This is a Task Group Instruction (TGI) detailing inspection, repair, and preservation work required for the Generator Room (3-370-0-E) aboard the USS HOWARD (DDG-83). The work includes inspecting and repairing bilge drain wells, strainer plates, valves, piping sections, zinc anodes, and floor plates in multiple spaces including the Generator Room, Cross Flooding Duct, Gas Turbine Waste Drain Collecting Tank, Fuel Tank Groups, Crew Living Spaces, and Fan Room.
The work requires specialized materials including CRES 316L strainer plates, zinc anodes, gaskets, couplings, and various piping components as detailed in the material list. Critical requirements include Level III cleanliness for piping systems/equipment and fabrication of non-flammable closure for fire zone boundary work. The contractor work period is scheduled from April 7, 2025 through July 29, 2025. The work involves ultrasonic thickness measurements, visual inspections, preservation of surfaces, and various repairs to bilge drain wells and associated components. Government-furnished materials and services include crane operations, utilities, safety inspections, and technical support.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: CMPT 3-370-0-E AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
DDG-83 USS HOWARD JC2
CU PHASE TITLE:
F/O - INSPECT, REPAIR, AND PRESERVE GENERATOR ROOM (3-370-0-E)
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
MASAMICHI HAGA 231B. 315-243-2513 25-APR-2024
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B. 315-243-4502 25-APR-2024
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
SURFMEPP
This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: CMPT 3-370-0-E AY A 0
FOUO
SHIP: DDG-83 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-8 J 1-2 M 1-3 Sketch (1)
1. SCOPE/PURPOSE
1.1 Title: Generator Room (3-370-0-E); inspect, repair, and preserve
1.2 Location of Work:
1.2.1 Generator Room (3-370-0-E)
1.2.2 Cross Flooding Duct Frame 368
1.2.3 Gas Turbine Waste Drain Collecting Tank (4-370-2-F)
1.2.4 Fuel Tank Group-5 (5-354-0-F)
1.2.5 Fuel Tank Group-6 (5-370-0-F)
1.2.6 Crew Living Space No. 6 (3-338-3-L)
1.2.7 Crew Living Space No. 7 (3-350-2-L)
1.2.8 Fan Room (3-362-0-Q)
1.3 Identification:
1.3.1 Quantity (One EA), Cross Flooding Duct Frame 368
1.3.2 Quantity (One Lot), Floor Plate of Bilge Area in 3-370-0-E, Frames between 370 and 386, Port and Starboard (Stbd)
Remarks: See 2.3 for material and detail
1.3.3 Quantity (One AY), Box Strainer Plate Assembly on Bilge Drain Well in 3-370-0-E Material: CRES 316L Remarks: See 2.5 and 2.6 for detail
1.3.4 Quantity (One AY), Strainer Plate Assembly on Bilge Drain Well in 3-370-0-E Material: CRES 316L Remarks: See 2.4 for detail
1.3.5 Quantity (One EA), Oily Waste Transfer System Valve
Mfr: Various Size: 2.50-Inch IPS Type: Foot Valve No: OWT-V-79 (MDI/V0078)
1.3.6 Quantity (One AY), Flanged Piping Section: Main Drainage, Valve to Drain Well Tail Piece Size: 4 Inch IPS (4.500 Inch OD x 0.109 Inch WT) Material: Cu-Ni 90-10 Remarks: See 2.8 for details.
FOUO
SHIP: DDG-83 CHG/VER: 0/0
1.3.7 Quantity (One EA), Bilge Drain Well in 3-370-0-E, between Frames 370 and 373, and Longitudinal No. 1P and Ship’s Center Line, Port
Reading Point: 6 Inches x 6 Inches Grid Pattern in Bilge Drain Well, including beneath the bottom of suction piping(s)
Remarks: See 2.14 and 2.15 for base material and Sketch Enclosure-01 for detail
1.3.8 Quantity (2 EA), Zinc Anode, including studs on Bilge Drain Well in 3-370-0-E Type: ZHC-23 Size: 6 Inches x 12 Inches x 1-1/4 Inches Thickness Remarks: See 2.9 for material and detail
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 622-
6219167
FLOOR PLATES, GRATINGS &
HANDRAILS -AFT GEN RM ARR-
FAB & INSTL
R Y SE
E N
OT
E
4 PDD 611-
ELM-240155
MOD OF DRAIN WELL STRAINER
PL IN GEN RM (3-370-0-E)
- Y AL
L
5 DWG 611-
6221132
FABRICATION OF MISC DECK
FITTING - ZONE 3
AN Y 15
9A ,15 9B
6 DWG 600-
7026471
HULL OUTFIT INSTL DZ 3330 2ND
PLATF FR 370-410
G Y 3C ,4 D, 6A
7 DWG 534-
6567443
WASTE & OILY WASTE WATER
PIPING SYS DIAGRAM
K Y 4A
1.3.9 Quantity (21 SF), Deck Plating around the Bilge Drain Well in 3-370-0-E Remarks: The area is between Frames 370 and 374, and Longitudinal No. 1S and No. 2P except around vertical surfaces
1.3.10 Quantity (520 SF), Bilge Area in 3-370-0-E, Frames between 370 and 386, Port and Stbd Remarks: The area is up to 2 inches above grating level including all structure members, grating frames and support, deck fittings, drain wells, bulkhead fittings, foundation, piping, piping hangers, top side of manhole covers, and boundary bulkheads
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Critical Coated Area: CCNY-DDG83-014-25 for the area listed in 1.3.10
1.5.2 Potential Asbestos Hazard
1.5.3 Dry Dock Work
1.6 Contractor work start date: 4/7/2025
1.7 Contractor work completion date: 7/29/2025
2. REFERENCES:
FOUO
SHIP: DDG-83 CHG/VER: 0/0
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
8 DWG 529-
6567414
DDG-51 CLASS MAIN &
SECONDARY DRAINAGE SYS
DIAG
F Y 4A
9 DWG 113-
8570500
BILGE WELL REDESIGN MODS &
ML
A Y 1,6 ,7
10 LAR
83111/DDG5
1/1209108
THIS ALT MODIFIED FROM A
SHIPALT TO A (AER)
ALTERATION EQUIVELENT TO A
REPAIR
- Y AL
L
11 LAR
83111/DDG6
9/1144629
CLARIFICATION OF DRAIN
WELLS AND BILGE POCKETS
- Y AL
L
12 LAR
83111/DDG6
3/1129844
REVISE MATL THICKNESS TO
1/2"
- Y AL
L
13 DWG 633-
6567062
Installation of Cathodic Protection & Zinc Anode
AB Y 4A
,4 B
14 DWG 100-
7026700
UNIT STRUCTURAL ARR DWG
ASSY UNIT 3220
F Y 3,5 A, 6,6 C
15 DWG 100-
7026703
UNIT STRL ARR DWG ASSY UNIT
H Y 3,4 ,6, 16 TM T9074-
AS-GIB-
010/271
Requirements for Nondestructive Testing Methods
1 N
17 TM S9086-
DA-STM-
010/CH-100
Hull Structures 4 N
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish the requirements of 099-902YO of 2.2 for each space listed in 1.3.1.
5.2 Remove each existing floor plate listed in 1.3.2 in way of bilge preservation, using 2.3 for guidance.
5.2.1 Matchmark, identify and retain each deck plate and grating.
5.3 Pump out, clean and dry the bilge area located in 1.2.1 free from oil, debris, and other foreign matter.
5.4 Remove each existing box strainer plate assembly listed in 1.3.3 in accordance with 2.4, using 2.5 and 2.6 for guidance.
5.5 Fabricate and install each new strainer plate assembly listed in 1.3.4 in accordance with 2.4.
5.5.1 Template detail from existing shipboard conditions for new fabrication and installation.
C1209.3 Shimizu, 11120180, SS, 5/22/2024
Shinya.Shimizu.ja Line
FOUO
SHIP: DDG-83 CHG/VER: 0/0
5.5.2 New strainer material must be CRES Grade 316L.
5.5.3 Dimensions of openings in perforated metal must be of same size as existing.
5.5.4 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) D, Lines One through 7.
5.6 Remove each valve listed in 1.3.5, using 2.7 for guidance.
5.6.1 Restore each mating surface exposed by removal. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by hand tools.
5.6.2 Accomplish an inspection of each valve for evidence of damage or deterioration and each valve seating mechanism for freedom of movement.
5.6.2.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 5.6.2 to the SUPERVISOR.
5.6.3 Retain each removed valve and associated component for installation.
5.7 Remove each flanged piping section listed in 1.3.6 from each bilge drain well listed in 1.3.7 and, located in 1.2.1 to the first flange upstream of the bell mouth, using 2.8 for guidance.
5.7.1 Matchmark, identify, and retain each flanged pipe section.
5.8 Restore each piping flange mating surface exposed by removal of the piping system in 5.7, listed in 1.3.6 from each bilge drain well listed in 1.3.7, and located in 1.2.1 in accordance with 2.8.
5.8.1 Restore each piping flange mating surface exposed by disassembly of piping system. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by a hand tool. Maintain phonographic finish on each flange that has it.
5.9 Remove existing and install new each zinc anode listed in 1.3.8 in accordance with 2.9 through 2.12, using 2.13 through 2.15 for guidance.
5.9.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.9.2 Install new washers and new nuts conforming to material list of 2.9.
5.10 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line(s) 13, Column(s) A, for surfaces preparation for each bilge drain well and deck plating listed in 1.3.7 and 1.3.9.
5.11 Accomplish ultrasonic thickness measurement (UTM) on each bilge drain well listed in 1.3.7 in accordance with Paragraph 6.7 of 2.16 and 2.17, using 2.14 and 2.15 for guidance.
5.11.1 Accomplish a visual inspection of each bilge drain well and deck plating listed in 1.3.7 and 1.3.9 for structural integrity, deterioration, pitting, each crack, and area of damage or distortion, using 2.14 and 2.15 for guidance.
5.11.2 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 5.11 and 5.11.1 to the SUPERVISOR.
5.12 Accomplish the following repairs of each bilge drain well listed in 1.3.7, located in 1.2.1, based on each report in 5.11.2, using 2.14 and 2.15 for guidance, as designated by the SUPERVISOR. See 5.18.4 and 5.18.5.
FOUO
SHIP: DDG-83 CHG/VER: 0/0
5.12.1 Remove existing, fabricate and install new a total of 5 square feet of deteriorated bilge drain well bottom plate(s), using 0.5 inch thickness plate conforming to MIL-S-22698 DH-36 for bottom plate, using 2.14 and 2.15 for guidance.
5.12.2 Chip and grind each surface flush in way of each repair.
5.12.3 Base metal weld build-up a total of 29 square inches of each plate defect.
5.12.3.1 For bidding purposes, the weld build-up must be one quarter inch thick.
5.12.3.2 Surface must be ground to sound metal prior to base metal weld build-up.
5.12.3.3 Fill each local pit and groove with weld metal prior to the application of each principal build-up layer.
5.12.3.4 Grind each surface of completed base metal weld build-up smooth if greater than 1/8 inch above plate surface.
5.12.4 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.13 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line(s) 13, for each area listed in 1.3.10.
5.13.1 Submit one legible copy, in hard copy or approved transferrable media, of a report identifying inaccessible area(s) with mapping plan and recommended preservation plan for the area to the SUPERVISOR within 3 working days ship check becomes possible after contracting.
5.13.2 Accomplish visual inspection of each area, including floor plate and support, foundation, piping, piping hanger and liner, and structural member for structural integrity, deterioration, pitting, crack, and area of damage or distortion.
5.13.2.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 5.13.2 to the SUPERVISOR.
5.14 Install each floor plate removed in 5.2 in accordance with 2.3.
5.14.1 Accomplish repair to floor plate using visual inspection in 5.13.2 when directed by SUPERVISOR. See 5.18.4 and 5.18.5.
5.14.2 Weld fill, drill and tap a total of 40 holes in floor plate support structure.
5.14.3 Chip and grind each surface flush in way of each repair.
5.14.4 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A and D, Lines One through 7.
5.14.5 Chase and tap each exposed threaded area.
5.15 Install each valve listed in 1.3.5, using 2.7 for guidance.
5.15.1 Remove existing and install new each piping joint gasket. Each gasket must conform to UNAFLEX Type 87, 96, or MIL-PRF-1149.
5.15.2 Remove existing and install new each piping joint fastener. Each screw must conform to MIL-DTL-1222, Grade 400 or 405, nickel-copper alloy. Each self-locking nut must conform to NASM17828.
5.16 Install each flanged piping section retained in 5.7.1 in accordance with 2.8, using 2.15 for guidance.
5.17 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
FOUO
SHIP: DDG-83 CHG/VER: 0/0
5.18 Notes:
5.18.1 Planner: Code 231B M. Haga, 243-2513
Planner: Code 231B Y. Koyama, 070-7787-2059 Planner: Code 232 K. Ikeda, 243-0958 Planner: Code 233 M. Yamaguchi, 080-9350-1450 Planner: Code 234 D. Ogawa, 243-5968 Engineer: Code 250 I. Hayasaka, 243-4334 Engineer: Code 260 T. Fukai, 243-4340
5.18.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.18.3 This TGI meets the intent of DDG CSWT File Nos. 113-002 and 631-047.
5.18.4 Removal and installation of interferences, and gas free operation, preservation of boundary spaces relating to front loading structure repair are not included in this TGI. They will be covered by a DL in the future based on Contractor submitted condition report.
5.18.5 Materials for structure members relating to front loading repair will be provided in the future as a DL based on Contractor submitted condition report.
5.18.6 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.18.7 Provision of oily/chemical water barge will be coordinated by Project Team.
5.18.8 WPC will copy the following pages in reference.
REF. 2.3: Pages, 3A, 5A16, 5B16, 5C16, 5D14, 5J16, 5R, 5T16, and 5U
5.18.9 Opening, initial cleaning, and closing of each space listed in 1.2.3 through 1.2.5 will be covered by the following TGI No(s).
Gas Turbine Waste Drain Collecting Tank (4-370-2-F): 38JC212325A01 (KTR TGI) Fuel Tank Group-5 (5-354-0-F): 38JC212353A01 (KTR TGI) Fuel Tank Group-6 (5-370-0-F): 38JC212311A01 (KTR TGI)
5.18.10 JCNs EM04-ZAD0 and EM04-ZAD2 are related to this TGI.
5.19 Government Furnished Material (GFM):
5.19.1 SRF-JRMC will provide GFM listed in Appendix "M".
5.20 SRF-JRMC will provide the following service work: (TGI No. 38JS212301S02)
5.20.1 [C740] Crane and crane rigging service.
5.20.2 [X99E] Utility service, electrical.
5.20.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
5.20.4 [C106.1] Safety inspection for SRF-JRMC employees.
FOUO
SHIP: DDG-83 CHG/VER: 0/0
5.20.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.20.6 [C133] QA inspection for (G) symbol(s) and review of coating application data.
5.20.7 [C250] Technical support for frontload repair work.
FOUO
M-1
SHIP: DDG-83 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
CMPT 3-370-0-E AY A 0 0
CU PHASE TITLE:
F/O - INSPECT, REPAIR, AND PRESERVE GENERATOR ROOM (3-370-0-E)
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38JC212301 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M INSULATION, FIRE, MATERIAL
ORDER FOR KTR
INSULATION, FIRE, SIZE: 24"W
X 36"L X 1-1/4"THK,
LIGHTWEIGHT MARINE
BLANKET, BIW CATALOG NO.
47215-030, 3SHEETS/BOX
ORIG: C231B M.HAGA 243-2513
LL4823204 NA 4 N 4/BX
002 M CAP, STUD, 3/16"DIA,
MATERIAL ORDER FOR KTR
CAP, STUD, MATL: CRES 304,
HD DIA: 1-1/16",
USE FOR 3/16"DIA STUD,
USE FOR NAVY ANNULAR
RING STUDS, 3/16"DIA,
USE FOR HULL THERMAL
INSULATION
ORIG: C231B M.HAGA 243-2513
9Z 5340 LL4945008 NA 4 N 50/EA
003 M ADHESIVE, MATERIAL ORDER
FOR KTR
ORIG: C231B M.HAGA 243-2513
9B 8040 002738708 NA 4 Y 41155232 1/GL
004 M TAPE,TEX, MATERIAL ORDER
FOR KTR
ORIG: C231B M.HAGA 243-2513
9B 8315 002671632 NA 4 N 41155233 1/RO
NOTES:
FOUO
M-2
SHIP: DDG-83 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
005 M TAPE,TEX, MATERIAL ORDER
FOR KTR
ORIG: C231B M.HAGA 243-2513
9B 8315 002671633 NA 4 N 41155235 1/RO
006 M SCREW, PAN HEAD, MATERIAL
ORDER FOR KTR
SCREW, PAN HEAD, 5/16"-
18UNC-2A X 3/4"LG, CRES,
PAN HEAD, CROSS
RECESSED, WITH NYLON
LOCKING STRIP
ORIG: C231B M.HAGA 243-2513
LL4599435 NA 4 N
200/EA
101 M ANODE,CORROSION PRE,
ORIG: C231B, Y. KOYAMA 070-
7787-2059
ORDERED FOR KTR
9B 5342 008136058 NA 4 N 41025106 2/EA
102 M STUD,WEL, ORIG: C231B, Y.
KOYAMA 070-7787-2059
ORDERED FOR KTR
9B 5307 012813886 NA 4 N 41025108 4/EA
103 M NUT,SELF, ORIG: C231B, Y.
KOYAMA 070-7787-2059
ORDERED FOR KTR
9B 5310 005957421 NA 4 N 41025109 4/EA
104 M WASHER,L, ORIG: C231B, Y.
KOYAMA 070-7787-2059
ORDERED FOR KTR
9B 5310 015492705 NA 4 N 41025110 4/EA
105 M SHEET, PERFORATED, 4,
SHEET, PERFORATED,
SIZE: 4FT X 4FT X 9/16" THK,
MATL: ASTM A240 CLASS 316L,
HOLE: 3/4" DIA DRILL, HOLE
PITCH: 1-1/2" STAGGERED.
ORIG: C231B, Y. KOYAMA 070-
7787-2059
ORDERED FOR KTR
9B 9515 LL9305688 NA 4 N 41117469 1/SH
106 M PLATE, METAL, 4FT X , PLATE,
METAL, 4FT X 8FT X 3/4" THK,
CRES 316L, ASTM A240.
ORIG: C231B, Y. KOYAMA 070-
7787-2059
ORDERED FOR KTR
9B 9515 LL9305687 NA 4 N 41117468 1/PM
107 M STUD, 5/8"-11UNC-2A ,
CONTINUOUS-THREAD STUD,
MIL-DTL-1222, TYPE IV, 5/8"
DIA, COARSE
THREAD UNC, CLASS 2A, 1-
3/4" LONG (NOMINAL),
CRES COLD WORKED GRADE
316, NO LOCKING ELEMENT,
NO COATING
ORIG: C231B, Y. KOYAMA 070-
7787-2059
ORDERED FOR KTR
9B 5307 LL7029557 NA 4 N 41107435 7/EA
108 M NUT,SELF-LOCKING,HE, ORIG:
C231B, Y. KOYAMA 070-7787-
ORDERED FOR KTR
9B 5310 015549323 NA 4 N 41025111 7/EA
109 M WASHER,FLAT, ORIG: C231B,
Y. KOYAMA 070-7787-2059
ORDERED FOR KTR
9B 5310 015574109 NA 4 N 41025112 7/EA
FOUO
M-3
SHIP: DDG-83 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
201 M SEAT,VAL, ORIG: C232, K.
IKEDA, 243-0958
ORDERED FOR KTR
9B 4820 000356971 NA 4 N 41065095 2/EA
202 M SEAT,VAL, ORIG: C232, K.
IKEDA, 243-0958
ORDERED FOR KTR
9B 4820 010717388 NA 4 N 41065097 6/EA
203 M GASKET, ORIG: C232, K.
IKEDA, 243-0958
ORDERED FOR KTR
9B 5330 015860604 NA 4 N 41065098 2/EA
400 M COUPLING,TUBE,
ORIGINATOR:C234 D, OGAWA
080-9345-4110
ORDERED FOR KTR
9B 4730 014635878 NA 4 N 41065006 4/EA
401 M COUPLING,TUBE,
ORIGINATOR:C234 D, OGAWA
080-9345-4110
ORDERED FOR KTR
9B 4730 014635857 NA 4 N 41065008 4/EA
402 M SLEEVE,, ORIGINATOR:C234
D, OGAWA 080-9345-4110
ORDERED FOR KTR
9B 4730 LL4903762 NA 4 N 41067416 4/EA
403 M BACKING, ORIGINATOR:C234
D, OGAWA 080-9345-4110
ORDERED FOR KTR
9B 4730 LL4558775 NA 4 N 41067412 4/EA
404 M COUPLING,TUBE,
ORIGINATOR:C234 D, OGAWA
080-9345-4110
ORDERED FOR KTR
9B 4730 005423290 NA 4 N 41065010 4/EA
405 M BACKING, ORIGINATOR:C234
D, OGAWA 080-9345-4110
ORDERED FOR KTR
9B 4730 LL4558779 NA 4 N 41067413 4/EA
406 M COUPLING,TUBE,
ORIGINATOR:C234 D, OGAWA
080-9345-4110
ORDERED FOR KTR
9B 4730 007225471 NA 4 N 41065013 3/PG
407 M BACKING, ORIGINATOR:C234
D, OGAWA 080-9345-4110
ORDERED FOR KTR
9B 4730 LL4558781 NA 4 N 41067414 4/EA
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-83 CMPT 3-370-0-E AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38JC212301 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-83 CMPT 3-370-0-E AY A 0
38JC212301A01 SHEET 1 OF 1
SKETCH
ENCLOSURE-01