200 SLAB FLOOR PLAN
MCR-AE-201 LEVEL 1 DIMENSION FLOOR PLAN
MCR-AE-202 LEVEL 1 FLOOR PLAN
MCR-AE-203 UTILITY YARD FLOOR PLAN
MCR-AE-204 ROOF PLAN AND SITE PLAN
MCR-AE-301 PLAN DETAILS
MCR-AE-302 CAST STONE DETAILS
MCR-AE-401 EXTERIOR ELEVATIONS
MCR-AE-402 EXTERIOR ELEVATIONS
MCR-AE-403 EXTERIOR ELEVATIONS
MCR-AE-404 ENLARGED ELEVATION DETAILS
MCR-AE-501 BUILDING SECTIONS
MCR-AE-511 WALL SECTIONS
MCR-AE-512 WALL SECTIONS
MCR-AE-513 WALL SECTIONS
MCR-AE-521 SECTION DETAILS
MCR-AE-522 SECTION DETAILS
Electronic Health Records Modernization 00 01 15 -6
MCR-AE-601 INTERIOR ELEVATIONS
MCR-AE-602 DATA CENTER ELEVATIONS
MCR-AE-701 LEVEL 1 REFLECTED CEILING PLAN
MCR-AE-801 VERTICAL CIRCULATION PLANS
MCR-AE-802 VERTICAL CIRCULATION SECTIONS AND ELEV
MCR-AE-803 VERTICAL CIRCULATION STAIR AND RAIL DETAILS
Q1-AD-201 LEVEL 1 DEMOLITION PLAN
Q1-AE-101 OVERALL PLAN
Q1-AE-201 PLANS AND ELEVATIONS
Q3-AE-101 OVERALL PLAN
Q4-AE-101 OVERALL FLOOR PLAN
Q4-AE-201 PLANS AND ELEVATIONS
Q27-AE-101 OVERALL PLAN
Q27-AE-201 FLOOR PLANS AND ELEVATIONS
Q32-AE-101 OVERALL PLAN
Q32-AE-201 PLANS AND ELEVATIONS
END VOLUME 1
Electronic Health Records Modernization 00 01 15 -7
VOLUME 2
GENERAL INFORMATION
SHEET NO. SHEET NAME
00-GI-000.V2 COVER SHEET - VOLUME 2
00-GI-001.V2 INDEX OF DRAWINGS - VOLUME 2
MECHANICAL
SHEET NO. SHEET NAME
MH-001 HVAC GENERAL INFORMATION
MH-002 SCHEDULES
MH-003 SCHEDULES
MH-004 CALCULATIONS
MH-005 DETAILS
MH-006 DETAILS
MH-007 CONTROLS INFORMATION
MH-008 DIAGRAMS
MH-009 DIAGRAMS
69-MH-201 BUILDING 69 HVAC PLANS
200-MH-200 BUILDING 200/200E GROUND HVAC PLAN
200-MH-201 BUILDING 200/200E LEVEL 1 HVAC PLAN
200-MH-202 BUILDING 200/200E LEVEL 2 HVAC PLAN
200-MH-203 BUILDING 200/200E LEVEL 3 HVAC PLAN
200-MH-204 BUILDING 200/200E LEVEL 4 HVAC PLAN
200-MH-205 BUILDING 200/200E LEVEL 5, 6, 7 HVAC PLANS
200-MH-300 BUILDING 200/200E ENLARGED PLANS
200-MH-301 BUILDING 200/200E ENLARGED PLANS
200-MH-302 BUILDING 200/200E ENLARGED PLANS
200-MH-303 BUILDING 200/200E ENLARGED PLANS
200-MH-304 BUILDING 200/200E ENLARGED PLANS
202-MH-201 BUILDING 202 HVAC PLANS
202-MH-202 BUILDING 202 ENLARGED HVAC PLANS
203-MH-201 BUILDING 203 HVAC PLANS
203-MH-301 BUILDING 203 ENLARGED HVAC PLANS
204-MH-201 BUILDING 204 HVAC PLAN
204-MH-301 BUILDING 204 ENLARGED HVAC PLAN
205-MH-201 BUILDING 205 HVAC PLANS
205-MH-301 BUILDING 205 ENLARGED HVAC PLANS
205-MH-302 BUILDING 205 ENLARGED HVAC PLANS
Electronic Health Records Modernization 00 01 15 -8
206-MH-201 BUILDING 206 HVAC PLANS
206-MH-301 BUILDING 206 ENLARGED HVAC PLANS
206-MH-302 BUILDING 206 ENLARGED HVAC PLANS
207-MH-201 BUILDING 207 HVAC PLANS
207-MH-301 BUILDING 207 ENLARGED HVAC PLANS
207-MH-302 BUILDING 207 ENLARGED HVAC PLANS
208-MH-201 BUILDING 208 HVAC PLANS
209-MH-201 BUILDING 209 HVAC PLANS
209-MH-301 BUILDING 209 ENLARGED HVAC PLANS
210-MH-201 BUILDING 210 HVAC PLANS
210-MH-301 BUILDING 210 ENLARGED HVAC PLANS
211-MH-201 BUILDING 211 HVAC PLANS
212-MH-201 BUILDING 212 HVAC PLANS
212-MH-301 BUILDING 212 ENLARGED HVAC PLANS
221-MH-201 BUILDING 221 HVAC PLANS
232-MH-201 BUILDING 232 HVAC PLANS
232-MH-301 BUILDING 232 ENLARGED PLANS
238-MH-201 BUILDING 201, 238, AND 239 HVAC PLANS
238-MH-301 BUILDING 201, 238, AND 239 ENLARGED PLANS
240-MH-201 BUILDING 240 HVAC PLANS
255-MH-201 BUILDING 255 HVAC PLANS
MCR-MH-201 BUILDING MCR FOUNDATION HVAC PLAN
MCR-MH-202 BUILDING MCR LEVEL 1 HVAC PLAN
MCR-MH-203 BUILDING MCR LEVEL 1 HVAC PIPING PLAN
MCR-MH-204 BUILDING MCR LEVEL 1 HVAC RCP PLAN
MCR-MH-301 BUILDING MCR SECTIONS
MCR-PP-201 BUILDING MCR FOUNDATION PLUMBING PLAN
MCR-PP-202 BUILDING MCR LEVEL 1 PLUMBING PLAN
MCR-PP-203 BUILDING MCR LOWER ROOF PLUMBING & HVAC PLAN
MCR-PP-204 BUILDING MCR ROOF PLUMBING PLAN
Q1-MH-201 BUILDING Q1 HVAC PLANS
Q3-MH-201 BUILDING Q3 HVAC PLANS
Q4-MH-201 BUILDING Q4 HVAC PLANS
Q27-MH-201 BUILDING Q27 HVAC PLANS
Q32-MH-201 BUILDING Q32 HVAC PLANS
END VOLUME 2
Electronic Health Records Modernization 00 01 15 -9
VOLUME 3
SHEET NO. SHEET NAME
00-GI-000.V3 COVER SHEET - VOLUME 3
00-GI-001.V3 INDEX OF DRAWINGS - VOLUME 3
TELECOMMUNICATIONS
SHEET NO. SHEET NAME
00-TG-001 LEGEND, ABBREVIATION LIST, AND GENERAL NOTES
00-TS-000 TELECOMM OVERALL SITE PLAN
00-TS-001 TELECOMM SITE PLAN
00-TS-002 TELECOMM SITE PLAN
00-TS-003 TELECOMM SITE PLAN
00-TS-004 TELECOMM SITE PLAN
00-TS-005 TELECOMM SITE PLAN
200-TD-001 B200 GROUND LEVEL DEMOLITION PLAN
200-TD-011 B200 LEVEL 1 DEMOLITION PLAN
200-TD-012 B200 LEVEL 1 DEMOLITION PLAN - MRI
200-TD-021 B200 LEVEL 2 DEMOLITION PLAN
200-TD-031 B200 LEVEL 3 DEMOLITION PLAN
200-TD-041 B200 LEVEL 4 DEMOLITION PLAN
200-TD-051 B200 LEVEL 5 DEMOLITION PLAN
200-TD-061 B200 LEVEL 6 DEMOLITION PLAN
200-TD-071 B200 LEVEL 7 DEMOLITION PLAN
200-TN-001 B200 GROUND LEVEL TELECOMMUNICATIONS PLAN
200-TN-011 B200 LEVEL 1 TELECOMMUNICATIONS PLAN
200-TN-012 B200 LEVEL 1 TELECOMMUNICATIONS PLAN - MRI
200-TN-021 B200 LEVEL 2 TELECOMMUNICATIONS PLAN
200-TN-031 B200 LEVEL 3 TELECOMMUNICATIONS PLAN
200-TN-041 B200 LEVEL 4 TELECOMMUNICATIONS PLAN
200-TN-051 B200 LEVEL 5 TELECOMMUNICATIONS PLAN
200-TN-061 B200 LEVEL 6 TELECOMMUNICATIONS PLAN
200-TN-071 B200 LEVEL 7 TELECOMMUNICATIONS PLAN
200E-TD-001 B200E GROUND LEVEL DEMOLITION PLAN
200E-TD-011 B200E LEVEL 1 DEMOLITION PLAN
200E-TD-021 B200E LEVEL 2 DEMOLITION PLAN
200E-TD-031 B200E LEVEL 3 DEMOLITION PLAN
200E-TD-041 B200E LEVEL 4 DEMOLITION PLAN
200E-TN-001 B200E GROUND LEVEL TELECOMMUNICATIONS PLAN
Electronic Health Records Modernization 00 01 15 -10
200E-TN-011 B200E LEVEL 1 TELECOMMUNICATIONS PLAN
200E-TN-021 B200E LEVEL 2 TELECOMMUNICATIONS PLAN
200E-TN-031 B200E LEVEL 3 TELECOMMUNICATIONS PLAN
200E-TN-041 B200E LEVEL 4 TELECOMMUNICATIONS PLAN
201-TD-011 B201/238/239 BASEMENT & LEVEL 1 DEMOLITION PLAN - BLDG. 201, 238, &
201-TN-011 B201/238/239 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN - BLDG. 201,
238, & 239
202-TD-011 B202 LEVEL 1 & 2 DEMOLITION PLAN
202-TN-011 B202 LEVEL 1 & 2 TELECOMMUNICATIONS PLAN
203-TD-011 B203 LEVEL 1 & 2 DEMOLITION PLAN
203-TD-031 B203 LEVEL 3 DEMOLITION PLAN
203-TN-011 B203 LEVEL 1 & 2 DEMOLITION PLAN
203-TN-031 B203 LEVEL 3 TELECOMMUNICATIONS PLAN
204-TD-011 B204 BASEMENT & LEVEL 1 DEMOLITION PLAN
204-TD-021 B204 LEVEL 2 & PENTHOUSE DEMOLITION PLAN
204-TN-011 B204 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN
204-TN-021 B204 LEVEL 2 & PENTHOUSE TELECOMMUNICATIONS PLAN
205-TD-011 B205 LEVEL 1 DEMOLITION PLAN
205-TD-021 B205 LEVEL 2 DEMOLITION PLAN
205-TD-031 B205 LEVEL 3 DEMOLITION PLAN
205-TN-011 B205 LEVEL 1 TELECOMMUNICATIONS PLAN
205-TN-021 B205 LEVEL 2 TELECOMMUNICATIONS PLAN
205-TN-031 B205 LEVEL 3 TELECOMMUNICATIONS PLAN
206-TD-011 B206 LEVEL 1 DEMOLITION PLAN
206-TD-021 B206 LEVEL 2 DEMOLITION PLAN
206-TD-031 B206 LEVEL 3 & PENTHOUSE DEMOLITION PLAN
206-TN-011 B206 LEVEL 1 TELECOMMUNICATIONS PLAN
206-TN-021 B206 LEVEL 2 TELECOMMUNICATIONS PLAN
206-TN-031 B206 LEVEL 3 & PENTHOUSE TELECOMMUNICATIONS PLAN
207-TD-011 B207 LEVEL 1 DEMOLITION PLAN
207-TD-021 B207 LEVEL 2 DEMOLITION PLAN
207-TD-031 B207 LEVEL 3 & PENTHOUSE DEMOLITION PLAN
207-TN-011 B207 LEVEL 1 TELECOMMUNICATIONS PLAN
207-TN-021 B207 LEVEL 2 TELECOMMUNICATIONS PLAN
207-TN-031 B207 LEVEL 3 & PENTHOUSE TELECOMMUNICATIONS PLAN
208-TD-011 B208 BASEMENT & LEVEL 1 DEMOLITION PLAN
208-TN-011 B208 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN
Electronic Health Records Modernization 00 01 15 -11
209-TD-011 B209 BASEMENT & LEVEL 1 DEMOLITION PLAN
209-TD-021 B209 LEVEL 2 DEMOLITION PLAN
209-TN-011 B209 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN
209-TN-021 B209 LEVEL 2 TELECOMMUNICATIONS PLAN
210-TD-011 B210 BASEMENT & LEVEL 1 DEMOLITION PLAN
210-TD-021 B210 LEVEL 2 & 3 DEMOLITION PLAN
210-TN-011 B210 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN
210-TN-021 B210 LEVEL 2 & 3 TELECOMMUNICATIONS PLAN
211-TD-011 B211 LEVEL 1 DEMOLITION PLAN
211-TN-011 B211 LEVEL 1 TELECOMMUNICATIONS PLAN
212-TD-011 B212 BASEMENT & LEVEL 1 DEMOLITION PLAN
212-TN-011 B212 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN
221-TD-011 B221 LEVEL 1 & ATTIC DEMOLITION PLAN
221-TN-011 B221 LEVEL 1 & ATTIC TELECOMMUNICATIONS PLAN
232-TD-011 B232 LEVEL 1 DEMOLITION PLAN
232-TD-021 B232 LEVEL 2 DEMOLITION PLAN
232-TN-011 B232 LEVEL 1 TELECOMMUNICATIONS PLAN
232-TN-021 B232 LEVEL 2 TELECOMMUNICATIONS PLAN
235-TD-011 B235 LEVEL 1 DEMOLITION PLAN
235-TN-011 B235 LEVEL 1 TELECOMMUNICATIONS PLAN
240-TD-011 B240 BASEMENT & LEVEL 1 DEMOLITION PLAN
240-TN-011 B240 BASEMENT & LEVEL 1 TELECOMMUNICATIONS PLAN
248-TD-001 B248 BASEMENT DEMOLITION PLAN
248-TN-001 B248 BASEMENT TELECOMMUNICATIONS PLAN
255-TD-011 B255 LEVEL 1 DEMOLITION PLAN
255-TN-011 B255 LEVEL 1 TELECOMMUNICATIONS PLAN
300-TD-011 B300 LEVEL 1 & 2 DEMOLITION PLAN
300-TN-011 B300 LEVEL 1 & 2 TELECOMMUNICATIONS PLAN
Q1-TD-011 BQ1 BASEMENT & LEVEL 1, 2, & 3 DEMOLITION PLAN
Q1-TN-011 BQ1 BASEMENT & LEVEL 1, 2, & 3 TELECOMMUNICATIONS PLAN
Q3-TD-011 BQ3 BASEMENT & LEVEL 1, 2, & 3 DEMOLITION PLAN
Q3-TN-011 BQ3 BASEMENT & LEVEL 1, 2, & 3 TELECOMMUNICATIONS PLAN
Q4-TD-011 BQ4 BASEMENT & LEVEL 1, & 2 DEMOLITION PLAN
Q4-TN-011 BQ4 BASEMENT & LEVEL 1, & 2 TELECOMMUNICATIONS PLAN
Q27-TD-011 BQ27 BASEMENT & LEVEL 1, & 2 DEMOLITION PLAN
Q27-TN-011 BQ27 BASEMENT & LEVEL 1, & 2 TELECOMMUNICATIONS PLAN
Q32-TD-011 BQ32 BASEMENT & LEVEL 1, & 2 DEMOLITION PLAN
Electronic Health Records Modernization 00 01 15 -12
Q32-TN-011 BQ32 BASEMENT & LEVEL 1, & 2 TELECOMMUNICATIONS PLAN
069-TD-011 B069 BASEMENT & LEVEL 1, & 2 DEMOLITION PLAN
069-TN-011 B069 BASEMENT & LEVEL 1, & 2 TELECOMMUNICATIONS PLAN
MCR-TN-011 MCR TELECOMMUNICATIONS PLAN
MCR-TN-012 MCR CABLE TRAY & GRID IDENTIFICATION PLAN
TJ-001 EXISTING TELECOMM RACK ELEVATIONS
TJ-002 EXISTING TELECOMM RACK ELEVATIONS
TJ-003 EXISTING TELECOMM RACK ELEVATIONS
TJ-004 EXISTING TELECOMM RACK ELEVATIONS
TJ-005 EXISTING TELECOMM RACK ELEVATIONS
TJ-006 EXISTING TELECOMM RACK ELEVATIONS
TJ-007 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-008 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-009 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-010 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-011 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-012 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-013 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-014 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-015 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-016 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-017 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-018 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-019 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-020 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-021 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-022 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-023 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-024 TELECOMM CABLE DEMOLITION SCHEDULES
TJ-025 FIBER ONE LINE DIAGRAM
TJ-026 TELECOMM CABINET ELEVATIONS - HDA
TJ-027 TELECOMM CABINET ELEVATIONS - MDA and ER
TJ-028 MCR MDA HDA CABLE ONE LINE
TJ-029 TELECOMM RACK ELEVATIONS
TJ-030 TELECOMM RACK ELEVATIONS
TJ-031 TELECOMM RACK ELEVATIONS
TJ-032 TELECOMM RACK ELEVATIONS
Electronic Health Records Modernization 00 01 15 -13
TJ-033 TELECOMM DETAILS
TJ-034 TELECOMM DETAILS
TJ-035 TELECOMM DETAILS
TJ-036 TELECOMM MCR CABINET DETAILS
TJ-037 TELECOMM BONDING DETAILS
TJ-038 TELECOMM BONDING DETAILS
TJ-039 TELECOMM BONDING DETAILS
TJ-040 TELECOMM BONDING DETAILS
TJ-041 TELECOMM BONDING DETAILS
TJ-042 TELECOMM CABLE SCHEDULES
TJ-043 TELECOMM CABLE SCHEDULES
TJ-044 TELECOMM CABLE SCHEDULES
TJ-045 TELECOMM CABLE SCHEDULES
TJ-046 TELECOMM CABLE SCHEDULES
TJ-047 TELECOMM CABLE SCHEDULES
TJ-048 TELECOMM CABLE SCHEDULES
TJ-049 TELECOMM J-HOOK DETAILS
END VOLUME 3
Electronic Health Records Modernization 00 01 15 -14
VOLUME 4
GENERAL INFORMATION
SHEET NO. SHEET NAME
00-GI-000.V4 COVER SHEET - VOLUME 4
00-GI-001.V4 INDEX OF DRAWINGS - VOLUME 4
ELECTRICAL
SHEET NO. SHEET NAME
000-EG-001 LEGEND, ABBREVIATION LIST, AND GENERAL NOTES
000-ES-001 OVERALL ELECTRICAL SITE PLAN
000-ES-002 ELECTRICAL SITE PLAN
000-ES-003 ELECTRICAL SITE PLAN
000-ES-004 ELECTRICAL SITE PLAN
000-ES-005 ELECTRICAL SITE PLAN
000-ES-006 ELECTRICAL SITE PLAN
069-ED-011 BUILDING 69 BASEMENT, LEVEL 1, & 2 DEMOLITION PLAN -BLDG. 69
069-EP-011 BUILDING 69 BASEMENT & LEVEL 1, 2 POWER PLAN -BLDG. 69
200-ED-001 BUILDING 200 GROUND LEVEL DEMOLITION PLAN -BLDG 200
200-ED-011 BUILDING 200 LEVEL 1 DEMOLITION PLAN -BLDG. 200
200-ED-021 BUILDING 200 LEVEL 2 DEMOLITION PLAN -BLDG. 200
200-ED-031 BUILDING 200 LEVEL 3 DEMOLITION PLAN -BLDG 200
200-ED-041 BUILDING 200 LEVEL 4 DEMOLITION PLAN -BLDG 200
200-ED-051 BUILDING 200 LEVEL 5 DEMOLITION PLAN -BLDG 200
200-ED-061 BUILDING 200 LEVEL 6 DEMOLITION PLAN -BLDG 200
200-EP-001 BUILDING 200 GROUND LEVEL POWER PLAN -BLDG. 200
200-EP-011 BUILDING 200 LEVEL 1 POWER PLAN -BLDG. 200
200-EP-021 BUILDING 200 LEVEL 2 POWER PLAN -BLDG. 200
200-EP-031 BUILDING 200 LEVEL 3 POWER PLAN -BLDG. 200
200-EP-041 BUILDING 200 LEVEL 4 POWER PLAN -BLDG. 200
200-EP-051 BUILDING 200 LEVEL 5 POWER PLAN -BLDG. 200
200-EP-061 BUILDING 200 LEVEL 6 POWER PLAN -BLDG. 200
200E-ED-001 BUILDING 200E GROUND LEVEL DEMOLITION PLAN -BLDG. 200E
200E-ED-011 BUILDING 200E LEVEL 1 DEMOLITION PLAN -BLDG. 200E
200E-ED-021 BUILDING 200E LEVEL 2 DEMOLITION PLAN -BLDG. 200E
200E-ED-031 BUILDING 200E LEVEL 3 DEMOLITION PLAN -BLDG 200E
200E-EP-001 BUILDING 200E GROUND LEVEL POWER PLAN -BLDG. 200E
200E-EP-011 BUILDING 200E LEVEL 1 POWER PLAN -BLDG. 200E
200E-EP-021 BUILDING 200E LEVEL 2 POWER PLAN -BLDG. 200E
Electronic Health Records Modernization 00 01 15 -15
200E-EP-031 BUILDING 200E LEVEL 3 POWER PLAN -BLDG. 200E
201-ED-011
BUILDING 201 & 238 BASEMENT & LEVEL 1 DEMOLITION PLAN -BLDG.
201 & 238
201-EP-011
BUILDING 201 & 238 BASEMENT & LEVEL 1 POWER PLAN -BLDG. 201 &
202-ED-011 BUILDING 202 LEVEL 1 DEMOLITION PLAN -BLDG. 202
202-EP-011 BUILDING 202 LEVEL 1, 2, AND ROOF POWER PLAN -BLDG. 202
203-ED-011 BUILDING 203 LEVEL 1 & LEVEL 2 DEMOLITION PLANS -BLDG. 203
203-ED-031 BUILDING 203 LEVEL 3 DEMOLITION PLANS -BLDG. 203
203-EP-011 BUILDING 203 LEVEL 1 & LEVEL 2 POWER PLANS -BLDG. 203
203-EP-031 BUILDING 203 LEVEL 3 POWER PLANS -BLDG. 203
204-ED-011 BUILDING 204 BASEMENT & LEVEL 1 DEMOLITION PLANS -BLDG. 204
204-ED-021 BUILDING 204 LEVEL 2 & PENTHOUSE DEMOLITION PLANS -BLDG. 204
204-EP-011 BUILDING 204 BASEMENT & LEVEL 1 POWER PLANS -BLDG. 204
204-EP-021 BUILDING 204 LEVEL 2 & PENTHOUSE POWER PLANS -BLDG. 204
205-ED-011 BUILDING 205 LEVEL 1 DEMOLITION PLAN -BLDG. 205
205-ED-021 BUILDING 205 LEVEL 2 DEMOLITION PLAN -BLDG. 205
205-ED-031 BUILDING 205 LEVEL 3 DEMOLITION PLAN -BLDG. 205
205-EP-011 BUILDING 205 LEVEL 1 POWER PLAN -BLDG. 205
205-EP-021 BUILDING 205 LEVEL 2 POWER PLAN -BLDG. 205
205-EP-031 BUILDING 205 LEVEL 3 POWER PLAN -BLDG. 205
205-EP-041 BUILDING 205 ROOF POWER PLAN -BLDG. 205
206-ED-011 BUILDING 206 LEVEL 1 DEMOLITION PLAN -BLDG 206
206-ED-021 BUILDING 206 LEVEL 2 DEMOLITION PLAN -BLDG 206
206-ED-031 BUILDING 206 LEVEL 3 & PENTHOUSE DEMOLITION PLAN -BLDG 206
206-EP-011 BUILDING 206 LEVEL 1 POWER PLAN -BLDG. 206
206-EP-021 BUILDING 206 LEVEL 2 POWER PLAN -BLDG. 206
206-EP-031 BUILDING 206 LEVEL 3 POWER PLAN -BLDG. 206
206-EP-041 BUILDING 206 PENTHOUSE POWER PLAN -BLDG. 206
207-ED-011 BUILDING 207 LEVEL 1 DEMOLITION PLAN -BLDG. 207
207-ED-021 BUILDING 207 LEVEL 2 DEMOLITION PLAN -BLDG. 207
207-ED-031 BUILDING 207 LEVEL 3 & PENTHOUSE DEMOLITION PLAN -BLDG. 207
207-EP-011 BUILDING 207 LEVEL 1 POWER PLAN -BLDG. 207
207-EP-021 BUILDING 207 LEVEL 2 POWER PLAN -BLDG. 207
207-EP-031 BUILDING 207 LEVEL 3 POWER PLAN -BLDG. 207
207-EP-041 BUILDING 207 PENTHOUSE POWER PLAN -BLDG. 207
208-ED-011 BUILDING 208 BASEMENT & LEVEL 1 DEMOLITION PLAN -BLDG. 208
208-EP-011 BUILDING 208 BASEMENT & LEVEL 1 POWER PLAN -BLDG. 208
Electronic Health Records Modernization 00 01 15 -16
209-ED-011 BUILDING 209 BASEMENT & LEVEL 1 DEMOLITION PLAN -BLDG. 209
209-ED-021 BUILDING 209 LEVEL 2 DEMOLITION PLAN -BLDG. 209
209-EP-011 BUILDING 209 BASEMENT & LEVEL POWER PLAN -BLDG. 209
209-EP-021 BUILDING 209 LEVEL 2 & ROOF POWER PLAN -BLDG. 209
210-ED-011 BUILDING 210 BASEMENT & LEVEL 1 DEMOLITION PLAN -BLDG. 210
210-ED-021 BUILDING 210 LEVEL 2 & 3 DEMOLITION PLAN -BLDG. 210
210-EP-011 BUILDING 210 BASEMENT & LEVEL 1 POWER PLAN -BLDG. 210
210-EP-021 BUILDING 210 LEVEL 2 & LEVEL 3 POWER PLAN -BLDG. 210
211-ED-011 BUILDING 211 LEVEL 1 DEMOLITION PLAN -BLDG. 211
211-EP-011 BUILDING 211 LEVEL 1 POWER PLAN -BLDG. 211
212-ED-011 BUILDING 212 BASEMENT & LEVEL 1 DEMOLITION PLAN -BLDG. 212
212-EP-011 BUILDING 212 BASEMENT & LEVEL 1 POWER PLAN -BLDG. 212
221-ED-011 BUILDING 221 LEVEL 1 & ATTIC DEMOLITION PLAN -BLDG. 221
221-EP-011 BUILDING 221 LEVEL 1 & ATTIC POWER PLAN -BLDG. 221
232-ED-011 BUILDING 232 LEVEL 1 DEMOLITION PLAN -BLDG. 232
232-ED-021 BUILDING 232 LEVEL 2 DEMOLITION PLAN -BLDG. 232
232-EP-011 BUILDING 232 LEVEL 1 POWER PLAN -BLDG. 232
232-EP-021 BUILDING 232 LEVEL 2 POWER PLAN -BLDG. 232
239-EP-011 BUILDING 239 LEVEL 1 POWER PLAN -BLDG. 239
240-ED-011 BUILDING 240 BASEMENT & LEVEL 1 DEMOLITION PLAN -BLDG.240
240-EP-011 BUILDING 240 BASEMENT & LEVEL 1 POWER PLAN -BLDG.240
255-ED-011 BUILDING 255 LEVEL 1 DEMOLITION PLAN -BLDG. 255
255-EP-011 BUILDING 255 LEVEL 1 POWER PLAN -BLDG. 255
Q1-ED-011 BUILDING Q1 BASEMENT & LEVEL 1,2,3 DEMOLITION PLAN -BLDG. Q1
Q1-EP-011 BUILDING Q1 BASEMENT & LEVEL 1,2,3 POWER PLAN -BLDG. Q1
Q3-ED-011
BUILDING Q3 BASEMENT AND LEVEL 1,2,3 DEMOLITION PLAN -BLDG.
Q3
Q3-EP-011 BUILDING Q3 BASEMENT & LEVEL 1, 2, 3 POWER PLAN -BLDG. Q3
Q4-ED-011 BUILDING Q4 BASEMENT & LEVEL 1,2,3 DEMOLITION PLAN -BLDG. Q4
Q4-EP-011 BUILDING Q4 BASEMENT & LEVEL 1, 2 POWER PLAN -BLDG. Q4
Q27-ED-011 BUILDING Q27 BASEMENT & LEVEL 1, 2 DEMOLITION PLAN -BLDG. Q27
Q27-EP-011 BUILDING Q27 BASEMENT & LEVEL 1, 2 POWER PLAN -BLDG. Q27
Q32-ED-011 BUILDING Q32 BASEMENT & LEVEL1, 2 DEMOLITION PLAN -BLDG. Q32
Q32-EP-011 BUILDING Q32 BASEMENT & LEVEL 1, 2 POWER PLAN -BLDG. Q32
MCR-EP-011 BUILDING MCR MCR POWER PLAN
MCR-EP-012 BUILDING MCR MCR LIGHTING PLAN
MCR-EP-013 BUILDING MCR MCR ENLARGEMENTS
000-EJ-001 EQUIPMENT GROUNDING DETAILS
Electronic Health Records Modernization 00 01 15 -17
069-EJ-001 BLDG 69 PARTIAL ELECTRICAL ONE-LINE & PANEL SCHEDULE
200-EJ-001 BLDG 200 NORMAL ELECTRICAL ONE-LINE DIAGRAM
200-EJ-002 BLDG 200 NORMAL ELECTRICAL ONE-LINE DIAGRAM
200-EJ-003 BLDG 200 EMERGENCY ELECTRICAL ONE-LINE DIAGRAM
200-EJ-004 BLDG 200E ELECTRICAL ONE-LINE DIAGRAM
200-EJ-005 BLDG 200 & 200E ELECTRICAL PANEL SCHEDULES
200-EJ-006 BLDG 200 & 200E ELECTRICAL PANEL SCHEDULES
200-EJ-007 BLDG 200 & 200E ELECTRICAL PANEL SCHEDULES
201-EJ-001 BLDG 201 & 239 ELECTRICAL PANEL SCHEDULES
202-EJ-001 BLDG 202 & 211 NORMAL ELECTRICAL ONE-LINE DIAGRAM
202-EJ-002 BLDG 202 & 211 ELECTRICAL PANEL SCHEDULES
203-EJ-001 BLDG 203 ELECTRICAL DEMOLITION ONE-LINE DIAGRAM
203-EJ-002 BLDG 203 ELECTRICAL ONE-LINE DIAGRAM
203-EJ-003 BLDG 203 ELECTRICAL PANEL SCHEDULES
204-EJ-001 BLDG 204 ELECTRICAL ONE-LINE DIAGRAM
204-EJ-002 BLDG 204 ELECTRICAL PANEL SCHEDULES
205-EJ-001 BLDG 205 ELECTRICAL ONE-LINE DIAGRAM
205-EJ-002 BLDG 205 ELECTRICAL PANEL SCHEDULES
206-EJ-001 BLDG 206 ELECTRICAL ONE-LINE DIAGRAM
206-EJ-002 BLDG 206 & 208 ELECTRICAL PANEL SCHEDULES
207-EJ-001 BLDG 207 PARTIAL ONE-LINE DIAGRAMS
207-EJ-002 BLDG 207 ELECTRICAL PANEL SCHEDULES
209-EJ-002 BLDG 209 ELECTRICAL PANEL SCHEDULES
210-EJ-001 BLDG 210 & 255 ELECTRICAL ONE-LINE DIAGRAM
210-EJ-002 BLDG 210 & 255 ELECTRICAL PANEL SCHEDULES
212-EJ-001 BLDG 212 ELECTRICAL PANEL SCHEDULES
221-EJ-001 BLDG 221 PARTIAL ELECTRICAL ONE-LINE DIAGRAM
221-EJ-002 BLDG 221 ELECTRICAL PANEL SCHEDULES
232-EJ-001 BLDG 232 ELECTRICAL ONE-LINE DIAGRAM
232-EJ-002 BLDG 232 ELECTRICAL PANEL SCHEDULES
238-EJ-001 BLDG 238 PARTIAL ELECTRICAL ONE-LINE DIAGRAMS
238-EJ-002 BLDG 238 ELECTRICAL PANEL SCHEDULES
244-EJ-001 BLDG 244 PARTIAL ELECTRICAL ONE-LINE DIAGRAM
244-EJ-002 BLDG 244 GEN 9 & 10 ELECTRICAL ONE-LINE DIAGRAM
246-EJ-001 CAMPUS MV SYSTEMS ELECTRICAL DEMOLITION ONE-LINE DIAGRAM
246-EJ-002 CAMPUS MV SYSTEMS ELECTRICAL ONE-LINE DIAGRAM
G11-EJ-001 GEN 11 ELECTRICAL ONE-LINE DIAGRAM
Electronic Health Records Modernization 00 01 15 -18
MCR-EJ-001 MCR ELECTRICAL ONE-LINE DIAGRAM
MCR-EJ-002 MCR ELECTRICAL PANEL SCHEDULES
MCR-EJ-003 MCR ELECTRICAL PANEL SCHEDULES
Q1-EJ-001 BLDG Q1 PARTIAL ELECTRICAL ONE-LINE DIAGRAM
Q1-EJ-002 BLDG Q1, Q3 & Q4 ELECTRICAL PANEL SCHEDULES
Q32-EJ-001 BLDG Q32 PARTIAL ELECTRICAL ONE-LINE DIAGRAM
Q32-EJ-002 BLDG Q27 & Q32 ELECTRICAL PANEL SCHEDULES
FIRE PROTECTION
SHEET NO. SHEET NAME
000-FP-001 FIRE PROTECTION GENERAL NOTES, DIAGRAM, LEGEND
000-FP-002 FIRE PROTECTION SIGNAGE REQUIREMENTS
000-FP-003 FIRE PROTECTION SITE PLAN - MCR
MCR-FP-100 FIRE BARRIER AND EXTINGUISHER PLAN - MCR
MCR-FP-101 CLEAN AGENT PLAN - MCR
MCR-FA-101 FIRE ALARM PLAN - MCR
MCR-FS-100 FIRE SPRINKLER HAZARD CLASSIFICATION PLAN - MCR
MCR-FS-101 FIRE SPRINKLER PLAN - MCR
MCR-FS-102 FIRE SPRINKLER CALCULATION NODES - MCR
MCR-FS-501 FIRE SPRINKLER DETAILS
200-FS-001 GROUND LEVEL FIRE SPRINKLER PLAN
200-FS-011 BLDG 200 LEVEL 1 FIRE SPRINKLER PLAN
200-FS-021 BLDG 200 LEVEL 2 FIRE SPRINKLER PLAN
200-FS-031 BLDG 200 LEVEL 3 FIRE SPRINKLER PLAN
200-FS-041 BLDG 200 LEVEL 4 FIRE SPRINKLER PLAN
200-FS-051 BLDG 200 LEVEL 5 FIRE SPRINKLER PLAN
200-FS-061 BLDG 200 LEVEL 6 FIRE SPRINKLER PLAN
200E-FS-001 BLDG 200E GROUND LEVEL FIRE SPRINKLER PLAN
200E-FS-011 BLDG 200E LEVEL 1 FIRE SPRINKLER PLAN
200E-FS-021 BLDG 200E LEVEL 2 FIRE SPRINKLER PLAN
200E-FS-031 BLDG 200E LEVEL 3 FIRE SPRINKLER PLAN
201-FS-001 BLDG 201, 238 & 239 BASEMENT & LEVEL 1 FIRE SPRINKLER PLAN
202-FS-012 BLDG 202 LEVEL 2 FIRE SPRINKLER PLAN
203-FS-031 BLDG 203 LEVEL 3 FIRE SPRINKLER PLAN
204-FS-021 BLDG 204 LEVEL 2 FIRE SPRINKLER PLAN
205-FS-011 BLDG 205 LEVEL 1 FIRE SPRINKLER PLAN
205-FS-021 BLDG 205 LEVEL 2 FIRE SPRINKLER PLAN
205-FS-031 BLDG 205 LEVEL 3 FIRE SPRINKLER PLAN
Electronic Health Records Modernization 00 01 15 -19
206-FS-011 BLDG 206 LEVEL 1 FIRE SPRINKLER PLAN
206-FS-021 BLDG 206 LEVEL 2 FIRE SPRINKLER PLAN
206-FS-031 BLDG 206 LEVEL 3 FIRE SPRINKLER PLAN
207-FS-011 BLDG 207 LEVEL 1 FIRE SPRINKLER PLAN
207-FS-021 BLDG 207 LEVEL 2 FIRE SPRINKLER PLAN
207-FS-031 BLDG 207 LEVEL 3 FIRE SPRINKLER PLAN
208-FS-011 BLDG 208 LEVEL 1 FIRE SPRINKLER PLAN
209-FS-011 BLDG 209 LEVEL 1 FIRE SPRINKLER PLAN
209-FS-021 BLDG 209 LEVEL 2 FIRE SPRINKLER PLAN
210-FS-011 BLDG 210 LEVEL 1 FIRE SPRINKLER PLAN
212-FS-011 BLDG 212 LEVEL 1 FIRE SPRINKLER PLAN
221-FS-011 BLDG 221 LEVEL 1 FIRE SPRINKLER PLAN
232-FS-021 BLDG 232 LEVEL 2 FIRE SPRINKLER PLAN
240-FS-011 BLDG 240 LEVEL 1 FIRE SPRINKLER PLAN
255-FS-011 BLDG 255 LEVEL 1 FIRE SPRINKLER PLAN
END VOLUME 4
- - - END - - -
Augusta,ME 02-13-2026
Electronic Health Records Modernization (EHRM)Infrastructure Upgrades, Togus, ME
01 00 00 - 1/30
GENERAL REQUIREMENTS
SECTION 01 00 00
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Electronic Health Records
Modernization(EHRM) Infrastructure Upgrades, VA Togus Medical Center, VA Project No. 402-22-700 as required by drawings and specifications.
B. Visits to the site by Bidders shall be made in accordance with the solicitation and at the discretion of the Contracting Officer.
C. Offices of GDM-AE, Inc. as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Work subject to tests and/or testing laboratory shall be retained by
General Contractor. Also see 014529 Testing and Laboratory Services, and 019100 General Commissioning Requirements.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
F. Normal working hours for this contract will be from 7:00AM to 4:30PM
(local time) Monday through Friday except for weekends and established
Federal Holidays.
G. Performing on-site work outside normal working hours will require approval from the Contracting Officer and the COR. Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff.
Electronic Health Records Modernization
01 00 00 - 2/30
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, Construction:
1. Work includes all general construction, alterations, and modifications necessary to support the Electronic Health Record
Modernization (EHRM) Infrastructure Upgrades at the Togus VA Medical
Center.
2. The scope includes the construction of the new free-standing Main Computer Room (MCR, selective demolition, site grading, and structural, architectural, and civil improvements to accommodate new electrical, mechanical, and communication infrastructure.
3. Work also includes patching and finishing, new rated wall assemblies where required by NFPA 75 and NFPA 101, security improvements, and restoration of all finishes and site features disturbed by new conduit routing and duct bank installation.
4. Mechanical system improvement work shall include all labor, materials, equipment, tools, and supervision necessary to complete the mechanical system improvements, including but not limited to the following:
a. Installation of new CRAC units with humidification and dehumidification capability to serve the MCR and Entrance Rooms
A100 and B112. CRAC units shall provide N + 1 redundancy and be networked for automated staging and Data Center Cooling
Optimization (DCCO) control.
b. Installation of new variable refrigerant flow (VRF) systems for non-data spaces within the MCR Building, and new dedicated mini-split systems for all new or modified Telecommunication Rooms
(TRs) and Enclosures (TEs), per HEFP Design Alert 15 and 7 abeyance guidance.
c. Modifications to existing DDC controls and integration of all new mechanical equipment into a BACnet-based DDC system with temperature and humidity monitoring for TR and MCR spaces.
d. Setup, programming, testing, and balancing of new and modified systems, including ERV, exhaust, hydronic, and leak detection systems.
e. Provision of all required insulation, ductwork, fire/smoke dampers, and firestopping in accordance with NFPA 90A and NFPA
101.
Electronic Health Records Modernization
01 00 00 - 3/30
5. Electrical system work shall include furnishing all labor, materials, equipment, tools, and supervision necessary to perform the electrical construction and modifications, including, but not limited to, the following:
a. Provide new power distribution for the MCR Building, including new service, new automatic transfer switches, new UPS units, and
N + 1 redundant A/B distribution per OIT standards.
b. Provide new power connections for all new mechanical equipment
(CRAC units, mini-splits, pumps, ERVs) and telecommunication spaces, including dedicated A/B rack circuits, locking receptacles, and rack-mounted PDUs and UPS units for each TR.
c. Install new grounding and bonding infrastructure including Primary and Secondary Bonding Busbars (PBB/SBB), Rack Bonding
Busbars (RBB), and Telecommunication Bonding Backbone (TBB) systems within all TRs and the MCR.
d. Provide new UPS systems and Emergency Power Off (EPO) circuits for the MCR and TRs as required by NFPA 75 and VA Design Manuals.
e. Install lighting and controls, including energy-efficient LED fixtures, occupancy sensors, and emergency/egress lighting per
NFPA 101.
f. Coordinate telecommunication power connections with Division 27 pathways and fiber infrastructure to maintain redundant A/B power and data routes from the MCR to each TR.
6. Telecommunication systems work shall include furnishing all labor, materials, equipment, tools, and supervision necessary to provide and install the complete telecommunications infrastructure required by this design, including, but not limited to, the following:
a. Work includes all labor, materials, equipment, and supervision necessary to furnish and install the complete telecommunications infrastructure required by this design.
b. Provide new Main Computer Room (MCR) serving as the primary data hub for the Togus VA campus, including site wide fiber distribution. Install MDA, HDA, and server cabinets, fiber channel systems, and containment hardware per ANSI/TIA-942-B and
VA OIT requirements.
c. Construct and upgrade TR and TE spaces throughout the campus per the approved TR Matrix. Provide new Channel Racks with vertical cable managers, PDUs, UPS units, bonding busbars, and grounding
Electronic Health Records Modernization
01 00 00 - 4/30 connections. All TRs to receive Category 6A horizontal cabling, fiber termination hardware, and new 4-inch riser conduits between floors.
d. Install fiber optic backbone infrastructure consisting fiber optic cabling from the MCR to each TR for A-side and B-side redundancy. Cables shall be factory-terminated trunk assemblies with cassettes and patch panels in accordance with ISTS and
ANSI/TIA standards.
e. Provide horizontal Category 6A cabling for all Work Area Outlets (WAOs), WAPs, cameras, and devices as shown on the drawings. All cabling shall be labeled and tested.
f. Install cable pathways including overhead J-hooks, cable tray, and raceway systems with 40 % spare capacity, maintaining required separation from power. Provide UL-listed fire-stopping systems at barrier penetrations.
g. Integrate security and monitoring systems including card readers, motion sensors, and digital IP-PoE cameras in all new TRs and the
MCR, tied to campus access control and SSTV systems.
h. Provide fire alarm integration for MCR and TR spaces as required by NFPA 72 and the VA Fire Protection Design Manual. The MCR shall include detectors, manual release/abort stations, amber/red strobes, and interface to the campus fiber network via Class X connection.
i. Coordinate phasing and migration of existing data equipment per the phasing plan, ensuring VA devices remain online throughout cutovers and that redundant systems are operational before demolition of legacy infrastructure.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
Electronic Health Records Modernization
01 00 00 - 5/30
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security escort and arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Key Control:
1. Only a limited number of keys will be issued to the contractor. Key requests shall be made in writing to the COR.
2. If the Contractor loses a key, a charge of $30 will be billed for a replacement key.
3. Ensure all doors leading to and from construction are either monitored or locked to prevent access to the area from unauthorized persons.
D. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
“sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
Electronic Health Records Modernization
01 00 00 - 6/30
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting
Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document
Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the
EDMS system.
“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Contractor may have designated areas pending campus activities, to be coordinated by the COR or COR representative. Designated areas shall be determined in conjunction with FMS leadership.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the
Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the
Contracting Officer and shall be built with labor and…