TGI 38JC259301T01.pdf
PDF 91 KB Posted
- Solicitation number
- N6264925RA007
About this file
This is a Task Group Instruction (TGI) document for maintenance work on the USS HOWARD (DDG-83) sewage system. The document (TGI No. 59311-3-300KTR) specifies a tightness and operational test for the Sewage (VCHT) System and chemical flush to be performed by a contractor.
The work falls under Project JC2, System 59311, with work certification requiring DLs signatures. The document was prepared by Koutaro Susa (Code 246.2) on April 27, 2024, and approved by John Sophabmixay on May 15, 2024. The work is assigned Job Control Number (JCN) ER01-ZAL6 and Job Summary ID 593A1101. The zone manager is listed as Takehide Yaginuma for Zone U. This TGI is marked as FOUO (For Official Use Only) and includes reference to technical publication TP 59311-3-300KTR for the sewage system operations.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
20-MAY-2024 1038
20.14.12.0.8874 (April 2024) ICN: 38JC259301 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 59311-3-300KTR TT T 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-83 USS HOWARD JC2 59311
CU PHASE TITLE: SEWAGE SYS (T & OP), CHEM FLUSH - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
ER01ZAL6
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
SUSA, KOUTARO 246.2 3152431107 27-APR-2024
APPROVED BY: CODE: PHONE: DATE:
SOPHABMIXAY, JOHN 246.2 3152432291 15-MAY-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ER01-ZAL6
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
593A1101
Tightness & Operational Test for Sewage (VCHT) System - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
20-MAY-2024 1038
20.14.12.0.8874 (April 2024) (Continued) ICN: 38JC259301 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 59311-3-300KTR TT T 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-83 USS HOWARD JC2 59311
CU PHASE TITLE: SEWAGE SYS (T & OP), CHEM FLUSH - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 59311-3-300KTR SEWAGE SYS (T & OP) - KTR LAT Y
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38JC259301 KEY OP: T01
File details come from the government source that posted it. Updated .