TGI 38JC259301A01 rev1.pdf
PDF 1 MB Posted
- Solicitation number
- N6264925RA007
About this file
This is a Task Group Instruction (TGI) for chemical flush cleaning of the Vacuum, Collection, Holding and Transfer (VCHT) piping system throughout the USS HOWARD (DDG-83). The work involves cleaning and flushing two VCHT piping systems - one forward and one aft - with procedures including chemical cleaning, neutralization, and borescope inspection. The contractor must coordinate work to ensure uninterrupted availability of crew sanitary spaces.
The work is to be performed between April 14, 2025 and September 24, 2025, requiring special handling of Class P-2 and P-3b piping. Key requirements include hydrostatic testing at 68 PSIG, pH level monitoring between 6-8 during neutralization, and detailed documentation of borescope inspections. The document includes a detailed material list specifying required pipes, elbows, and fittings. Support services will be provided by SRF-JRMC including crane operations, utility services, and safety/QA inspections. The TGI was prepared and approved in February 2024 under project number 59311 with job order 38JC259301.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4/14/2025
9/24/2025
C1209.3 Shimizu, 11120180, SS, 9/6/2024
Shinya.Shimizu.ja Line
File details come from the government source that posted it. Updated .