This is a Task Group Instruction (TGI) document for a tightness and operational test of the firemain system on the USS HOWARD (DDG-83), with document number 52111-3-300KTR. The TGI is dated May 20, 2024 and was prepared by Kazuhiro Nishimura and approved by John Sophabmixay of code 246.2.
The document outlines contractor requirements for testing the ship's firemain system, with job summary ID 521A1101 and Job Control Number EA01-L087. The work falls under Project JC2 and System 52111. The document references technical publication TP 52111-3-300KTR "FIREMAIN SYSTEM (T & OP) - KTR" as the governing document for the work. The TGI is marked as FOUO (For Official Use Only) and includes spaces for work certification signatures and records review upon completion.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
20-MAY-2024 1040
20.14.12.0.8874 (April 2024) ICN: 38JC252101 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 52111-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-83 USS HOWARD JC2 52111
CU PHASE TITLE: FIREMAIN SYS (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EA01L087
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
NISHIMURA, KAZUHIRO 246.2 3152433479 27-APR-2024
APPROVED BY: CODE: PHONE: DATE:
SOPHABMIXAY, JOHN 246.2 3152432291 13-MAY-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EA01-L087
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
KOMAKI, GORO U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
521A1101
Tightness & Operational Test for Firemain System - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
20-MAY-2024 1040
20.14.12.0.8874 (April 2024) (Continued) ICN: 38JC252101 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 52111-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-83 USS HOWARD JC2 52111
CU PHASE TITLE: FIREMAIN SYS (T & OP) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 52111-3-300KTR FIREMAIN SYSTEM (T & OP) -
KTR
LAT Y
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38JC252101 KEY OP: T01
File details come from the government source that posted it. Updated .