TGI 38JC263401T01.pdf
PDF 95 KB Posted
- Solicitation number
- N6264925RA007
About this file
This is a WebAIM Short Form Task Group Instruction (TGI) document for the USS HOWARD (DDG-83) related to tightness and operational testing of the potable water system. The TGI number is 53311-3-300KTR and it is dated June 11, 2024.
The document specifies contractor work for potable water system testing under project JC2, system 53311. The work was prepared by Souya Nemoto (Code 246.2) on May 23, 2024 and approved by John Sophabmixay on June 7, 2024. The zone manager is listed as Takehide Yaginuma for Zone U, with Job Summary ID 634A2101. The document references multiple Job Control Numbers (JCNs) including OD01-L011, OD01-L540, and several ZAJ/ZAL series numbers, though specific testing procedures and requirements are not detailed in this short form version.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
11-JUN-2024 1347
20.14.12.0.8874 (April 2024) ICN: 38JC263401 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 53311-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-83 USS HOWARD JC2 53311
CU PHASE TITLE: POTABLE WATER SYS (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
OD01L011 * OD01L540 * OD01ZAJ2 * OD01ZAJ3 * OD01ZAL2 * OD01ZAL3 * OD01ZAL4 * EA04L017
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
NEMOTO, SOUYA 246.2 3152433482 23-MAY-2024
APPROVED BY: CODE: PHONE: DATE:
SOPHABMIXAY, JOHN 246.2 3152432291 07-JUN-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
OD01-L011 * OD01-L540 * OD01-ZAJ2 * OD01-ZAJ3 * OD01-ZAL2 * OD01-ZAL3 * OD01-ZAL4
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
634A2101
Tightness & Operational Test for Potable Water System - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
11-JUN-2024 1347
20.14.12.0.8874 (April 2024) (Continued) ICN: 38JC263401 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 53311-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-83 USS HOWARD JC2 53311
CU PHASE TITLE: POTABLE WATER SYS (T & OP) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 53311-3-300KTR POTABLE WATER SYS (T &
OP) - KTR
LAT Y
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38JC263401 KEY OP: T01
File details come from the government source that posted it. Updated .