About this file
This document is a response to Request for Proposals (RFP) No. 8914-0-2020-BG submitted by Professional Environmental Engineers, Inc. (PE) to the City of Madison Engineering Department for environmental consulting services. The City seeks qualified environmental consulting firms to provide environmental site assessment services on an as-needed basis for properties owned by or being considered for purchase by the City, as well as sites in the right-of-way during construction activities. The scope of work is not predetermined; rather, City departments will define specific service needs and request firms to prepare site-specific work plans and cost estimates with not-to-exceed dollar amounts prior to initiating on-site activities. The RFP was issued on February 14, 2020, with the response deadline of February 13, 2020 (indicated as the date prepared), submitted to the City County Building in Madison, Wisconsin.
PE is a certified minority-owned and woman-owned business enterprise (M/WBE) that will serve as the prime contractor and self-perform at least 65 percent of professional services, partnering with Burns & McDonnell as a subcontractor. The PE team proposes four subteams: Management, Phase I, Phase II, and Remediation Support, led by Filippe Cade as Project Manager. PE demonstrates extensive experience with over 200 Phase I Environmental Site Assessments, 50 Phase II ESAs, and millions of dollars in remedial action work completed over the past five years throughout the Midwest, including prior work in Wisconsin for state and federal agencies. The firm's personnel include licensed professional engineers, geologists, environmental scientists, and specialists in hazardous materials assessment, asbestos/lead inspections, and remediation design. PE references multiple completed projects for municipal, state, and federal clients, demonstrating a 90 percent repeat business rate and strong performance records in environmental site assessment and remediation support activities.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prepared for:
City of Madison Engineering Department
Prepared by:
Professional Environmental Engineers,Inc.
111 West Jackson Street, Suite 1700 Chicago, IL 60604
| CITY OF MADISON REQUEST FOR PROPOSALS |
| ENVIRONMENTAL CONSULTING SERVICES |
RFP# 8914-0-2020-BG February 14, 2020
February 13, 2020
City of Madison Purchasing Services City County Building, Room 407 210 Martin Luther King Jr. Blvd.
Madison, WI 53703
Re: Response to the Request for Proposal (RFP) No. 8914‐0‐2020‐BG for Environmental
Consulting Services
Dear Sir or Madam, Professional Environmental Engineers, Inc. (PE) is pleased to present our response to the above‐referenced RFP. As required, we have included the requested hard copies and electronic copies.
PE is a full‐service environmental engineering and consulting company with headquarters in St.
Louis and a satellite office in downtown Chicago, with satellite offices throughout the Midwest.
PE has teamed with Burns & McDonnell (BMcD) and will work with them out of their Madison, WI office. PE is a certified minority‐owned and woman‐owned business enterprise (M/WBE) that will be the prime contractor on the contract and self‐perform at least 65% of the professional services of this contract.
PE is committed to provide Environmental Consulting Services as described in the RFP at the price and in accordance with the schedule presented herein.
PE appreciates the opportunity to submit a response to provide Environmental Consulting Services to the City of Madison. If you have any questions regarding the enclosed material, please feel free to contact the undersigned at (312) 214‐3146 or fcade@pe‐engrs.com.
Respectfully submitted, PROFESSIONAL ENVIRONMENTAL ENGINEERS, INC.
Filippe B. Cade President
Response to RFP No. 8914‐0‐2020‐BG for Environmental Consulting Services
Client Focused, Client Driven 2
EXECUTIVE SUMMARY
RELEVANT
Professional Environmental Engineers, Inc. (PE) has been an integral part of the strategic planning process for municipal clients throughout the existence of the company. By understanding client/stakeholder objectives, factors that control project decisions, regulatory requirements, technical conditions, and available cleanup options, PE has helped turn difficult scenarios/situations into successful projects. We have investigated numerous sites contaminated with petroleum hydrocarbons (gasoline, diesel and jet fuel, heating oil, waste oil, hydraulic fluids, and kerosene), chlorinated solvents (including TCE and PCE), methyl tert‐butyl ether (MTBE), other volatile and semi‐volatile organic compounds (VOCs/SVOCs), polynuclear aromatic hydrocarbons (PAHs), heavy metals, polychlorinated biphenyls (PCBs), herbicides and pesticides, dioxins/furans, asbestos, lead‐based paint, mold, and even pigeon droppings. These analyses have included (where applicable) the identification and screening of potential treatment technologies, assembling technologies into alternatives, preparation of preliminary cost and schedule estimates, and evaluation/comparison of alternatives (for performance, long‐ and short‐term effectiveness, implementability, cost, and state/community acceptance).
Over the past 20 years, PE has performed hundreds of environmental engineering projects comprising environmental audits, Phase I and Phase II environmental site assessments, UST management projects, NEPA assessments, SWPPP and SPCC plan updates, wetland delineations / permitting and restoration, vapor encroachment assessments, hazardous materials assessments, and remediation support for many clients all over the Upper Midwest, including environmental engineering consulting services for units of government and other large landholders. Because of our local presence and our familiarity with the city and state regulations, PE has been a successful environmental consultant performing similar scopes of services for a variety of clients ranging from state agencies to city entities to the federal government.
PE has partnered with Burns & McDonnell on this proposal as sub consultant and teammate to provide additional support staff and regulatory compliance expertise to a full range of Phase I ESA, Phase II ESA, and Remediation Support services.
Why is our project team, led by PE, the best choice for this contract?
The PE Team is uniquely qualified to perform this work for the City of Madison based on the following facts:
We’ve Done it Before! – Environmental site assessment (ESA) and remedial action
This Team has partnered on several vital projects throughout the Midwest and has developed a strong working relationship with the diversified skill sets needed to make this TEAM the most capable to perform this important contract successfully.
Client Focused, Client Driven 3 services have been the building blocks of our company since it began in 1997. We have participated in hundreds of major re‐development projects throughout Missouri, Illinois, Iowa, and Wisconsin and have a clear understanding of the requirements for this work.
We Understand the Scope! – As a result of the above‐noted experience, we clearly understand the scope of work, the technical and administrative issues, and how to successfully complete assigned task orders.
We’ve Got a Strong Performance Record! – We have an excellent past record of performance with respect to factors such as responsiveness, communication, timeliness, and exceeding expectations. Our commitment to customer satisfaction results in repeat business, referrals, and high approval ratings. In fact, 90% of our business is the result of repeat business with local and state agencies, the federal government, and numerous commercial clients.
Our Experienced Staff is Available! – PE has assembled a team of experienced personnel who are readily available to work on this new contract. Our team has significant experience in Phase I/II ESAs, ACM/LBP/PCB/HHW inspections and abatement, preparation of project plans including QAPPs, HSPs, SAPs and QCPs, preparation of and enactment of remedial design/remedial action plans, and other environmental assessment services. PE also has state registered professionals that will be part of the project team. In addition, PE has teamed with Burns & McDonnell Engineering to support us on this contract. They have a Madison, WI office that will serve as our team’s home office and have dozens of qualified and experienced professionals available to execute this contract.
Client Focused, Client Driven 4
QUALIFICATIONS AND TECHNICAL EXPERIENCE
RELEVANT
The information below describes PE’s technical approach to the work, company and staff qualifications, as well as competence and relevant experience based on specific services that PE offers as they pertain to this contract and the RFP. As shown, PE is more than able to meet the City of Madison project needs and fulfill the objectives of the opportunity.
1.0 FIRM BACKGROUND AND KEY STAFF
RELEVANT
PE is a small minority/women business enterprise (MBE/WBE) that is certified by the Small Business Administration, the State of Illinois, Cook County, the City of Chicago, the City of St Louis, the State of Missouri, and the National Minority Supplier Development Council (NMSDC).
PE is a full‐service engineering and consulting firm that specializes in providing cost‐effective environmental solutions for both government and commercial clientele. PE staff readily serves public clients (including cities, counties, townships, unified school districts, developers, architects, lending institutions, and other project stakeholders. In fact, PE has a Phase I ESA and Phase II ESA contract with both the Missouri Department of Natural Resources and the Kansas Department of Health and Environment.
PE was incorporated in 1997 and has been in business for 22 years (as currently constituted) providing environmental consulting and engineering services. PE is currently owned and operated by Carolyn Green, CEO, and is headquartered in St. Louis, MO with a satellite office at 111 West Jackson Street, Chicago, IL. In addition, a team of PE employees work in a shared collaboration space with our proposed partner for this opportunity, Burns & McDonnell at 1431 Opus Place, Downers Grove, IL and at 505 S. Rosa Road in Madison, WI.
2.0 PROJECT TEAM
The PE Team has the technical, field, and administrative staff with the appropriate certifications to handle the scope of services required under this RFP and thus meet the City of Madison’s needs. PE has nearly 40 full‐time environmental personnel, including engineers, geologists, environmental scientists, chemists, biologists, hydrogeologists, project managers, technicians, graphic design specialists, CAD operators, health and safety specialists, technical writers, air‐ sampling professionals, radiation specialists, hazardous material managers, asbestos/lead inspectors, and word processors. Burns & McDonnell, our proposed partner, is an 100% employee‐owned full‐service engineering firm. The world‐wide headquarters is located in Kansas City, MO with a local office at 505 S Rosa Road in Madison, WI. The company is over 120 years old and currently has over 7,000 employee‐owners. Burns & McDonnell provides industry‐leading environmental remediation services across multiple industries including MGP, utility, RCRA, brownfield, manufacturing/industrial facilities, and sediment projects.
PE has worked side by side with Burns & McDonnell on over 300 projects for the last 5 years and have nearly $3M in shared work over this timeframe. In fact, we have collaborated on over 150 local stormwater projects together over the last 11 months from March 2019 through January 2020. Our team pulls key staff from both PE and Burns & McDonnell into one cohesive team.
The Team Organization Chart proposed for this contract is at the end of this section. The Project Manager will lead the efforts and be responsible and directly accountable to the City of Madison for the overall success of the Project. The Project Manger selected for the PE Team is Filippe Cade of PE. Mr. Cade was selected for this position because of his strong project management experience and extensive project execution experience on similar environmental site assessment projects in this RFP for government agencies throughout the Midwest, which will allow the team to “hit the ground running” upon receipt of the first task order. As the Project Manager for this project, Mr. Cade will have the authority to ensure that the appropriate resources are assigned to the Task Orders, and he, along with each designated Team Lead, will communicate regularly with the City of Madison personnel.
PE proposes to conduct the project with multiple “sub‐teams” in order to assure that project objectives are completed within the specified time frame. The sub‐teams will consist of a Management team, Phase I team, Phase II team, and Remedial Support team.
The Management Team, led by Filippe Cade, P.E. as noted above, will attend, and participate in, technical project planning meetings, identify and manage task resources, and review project deliverables for technical content and quality.
The Phase I Team, led by Robert Louden, will begin working on completing Phase I ESAs as soon as properties are identified, project objectives are defined, access agreements are in place, and H&S plans have been approved for internal use. This team will identify properties with RECs for Phase II work.
The Phase II Team, led by Ms. Joanne Reno, P.E., a state licensed engineer, will begin preparation of the relevant planning documents for the Phase II work. Upon approval of the Phase I ESA, PE will begin implementation of the Phase II work.
The Remediation Support Team, led by Erik Ehrengren, a Wisconsin licensed engineer, will coordinate remedial activities.
With the support of the Project Manager, the Team Leads will identify key discipline leads, subcontractor specialists and identify small business subcontracting opportunities. To the greatest extent possible, Team Leads and key technical personnel will be dedicated to their respective projects for the life of the Task Order(s), to ensure continuity, and to build and maintain knowledge of the project(s).
Additional background on the Management Team and the Sub‐team Leads is as follows:
FILIPPE CADE PE
PROJECT MANAGER
Filippe Cade, P.E. – Mr. Cade is PE’s Chief Engineer and President of PE. He has a B.S. in Environmental Engineering and over 25 years of experience in environmental consulting and manages PE’s Chicago office and staff. He is registered in 8 states with his Wisconsin registration in progress. Mr. Cade specializes in program and project management with technical expertise in Phase I/Phase II environmental site assessments, environmental audits, UST management, property condition assessments and other sampling/assessments (i.e., radon, lead‐in‐paint/drinking water and soil/groundwater). He has investigated numerous UST/AST sites, brownfield properties, landfills, TNT and other waste lagoons, battery burial areas, military burn and detonation areas, dumps, and other miscellaneous sites. Additionally, he has performed site investigations and remediation support at sites contaminated with hydrocarbons, metals, volatile and semi‐volatile organics, chlorinated pesticide/ insecticides, asbestos, PCBs, and TCE. Mr. Cade will serve as the Project Manager.
ROBERT LOUDEN CHMM
PHASE I ESA TEAM LEAD
Bob Louden, CHMM – Mr. Louden is the Sr. Geologist and Director of UST/ESA Services for PE;
he will be utilized as the Team Lead for Phase I ESAs. Mr. Louden has a B.S. and M.S. degree in Geology/Earth Sciences and over 25 years of environmental consulting experience. His tank experience includes UST removals/closures, locating tanks and product lines (using geophysical applications), installation and operation of tank monitoring systems, soil and groundwater site assessments, recovery of free product, risk‐based assessments and closures, soil and groundwater remediation (dig and haul, SVE, capping, bioremediation, bioventing, landfarming, soil washing, pump‐and‐treat, air sparging, natural attenuation, ORC injection, dual‐phase high vacuum extraction (DPHVE), and land‐use controls), long‐term groundwater monitoring, and reimbursement. In addition to the UST work, Mr. Louden has conducted assessments, designs, and remediation at hundreds of brownfield sites within the Chicago, St Louis, and Kansas City areas. His experience includes Phase I and Phase II ESAs, asbestos and LBP surveys, MRBCA Tier 1 and Tier 2 assessments, geophysical surveying, waste characterization, HHW surveys, RDs, RAWPs, specifications (for demolition, UST removals, soil remediation, structure decontamination, and site restoration), contract administration and field oversight, soil and groundwater remediation, and report writing. Mr. Louden is certified in the ASTM Environmental Site Assessment Standard Practices for Phase I Site Assessment (1527).
JOANNE RENO PE
PHASE II ESA TEAM LEAD
Joanne Reno, P.E. – Ms. Reno is a Professional Engineer with over 19 years of environmental experience. She is a graduate from Southern Illinois University with a Civil Engineering degree.
Ms. Reno will serve as the Phase II ESA Team Lead. Ms. Reno is a licensed professional engineer (#062.059524) and a state licensed Asbestos Management Planner. Ms. Reno and has worked on dozens of projects and has managed numerous asbestos project designs, UST, hazardous waste, and compliance issues. Ms. Reno has managed Phase II investigations ranging from $10,000 to $900,000.
ERIK G EHRENRGEN PE
REMEDIATION SUPPORT TEAM LEAD
Erik Ehrengren, P.E. – Mr. Ehrengren is a Wisconsin professional environmental engineer with more than 12 years of diverse experience. Mr. Ehrengren has a background in civil and environmental engineering design, environmental due diligence (Phase I/Phase II ESAs), environmental compliance and permitting. He currently assists with environmental remediation design and planning. Mr. Ehrengren also has experience in UST management and has performed remedial design, investigation, and oversite on numerous projects. Mr. Ehrengren has in‐depth knowledge of Wisconsin environmental regulation, subsurface investigation activities, construction, and various environmental remediation approaches. Mr. Ehrengren will be the Remediation Support Team Lead.
Resumes of the key proposed team members are presented in Exhibit A. Other project‐level professionals other than those listed above are available for work on this project on an as‐ needed basis in order to assure that the City of Madison’s work is given top priority.
3.0 EXPERIENCE
PE, along with Burns & McDonnell, brings a team with a long history of executing environmental projects throughout Illinois ranging from Phase Is, Phase IIs, and preparation of SWPPPs and SPCC Plans to asbestos, lead, and mold consulting to the removal of USTs and LUSTs (and preparation of regulatory forms), completion of CCDD projects, and site remediation and restoration. We have participated in hundreds of mission‐critical environmental projects throughout the Midwest (including Madison, Wisconsin) and have a clear understanding of the requirements for this work. Further, our Team has the proven experience and completed Wisconsin project work under the Wisconsin Department of Transportation (WisDOT), Wisconsin Department of Natural Resources (WDNR), Wisconsin Department of Safety and Professional Services (DSPS), Wisconsin Department of Health Services (WHS), Wisconsin Economic Development Corporation (WEDC), US Environmental Protection Agency (US EPA), the Occupational Safety and Health Administration (OSHA), and all other local, state, and federal regulations.
Our Team has performed over 125 Phase I ESAs and 50 Phase II ESAs and millions of dollars of remedial action work in the past 5 several years and we are very familiar with the rules and regulations that govern the City of Madison. Our team pulls key staff from both PE and Burns & McDonnell into one cohesive team.
I. Experience with Phase I Environmental Site Assessments
PE performs numerous Phase I ESAs (and related services) every year for clients in Missouri and Illinois. Our clientele includes developers, city and county municipalities, school districts, architects, demolition/construction companies, oil companies, banks, federal agencies, and other miscellaneous entities. Individual assessments have been conducted by PE at hundreds of different site locations, including gas stations, dry cleaners, chemical plants, auto repair/salvage yards, tanneries, farm land, machine shops, foundries, tar manufactures, schools, restaurants, hotels/motels, car washes, printers, warehouses, undeveloped property, vacant lots, plating facilities, shopping malls, laundry mats, and other miscellaneous commercial/industrial facilities. Specific clients include Bank of America, Nations Bank, Commerce Bank, McCormack Baron Salazar, East St. Louis School District 189, St. Louis University, St. Louis Development Corporation, St. Louis County Economic Council, City of St.
Louis, Trivers Associates, St. Louis Metropolitan Sewer District, Colliers Turley Martin Tucker, City of Kirkwood, Kennedy Associates, Kansas City Southern Railroad, the YWCA, East St. Louis Housing Authority, CB Richard Ellis, Emerson Park Development Corporation, St. Louis Housing Authority, MLB Realty, City of Sikeston, Independent Brokers Network L.L.C., Union Planters, Employment Connection, Warner Jenkinson, St. Louis Office for MR & DD, Midwest Biodiesel, and Dalmark Group LLC.
All Phase I work PE performs complies with ASTM Standard E1527‐13 and includes reports with conclusions regarding the presence (or absence) of recognized environmental conditions
(RECs), vapor encroachment conditions (VECs), and business environmental risks (if requested), recommendations regarding needed characterization of RECs, a detailed site plan, and supporting documentation. Many of PE’s environmental professionals have received Phase I training (from accredited organizations) specific to the current ASTM standard.
PE has completed over 200 Phase I ESAs over the last 5 years. A list of some of PEs Phase I ESA projects demonstrating our past record of performance for ESAs performed by the office working on this project in the past five years is as follows:
Project Name Location Client Date Completed
Phase I ESA, Coca‐Cola Facility on Progress Blvd
Peru, IL Coca‐Cola Refreshments
November
Phase I ESA, Midwest Biodiesel Facility
South Roxana, IL Midwest Biodiesel Products
April 2014
Phase I and II ESA, Forum Mobil Home Park
Collinsville, IL Ivanhoe Properties, LLC
April 2015
Phase I ESA, Dollar General Greenville, IL Nor Cal Commercial Real Estate
December
Phase I ESA, Dixon Reporting Center Phase I, ACM & Lead
Dixon, IL Nicor Gas April 2017
Phase I ESA, Dixon Yard, Phase I, ACM & Lead
Dixon, IL Nicor Gas April 2017
Phase I ESA, Water Plant Fischer, IL Illinois American Water
October
Phase I ESA, Water Tower Fisher, IL Illinois American Water
October
Phase I ESA, Sewer Plant Fisher, IL Illinois American Water
October
Phase I ESA, 615 West Street Jacksonville, IL Ameren May 2018
Phase I ESA, 5911 Gateway Industrial
Belleville, IL Crescent Parts April 2018
Phase I ESA, 19150 Glennwood St
Glennwood, IL Nicor Gas June 2018
Our Teammate, Burns & McDonnell, performs Phase I ESAs across the nation and Illinois for a diverse clientele. Our team has managed simple and complex Phase I projects. All Phase I work is performed with trained staff in accordance with ASTM Standard E1527‐13 and provide thorough review all available sources. Reporting provides supporting documentation, appropriate conclusions and recommendations on further site characterization. A list of some of Burns & McDonnell’s Phase I ESA projects demonstrating their past record of performance for ESAs by the office working on this contract in the past five years is as follows:
Completed
Crescent Boulevard Parkway Improvements, ROW PESA
Glen Ellyn, IL DuPage County DOT August 2014
TRN, Harlem Avenue Improvement Study, ROW PESA
Frankfort, IL Village of Frankfort April 2016
Grand Avenue, DuPage County ‐ Right‐of‐way PESA
Elmhurst, IL IDOT January 2019
York Street, Elmhurst ‐ Right‐of‐ way PESA
Elmhurst, IL IDOT September
MWRD, Cherry Creek East Branch
Flossmoor, IL MWRD January 2016
Former Electronics Manufacturing Facility, Phase I/II
Franklin Park, IL Digital Realty Transfer
November
Spring Coil Manufacturing ‐ Phase I ESA/Phase II ESA;
Chicago, IL Peoples Gas April 2018
United Airlines, ORD, Hangar & Lot C, Phase I/Phase II ESA
Chicago, IL United Airlines March 2017
ORD, American Airlines Proposed Hangar, Phase I ESA
Chicago, IL American Airlines August 2016
ORD, American Airlines Proposed GEM, Phase I ESA
Chicago, IL American Airlines August 2016
II. Experience with Phase II Environmental Site Assessments
PE performs numerous Phase II ESAs (and related services) every year for commercial clients in Missouri and Illinois, including for many of the clients listed above. All Phase II work PE performs complies with the ASTM Standard (E1903‐11) and includes the preparation of reports explaining the nature, scope and extent of contamination, and the estimated cost of remediating, removing, abating and/or reducing such contaminants. PE also performs detailed soil, groundwater, soil gas and indoor air site assessments, risk assessments (including ecological, human health, and risk analyses in accordance with Illinois Environmental Protection Agency (IEPA) Tiered Approach to Corrective Action (TACO) guidelines, environmental audits, geophysical surveys (including magnetic, electromagnetic, and ground‐penetrating radar applications), waste characterization/profiling, and numerous specialty assessments (asbestos and lead surveys, wetland investigations/delineations, archaeological surveys, PCB and radon sampling/testing, electromagnetic field (EMF) surveys, indoor air quality (IAQ) and mold/fungi assessments, household hazardous waste (HHW) surveys/inventories, geotechnical soil investigations, and noise assessments) at brownfield and other re‐development sites throughout the region.
A list of some of PE’s Phase II ESA projects demonstrating our past record of performance for
ESAs by the office working on this contract in the past five years is as follows:
Completed
Phase II ESA, Forum Mobil Home Park
Collinsville, IL Ivanhoe Properties, LLC
April 2015
Phase II ESA, 1135 N. Maple St DuQuoin, IL UES Consulting Services, Inc.
January 2016
Phase II ESA, 19150 Glennwood Road
Glenwood, IL Nicor Gas August 2018
Phase II ESA, 19150 Glennwood Road (follow up)
Glenwood, IL Nicor Gas September
Phase II ESA, 615 West Street Jacksonville, IL Ameren July 2018
Phase II ESA, Dixon Yard Dixon, IL Nicor Gas August 2018
Phase II ESA, Dixon Reporting Center
Dixon, IL Nicor Gas August 2018
A list of some of BMcD’s Phase II ESA projects demonstrating their past record of performance for ESAs by the office working on this contract in the past five years is as follows:
Completed
Digital Realty Transfer ‐ Former Electronics Manufacturing Facility, Phase I/Phase II
Franklin Park, IL Digital Realty Transfer
November
Spring Coil Manufacturing ‐ Phase I ESA/Phase II ESA;
Chicago, IL Peoples Gas April 2018
United Airlines, ORD, Hangar & Lot C, Phase I/Phase II ESA;
Airport property around facilities
Chicago, IL United Airlines March 2017
Mutual Fuel Gas Works – Comprehensive Site Investigation
Chicago, IL Peoples Gas 2016
Various MGP Sites Comprehensive and Focused Site Investigations
Illinois Confidential 2000 ‐ Ongoing
III. Experience with Remediation Support and Implementing Remediation Activities
The basic stages of a remedial design include review of assessment details, strategic planning, feasibility studies, cost estimating and analysis, and preparation of a work plan and/or plans and specifications. The PE Team provides all of these services and has prepared numerous remedial action work plans (RAWPs) for the municipalities, state regulatory agencies, the USACE, and the US EPA. The majority of RAWPs submitted by PE to state agencies are primarily for risk‐based cleanup regulated through the state UST/LUST programs, through the state Brownfields Program, or through the federal Brownfields or Superfund program. PE has provided RAWPs and remediation specifications for numerous brownfield sites over the last 20 years within the Midwest. These designs include specifications for demolition, clearing and grubbing, mold/asbestos/LBP abatement, structural decontamination (for PCBs, mercury, and other miscellaneous spills), UST removals, brick/rock/concrete recycling (sorting, crushing, & sizing for re‐use as fill material), HHW removal and disposal, soil excavation/transportation /disposal, backfilling and compaction, grading, storm‐water/runoff control, site security/fencing, de‐watering, groundwater remediation, and waste disposal. PE has used the applicable regulatory criteria on numerous hazardous waste sites and has a thorough understanding of the guidance document for this process.
PE has prepared remedial action plans and bid packages (including specifications) for numerous brownfield clients, including the City of St. Louis, the East St Louis School District, and MBS.
Plans and specifications have been prepared by PE for numerous tasks, including general work conditions, fencing and site security, decommissioning of utilities, building and equipment decontamination, asbestos and LBP abatement, household hazardous waste removal, structure demolition, UST removals, free product recovery, soil excavation and disposal, backfilling and grading, site restoration, and other miscellaneous tasks. In addition to preparing bid packages, PE has prepared engineer estimates, conducted bid/job walks, provided written answers to contractor questions, and assisted with contractor bid evaluations.
IV. Example Projects (within the last 3 years)
Project No. 1: West Haven, United States Department of Agriculture (USDA), Natural Resources Conservation Service (NRCS), Phase I/Phase II Environmental Site Assessments PE was contracted by the USDA – NRCS to perform an environmental assessment of select property. Specifically, PE prepared 20 Phase I ESAs encompassing a total of 32 parcels at various sites in West Haven, Connecticut on behalf of the USDA ‐ NRCS, as preparation for entry of the sites into the Emergency Watershed Protection Floodplain Easement Program. PE reviewed multiple historic and regulatory sources, including previous reports provided to PE by the User (NRCS) and owners (City of West Haven and Jimmies, Inc.) of the parcels. PE accomplished the workload by breaking the ESAs into four groups of five, which were completed in 40‐day intervals. Multiple RECs, including the presence of former waste disposal areas, buried solid waste, and suspect fill materials, were identified, and Phase II work plans are currently in production. PE conducted a massive Phase II effort at the sites to address the following Recognized Environmental Conditions:
Identify potential buried drums and/or underground storage tanks at the former Waste Treatment facility, and suspected solid waste dumping areas at the terminus of May Street and south of Blohm Street.
Identify potential buried drums and/or underground storage tanks at the former restaurant at 15 Beach Street and suspected solid waste dumping area between 15 Beach Street and 11 Third Avenue Extension.
Identify and characterize suspected contamination in soil, groundwater, surface water and sediments originating from the former Waste Treatment facility, solid waste dumping throughout the site, and/or historical usage of oil as a mosquito control device.
Identify and characterize suspected contamination in soil originating from imported fill.
Identify and characterize suspected hazardous materials (lead based paint and asbestos containing materials) inside the former restaurant at 15 Beach Street.
Prepare a Phase II ESA summarizing findings.
PE conducted field work (including brush clearing, geophysical surveying, trenching, drilling, hand‐augering, and soil, groundwater, sediment and surface water sampling) from June through August 2016. Specifically, PE drilled a total of 55 soil borings, collected a total of 110 soil samples (two per boring), installed and sampled a total of 20 temporary monitoring wells, collected 20 sediment and 20 surface water samples from Old Field Creek, and excavated and sampled soil from 24 trenches. PE submitted the Final Phase II ESA reports in December 2016 and presented the findings to NRCS and the City of West Haven in January 2017.
Agency Name: NRCS Agency Contact: Arthur Ramthun, CT NRCS State Conservation Engineer Email: Arthur.Ramthun@ct.usda.gov Phone: 860‐871‐4030 (office); 860‐578‐0304 (cell) Performance Period: May 2015 –– February 2017 Total Dollar Award: $16,491 (Phase I ESA), $247,525 (Phase II ESA) Staff in this Proposal: Filippe Cade, Joanne Reno, Bob Louden
Project No. 2: Arlington Grove Brownfield Redevelopment, Phase I, Phase I, Hazardous Materials Surveys, and Phase III, McCormack Baron Salazar (MBS), St. Louis The Arlington Grove Redevelopment is an Enterprise Green Communities mixed–finance, mixed–income housing, mixed–use redevelopment project. PE provided environmental services to MBS at this site including soil and groundwater sampling, monitoring well installation, interpretation of analytical data and remedial design recommendations, Missouri Department of Natural Resources (MDNR) Tier 1 risk assessments, UST closure reporting, and asbestos and lead based paint surveys for the Missouri Brownfields/Voluntary Cleanup Program
(BVCP).
PE conducted a Phase I ESA and Phase II ESA, which included sampling of soil and buried debris in test pits, as well as soil and groundwater from borings and temporary piezometers. in order to characterize soil that would be removed and/or reused on site during redevelopment activities. The Phase II ESA revealed evidence of metals (lead and arsenic) and PAH (benzo(a)pyrene) contamination above state regulatory Default Target Levels (DTLs) in fill soil and buried debris. Native soils sampling and analytical results were all below the MDNR DTL’s.
PE managed the remediation of the impacted soils. PE also assisted MBS in the preparation of the application for the MDNR’s BVCP. PE served as liaison between MBS and the MDNR in the implementation of environmental investigation and remediation activities in order to move the site towards closure. PE also provided oversight for the removal of USTs and provided closure sampling and reporting. Additionally, during the Phase I and II ESA’s it was discovered that a former drycleaner had been present on the southeast portion of the property. PE prepared the necessary documents in order to enter the site in the Dry‐cleaning Environmental Response Trust (DERT) fund, which allowed for the reimbursement of environmental activities related to site cleanup. PE prepared several work plans, cost estimates, conducted soil sampling, groundwater monitoring, preparation of Tier 1 risk assessment and provided support to MBS for the submittal of reimbursement packages to the DERT fund. PE also prepared asbestos abatement specifications and conducted third party oversight for the asbestos abatement activities.
PE prepared a comprehensive Closeout Report that documented the results of all sampling and remediation activities that occurred on the BVCP portion of the property. PE also worked with MBS’s private consultant and legal counsel to develop an Environmental Covenant to be filed with the property deed.
Company Name McCormack Barron Salazaar Company Contact: Mr. David Dumey, Vice President Email: David.Dumey@McCormackBaron.com Phone: 314‐554‐4907 Performance Period: February 2014 through March 2017 Total Dollar Award: $500,000 Staff in this Proposal: Filippe Cade, Bob Louden
Project No. 3: Phase I ESA, Phase II ESA, and Environmental Consulting Activities, BJC – Washington University Medical Campus East Parking Garage, St Louis, MO PE was contracted by BJC Healthcare for initially $10K in environmental services and ended up performing $400K of work over a nearly two year engagement for BJC. Initially, PE was called out to a construction site when the drilling contractor encountered free product while drilling piers for the foundation for the multi‐level parking garage, referred to as the BJC East Parking Garage site. PE responded immediately by halting all drilling activities and performing a fast track Phase I ESA in conjunction with a Phase II ESA to evaluate levels of contaminants in the soil, groundwater, and free product. As identified in the Phase I, the subject property had previously been occupied with above‐ground fuel oil storage tanks. The Phase II ESA revealed the presence of free product and petroleum contamination in soil and groundwater. PE provided field screening of excavated soil, coordination of the removal of a 8,000 gallon UST, management of the on‐site storage of solid and liquid wastes, management of removal of solid and liquid wastes from site, and tracking of documentation of disposal of the solid special waste in conjunction with the subsurface construction work on this project. PE oversaw the disposal of approximately 36,000 tons of solid special waste and over 580,000 gallons of liquid waste throughout the construction activities.
In conjunction with these activities, PE performed environmental monitoring during the site earthwork activities. PE identified and documented action levels prior to the start of the activity and periodically monitored the ambient levels with respect to the action levels for the periods and durations specified by the onsite safety representative. PE monitored the following parameters: levels of VOCs in the ambient air, levels of oxygen in the ambient air (monitoring for oxygen‐rich or oxygen deficient conditions), and lower explosive levels. PE communicated to the client when the action levels for any of these parameters were approached, and immediately notified the client of any exceedances of the action levels so that the appropriate control measures could be taken. PE recorded meter readings in the field, and copies of the field notes were provided.
PE received a 4.8 out of 5 on the scorecard by the BJC Project Manager for this project.
Agency Name: BJC Agency Contact: Ramona Tumblin Rucker Email: ramona.tumblin‐rucker@bjc.org Phone: (314) 575‐3014 Performance Period: October 2014 – April 2017 Total Dollar Award: $384,741 Staff in this Proposal: Filippe Cade, Joanne Reno, Bob Louden, Mike Kirby
Project No. 4: Remediation and Restoration of More’s Lake, City of Columbia, Missouri (2016‐ present) ($1.5M) BMcD is assisting the City of Columbia to remediate and restore More’s Lake, which is an inactive Coal Combustion Residual (CCR) impoundment into a proposed public park. In the late 1800’s, the More family constructed the Lake for farm and recreational purposes. The More’s Lake project is a special and unique opportunity because the Lake has the potential to be returned to its original recreational use. The park planning program also will consider terrestrial and aquatic habitat development. BMcD is working with regulators within the Missouri Department of Natural Resources and with City stakeholders to first remediate the site. Their project team developed final closure plans, conducted site sampling, addressed permitting requirements, and provided construction oversight for the closure. The next phase of the project will involve providing engineering design and complete the construction plans and specifications for the restoration phase of the project. The proposed project involves the restoration of the island that was originally a part of the lake. This work will require our staff to work closely with the City during the design process to expose the remaining two sides of the existing retaining wall that forms the island to evaluate the existing conditions and confirm the existing walls are stable. We will also assist the City to identify design options for a new pedestrian bridge and the remainder of the park.
REFERENCE: Christian Johanningmeier, Power Production Superintendent, City of Columbia –
Water & Light Department 1501 Business Loop 70E Columbia, Missouri 65205
(573) 874‐6236 Staff in this Proposal: Erik Ehrengren, P.E.
Project No. 5: Chicago, Spring Coil Manufacturing – Peoples Gas, Phase I/II Environmental Site Assessment (April 2018): Burns & McDonnell prepared a Phase I ESA and conducted a Phase II Investigation for spring coil manufacturing facility located in Chicago, IL on behalf of Peoples Gas. The parcel was to be used for future development of a new service center/shop.
Burns & McDonnell conducted the site visit, reviewed historic and regulatory sources, reviewed City of Chicago records, and prepared the Phase I ESA report. Based on findings in the Phase I ESA, Burns & McDonnell conducted the Phase II investigation to assess current site conditions to assist the Client with planning future site development. Burns & McDonnell coordinated with subcontractors, completed the field investigation and sampling, and prepared a report to summarize findings. Completed in April 2018.
Staff in this Proposal: Anthony Walas, Stavroula Panagiotopoulos
The PE Team regularly employs safe and cost effective remediation strategies and employs traditional cleanup approaches and/or risk based corrective action at brownfield sites.
4.0 REFERENCES
Contact information for references is provided below:
City of St Louis – St. Louis Development Corporation Scope: Phase I ESAs, Phase II ESAs, Asbestos/Lead Surveys, Remediation Oversight Peter Phillips, Major Project Manager 1520 Market Street, Suite 2000 St. Louis, MO 63103 314.657.3738 phillipsp@stlouis‐mo.gov
City of St. Louis – Board of Public Service Scope: Phase I/II ESAs, Lead‐based Paint Inspections, Asbestos Services, HHW Surveys, Mold Inspections, preparation of remedial designs and project specifications, engineer estimates, work plan preparation, pre‐bid site walks, review of contractor submittals Ms. Brenna Brown Civil Design Engineer City of St. Louis 1200 Market Street, Room 301 St. Louis, MO 63103 314‐622‐3535 brownb@stlouis‐mo.gov
City of St Louis – Lambert – St. Louis International Airport Scope: Phase I ESAs, Lead‐based Paint Inspections & Abatement, Asbestos Services, HHW Surveys, Mold Inspections/Abatement Mr. Jon Strobel Airport EHS Manager St. Louis International Airport 11495 Natural Bridge Road Bridgeton, MO 63044 314‐551‐5035 jmstrobel@flystl.com
United States Department of Agriculture, Natural Resources Conservation Service Scope: Phase I ESAs, Phase II ESAs, Remediation Planning Support Arde Ramthun, PE, State Conservation Engineer 344 Merrow Road Tolland, CT 06084 860‐871‐4030 / 860‐578‐0304 Arthur.Ramthun@ct.usda.gov
City of Columbia, Missouri – Water & Light Department Scope: Remediation and Restoration of More’s Lake Mr. Christian Johanningmeier, Power Production Superintendent 1501 Business Loop 70E Columbia, Missouri 65205
(573) 874‐6236
EXHIBIT A – RESUMES
Professional Environmental Filippe B. Cade, P.E.
Project ManagerEngineers, Inc.
CAREER SUMMARY
Mr. Cade has over than 25 years of experience in environmental engineering and consulting, with particular emphasis in the hazardous waste field. He specializes in program and project management with technical expertise in hazardous waste investigations, remedial designs, soil/groundwater remediation, and environmental assessments and studies. He is the Chief Engineer for the company and maintains responsibility for managing the engineering components of PE’s current environmental contracts.
EDUCATION
B.S., Engineering and Public Policy (Minor in Environmental Engineering Sciences), Washington University, St. Louis, MO, May 1994
PROFESSIONAL REGISTRATIONS
Registered Professional Engineer, 1999, State of Missouri, State of Kentucky, State of Ohio, State of Georgia, State of Nebraska, State of Pennsylvania, State of Alabama, State of Texas, State of Kansas, State of Mississippi
TRAINING
OSHA 40‐hour Hazardous Waste Operation & Emergency Response Course (29 CFR 1910.120); OSHA 8‐hour Annual Updates
Project Management Training Courses, Jacobs Engineering, Inc., SAIC, and Ajera
Triad Approach to Site Investigations, US Army Corps of Engineers – Kansas City District
RELATED EXPERIENCE
Project Manager/Senior Technical Reviewer for Phase I Environmental Site Assessments at dozens of properties in Missouri and Illinois, including Liberty Heartland Meadows, City Parc on Pine, East St Louis School District, Willshire Hills, Woodbury Place, Gentry Estates, and the Lambert St. Louis International Airport.
Project Manager for the completion of Phase I Environmental Site Assessments for the Houston Housing Authority at multiple properties throughout the City of Houston, including the Villas at Winkler, 100 East 45th Street, Carrington Court Apartments, and 7900 Westminster Street.
KEY PERSONNEL
Project Manager for the NEPA/Environmental Assessment Activities associated with the expansion of the Northeast Water Purification Plant in Houston, Texas to identify and evaluate the outstanding environmental issues and impacts to ensure that expansion activities are in compliance with the applicable environmental regulations, policies and guidelines.
Project Manager for the completion of Phase I Environmental Site Assessments for the St Louis Development Corporation at multiple properties throughout the City of St.
Louis, including 4133 Geraldine, Athlone and Holly Street, and Red Sea Development
Project Manager for the completion of a Phase I ESA, Phase II ESA, and site characterization activities (involving collection of nearly 150 soil samples) at a former auto repair shop brownfield area, which revealed the presence of widespread lead in surficial soil at concentrations in excess of the Missouri Risk‐Based Target Levels (RBTLs).
Project Principal for the performance of an Environmental Review for a stormwater system improvement project within the City of Matthews, Missouri, which was partially financed with CDBG funds. The Environmental Review consisted of a NEPA Survey, which included the following: Identification of Wetlands and Sensitive Species, a Cultural Resources Survey. And an Environmental Analysis, which included the preparation of an Environmental Assessment Report and a FONSI.
Project Principal for the Environmental Assessment (to include an Environmental Review) for a wastewater treatment facility improvement project in the Village of Penermon, Missouri. Project was partially financed with CDBG funds. Evaluated 7 alternatives as part of the assessment: No action, Repair of Existing Lagoon, Lagoon Replacement, Recirculating Sand Filter, Abandon lagoon and connect to Essex Modifications of existing lagoon into a Controlled Discharge Lagoon, and Modifications of existing lagoon into a No Discharge Land Application System (this option was recommended by PE (and selected by the City).
Project Manager for the Phase I and Phase II Environmental Site Assessment of the Washington University East Garage Area for BJC. Performed soil and groundwater sampling to characterize the site. Developed the conceptual site model to evaluate hydrocarbons and solvent contamination in soil at depth and in the groundwater.
Prepared and stamped specifications for the management, coordination, and removal / disposal of contaminated solid and liquid waste – over 29,000 tons of solid waste and 580,000 gallons of liquid waste.
Project Manager for the Wetlands Delineation for the Dakota Access Pipeline project throughout the state of Iowa for a confidential energy company in Houston, Texas.
Professional Environmental Joanne M. Reno, P.E.
Senior Environmental EngineerEngineers, Inc.
Ms. Reno has over 18 years of experience in civil engineering (both consulting and private industry), with particular emphasis in the environmental field. She currently specializes in project management with technical expertise in soil remediation, project scheduling, feasibility site assessments, and soil and groundwater investigations.
EDUCATION
1999, B.S., Civil Engineering with an emphasis in Environmental, Hydraulics, and Geotechnical (Minor in Mathematics), Southern Illinois University, Carbondale, IL.
PROFESSIONAL REGISTRATIONS
Illinois Licensed Professional Engineer, 12/29/06, License No. 062.059524.
TRAINING
40‐Hour OSHA HAZWOPER Training, 2000, 8‐hour refreshers (Current)
8‐Hour OSHA Site Supervisor Training
RELATED EXPERIENCE
Sr. Project Engineer for a Focused Remedial Investigation/Feasibility Study at a former Atlas Missile Site in Little River, KS. The project included drilling/logging/sampling boreholes through overburden and bedrock, installing/developing/sampling shallow and deep groundwater monitoring wells, and conducting seven quarterly monitoring/sampling rounds. Coordinated the validation of all of the data and worked with the project scientists and engineers to review/interpret results and present the site conceptual model to the client. Working on completing the Remedial Investigation report for regulatory approval.
Also provides CADD support in generating potentiometric surface and isoconcentration maps for the data evaluation.
Sr. Project Engineer for the Site Investigation of the Spruce Street Fire Department Garage in St. Louis, Missouri responsible for free product gauging and recovery as well as groundwater sampling activities. Developed a work plan for further free product recovery and groundwater sampling activities. Managed the implementation of six dual‐phase high vacuum extraction (DPHVE) events and reevaluated extent and degree of contamination.
Developed and submitted a revised work plan to include one DPHVE event, groundwater sampling, and examination of utility corridors as potential routes for contamination migration. Currently executing the latest work plan.
Sr. Project Engineer for the Site Investigation of the Chain of Rocks site in St. Louis, Missouri responsible for groundwater sampling activities to further characterize the extent and degree of contamination. Following the discovery of free product, submitted to MDNR a work plan for monthly DPHVE events followed by quarterly groundwater monitoring.
Performed DPHVE recovering gallons of a gasoline/diesel fuel mixture. Developing a work plan to reevaluate the site conditions and perform quarterly sampling to fully characterize the contamination.
Sr. Project Engineer for the Site Investigation of multiple properties for Nicor Gas across Illinois, including soil sampling and groundwater monitoring activities to evaluate impact to groundwater from previous site operations.
Sr. Project Engineer for the Site Investigation of multiple properties for Ameren Services across Illinois and Missouri, including soil sampling and groundwater monitoring activities to evaluate impact to groundwater from previous site operations.
Project Engineer responsible for managing the high profile Herculaneum lead smelter removal action in Herculaneum, Missouri under the Superfund Technical Assessment and Response Team (START) contract for the Environmental Protection Agency (EPA) Region 7.
Managed START costs exceeding $2,000,000. Communicated regularly with the public and local, state, and federal agencies. Maintained START health and safety. Independently oversaw remediation activities including assessment and confirmation sampling of soils and interiors. Led recontamination sampling of soils and interior dust. Conducted monthly and quarterly road dust sampling. Maintained site‐wide database. Designed, constructed, and maintained samplers for a passive air deposition study. Independently analyzed data utilizing numeric and graphic techniques. Trained all support personnel. Developed and enhanced Standard Operating Procedures (SOPs) for soil and interior dust sampling at lead‐ contaminated residential sites for the EPA. Worked with the project team to develop the Feasibility Study. Served as an emergency responder.
Sr. Engineer…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .