TGI 38JC213601A01.pdf
PDF 1 MB Posted
- Solicitation number
- N6264925RA007
About this file
This is a Task Group Instruction (TGI) document detailing repair work required for the USS HOWARD (DDG-83) forecastle area. The scope includes repairing structural members and replacing the nonskid system, specifically: repairing a bulkhead plate between frames 110-112 on the port side, replacing a guard support for a handwheel guard between frames 15-17 on the port side, and replacing approximately 6,000 SF of nonskid deck plating between frames NN and 126 on both port and starboard sides.
The work requires fabrication and installation of new bulkhead plates and guard supports using high-tensile steel materials (MIL-S-22698 Grade DH36/AH36), power tool cleaning to bare metal, air hose testing of welds, and application of Visual Landing Aid markings in accordance with NAVAIR specifications. The work affects a fire zone boundary and requires non-flammable closure fabrication. The contractor work period is scheduled for April 15, 2025 through August 26, 2025. The document includes specific material requirements and associated engineering instructions for proper installation and testing procedures. Government-furnished materials and services include crane operations, utilities, safety inspections, and quality assurance inspections by SRF-JRMC personnel.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: FORECASTEL NONSKID AY A 0 2
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
DDG-83 USS HOWARD JC2
CU PHASE TITLE:
F/O - ACCOMPLISH RPR STRL MEMBER AND REPLT NONSKID SYSTEM ON FORECASTLE
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
MOTONORI HAYASHI 231B. 315-243-6145 13-MAY-2024
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B. 315-243-4502 13-MAY-2024
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
Need to correct CCNY Number.
CHANGE INSTRUCTIONS:
CH1: Admin change (5/13/2024) CH2: Correct Paragraph 1.5.1 CCNY Number (7/29/2024)
SPECIAL REQUIREMENTS:
This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: FORECASTEL NONSKID AY A 0
FOUO
SHIP: DDG-83 CHG/VER: 2/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG
NO.
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-4 J1-2 M1-2 Engrg Inst (1-3)
1. SCOPE/PURPOSE
1.1 Title: Repair of Structural Member and Replacement of Nonskid System on Forecastle; accomplish
1.2 Location of Work:
1.2.1 01 Level Weather, Frames between NN and 126, Port and Starboard (Stbd)
1.2.2 Security Light Stowage (01-110-2-A)
1.2.3 Windlass Machinery Room (0 1/2-2-0-Q)
1.3 Identification:
1.3.1 Quantity (One EA), Bulkhead Plate, Sloping House Side Bulkhead in 01 Level Weather, Frames between 110 and 112, Port
Material: HTS, MIL-S-22698 GR-DH36, 7.65 LBs Plate Remarks: See 2.3 for detail.
1.3.2 Quantity (One EA), Guard Support of Handwheel Guard in 01 Level Weather, Frames between 15 and 17, Port
Material: HTS, MIL-S-22698 GR-AH36, 10 Inches x 4 Inches x 12 LBs I-T Remarks: See Engrg Inst Enclosure-01 for detail.
1.3.3 Quantity (6,000 SF), 01 Level Deck Plating, Frames between NN and 126, including vertical surface up to height of 4 inches from deck in and around nonskid deck area, Port and Stbd
Remarks: The area is except exterior surface of vertical launching system and surface where rubber tile is installed.
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Critical Coated Area: CCNY-DDG83-030-25 for the area listed in 1.3.3.
1.5.2 Potential Asbestos Hazard
1.6 Contractor Work start date: 4/15/2025
1.7 Contractor Work completion date: 8/26/2025
2. REFERENCES:
FOUO
SHIP: DDG-83 CHG/VER: 2/0
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - N 2 LI FY-25 Local Standard Items - ORG N
3 PDD 150-
ELM-240113
RPR PLAN OF CRSN HOLES IN
WTRTT HSE FRONT SLOPING
BHD FR 110 (01 LVL, PORT, WEA)
- Y AL
L
4 PDD 150-
ELM-230183
TEMP REPAIR FOR CORROSION
HOLES IN 01 LVL WEA, FR 110
- Y AL
L
5 TM
SYSTEMS &
SPECIFICAT
IONS
SSPC Painting Manual Volume 2 - N
3. APPENDICES:
3.1 Appendix “J” TGI Job Summary Information Sheet
3.2 Appendix "M" TGI Material List
3.3 Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Remove existing, fabricate and install new each bulkhead plate and guard support listed in 1.3.1 and 1.3.2 in accordance with Enclosure-01 and 2.3.
5.1.1 Remove existing temporary patch on each bulkhead plate listed 1.3.1, using 2.4 for guidance.
5.1.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.1.3 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each bulkhead plate listed in 1.3.1. Allowable leakage: None.
5.2 Prepare a sketch showing each existing nonskid location and marking located in 1.2.1.
5.2.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 5.2 to the SUPERVISOR.
5.3 Install a temporary containment enclosure to the area located in 1.2.1.
5.3.1 Remove the temporary containment enclosure upon completion of the work.
5.4 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line(s) 9, for each area listed in 1.3.3.
5.4.1 Power tool clean to bare metal for each vertical surface. Accomplish each requirement of Surface Preparation Specification SSPC-SP 11 of 2.5.
5.5 Apply each new Visual Landing Aid (VLA) marking in accordance with Naval Air Warfare Center (NAWC) Marking and Lighting VLA and Aircraft Operating Clearance Drawing provided by NAVAIR and using the sketch prepared in 5.2 for each marking not covered by NAVAIR.
5.5.1 Contact the local NAVAIR Aeronautical Shipboard Installation Representative (ASIR) Field Office via the SUPERVISOR for the current drawing.
C1209.3 Shimizu, 11120180, SS, 7/29/2024
Shinya.Shimizu.ja Line
FOUO
SHIP: DDG-83 CHG/VER: 2/0
5.5.2 Verify each marking lay out prior to the application of each color topping.
5.5.2.1 Contact the Local NAVAIR ASIR Field Office via the SUPERVISOR for verification of each VLA marking prior to application of color topping.
5.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.7 Notes:
5.7.1 Planner: Code 231B M. Hayashi, 243-6145
Planner: Code 231B R. Takagi, 243-9982 Planner: Code 233 M. Takemura, 080-9350-1458 Planner: Code 234 Hasegawa, 243-2497 Engineer: Code 250 A. Fujikake, 243-8427
5.7.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.7.3 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.7.4 This TGI meets the intent of DDG CSWT File No. 634-039.
5.7.5 This TGI clears DFS DDG-83-1001-2023 in its entirety.
5.7.6 JCNs EX03-ZA11, ES01-NNY4, and ES01-NNY5 are related to this TGI.
5.8 Government Furnished Material (GFM):
5.8.1 SRF-JRMC will provide GFM listed in Appendix “M”.
5.9 SRF-JRMC will provide the following service work: (TGI No. 38JC213601S02)
5.9.1 [C740] Crane and crane rigger service.
5.9.2 [X99E] Utility service, electrical.
5.9.3 [X99M] Utility service, including water supply, steam supply, and low pressure air supply except onboard blasting work.
5.9.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.9.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.9.6 [C133] QA inspection for (G) symbol(s) and review of coating application data.
FOUO
M-1
SHIP: DDG-83 CHG/VER: 2/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
FORECASTEL NONSKID AY A 0 0
CU PHASE TITLE:
F/O - ACCOMPLISH RPR STRL MEMBER AND REPLT NONSKID SYSTEM ON FORECASTLE
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38JC213601 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
100 M INSULATI, ORIG: C231B, R.
TAKAGI, 243-9982
ORDERED FOR KTR
9Q 5640 013713263 NA 4 N 41325074 5/SH
101 M SOUND CO, ORIG: C231B, R.
TAKAGI, 243-9982
ORDERED FOR KTR
9Q 5640 013837815 NA 4 N 41325076 2/SH
102 M TAPE,TEX, ORIG: C231B, R.
TAKAGI, 243-9982
ORDERED FOR KTR
9B 8315 002671632 NA 4 N 41325077 1/RO
103 M TAPE,TEX, ORIG: C231B, R.
TAKAGI, 243-9982
ORDERED FOR KTR
9B 8315 002671633 NA 4 N 41325078 1/RO
104 M ADHESIVE, ORIG: C231B, R.
TAKAGI, 243-9982
ORDERED FOR KTR
9B 8040 002738708 NA 4 Y 41325080 1/GL
105 M CAP,SNAP, ORIG: C231B, R.
TAKAGI, 243-9982
ORDERED FOR KTR
9B 5325 007377648 NA 4 N 41325081 10/EA
106 M PLATE,ME, ORIG: C231B, R.
TAKAGI, 243-9982
ORDERED FOR KTR
9B 9515 002375350 NA 4 N 41325082 4/SF
NOTES:
FOUO
M-2
SHIP: DDG-83 CHG/VER: 2/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
107 M BEAM, I-T SHAPE, BEAM, I-T
SHAPE, 10" X 4" X 12#, HIGH
TENSILE STEEL, MIL-S-22698,
GRADE AH-36, CUT FROM 10"
X 4" X 12#, I-BEAM, TWO SIDES OF ONE
FLANGE REMOVED
ORIG: C231B, R. TAKAGI, 243-
ORDERED FOR KTR
ONE EA X 10 FT CONTINUES
LENGTH
9B 9520 LL9001626 NA 4 N 41397554 10/FT
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-83 FORECASTEL NONSKID AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38JC213601 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-83 FORECASTEL NONSKID AY A 0
SUBJECT: RPR PLAN OF CRSN HOLES IN GUARD SPRT OF HANDWHEEL GUARD
ON 01 L VL (FR 15, PORT, WEA)
ICN: 38JC213601
JCN: ES01-NNY5
ORIGIN A TOR: C250 A. FUJIKAKE
DATE: 4/29/2024
REFERENCES:
(a) DDG51CL-581-6220300 "V", FAB OF AHR HDLG FTG
(b) DDG51CL-100-7026661 "G", UNIT STRL ARR DWG ASSY UNIT 1160
NOTES:
1. THE PURPOSE OF THIS ENGINEERING INSTRUCTION IS TO PROVIDE REPAIR PLAN OF
CORROSION HOLES IN GUARD SUPPORT OF HANDWHEEL GUARD ON 01 LEVEL (FR 15, PORT
SIDE, WEATHER) OF THE USS HOWARD (DOG 83).
2. REMOVAL NOTE: EXISTING STRUCTURE MEMBER WHICH IS RENEWED SHALL BE REMOVED WITH
SAME DIMENSIONS SHOWN ON INSTALLATION PLANS.
3. ALL WELDING FOR STEEL MATERIALS SHALL BE CONDUCTED IN ACCORDANCE WITH SRF-JRMC
PROCESS INSTRUCTION N0.100-2 OR TABLE 2 OF NAVSEA STD ITEM N0.009-12
RESPECTIVELY. AFTER ALL WELDING, VT SHALL BE REQUIRED IN ACCORDANCE WITH
PARAGRAPH 6.4 OF MIL -STD-1689.
4. FOR INFORMATION OF GUARD SUPPORT OF HANDWHEEL GUARD NOT SHOWN ON THIS
INSTRUCTION, SEE REF ( a).
5. FOR INFORMATION OF HULL STRUCTURES NOT SHOWN ON THIS INSTRUCTION, SEE REF (b ).
ENGRG INST
SHEET 1 OF 3
38JC213601A01 ENCLOSURE-01
PC NO
DESCRIPTION
10 x 4 x 12# I-T
-I
HATCH
01-20-2
I -
LIST OF MATERIAL
QTY MATERIAL SPEC REMARKS
1 LF STEEL MIL-S-22698
(HS)
EB
+ - I
KEY eLA�
01 LVL
PORT SIDE
ENGRG INST
GR AH-36
RPR OF GUARD SPRT AT L-3 P
FOR FAB & INSTL, SEE EL 3-A
Wf.ATHER
I- 10 5
SHELL (P)
{t_ SHIP
FWD_
SHEET 2 OF 3
10 x 4 x 12# I-T, HS
GUARD PL
10.2# HS
WEB & FLG
1 4
1 4
SNIPE
3/4 X 3/4
REF LINE
16 15
EL 3-A
FAB & INSTL
GUARD SPRT OF HANDWHEEL GUARD
AT L-3 (P)
LKG OUlBD
ENGRG INST
01 LVL
12.75# HS
FWD_
SHEET 3 OF 3