TGI 38JC252101A01.pdf
PDF 1 MB Posted
- Solicitation number
- N6264925RA007
About this file
This is a Task Group Instruction (TGI) for replacing overboard discharge piping in the USS HOWARD (DDG-83). The work involves replacing the firemain overboard discharge piping assembly in Auxiliary Machinery Room No. One, including a nozzle assembly made of steel with specific dimensions (3-1/2 inch O.D. x 0.250 inch wall thickness) and a waster sleeve. The work affects underwater hull areas and fire zone boundaries, requiring fabrication of non-flammable closures.
The work is to be performed between April 15, 2025 and July 29, 2025, with cleanliness level III requirements for the piping system. Key specifications include Class P-2 piping standards and hydrostatic testing at 50 PSIG. The document includes a detailed material list specifying tubes, plates, screws, and other components needed for the installation. The work requires coordination with SRF-JRMC who will provide various services including crane operations, utility services, and safety inspections. The TGI is part of a larger ship repair contract package for USS HOWARD's FY25 Selected Restricted Availability (SRA) in Yokosuka, Japan.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4/15/2025
7/29/2025
C1209.3 Shimizu, 11120180, SS, 9/7/2024
Shinya.Shimizu.ja Line
File details come from the government source that posted it. Updated .