TGI 38JC212364T01.pdf

PDF 92 KB Posted

Attached to
USS HOWARD DDG83 FY25 5C1 SRA Bundle 4 (YOKOSUKA, JAPAN)
Solicitation number
N6264925RA007
Issued by

About this file

This is a Task Group Instruction (TGI) form documenting requirements for tightness and operational testing of the Oily Waste Water System in AMR #1 aboard the USS HOWARD (DDG-83). The document (ICN: 38JC212364, KeyOp: T01) is dated July 1, 2024 and was prepared by Kazuya Harada (Code 246.2) on May 30, 2024, approved by Jason Y. Ohta on June 18, 2024.

The TGI (number 59321-3-300KTR) specifies contractor work requirements under Project JC2, System 59321, with multiple associated Job Control Numbers (JCNs) listed. Zone Manager Takehide Yaginuma is assigned to zone U. The document references technical procedure TP 59321-3-300KTR "OILY WASTE WATER SYS (T) - KTR" as the governing document for the work. This TGI is part of a larger ship repair availability package for USS HOWARD to be performed in Yokosuka, Japan.

View the file

Other files

File Type Posted
2.03 Amendment 0011 25RA007.pdf PDF
2.01 Amendment 0010 25RA007.pdf PDF
2.01 Amendment 0009 25RA007.pdf PDF
2.01 Amendment 0008 25RA007.pdf PDF
2.01 Amendment 0007 25RA007.pdf PDF
TGI 38JC286401A01 rev1.pdf PDF
TGI 38JC258801A01 rev1.pdf PDF
TGI 38JC2123ANA01 rev1.pdf PDF
TGI 38JC252101A01 rev1.pdf PDF
TGI 38JC263401A01 rev1.pdf PDF
TGI 38JC258802A01 rev1.pdf PDF
TGI 38JC263402A01 rev1.pdf PDF
TGI 38JC212364A01 rev1.pdf PDF
TGI 38JC259301A01 rev1.pdf PDF
TGI 38JC286503A01 rev1.pdf PDF
TGI 38JC2123AMA01 rev2.pdf PDF
TGI 38JC212301A01 rev1.pdf PDF
2.01 Amendment 0006 25RA007.pdf PDF
TGI 38JC213601A01 rev1.pdf PDF
TGI 38JC212302A01 rev1.pdf PDF
2.01 Amendment 0005 25RA007.pdf PDF
Revised TGI 38JC263401A01.pdf PDF
2.01 Amendment 0004 25RA007.pdf PDF
2.01 Amendment 0003 25RA007.pdf PDF
2.01 Amendment 0002 25RA007.pdf PDF
2.01 Amendment 0001 25RA007.pdf PDF
TGI 38JC2123AMA01 rev1.pdf PDF
TGI 38JC2123ANA01.pdf PDF
TGI 38JC212364A01.pdf PDF
TGI 38JC213601A01.pdf PDF
TGI 38JC258802T01.pdf PDF
TGI 38JC259301T01.pdf PDF
TGI 38JC252101T01.pdf PDF
TGI 38JC258802A01.pdf PDF
TGI 38JC212302T01.pdf PDF
TGI 38JC263402A01.pdf PDF
TGI 38JC212302A01.pdf PDF
2.03 Attachment IV N6264925RA007 Request for Information Form.doc DOC document
TGI 38JC259301A01.pdf PDF
TGI 38JC211001A01.pdf PDF
TGI 38JC212301T01.pdf PDF
TGI 38JC263401T02.pdf PDF
2.03 Attachment III N6264925RA007 Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
TGI 38JC212301A01.pdf PDF
TGI 38JC258801A01.pdf PDF
TGI 38JC263401T01.pdf PDF
N6264925RA007.pdf PDF
TGI 38JC2123AMA01.pdf PDF
TGI 38JC252101A01.pdf PDF
TGI 38JC286503A01.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

01-JUL-2024 1250

20.14.12.0.8874 (April 2024) ICN: 38JC212364 KeyOp: T01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 59321-3-300KTR TT T 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-83 USS HOWARD JC2 59321

CU PHASE TITLE: OILY WASTE WATER SYS, AMR #1 (T & OP) - KTR

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 2

EA01ZBW6 * EA01ZBW7 * EA01ZBX9 * ES01NP1P * ES01NP1Q * ES01NP1R * ES01NP1S * ES01NP1T * ES01NP1U * ES01NP1W * ES01NP1X * ES01NP1Y * ES01NP1Z * ES01NP20 * ES01NP21 * ES01NP22 * ES01NP3T * ES01NP1V

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

HARADA, KAZUYA 246.2 3152432048 30-MAY-2024

APPROVED BY: CODE: PHONE: DATE:

OHTA, JASON Y. 246.2 3152435901 18-JUN-2024

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EA01-ZBW6 * EA01-ZBW7 * EA01-ZBX9 * ES01-NP1P * ES01-NP1Q * ES01-NP1R * ES01-NP1S * ES01-NP1T * ES01-NP1U *

ES01-NP1V * ES01-NP1W * ES01-NP1X * ES01-NP1Y * ES01-NP1Z * ES01-NP20

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

123A4164

Tightness & Operational Test for Oily Waste Water System - KTR.

TGI Short Form

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

01-JUL-2024 1250

20.14.12.0.8874 (April 2024) (Continued) ICN: 38JC212364 KeyOp: T01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 59321-3-300KTR TT T 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-83 USS HOWARD JC2 59321

CU PHASE TITLE: OILY WASTE WATER SYS, AMR #1 (T & OP) - KTR

FOUO Pg 2 of 2

JCNs (Cont.):

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 TP 59321-3-300KTR OILY WASTE WATER SYS (T)

- KTR

LAT Y

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38JC212364 KEY OP: T01

ES01-NP21 * ES01-NP22 * ES01-NP3T

File details come from the government source that posted it. Updated .