About this file

This document is an Amendment (Amendment 0008) to a federal solicitation for an Indefinite-Delivery Indefinite-Quantity (IDIQ) Small Business Multiple Award Construction Contract. The procurement is a total small business set-aside for general construction projects primarily at Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point in the NAVFAC MIDLANT Marine Corps Installation East Area of Responsibility.

The amendment incorporates two Pre-Proposal Information (PPI) Responses addressing specific technical details. The first response confirms that the solicitation requires a baseline schedule for the seed project, to be provided in accordance with specification section 01 32 16.00 20. The second response provides clarification about range hood specifications, requiring a UL 300A listed residential range top extinguishing system. All correspondence regarding the solicitation should be directed to Jonathan Durham via email. The amendment was issued on 08-Apr-2025 with an effective date of the same day.

View the file

Other files

File Type Posted
N4008524R2785 Amendment 0010.pdf PDF
N4008524R2785 Amendment 0009.pdf PDF
N4008524R2785 Amendment 0007.pdf PDF
M101_rev 2.pdf PDF
N4008524R2785 Amendment 0006.pdf PDF
VMR- uncapped.jpg JPG image
E-101.pdf PDF
E-105.pdf PDF
M103.pdf PDF
M104.pdf PDF
M602.pdf PDF
VMR- capped.jpg JPG image
T-1.pdf PDF
25 05 11.00.pdf PDF
A-105.pdf PDF
A-501.pdf PDF
E-102.pdf PDF
M501.pdf PDF
M101.pdf PDF
A-202.pdf PDF
E-106.pdf PDF
M802.pdf PDF
N4008524R2785 Amendment 0005.pdf PDF
23 09 00.pdf PDF
23 09 23.13 20 Attachment 4.pdf PDF
23 09 13.pdf PDF
23 09 23.02.pdf PDF
N4008524R2785 Amendment 0004.pdf PDF
Attachment Q - Revised Drawings.pdf PDF
23 09 23.13 20 Attachment 5.pdf PDF
Attachment N - Revised Eletrical-Telecomm Sheets.pdf PDF
Attachment O - Revised Specs pg3.pdf PDF
N4008524R2785 Amendment 0003.pdf PDF
Attachment P - Site Visit Log.pdf PDF
Attachment I - Site Visit Information REVISED.pdf PDF
Attachment I - Site Visit Information.pdf PDF
N4008524R2785 Amendment 0001.pdf PDF
Attachment K - Asbestos Inspection Report.pdf PDF
Attachment J - Site Visit Participant Log.xlsx XLSX spreadsheet
Attachment L - Electrical Room.pdf PDF
N4008524R2785 Small Business Marine Corps MACC for General Construction.pdf PDF
N4008524R2785 Small Business Marine Corps MACC for General Construction.pdf PDF
Attachment C- PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
Attachment D - B1005 Price Proposal Form.docx DOCX document
Attachment G - B1005 Statement of Work.pdf PDF
Attachment A - PPI LOG TEMPLATE.xlsx XLSX spreadsheet
Attachment B - CONSTRUCTION AND DESIGN EXPERIENCE PROJECT DATA.docx DOCX document
Attachment E - B1005 Drawings.pdf PDF
Attachment F - B1005 Specifications.pdf PDF
Attachment H - PIEE VENDOR ACCESS INSTRUCTIONS.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provi ded herei n, all t erms and condit ions of t he document referenced in Item 9A or 10A, as heretofore changed, remai ns unchanged and in ful l force and effect .

15A. NAME AND TIT LE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

ST ANDARD FORM 30 (Rev. 10-83) Prescr ibed by GSA

FAR (48 CFR) 53.243

Indefinite-Delivery Indef inite-Quantity Small Business Multiple Aw ard Construction Contract for General Construction Projects Primarily aboard Mar ine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point in the NAVFAC MIDLANT Marine Corps Installation East Area of Responsibility

This procurement is being solicited as a total small business set-aside.

All correspondence regarding this solicitation shall be directed via email to Jonathan Durham at jonathan.m.durham.civ@us.navy.mil

See Continuation Page

1. CONTRACT ID CODE P AGE OF P AGES

J 1 3

16A. NAME AND T ITLE OF CONTRACTING OFFICER (Type or print)

16C. DAT E SIGNED

BY 08-Apr-2025

16B. UNITED ST AT ES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contract ing Officer)(Signature of person author ized t o sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Count y, Stat e and Zip Code) X N4008524R2785

X 9B. DAT ED (SEE IT EM 11)

11-Feb-2025

10B. DAT ED (SEE IT EM 13)

9A. AMENDMENT OF SOLICITAT ION NO.

11. THIS IT EM ONLY APPLIES T O AMENDMENT S OF SOLICITATIONS

X The above numbered soli cit ati on i s amended as set forth in It em 14. The hour and date specified for rece ipt of Offer is ext ended, X is not extended.

Offer must acknowl edge rece ipt of t his amendment pri or to the hour and date specified in the sol ici tat ion or as amended by one of t he fol lowing methods:

(a) By compl eti ng Items 8 and 15, and returning copi es of the amendment ; (b) By acknowledgi ng recei pt of thi s amendment on each copy of t he offer submit ted;

or (c) By s epara te let ter or t elegram whi ch i ncludes a refe rence t o t he s olic ita tion and amendment numbers . FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE P LACE DESIGNATED FOR THE RECEIPT OF OFFERS P RIOR TO THE HOUR AND DATE SP ECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of thi s amendment you desire t o change an offer already submit ted, s uch change may be made by t elegram or let ter, provided each t elegram or l ett er makes re ference to the sol ici tat ion and this amendment , and is received prior to the openi ng hour and dat e speci fi ed.

12. ACCOUNTING AND APPROPRIATION DAT A (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE

CONT RACT ORDER NO. IN ITEM 10A.

B. T HE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED T O REFLECT THE ADMINIST RATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORT H IN ITEM 14, PURSUANT TO T HE AUTHORITY OF FAR 43.103(B).

C. T HIS SUPPLEMENT AL AGREEMENT IS ENT ERED INTO PURSUANT TO AUTHORITY OF:

D. OT HER (Specify type of modification and authorit y)

E. IMPORTANT: Contract or is not, is required to sign this document and return copies t o the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/cont ract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/ MODIFICATION NO. 5. P ROJECT NO.(If appli cable )

6. ISSUED BY

3. EFFECTIVE DATE

08-Apr-2025

CODE

NAVFACSYSCOM M ID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511- 3095

N40085 7. ADMINISTERED BY (If other t han item 6)

4. REQUISITION/P URCHASE REQ. NO.

CODE

See I tem 6

FACILITY CODECODE

EMAIL:TEL:

N4008524R2785

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0008

The purpose of this amendment is to:

1. Incorporate PPI Responses

1. Incorporate PPI Response

No Date

Submitted

Reference Question Response

Page Section Para

153 04/03/2025 Does this solicitation require a baseline schedule for the seed project? Page 6 of the solicitation under "Evaluation Factors for Award" it states the following:

The solicitation requires the evaluation of price and the following non-cost/price factors. Factor 1 - Corporate Experience. Factor 2 - Safety. Factor 3 - Management Approach and Schedule. Factor 4 - Past Performance.

Amendment 0004 provided a revised specification for such but does not identify a schedule as being required for the seed. Please advise.

Yes, the solicitation requires a baseline schedule be provided for the seed project in accordance with specification section 01 32 16.00 20.

154 04/03/2025 Concerning the range hood. Amendment 0007 provided the following: Question: Per RFI #97, it states that a fire suppression specification was provided in Amendment 0006, but this has not been provided per the comments in the drawings for a pre-engineered wet chemical fire suppression system. Please provide the specifications for this scope. Response: See Range hood specification in 23 73 33.

From Amendment 0006, revised specification 23 73 33, paragraph 2.1.6 Range Hoods - UL 507 and UL 300A, with AMCA seal, separately switched 2 speed exhaust fan and lights. Fan capacity shall be 400 cfm.

Provide 30-inch stainless steel range hood with easily removable washable metal filter, zinc-coated steel ducts to exterior of building, and backdraft damper.

This product does not meet the requirements of a wet chemical system. Furthermore, a wet chemical system is, by code, required for commercial kitchens, which Building 1005 will not be utilized as such. Is it acceptable to provide range hoods as defined in the amended specifications and provide the proper fire

Provide and install range hood with a UL 300A listed residential range top extinguishing system.

N4008524R2785 extinguisher either wall mounted directly beside or in close vicinity of the range? If not, could you please provide the correct specification under Division 21 and identify the product as CaptiveAire or equal?

(End of Summary of Changes)