This document is an Amendment of Solicitation for an Indefinite-Delivery Indefinite-Quantity (IDIQ) Small Business Multiple Award Construction Contract issued by the Naval Facilities Engineering Command (NAVFAC) for general construction projects at Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point. The procurement is a total small business set-aside, with all correspondence to be directed to Jonathan Durham via email.

Amendment 0009 clarifies responses to previous Potential Pricing Inquiries (PPIs), specifically addressing schedule requirements for the technical proposal and seed project. Key clarifications include: a schedule is not required as part of the technical proposal submission, Specification Section 01 32 17 (Cost-Loaded Network Analysis Schedules) can be deleted entirely, and the firm awarded the seed project will be required to provide a schedule as part of pre-construction submittals. The amendment was issued on 08-Apr-2025 and does not extend the solicitation's receipt of offer date.

View the file

Other files

File Type Posted
N4008524R2785 Amendment 0010.pdf PDF
N4008524R2785 Amendment 0008.pdf PDF
M101_rev 2.pdf PDF
23 73 33_Amendment 2.pdf PDF
E-103.pdf PDF
E-104.pdf PDF
E-107.pdf PDF
M601.pdf PDF
A-202.pdf PDF
E-106.pdf PDF
M802.pdf PDF
VMR- capped.jpg JPG image
T-1.pdf PDF
25 05 11.00.pdf PDF
A-105.pdf PDF
A-501.pdf PDF
E-102.pdf PDF
M501.pdf PDF
M101.pdf PDF
N4008524R2785 Amendment 0005.pdf PDF
01 32 16.00 20.pdf PDF
22 00 00.pdf PDF
23 09 23.13 20 Attachment 2.pdf PDF
N4008524R2785 Amendment 0004.pdf PDF
Attachment Q - Revised Drawings.pdf PDF
23 09 23.13 20 Attachment 5.pdf PDF
23 09 13.pdf PDF
23 09 23.02.pdf PDF
Attachment M - Specifications TOC.pdf PDF
N4008524R2785 Amendment 0003.pdf PDF
Attachment P - Site Visit Log.pdf PDF
Attachment N - Revised Eletrical-Telecomm Sheets.pdf PDF
Attachment O - Revised Specs pg3.pdf PDF
N4008524R2785 Amendment 0002.pdf PDF
Attachment I - Site Visit Information REVISED.pdf PDF
Attachment J - Site Visit Participant Log.xlsx XLSX spreadsheet
Attachment L - Electrical Room.pdf PDF
N4008524R2785 Amendment 0001.pdf PDF
Attachment K - Asbestos Inspection Report.pdf PDF
Attachment I - Site Visit Information.pdf PDF
N4008524R2785 Small Business Marine Corps MACC for General Construction.pdf PDF
Attachment A - PPI LOG TEMPLATE.xlsx XLSX spreadsheet
Attachment B - CONSTRUCTION AND DESIGN EXPERIENCE PROJECT DATA.docx DOCX document
Attachment E - B1005 Drawings.pdf PDF
Attachment F - B1005 Specifications.pdf PDF
Attachment H - PIEE VENDOR ACCESS INSTRUCTIONS.pdf PDF
N4008524R2785 Small Business Marine Corps MACC for General Construction.pdf PDF
Attachment C- PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
Attachment D - B1005 Price Proposal Form.docx DOCX document
Attachment G - B1005 Statement of Work.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Indefinite-Delivery Indefinite-Quantity Small Business Multiple Aw ard Construction Contract for General Construction Projects Primarily aboard Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point in the NAVFAC MIDLANT Marine Corps Installation East Area of Responsibility

This procurement is being solicited as a total small business set-aside.

All correspondence regarding this solicitation shall be directed via email to Jonathan Durham at jonathan.m.durham.civ@us.navy.mil

See Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Apr-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008524R2785

X 9B. DATED (SEE ITEM 11)

11-Feb-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Apr-2025

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008524R2785

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0009

The purpose of this amendment is to:

1. Clarify the Responses to PPI #153

1. Clarify the Responses to PPI #2, #34, and #153

No Date

Submitted

Reference Question Response

Page Section Para

2 This section states that the Evaluation Factors for Award under Factor 3 include a Management Approach and Schedule, however, detailed instructions for Factor 3 on page 14 of 87 do not mention any requirement for a Schedule. Please confirm that a schedule IS NOT required for the Technical Proposal.

Schedule is not required as part of the technical proposal.

34 Spec Section 01 32 17 (COSTLOADED NETWORK ANALYSIS SCHEDULES) is in conflict with the requirements of Spec Section 01 32 16

(CONSTRUCTION PROGRESS

DOCUMENTATION). Currently, the specified requirement for all MACC Task Orders performed at MCB Camp Lejeune only requires schedules to be submitted in accordance with Spec Section 01 32 16.

Also, Cost-Loaded are extremely expensive to build & maintain. Can Spec Section 01 32 17 be deleted be Amendment?

Spec Section 01 32 17 can be deleted in its entirety. See attached revised specifications.

153 04/03/2025 Does this solicitation require a baseline schedule for the seed project? Page 6 of the solicitation under "Evaluation Factors for Award" it states the following:

The solicitation requires the evaluation of price and the following non-cost/price factors. Factor 1 - Corporate Experience. Factor 2 - Safety. Factor 3 - Management Approach and Schedule. Factor 4 - Past Performance.

Amendment 0004 provided a revised specification for such but does not identify a schedule as being required for the seed. Please advise.

Yes, the solicitation requires a baseline schedule be provided for the seed project in accordance with specification section 01 32 16.00 20.

To confirm, per PPI Response #2 a schedule is not required to be submitted for the technical proposal.

- SEE BELOW THE TABLE

N4008524R2785

To clarify, the firm that is awarded the seed project will be required to provide a schedule, per the specifications referenced in PPI Responses #34 and #153, as part of the pre-construction submittals.

(End of Summary of Changes)