This document is an Amendment (Amendment 0008) to a federal solicitation for an Indefinite-Delivery Indefinite-Quantity (IDIQ) Small Business Multiple Award Construction Contract. The procurement is a total small business set-aside for general construction projects primarily at Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point in the NAVFAC MIDLANT Marine Corps Installation East Area of Responsibility.
The amendment incorporates two Pre-Proposal Information (PPI) Responses addressing specific technical details. The first response confirms that the solicitation requires a baseline schedule for the seed project, to be provided in accordance with specification section 01 32 16.00 20. The second response provides clarification about range hood specifications, requiring a UL 300A listed residential range top extinguishing system. All correspondence regarding the solicitation should be directed to Jonathan Durham via email. The amendment was issued on 08-Apr-2025 with an effective date of the same day.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provi ded herei n, all t erms and condit ions of t he document referenced in Item 9A or 10A, as heretofore changed, remai ns unchanged and in ful l force and effect .
15A. NAME AND TIT LE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
ST ANDARD FORM 30 (Rev. 10-83) Prescr ibed by GSA
FAR (48 CFR) 53.243
Indefinite-Delivery Indef inite-Quantity Small Business Multiple Aw ard Construction Contract for General Construction Projects Primarily aboard Mar ine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point in the NAVFAC MIDLANT Marine Corps Installation East Area of Responsibility
This procurement is being solicited as a total small business set-aside.
All correspondence regarding this solicitation shall be directed via email to Jonathan Durham at jonathan.m.durham.civ@us.navy.mil
See Continuation Page
1. CONTRACT ID CODE P AGE OF P AGES
J 1 3
16A. NAME AND T ITLE OF CONTRACTING OFFICER (Type or print)
16C. DAT E SIGNED
BY 08-Apr-2025
16B. UNITED ST AT ES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contract ing Officer)(Signature of person author ized t o sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Count y, Stat e and Zip Code) X N4008524R2785
X 9B. DAT ED (SEE IT EM 11)
11-Feb-2025
10B. DAT ED (SEE IT EM 13)
9A. AMENDMENT OF SOLICITAT ION NO.
11. THIS IT EM ONLY APPLIES T O AMENDMENT S OF SOLICITATIONS
X The above numbered soli cit ati on i s amended as set forth in It em 14. The hour and date specified for rece ipt of Offer is ext ended, X is not extended.
Offer must acknowl edge rece ipt of t his amendment pri or to the hour and date specified in the sol ici tat ion or as amended by one of t he fol lowing methods:
(a) By compl eti ng Items 8 and 15, and returning copi es of the amendment ; (b) By acknowledgi ng recei pt of thi s amendment on each copy of t he offer submit ted;
or (c) By s epara te let ter or t elegram whi ch i ncludes a refe rence t o t he s olic ita tion and amendment numbers . FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE P LACE DESIGNATED FOR THE RECEIPT OF OFFERS P RIOR TO THE HOUR AND DATE SP ECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of thi s amendment you desire t o change an offer already submit ted, s uch change may be made by t elegram or let ter, provided each t elegram or l ett er makes re ference to the sol ici tat ion and this amendment , and is received prior to the openi ng hour and dat e speci fi ed.
12. ACCOUNTING AND APPROPRIATION DAT A (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE
CONT RACT ORDER NO. IN ITEM 10A.
B. T HE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED T O REFLECT THE ADMINIST RATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORT H IN ITEM 14, PURSUANT TO T HE AUTHORITY OF FAR 43.103(B).
C. T HIS SUPPLEMENT AL AGREEMENT IS ENT ERED INTO PURSUANT TO AUTHORITY OF:
D. OT HER (Specify type of modification and authorit y)
E. IMPORTANT: Contract or is not, is required to sign this document and return copies t o the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/cont ract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/ MODIFICATION NO. 5. P ROJECT NO.(If appli cable )
6. ISSUED BY
3. EFFECTIVE DATE
08-Apr-2025
CODE
NAVFACSYSCOM M ID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511- 3095
N40085 7. ADMINISTERED BY (If other t han item 6)
4. REQUISITION/P URCHASE REQ. NO.
CODE
See I tem 6
FACILITY CODECODE
EMAIL:TEL:
N4008524R2785
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0008
The purpose of this amendment is to:
1. Incorporate PPI Responses
1. Incorporate PPI Response
No Date
Submitted
Reference Question Response
Page Section Para
153 04/03/2025 Does this solicitation require a baseline schedule for the seed project? Page 6 of the solicitation under "Evaluation Factors for Award" it states the following:
The solicitation requires the evaluation of price and the following non-cost/price factors. Factor 1 - Corporate Experience. Factor 2 - Safety. Factor 3 - Management Approach and Schedule. Factor 4 - Past Performance.
Amendment 0004 provided a revised specification for such but does not identify a schedule as being required for the seed. Please advise.
Yes, the solicitation requires a baseline schedule be provided for the seed project in accordance with specification section 01 32 16.00 20.
154 04/03/2025 Concerning the range hood. Amendment 0007 provided the following: Question: Per RFI #97, it states that a fire suppression specification was provided in Amendment 0006, but this has not been provided per the comments in the drawings for a pre-engineered wet chemical fire suppression system. Please provide the specifications for this scope. Response: See Range hood specification in 23 73 33.
From Amendment 0006, revised specification 23 73 33, paragraph 2.1.6 Range Hoods - UL 507 and UL 300A, with AMCA seal, separately switched 2 speed exhaust fan and lights. Fan capacity shall be 400 cfm.
Provide 30-inch stainless steel range hood with easily removable washable metal filter, zinc-coated steel ducts to exterior of building, and backdraft damper.
This product does not meet the requirements of a wet chemical system. Furthermore, a wet chemical system is, by code, required for commercial kitchens, which Building 1005 will not be utilized as such. Is it acceptable to provide range hoods as defined in the amended specifications and provide the proper fire
Provide and install range hood with a UL 300A listed residential range top extinguishing system.
N4008524R2785 extinguisher either wall mounted directly beside or in close vicinity of the range? If not, could you please provide the correct specification under Division 21 and identify the product as CaptiveAire or equal?
(End of Summary of Changes)