About this file

This document is a Standard Form 30 Amendment to Solicitation N4008524R2785, modifying an Indefinite-Delivery Indefinite-Quantity (IDIQ) Small Business Multiple Award Construction Contract for general construction projects at Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point. The amendment extends the proposal due date from 27 March 2025 at 2:00 PM EDT to 03 April 2025 at 2:00 PM EDT and incorporates Potential Price Information (PPI) responses addressing key questions about bid bonds, subcontractor experience consideration, NIST security requirements, and insurance expectations.

The solicitation is a total small business set-aside, and all correspondence is to be directed to Jonathan Durham via email. The amendment clarifies that a bid bond is required for the seed project, with a contract duration of 446 days, and provides guidance on subcontractor experience consideration for corporate experience evaluation. For the seed project, a Basic Assessment under DFARS 252.204-7019 and 252.204-7020 will meet security requirements, with future task order security levels to be determined individually. Minimum insurance requirements can be found in Section 00 73 00 of the solicitation documents.

View the file

Other files

File Type Posted
N4008524R2785 Amendment 0010.pdf PDF
N4008524R2785 Amendment 0009.pdf PDF
N4008524R2785 Amendment 0008.pdf PDF
N4008524R2785 Amendment 0007.pdf PDF
M101_rev 2.pdf PDF
N4008524R2785 Amendment 0006.pdf PDF
VMR- uncapped.jpg JPG image
E-101.pdf PDF
E-105.pdf PDF
M103.pdf PDF
M104.pdf PDF
M602.pdf PDF
VMR- capped.jpg JPG image
T-1.pdf PDF
25 05 11.00.pdf PDF
A-105.pdf PDF
A-501.pdf PDF
E-102.pdf PDF
M501.pdf PDF
M101.pdf PDF
23 73 33_Amendment 2.pdf PDF
E-103.pdf PDF
23 09 00.pdf PDF
23 09 23.13 20 Attachment 4.pdf PDF
23 09 13.pdf PDF
23 09 23.02.pdf PDF
01 32 16.00 20.pdf PDF
22 00 00.pdf PDF
23 09 23.13 20 Attachment 2.pdf PDF
Attachment N - Revised Eletrical-Telecomm Sheets.pdf PDF
Attachment O - Revised Specs pg3.pdf PDF
N4008524R2785 Amendment 0003.pdf PDF
Attachment P - Site Visit Log.pdf PDF
Attachment M - Specifications TOC.pdf PDF
Attachment I - Site Visit Information REVISED.pdf PDF
N4008524R2785 Amendment 0002.pdf PDF
Attachment I - Site Visit Information.pdf PDF
N4008524R2785 Amendment 0001.pdf PDF
Attachment K - Asbestos Inspection Report.pdf PDF
Attachment J - Site Visit Participant Log.xlsx XLSX spreadsheet
Attachment L - Electrical Room.pdf PDF
N4008524R2785 Small Business Marine Corps MACC for General Construction.pdf PDF
Attachment C- PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
Attachment D - B1005 Price Proposal Form.docx DOCX document
Attachment G - B1005 Statement of Work.pdf PDF
Attachment A - PPI LOG TEMPLATE.xlsx XLSX spreadsheet
Attachment B - CONSTRUCTION AND DESIGN EXPERIENCE PROJECT DATA.docx DOCX document
Attachment E - B1005 Drawings.pdf PDF
Attachment F - B1005 Specifications.pdf PDF
Attachment H - PIEE VENDOR ACCESS INSTRUCTIONS.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Indefinite-Delivery Indefinite-Quantity Small Business Multiple Aw ard Construction Contract for General Construction Projects Primarily aboard Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point in the NAVFAC MIDLANT Marine Corps Installation East Area of Responsibility

This procurement is being solicited as a total small business set-aside.

All correspondence regarding this solicitation shall be directed via email to Jonathan Durham at jonathan.m.durham.civ@us.navy.mil

See Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Mar-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008524R2785

X 9B. DATED (SEE ITEM 11)

11-Feb-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Mar-2025

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008524R2785

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0005

The purpose of this amendment is to:

1. Extend the proposal due date

2. Incorporate PPI Responses

1. Extend the proposal due date

The proposal due date is extended from 27 March 2025 at 2:00PM EDT to 03 April 2025 2:00PM EDT

2. Incorporate PPI Responses

No. Date

Submitted Reference Question Response

Page Section Para

73 7

4. Evaluation Factors for

Award

Page 7 of the SF1442 document states "Bid Bond (SF-24): Offeror shall submit a bid bond (SF-24) in the amount of 20% of total project bid price for the seed project or $3M, whichever amount is less. The bid bond shall be in the name of the Offeror identified on the SF1442. " Can you please confirm a bid bond is required for the seed project, and estimate the expected duration of the project? We will need this information for the the surety company to provide us the bond documents.

A bid bond is required for the seed project. Per the General Requirements, the contract duration is 446 days which includes 15 days to receive and approve bonds.

74 3/13/2025 9

The solicitation says Government will not consider experience of subcontractors for factor 1 corporate experience, but what if we have an exclusive teaming agreement with them? Can we please use teaming subcontractor experience for this factor?

If the subcontractor is considered as a joint venture, affiliate, subsidiary, LLC, LTD member company and has meaningful involvement as detailed in Factor 1, then the subcontractor experience would be considered.

N4008524R2785

In regards to the NIST requirements, can you elaborate on what level of security will be required?

For the seed project, a Basic Assessment as described in DFARS 252.204-7019 and DFARS 252.204-7020 would meet the requirements. The level of required security on future task orders will be determined per task order.

Please refer to DFARS 252.204-7012 for more information on the specific requirements.

Answered PPI #24 on Amendment 003 clarifies that the Government via the Source Selection Evaluation Board should take into account past performance information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to the instant acquisition. However, Page 9 of 87 of the RFP specifically states that experience as the prime contractor is required on all submitted projects and the Government will not consider experience of" proposed subcontractors. In addition, NAVFAC MIDLANT has stated on all previous MACC RFPs for General "Construction that the experience of proposed subcontractors will not be considered for corporate experience and the Offeror’s experience as a subcontractor will not be considered."

Can it be confirmed by Amendment that subcontractor experience will be considered as Unacceptable if submitted as part of the relevant projects for Corporate Experience and Past Performance?

This procurement is being conducted under FAR part 15.

However, the Factor 1 Language in the RFP and as updated by the Amendment applies pertaining to subcontractor consideration.

Do the GCs need to provide a Builders Risk policy for this project?

Minimum insurance requirements can be found in Section 00 73 00 and in clauses and provisions included in the solicitation.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 27-Mar-2025 02:00 PM to 03-Apr-2025 02:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .