This is a Task Group Instruction (TGI) document for inspection and preservation work on the USS HOWARD (DDG-83) vacuum collection holding tank room. The work involves ultrasonic thickness measurements and preservation of tank top plating in Room No. 2 (4-300-0-E), covering 96 SF of tank top plating between Frames 300-308, one bilge drain well, and 170 SF of vertical surface plating up to 6 inches from the tank top.
The contractor must pump out, clean, and dry the spaces; perform ultrasonic thickness measurements using specific grid patterns (12"x12" for tank top, 6"x6" for bilge drain); and accomplish preservation requirements per specification 009-32. The work period is from March 31, 2025 to August 19, 2025. The document includes technical specifications, measurement requirements, and details about government-furnished services including crane operations, utilities, and inspection services. The work area contains potential asbestos hazards and requires special safety considerations. A detailed sketch shows the plan view of the preservation area and bilge drain well assessment locations.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
03-SEP-2024 1314
20.14.15.0.8998 (August 2024) ICN: 38JC2123AM KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 4-300-0-E MS A 2 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-83 USS HOWARD JC2 13011
CU PHASE TITLE: *F/O - INSP AND PSV TANK TOP PLATING IN VACUUME COLLECTION HLDG TANK ROOM NO. 2
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 4
ES01NP71 * ES01NP72
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
HAGA, MASAMICHI 231B 3152432513 24-AUG-2024
APPROVED BY: CODE: PHONE: DATE:
NAKANO, SEIICHI 231B 3152434519 29-AUG-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ES01-NP71 * ES01-NP72
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE 4-300-0-E 4 U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
123A19AM
1 SCOPE/PURPOSE:
1.1 Title: Tank Top Plating in Vacuum Collection Holding Tank Room No. 2 (4-300-0-E); inspect and preserve
1.2 Location of Work:
1.2.1 Vacuum Collection Holding Tank Room No. 2 (4-300-0-E)
1.3 Identification:
1.3.1 Quantity (96 SF), Tank Top Plating in 4-300-0-E, between Frames 300 and 308, and Longitudinals 3P and 3S, Port and Starboard (Stbd)
Reading Point: 12 Inches x 12 Inches Grid Pattern Remarks: See Ref. No. 5 and Ref. No. 6 for base material, and Sheet One of Sketch Enclosure-01 for detail.
1.3.2 Quantity (One EA), Blige Drain Well in 4-300-0-E, between Frames 300 and 302, and Longitudinal 1S and Ship’s Center
TGI Short Form
03-SEP-2024 1314
20.14.15.0.8998 (August 2024) (Continued) ICN: 38JC2123AM KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 4-300-0-E MS A 2 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-83 USS HOWARD JC2 13011
CU PHASE TITLE: *F/O - INSP AND PSV TANK TOP PLATING IN VACUUME COLLECTION HLDG TANK ROOM NO. 2
FOUO Pg 2 of 4
CU PHASE DESCRIPTION (Cont.)
Line, Stbd
Reading Point: 6 Inches x 6 Inches Grid Pattern, including beneath the bottom of suction piping(s) Remarks: See Ref. No. 5 and Ref. No. 6 for base material, and Sheet 2 of Sketch Enclosure-01 for detail.
1.3.3 Quantity (170 SF), Tank Top Plating in 4-300-0-E, between Frames 300 and 308, and Longitudinals 3P and 3S, including bilge drain well and vertical surface up to height of 6 inches from tank top plating, Port and Stbd
Remarks: See Sheet One of Sketch Enclosure-01 for detail.
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Critical Coated Area: CCNY-DDG83-031-25 for the area listed in 1.3.3.
1.5.2 Potential Asbestos Hazard.
1.6 Contractor work start date: 3/31/2025
1.7 Contractor work completion date: 8/19/2025
2. PROCEDURE:
2.1 Pump out, clean and dry each space located in 1.2.1 free from oil, debris, and other foreign matter.
2.2 Accomplish ultrasonic thickness measurement (UTM) on each area listed in 1.3.1 and 1.3.2 in accordance with Paragraph
6.7 of Ref. No. 3 and Ref. No. 4, using Ref. No. 5 and Ref. No. 6 for guidance.
2.2.1 Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 2.2 to the SUPERVISOR.
2.3 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 13, for each area listed in 1.3.3.
2.3.1 Submit one legible copy, in hard copy or approved transferrable media, of a report identifying inaccessible area(s) with mapping plan and recommended preservation plan for the area to the SUPERVISOR within 3 working days ship check becomes possible after contracting.
2.4 Notes:
2.4.1 Planner: Code 231B M. Haga, 243-2513
2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.4.3 Provision of oily/chemical water barge will be coordinated by Project Team.
2.4.4 This TGI is in response to CCIMS report No. CCIMS-G1N6-DDG83-047-24 from TGI No. 38JCA11014I02.
2.4.5 JCNs ES01-NP71 and ES01-NP72 are related to this TGI.
03-SEP-2024 1314
20.14.15.0.8998 (August 2024) (Continued) ICN: 38JC2123AM KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 4-300-0-E MS A 2 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-83 USS HOWARD JC2 13011
CU PHASE TITLE: *F/O - INSP AND PSV TANK TOP PLATING IN VACUUME COLLECTION HLDG TANK ROOM NO. 2
FOUO Pg 3 of 4
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
2.5 Government Furnished Material (GFM): None.
2.6 SRF-JRMC will provide the following service work: (TGI No. 38JC2123AMS02)
2.6.1 [C740] Crane and crane rigging service.
2.6.2 [X99E] Utility service, electrical.
2.6.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.6.6 [C133] QA inspection for (G) symbol(s) and review of coating application data.
03-SEP-2024 1314
20.14.15.0.8998 (August 2024) (Continued) ICN: 38JC2123AM KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 4-300-0-E MS A 2 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-83 USS HOWARD JC2 13011
CU PHASE TITLE: *F/O - INSP AND PSV TANK TOP PLATING IN VACUUME COLLECTION HLDG TANK ROOM NO. 2
FOUO Pg 4 of 4
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 TM T9074-AS-GIB-
010/271 Requirements for Nondestructive Testing Methods
1 N
4 TM S9086-DA-STM-
010/CH-100
Hull Structures 4 N
5 DWG 100-7026413 UNIT STRL ARR DWG ASSY
UNIT 2410
J Y 3,4, 5C
6 DWG 100-7026414 UNIT STRL ARR DWG ASSY
UNIT 3110
G Y 3,4
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 38JC2123AMA01-Sketch.pdf 29-AUG-2024 0000
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38JC2123AM KEY OP: A01
Sketch
38JC2123AMA01 ENCLOSURE-01 Sheet 1 of 2
PLAN VIEW
Vacuum Collection Holding Tank Room No. 2 (4-300-0-E)
12”
15” L3P
L3S
Preservation Area
Sketch 38JC2123AMA01 ENCLOSURE-01 Sheet 2 of 2
FORWARD
B C D
E
F G H
CL SHIP
L 1S
FR 300