TGI 38JC263402A01 rev1.pdf

PDF 230 KB Posted

Attached to
USS HOWARD DDG83 FY25 5C1 SRA Bundle 4 (YOKOSUKA, JAPAN)
Solicitation number
N6264925RA007
Issued by

About this file

This is a Task Group Instruction (TGI) document for inspection and preservation work on the deck plating of USS HOWARD (DDG-83) in compartment 1-399-0-J (Helicopter Fueling Station).

The work scope includes ultrasonic thickness measurement (UTM) on 100 SF of structural plating and preservation work on 105 SF of deck plating, including vertical surfaces up to 12 inches from the deck. The contractor work period is scheduled for April 16, 2025 through November 7, 2025. The document specifies requirements for UTM measurements per specified technical manuals and preservation requirements according to reference 009-32. SRF-JRMC will provide support services including crane operations, utilities (electrical, air, water, steam), safety inspections, gas free inspections, and QA inspections. The work requires submission of UTM measurement reports to the supervisor and references inspection report CCIMS-G1N6-DDG83-038-24 as the basis for this task.

View the file

Other files

File Type Posted
2.03 Amendment 0011 25RA007.pdf PDF
2.01 Amendment 0010 25RA007.pdf PDF
2.01 Amendment 0009 25RA007.pdf PDF
2.01 Amendment 0008 25RA007.pdf PDF
2.01 Amendment 0007 25RA007.pdf PDF
TGI 38JC286401A01 rev1.pdf PDF
TGI 38JC258801A01 rev1.pdf PDF
TGI 38JC2123ANA01 rev1.pdf PDF
TGI 38JC252101A01 rev1.pdf PDF
TGI 38JC263401A01 rev1.pdf PDF
TGI 38JC258802A01 rev1.pdf PDF
TGI 38JC212364A01 rev1.pdf PDF
TGI 38JC259301A01 rev1.pdf PDF
TGI 38JC286503A01 rev1.pdf PDF
TGI 38JC2123AMA01 rev2.pdf PDF
TGI 38JC212301A01 rev1.pdf PDF
2.01 Amendment 0006 25RA007.pdf PDF
TGI 38JC213601A01 rev1.pdf PDF
TGI 38JC212302A01 rev1.pdf PDF
2.01 Amendment 0005 25RA007.pdf PDF
Revised TGI 38JC263401A01.pdf PDF
2.01 Amendment 0004 25RA007.pdf PDF
2.01 Amendment 0003 25RA007.pdf PDF
2.01 Amendment 0002 25RA007.pdf PDF
2.01 Amendment 0001 25RA007.pdf PDF
TGI 38JC2123AMA01 rev1.pdf PDF
TGI 38JC2123ANA01.pdf PDF
TGI 38JC212364A01.pdf PDF
TGI 38JC213601A01.pdf PDF
TGI 38JC258802T01.pdf PDF
TGI 38JC259301T01.pdf PDF
TGI 38JC252101T01.pdf PDF
TGI 38JC258802A01.pdf PDF
TGI 38JC212302T01.pdf PDF
TGI 38JC263402A01.pdf PDF
TGI 38JC212302A01.pdf PDF
TGI 38JC212364T01.pdf PDF
2.03 Attachment IV N6264925RA007 Request for Information Form.doc DOC document
TGI 38JC259301A01.pdf PDF
TGI 38JC211001A01.pdf PDF
TGI 38JC212301T01.pdf PDF
TGI 38JC263401T02.pdf PDF
2.03 Attachment III N6264925RA007 Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
TGI 38JC212301A01.pdf PDF
TGI 38JC258801A01.pdf PDF
TGI 38JC263401T01.pdf PDF
N6264925RA007.pdf PDF
TGI 38JC2123AMA01.pdf PDF
TGI 38JC252101A01.pdf PDF
TGI 38JC286503A01.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

22-JUL-2024 0938

20.14.12.0.8874 (April 2024) ICN: 38JC263402 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-399-0-J MS A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-83 USS HOWARD JC2 13111

CU PHASE TITLE: F/O - INSPECT AND PRESERVE DECK PLATING IN 1-399-0-J

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 4

ES01NP4E

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

NAKANO, SEIICHI 231B 3152434519 19-JUL-2024

APPROVED BY: CODE: PHONE: DATE:

TAKAGI, RYOUTA 231B 3152434502 19-JUL-2024

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

ES01-NP4E

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE 1-399-0-J 1 U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

634A2102

1 SCOPE/PURPOSE:

1.1 Title: Deck Plating in 1-399-0-J; inspect and preserve

1.2 Location of Work:

1.2.1 Helicopter Fueling Station (1-399-0-J)

1.3 Identification:

1.3.1 Quantity (100 SF), Structural Plating in 1-399-0-J, including vertical surface up to height of 12 inches from deck

Reading Point: 12 Inches x 12 Inches Grid Pattern Remarks:

See Ref. No. 5 for base material.

The area excepts structural shapes.

TGI Short Form

22-JUL-2024 0938

20.14.12.0.8874 (April 2024) (Continued) ICN: 38JC263402 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-399-0-J MS A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-83 USS HOWARD JC2 13111

CU PHASE TITLE: F/O - INSPECT AND PRESERVE DECK PLATING IN 1-399-0-J

FOUO Pg 2 of 4

CU PHASE DESCRIPTION (Cont.)

1.3.2 Quantity (105 SF), Entire Deck Plating in 1-399-0-J, including vertical surface up to height of 12 inches from deck

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor work start date: 4/16/2025

1.7 Contractor work completion date: 11/7/2025

2. PROCEDURE:

2.1 Accomplish ultrasonic thickness measurement (UTM) on each area listed in 1.3.1 in accordance with Paragraph 6.7 of Ref. No. 3, and Ref. No. 4, using Ref. No. 5 for guidance.

2.1.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 2.1 to the SUPERVISOR.

2.2 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 6, for each area listed in 1.3.2.

2.3 Notes:

2.3.1 Planner: Code 231B S. Nakano, 243-4519

Planner: Code 234 S. Yamashita, 243-8308

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.3.3 This TGI is in response to inspection report No. CCIMS-G1N6-DDG83-038-24 from TGI No. 38JCA11006I04.

2.3.4 JCN ES01-NP4E is related to this TGI.

2.4 Government Furnished Material (GFM): None.

2.5 SRF-JRMC will provide the following service work: (TGI No. 38JC263402S02)

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [X99E] Utility service, electrical.

2.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.5.6 [C133] QA inspection for (G) symbol(s).

22-JUL-2024 0938

20.14.12.0.8874 (April 2024) (Continued) ICN: 38JC263402 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-399-0-J MS A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-83 USS HOWARD JC2 13111

CU PHASE TITLE: F/O - INSPECT AND PRESERVE DECK PLATING IN 1-399-0-J

FOUO Pg 3 of 4

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

22-JUL-2024 0938

20.14.12.0.8874 (April 2024) (Continued) ICN: 38JC263402 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-399-0-J MS A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-83 USS HOWARD JC2 13111

CU PHASE TITLE: F/O - INSPECT AND PRESERVE DECK PLATING IN 1-399-0-J

FOUO Pg 4 of 4

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N

3 TM T9074-AS-GIB-

010/271 Requirements for Nondestructive Testing Methods

1 N

4 TM S9086-DA-STM-

010/CH-100

Hull Structures 4 N

5 DWG 100-7026705 UNIT STRL ARR DWG - ASSY

UNIT 3340

H Y 3

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38JC263402 KEY OP: A01

File details come from the government source that posted it. Updated .