The A-105.pdf is a floor plan and finish schedule document for the Design Wing Relocation project at Marine Corps Base, Building 1005. The detailed architectural drawing provides a comprehensive room finish schedule covering 40 rooms, including offices, conference rooms, storage areas, mechanical spaces, and circulation areas. The floor plan specifies specific finishes for each room, including flooring types (LVP-1, CPT-1), base materials (RB-1), wall treatments (PNT-1, PNT-2, PNT-3), and ceiling types (ACT, GWB), with a note that certain rooms (40, 324, 331, 334 & 335) will retain existing finishes. The document includes a finish legend, general notes about installation methods, and interior finish transition details, indicating a precise approach to the renovation of the building's interior spaces.

View the file

Other files

File Type Posted
N4008524R2785 Amendment 0007.pdf PDF
A-202.pdf PDF
E-106.pdf PDF
M802.pdf PDF
23 73 33_Amendment 2.pdf PDF
E-103.pdf PDF
E-104.pdf PDF
E-107.pdf PDF
M601.pdf PDF
N4008524R2785 Amendment 0006.pdf PDF
VMR- uncapped.jpg JPG image
E-101.pdf PDF
E-105.pdf PDF
M103.pdf PDF
M104.pdf PDF
M602.pdf PDF
VMR- capped.jpg JPG image
N4008524R2785 Amendment 0005.pdf PDF
N4008524R2785 Amendment 0004.pdf PDF
Attachment Q - Revised Drawings.pdf PDF
23 09 23.13 20 Attachment 5.pdf PDF
01 32 16.00 20.pdf PDF
22 00 00.pdf PDF
23 09 23.13 20 Attachment 2.pdf PDF
23 09 00.pdf PDF
23 09 23.13 20 Attachment 4.pdf PDF
23 09 13.pdf PDF
23 09 23.02.pdf PDF
Attachment M - Specifications TOC.pdf PDF
Attachment N - Revised Eletrical-Telecomm Sheets.pdf PDF
Attachment O - Revised Specs pg3.pdf PDF
N4008524R2785 Amendment 0003.pdf PDF
Attachment P - Site Visit Log.pdf PDF
N4008524R2785 Amendment 0002.pdf PDF
Attachment I - Site Visit Information REVISED.pdf PDF
Attachment J - Site Visit Participant Log.xlsx XLSX spreadsheet
Attachment L - Electrical Room.pdf PDF
Attachment I - Site Visit Information.pdf PDF
N4008524R2785 Amendment 0001.pdf PDF
Attachment K - Asbestos Inspection Report.pdf PDF
N4008524R2785 Small Business Marine Corps MACC for General Construction.pdf PDF
Attachment A - PPI LOG TEMPLATE.xlsx XLSX spreadsheet
Attachment B - CONSTRUCTION AND DESIGN EXPERIENCE PROJECT DATA.docx DOCX document
Attachment E - B1005 Drawings.pdf PDF
Attachment F - B1005 Specifications.pdf PDF
Attachment H - PIEE VENDOR ACCESS INSTRUCTIONS.pdf PDF
N4008524R2785 Small Business Marine Corps MACC for General Construction.pdf PDF
Attachment C- PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
Attachment D - B1005 Price Proposal Form.docx DOCX document
Attachment G - B1005 Statement of Work.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X X

X X

318 320

321319

327 328

AREA OF WORK

F

AREA OF WORK

VMR-25

VMR-23

VMR-24

LVTCONCRETE

METAL-

SCHLUTER-RENO-U

OR EQUAL

CARPET

METAL-

SCHLUTER-SCHIENE

OR EQUAL

LVT

NEW LVTEXISTING LVT

METAL -

SCHLUTER-VINPRO-T

OR EQUAL

CONST. CONTR. NO.

CONSTRUCTION DOCUMENTS A-105

K. ROOT

K. ROOT / S. CONTRERAS

K. ROOT

K. ROOT

J. FRANKLIN ORR

DESIGN WING RELOCATION

BUILDING 1005

FINISH PLAN

60036654 21-0019

NOTED NA 7 36

ROOM FINISH SCHEDULE

ROOM

NUMBER ROOM NAME FLOOR BASE WALLS (PLAN NORTH) CEILING NOTES

NORTH EAST SOUTH WEST

39 RECORDS ROOM LVP-1/

CPT-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 -

40 DESIGN PLAN ROOM - - - - - - -

300 FLEX SPACE LVP-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT

301 M CONFERENCE CPT-1 RB-1 PNT-1 PNT-1 PNT-3 PNT-1 ACT

302 KITCHEN LVP-1 RB-1 PNT-1 PNT-1 PNT-3 PNT-1 GWB

303 LG CONFERENCE CPT-1 RB-1 PNT-3 PNT-1 PNT-1 PNT-1 ACT

304 PLOTTER CPT-1 RB-1 PNT-2 PNT-2 PNT-2 PNT-2 ACT

305, 307, 309 OFFICE CPT-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-2 ACT

306, 308, 310 OFFICE CPT-1 RB-1 PNT-1 PNT-2 PNT-1 PNT-1 ACT

311 CLOSET LVP-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT

312 ADMIN/CIRCULATION LVP-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT

313 TELECOM SC-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 GWB

SPEC COMPLIANT

FIRE RATED

BACKBOARD ALONG

ALL WALLS

314, 315 OFFICE CPT-1 RB-1 PNT-2 PNT-1 PNT-1 PNT-1 ACT

316 STORAGE CPT-1 RB-1 PNT-2 PNT-2 PNT-2 PNT-2 ACT

317 MULTI-PURPOSE

ROOM LVP-1 RB-1 PNT-2 PNT-2 PNT-2 PNT-2 ACT

318 PRINTER CPT-1 RB-1 PNT-2 PNT-2 PNT-2 PNT-2 ACT

319, 321 OFFICE CPT-1 RB-1 PNT-2 PNT-1 PNT-1 PNT-1 ACT

320 OFFICE CPT-1 RB-1 PNT-1 PNT-1 PNT-2 PNT-1 ACT

322, 326 OFFICE CPT-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-2 ACT

324 MECHANICAL - - - - - - GWB

323, 325 OFFICE CPT-1 RB-1 PNT-1 PNT-2 PNT-1 PNT-1 ACT

327, 329, 333 OFFICE CPT-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-2 ACT

331 MECHANICAL - - - - - - GWB

328, 330, 332 OFFICE CPT-1 RB-1 PNT-1 PNT-2 PNT-1 PNT-1 ACT

334 STORAGE LVP-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT

335 MECHANICAL - - - - - - -

NOTE: RM 40, 324, 331, 334 & 335 EXISTING FINISHES TO REMAIN.

FLOOR PLAN - REFLECTED CEILING1

0 5' 10' 20'

1/8" = 1'-0"

TR

UE

NORTH

PL

AN

N O

R

TH

INTERIOR FINISH DETAIL - TYPICAL FLOOR TRANSITIONS2

0 1" 2" 6"

6" = 1'-0" 3"

FINISH LEGEND

MARK MATERIAL BASIS OF DESIGN NOTES

CPT-1 CARPET TILE

MANUFACTURER: TARKETT

COLOR: COROLLARY 11577, BOUNTY 39408

SIZE: 24" x 24"

-INSTALLATION METHOD: VERTICAL ASHLER

LVT-1 LUXURY VINYL TILE

MANUFACTURER: TARKETT

COLOR: MELANGE PEME, SILTSTONE 11187 QU

SIZE: 18" x 18"

-INSTALLATION METHOD: VERTICAL ASHLER

SC-1 SEALED CONCRETE

PNT-1 WALL PAINT MANUFACTURER: SHERWIN WILLIAMS

COLOR: SW 7008 ALABASTER EGGSHELL FINISH, TYP., SEMI-GLOSS AT KITCHEN

PNT-2 WALL PAINT -

ACCENT COLOR 01

MANUFACTURER: SHERWIN WILLIAMS

COLOR: SW 6192 COASTAL PLAIN EGGSHELL FINISH

PNT-3 WALL PAINT -

ACCENT COLOR 02

MANUFACTURER: SHERWIN WILLIAMS

COLOR: SW 7616 BREEZY EGGSHELL FINISH, TYP., SEMI-GLOSS AT KITCHEN

PNT-4 METAL DOOR FRAME

PAINT

MANUFACTURER: SHERWIN WILLIAMS

COLOR: SW7047 PORPOISE SATIN FINISH

RB-1 RUBBER WALL BASE

MANUFACTURER: TARKETT

COLOR: TRADITIONAL WALL BASE, 29 MOON ROCK WG

SIZE: 4"

HDW-1 DRAWER PULLS 4" WIRE CABINET DRAWER PULL BRUSHED OR SATIN NICKEL

SS-1 COUNTER TOPS MANUFACTURER: AVONITE 9017 SAVOR

PL-1 PLASTIC LAMINATE

CASEWORK MANUFACTURER: FORMICA 8829 GRAPHITE TWILL

GENERAL NOTES

1. ALL VMR'S COVERS SHALL BE REMOVED, STORED OFF SITE, AND REINSTALLED IN

THE SAME LOCATION ON TOP OF FINISH FLOORING.

AutoCAD SHX Text

FACP

AutoCAD SHX Text E

AutoCAD SHX Text

NAC

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text 80091

AutoCAD SHX Text E1

AutoCAD SHX Text

MARINE CORPS BASE

AutoCAD SHX Text

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

AutoCAD SHX Text

CAMP LEJEUNE, NORTH CAROLINA

AutoCAD SHX Text

DESIGN DIR.

AutoCAD SHX Text

SUBMITTED BY:

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

CODE IDENT. NO

AutoCAD SHX Text

SIZE

AutoCAD SHX Text

SPEC.

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

SATISFACTORY TO:

AutoCAD SHX Text

APPROVED: PWO OR OICC:

AutoCAD SHX Text

DR.

AutoCAD SHX Text

DES.

AutoCAD SHX Text

CHK.

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

OF

AutoCAD SHX Text A105

AutoCAD SHX Text A105

Sheets and Views
A-105 FIN PLAN

File details come from the government source that posted it. Updated .