This is a product specification sheet for the M3C Filter Polisher, a fuel filtration and polishing system manufactured by Earthsafe Systems, Inc. The M3 series is available in three flow capacity options: 3 GPM (10 LPM), 5 GPM (20 LPM), and 10 GPM (40 LPM), with standard pressure capacity of 25 PSI (170 kPa). The unit features a compact welded steel construction measuring 36"W x 32"H x 12"D, weighing approximately 300 lbs, and is available with either an open frame or weatherproof enclosure. The system employs a positive displacement Viking H475 Series pump, magnetic conditioner, centrifugal filter separator, and final 1-micron dirt and water filtration. Inlet and outlet connections vary by capacity: 0.50 IN (12 MNPT) for 3 and 5 GPM models and 0.75 IN (18 MNPT) for the 10 GPM model.

The M3C operates on 120-230 VAC, single-phase, 50-60 Hz power with motor ratings of 0.33–1.0 HP (0.25–0.75 KW) and features a TEFC (IP 55) motor with integrated C1 controller and motor overload relay. The system includes comprehensive monitoring of inlet vacuum, outlet high pressure, filter water, flow, and leak conditions via multiple sensors, with output relays for filter run, filter alarm, and filter leak functions. The operator interface includes a Man-Off-Auto switch, programmable cycle time settings, pump run hour meter, and indicator lights for power, pump run, and alarm status. Standard accessories include a 3-gallon containment basin, suction and pressure gauges, and all required sensors. Optional accessories include a floor stand, C8 control module, Modbus interface, stainless steel enclosures, and dual-tank control capability. Contact information: Earthsafe Systems, Inc., 1000 W. Crossroads Parkway, Bolingbrook, IL 60490; (312) 226-7600; info@earthsafe.com.

View the file

Other files

File Type Posted
S30 - SAM - Special Notice - Cancellation - 36C77626R0062_2 - EHRM Infra Upgrades - Togus.pdf PDF
S06 - Amend 0002 - Att 03 - Corrected Agenda - RFP - 07202026 - EHRM Infra - Togus.pdf PDF
S06 - Amend 0002 - 36C77626R0062 - 07202026 - EHRM Infra - Togus.pdf PDF
S06 - Amend 0001 - Att 02 - SV - Attendance SHT - 06292026 - EHRM Infra - Togus.pdf PDF
S06 - Amend 0001 - 36C77626R0062 - 07142026 - EHRM Infra - Togus.pdf PDF
S06 - Amend 0001 - RFIs - 07132026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S06 - Amend 0001 - Att 01 - Rvd Structural Drwg - 06192026 - EHRM Infra - Togus.pdf PDF
S06 - Amend 0001 - Att 03 - SV - Agenda - RFP - 06292026 - EHRM Infra - Togus.pdf PDF
S02 - SOW - Att 05 - Drwg - Vol 3 - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 13 - Const Sch - 02132026 - EHRM Infra Upgrades - Constr Togus.pdf PDF
S02 - SOW - Att 26 - Cut Sheet 04 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - Att 03 -Prj Info Sheet for KTR - EHRM Infra Upgrade - Togus.docx DOCX document
S02 - SOW - Att 03 - Drwg - Vol 1C - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 22 - TS-000 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - Att 07 - 852.219-75 - 06172026 - EHRM Infra Upgrade - Togus.pdf PDF
S02 - Att 04 - Memo - Brand Name - 04092026 - EHRM Infra Upgrade - Togus.pdf PDF
S02 - SOW - Att 35 - Cut Sheet 13 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 17 - Memo - Phy Sec Compliance - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 27 - Cut Sheet 05 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 09 - Specs - Vol 3- 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 30 - Cut Sheet 08 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 24 - Cut Sheet 02 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - Att 05 - Division Cost Breakdown - EHRM Infra Upgrade - Togus.xlsx XLSX spreadsheet
S02 - SOW - Att 29 - Cut Sheet 07 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 37 - Cut Sheet 15 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 16 - Submittal Reg - 02182026 - EHRM Infra - Upgrades - Constr - Togus.xlsx XLSX spreadsheet
S02 - SOW - Att 14 - Design Calcs - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 18 - Memo - Prj Stnd Compliance - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 21 - PCRA 3 - MCR and Trench Work - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 40 - Cut Sheet 18 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 33 - Cut Sheet 11 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 01 - Drwg - Vol 1A - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 06 - Drwg - Vol 4 - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 11 - Haz Mat Report - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 12 - Geotechnical Report - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 32 - Cut Sheet 10 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 08 - Specs - Vol 1 - Div 02-14 - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 20 - PCRA 2 - Cabling and Data Outlets - EHRM Infra Upgrades - Constr - Togus.pdf PDF
RFP - EHRM Infra Upgrade - 36C77626R0062 - 06172026 - Togus.pdf PDF
S02 - SOW - Att 19 - PCRA 1 - TR Constr - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 07 - Specs - Vol 1 - Div 00-01 - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 15 - Design Narrative - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 23 - Cut Sheet 01 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 31 - Cut Sheet 09 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - Att 02 - PPQ - EHRM Infra Upgrade - Togus.docx DOCX document
S02 - SOW - Att 02 - Drwg - Vol 1B - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 34 - Cut Sheet 12 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - Att 01 - SOW - 05112026 - EHRM Infra Upgrades - Togus.pdf PDF
S02 - SOW - Att 10 - Specs - Vol 4 - 02182026 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
S02 - SOW - Att 36 - Cut Sheet 14 - EHRM Infra Upgrades - Constr - Togus.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

• Compact open frame or with weatherproof enclosure.

• �Positive displacement pump, magnetic conditioner, centrifugal filter separator, final 1 micron dirt and water.

• �Monitors inlet vacuum, outlet high pressure, filter water, flow, and leak.

Programmable controller with display, cycle time settings, pump run hour meter.

• HOA switch and lights for power, pump run, and alarm.

M3

M3: Filter Polisher

3, 5, 10 GPM (12, 20, 40 LPM)

M3C FILTER POLISHER

Dimensions 36”W x 32” H x 12”D (900W x 800H x 300D)

Flow Capacity 3, 5, or 10 GPM (10, 20, or 40 LPM)

Pressure Capacity Standard 25 PSI (170 kPa)

Pump Type Positive Displacement Viking H475 Series

Inlet / Outlet3 GPM 0.50 IN (12)
(MNPT)5 GPM 0.50 IN (12)

10 GPM 0.75 IN (18)

Weight 300 LB (140 KG) (Estimate)

Standard Accessories

Mag Conditioner Filter Separator

Final Filter 1 Micron + Water Suction — Pressure Gauges

Flow, Leak, Vacuum, Pressure, and Filter Water Sensors

Construction Welded Steel Construction Containment Basin (3 GAL) Standard Open Frame

Motor TEFC (IP 55)

Power 120-230 VAC, 1P, 50-60 Hz

0.33–1.0 HP (0.25–0.75KW)

Controller C1 Controller Motor Overload Relay

Output RelaysFilter Run
(Dry Contact)Filter Alarm

Filter Leak

Interface Man-Off-Auto Select Power ON Light Pump Run Light Pump Alarm Light

OperatorDOW and Time Start
ProgrammingCycle Time HR-MIN
OptionalFloor Stand
AccessoriesC8 Control

Modbus Interface CS Enclosure SS Enclosures Dual-Tank Control

How to Order M3.03 Filter-Polish 3 GPM M3.05 Filter-Polish 5 GPM M3.10 Filter-Polish 10 GPM

Earthsafe Systems, Inc.

1000 W. Crossroads Parkway Bolingbrook, IL 60490

T: (312) 226-7600 F: (312) 226-4706 info@earthsafe.com www.earthsafe.com

File details come from the government source that posted it. Updated .