N4008524R2785 Amendment 0006.pdf
PDF 239 KB Posted
- Solicitation number
- N4008524R2785
About this file
This document is an amendment (Amendment 0006) to a solicitation for an Indefinite-Delivery Indefinite-Quantity (IDIQ) Small Business Multiple Award Construction Contract for general construction projects at Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point. The amendment extends the proposal due date from Thursday, April 3, 2025, at 2:00 PM EDT to Wednesday, April 9, 2025, at 2:00 PM EDT, and includes several key modifications: revising the Management Approach requirements, incorporating Pricing and Performance Information (PPI) responses, updating specifications and drawings, and making changes to applicable clauses and provisions.
The solicitation is being conducted as a total small business set-aside, with all correspondence to be directed to Jonathan Durham via email. The amendment addresses various technical details, including modifications to door hardware specifications, fire alarm system requirements, electrical and mechanical work, and clarifications on asbestos and lead abatement. The revised specifications cover aspects such as window installations, cybersecurity, temporary HVAC, fire protection, and other construction-related elements. Contractors are advised to carefully review the updated documents and respond accordingly to the modified requirements.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Indefinite-Delivery Indefinite-Quantity Small Business Multiple Aw ard Construction Contract for General Construction Projects Primarily aboard Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point in the NAVFAC MIDLANT Marine Corps Installation East Area of Responsibility
This procurement is being solicited as a total small business set-aside.
All correspondence regarding this solicitation shall be directed via email to Jonathan Durham at jonathan.m.durham.civ@us.navy.mil
See Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 22
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Apr-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008524R2785
X 9B. DATED (SEE ITEM 11)
11-Feb-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Apr-2025
CODE
NAVFACSYSCOM MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008524R2785
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0006
The purpose of this amendment is to:
1. Extend Proposal Due Date
2. Revise Factor 3, Management Approach
3. Incorporate PPI Responses
4. Incorporate Revised Specifications and Drawings
5. Update Appicable Clauses and Provisions
1. Extend Proposal Due Date
The proposal due date is extended from Thursday 03 April 2025 at 2:00PM EDT to Wednesday 09 April 2025 at 2:00PM EDT.
2. Revise Factor 3, Management Approach
From:
(1) Solicitation Submittal Requirements:
Offeror shall submit a detailed Management Approach narrative describing how the offeror intends to successfully complete work awarded under this MACC. The narrative plan shall not exceed six (6) singled-sided pages or three
(3) double-sided pages (with the exception of the organizational chart). Information on pages beyond this limit will not be considered. The narrative, at a minimum, must address the following:
• Offeror’s strategy for successful execution of work awarded under resulting contract, managing multiple concurrent projects, and managing the geographic coverage of the contract requirements.
• Offeror’s plan for accomplishing varied Design-Bid-Build projects for general construction.
• The offeror shall describe the roles, responsibilities, and contractual relationships between the various firms that will perform this contract. The narrative shall also include a simple organizational chart that clearly identifies the lines of authority between the entities. (The organizational chart is not part of the page limitation).
• Offeror’s strategy for quality control, compliance with contract documents, cost/budget management, subcontractor management, and schedule requirements.
To:
(1) Solicitation Submittal Requirements:
Offeror shall submit a detailed Management Approach narrative describing how the offeror intends to successfully complete work awarded under this MACC. The narrative plan shall not exceed six (6) singled-sided pages or three
(3) double-sided pages. Information on pages beyond this limit will not be considered. The narrative, at a minimum, must address the following:
• Offeror’s strategy for successful execution of work awarded under resulting contract, managing multiple concurrent projects, and managing the geographic coverage of the contract requirements.
• Offeror’s plan for accomplishing varied Design-Bid-Build projects for general construction.
• Offeror’s strategy for quality control, compliance with contract documents, cost/budget management, subcontractor management, and schedule requirements.
3. Incorporate PPI Responses
Date Submitted
Reference Question Response
Page Section Paragraph
78 3/16/2025 17 / 1219
792 / 1219 929 / 1219
Attachment F.
Specifications
Section 01 30 00
Section 23 09 23.13
Section 28 31 70
The specifications reference (Cybersecurity for Facility-Related Control) but the specifications don't include any specification for cybersecurity (typically 01 50 00).
Is cybersecurity required for the seed project? If yes, please provide the specifications.
01 50 00 will not be included. Please see attached 25 10 00 for cyber specifications
79 3/16/2025 478 / 1219 Attachment
F.
Specifications
Section 07 27 36
Where is spray foam insulation required on this project?
This spec section can be omitted.
80 3/16/2025 A-501 Drawings Note 1
Note 1 states "DETAILS ARE
SHOWN FOR REFERENCE
ONLY. CONTRACTOR TO
ENGAGE A N.C. LICENSED
STRUCTURAL ENGINEER TO
PROVIDE SIGNED AND
SEALED DESIGN FOR A502
DETAILS AND NOTED
ELSEWHERE ON DRAWING."
Please provide Sheet A502
See updated notes on A501.
81 3/16/2025 A-501 Drawings Note 2
Note 2 states "FIELD VERIFY:
THE CONTRACTOR MUST
FIELD VERIFY ALL THE
CONDITIONS SHOWN. THESE
DETAILS ARE BASED ON
DATA FROM THE 1984
ORIGINAL CONSTRUCTION
DOCUMENTS. REFER TO
SOLICITATION FOR OTHER
INFORMATION."
Please provide the original construction documents and as-builts.
Original construction documents and as-builts will be provided after award.
82 3/16/2025 A-501 Drawings Note 5
Note 5 states "ROOF WORK: ALL
ROOF WORK MUST BE
COORDINATED WITH THE
ROICC. BUILDING STRUCTURE
MUST BE KEPT WATERTIGHT
AT ALL TIMES" It doesn't appear work is required on the roof, only insulation inside of the trusses.
What roof work is required?
Penetrations for plumbing and mechanical are required. See updated M001 and P501
83 3/16/2025 A-501 Drawings Note 8
Note 8 states "BUILDING
ENVELOPE: COMPLY WITH
ASHRAE 90.1 FOR THE
REQUIRED U AND R-VALUES"
This project is design-bid-build and insulation thicknesses, and R-values are provided in the drawings.
Shall the offeror bid the project per the prescribed insulation thicknesses and R-values provided in the drawings?
Yes, provide insulation per drawings. Report any discrepancies to the government prior to work proceeding.
84 3/16/2025 A-501 and
A-202 Drawings
Sheet A-501 indicates that most walls have an STC rating of 45.
However, the door schedule on A- 202 does not indicate STC ratings for the thirty-six (36) new wood doors. Section 08 14 00-Wood Doors indicates Acoustical Doors to have a Sound Transmission Class rating of 35. Section 08 11 13-Steel Doors and Frames is silent on STC ratings (related to the new steel frames to which will accept the new wood doors). Typically, the STC rating of new door/frame assemblies is required to match the STC rating of the wall assembly.
Please confirm the minimum STC ratings for the door assemblies (doors and frames).
Minimum door and frame STC rating is 35.
85 3/16/2025 A-501 and
A-202 Drawings
Due to the additional weight of STC rated wood doors, it is common to install Pressure Treated 2x framing added to both sides of the door jambs from floor to structure above.
Shall the offeror include additional framing?
Yes, provide additional framing to match.
86 3/16/2025 410 / 1219 555 / 1219
Specification
Section 05 40 00 1.7
Section 09 22 00 2.1.2.2
Section 05 40 states a minimum of 20 gauge for framing members and Section 09 22 provides a minimum of 26 gauge for non-structural framing members.
Please confirm Section 05 40 00
1.7 is the correct framing gauge requirements.
20 gauge is typical per 05 40 00. 26 gauge should be used for wall hung items per 09 22 00 i.e. cabinetwork, equipments, and fixtures.
87 3/16/2025 A-105 Drawings General Note 1
General Note 1 on A-105 states, “All VMR’s covers shall be removed, stored off site, and reinstalled in the same location on top of finish flooring.”
Please provide a brief description of “VMR’s” so the Contractor may properly price this work.
See provided pictures.
VMR is the location where the Vapor Intrusion Mitigation System (VIMS) can be tested. Environmental Department comes out monthly, removes the caps, and uses equipment to test the flow of vapors.
88 3/16/2025 A-105 Drawings
A-105, Room #313 Notes indicates the Telecom Rm is receive “spec compliant fire rated backboard along all walls. Section 27 10 00 discusses “backboard” and para.
2.7.13 indicates “Fire Rated int. grd ¾” plywood, 4x8 feet.”
Shall the offeror install the backerboard from floor to finish ceiling?
Yes, install from floor to finish ceiling.
89 3/16/2025 A-202 Drawings Note 4
The door schedule requires installing a new lintel for new 3068 door/frame in masonry wall.
Shall this be designed and engineered by licensed N.C structural engineer?
See updated sheet A202.
90 3/16/2025 A-202 Drawings
A-202 indicates there are two (2) sign types (e.g., Type A and Type B). Section 10 14 00.20 para. 2.2 indicates two different sign standards (e.g., Sign Std. 1:
commercial grade acrylic or ABS;
and Sign Std. 2: Extruded aluminum frame with all other components same as Sign Std 1).
Which sign type is required at each location?
Utilize sign Std. 1 for both sign types.
91 3/16/2025 667 / 1219 Specifications 10 14
00.20 2.5
Where are building directories required?
How many are required?
How many rooms on each directory?
Building directories are not required.
92 3/16/2025 576 / 1219
A-501 Specifications
Drawings 09 51 00
2.3.1
Section 09 51 00, paragraph 2.3.1- Wires indicates hanger wires to be 0.11-inch diameter, zinc-coated steel. Detail 10 on A-501 indicates 12 GA stainless steel hanger wire.
What is the hanger wire requirement?
Follow spec 09 51 00.
See updated A-501.
93 3/16/2025 M-001 Drawings
Sheet M001 Temporary HVAC Notes requires the Contractor shall provide, install and maintain three
(3) temporary heating and cooling units for the admin offices for the duration of the project. It also states the minimum cooling capacity of each unit to be 12,000 BTU/HR.
Considering this project has a 446-calendar day Period of Performance, the duration of heating and cooling will depend on the date the project is awarded.
1. What shall be the assumed date of award?
2. Is the offeror permitted provide heating and cooling on an as needed basis instead of for the entire project?
Provide temporary heating and cooling for the duration of construction
94 3/16/2025 M-104 Drawings Keynote
#2
The drawings illustrate two 8” exhaust ducts through the roof with roof cap.
1. Are there penetrations existing for these exhausts?
2. Is the roof under a warranty?
(if yes, what company installed this roof)
3. Will new penetrations void the roof warranty?
1. There is one existing penetration that shall be modified for new duct.
Contractor shall provide new penetration for additional exhaust duct.
2. Yes, Quality Roofers
3. Coordinate new/modified penetrations to maintain roof warranty.
95 3/16/2025 M-601 Drawings
Sheet M-601, Over Range Microwave Oven Schedule uses Mark “MW-1”. We cannot find MW-1 in the drawings anywhere.
How many MW-1s are required and where are they located?
MW-1's is removed from this contract. See updated mechanical sheets.
96 3/16/2025 M-601 A-104
Drawings
Sheet M-601, Over Range Microwave Oven Schedule and also Sheet A-104, FF&E Keynote #3, which indicates “New countertop microwave by others-NIC”.
Is the offeror to provide any other microwaves besides the ones we inquired on in the question above?
Contractor will not provide any microwaves in this contract.
97 3/16/2025 M-601 Drawings
Sheet M-601, Over Range Microwave Oven Schedule Note #1 states, “Provide pre-engineered wet chemical residential fire hood suppression system with electric shutoff.” We didn't find other information on this chemical residential fire hood suppression system with electric shutoff in the specifications.
What are the specifications for this wet chemical residential fire hood suppression system with electric shut off?
See attached fire suppression specification.
98 3/16/2025 932 / 1219 Specifications Section 28
31 70
The specifications require a Qualified Fire Protection Engineer
(QFPE).
May the QFPE be directly employed by a potential subcontractor?
Other than the contractual obligations with the Prime Contractor, the QFPE must have no other business relationship (i.e., employee, owner, partner, operating officer, distributor, salesman, technical representative, family relationship, or financial investment) with the Prime Contractor or subcontractors.
99 3/16/2025 958 / 1219 Specifications 28 31 70
Paragraph 3.10 indicates “Repair services and replacement parts for the fire alarm system must be available for a period of 10 years.
During the warranty period, the service technician must be on-site within 24 hours after notification and all repairs must be completed within 24 hours of arrival on-site.”
Please confirm the “warranty period” above is referring to the one-year construction warranty referenced in Section 01 78 00.
Confirmed the warranty period is for the one-year construction warranty.
100 3/16/2025 M-602 Drawings Note #1
The VAV Schedule Note #1 states, “Provide 120 VAC to 24 VAC transformer to power units along with wiring from transformer to units.” Sheet E-104, Work Notes #3 states, “…Provide new connections for VAV’s.”
Shall the new raceways and wiring be provided for powering the VAVs?
Yes, new raceways and wiring shall be provided for powering the VAVs.
101 3/16/2025 E-104 Drawings Note #1
Sheet E-104, Work Notes #1 states, “Provide new power and communication plan.” The drawings appear to provide this plan.
Shall the offeror provide a new plan/design?
This note is intended to instruct the contractor, in the broadest terms, to provide all necessary power and communication requirements for 300 wing as specified and guided by the electrical drawings. A full new design is not required nor intended.
102 3/16/2025 18 / 1219 Specifications 01 30 00
1.10
Section 01 30 00, paragraph 1.1 requires "Partnering, the Contractor is required to host a Facilitated (Formal) Partnering session. As further described in this section, the Contractor must include all costs associated with this Formal Partnering session including the third-party independent Facilitator Consultant, an “off base” meeting room and other incidental items (e.g. audio-visual equipment, easels, flipchart paper, colored markers, note pads, pens/pencils, colored flash cards). In addition, the Contractor must include all costs associated with hosting follow-on Partnering sessions (including the independent facilitator) @ three to six month intervals."
Will the Navy allow the follow-on Partnering sessions be held at the Contractor’s Construction trailer or must they also be held “off base”?
Yes, future partnering sessions will be held at the Contractor's construction trailer
103 3/16/2025 A-101 Drawings Demolition Note #19
Demolition Note #19 references “Bid Option A”. The CLINs are 0001 - 0003.
Shall demolition note 19 be included in CLIN 0001?
Yes, demo and installation of new windows shall be included in CLIN0001
104 3/16/2025 A-204
532 / 1219 Drawings
Specifications
Window Schedule 08 11 13
Sheet A-204 requires Pre-finished Aluminum frames with Clear glazing and “PVDF” coating.
Section 08 11 13 references Section 08 51 13-Aluminum Windows, however, this Section is not included in the Project Specifications.
Please provide Section 08 51 13.
New windows shall match existing.
105 3/16/2025 not specified
Is the offeror permitted to utilize space inside of the building for our onsite staff, in lieu of a project trailer?
No, Contractor shall provide his own office space.
106 3/16/2025 Amendment
Attachment K
For the base bid pricing, shall the offeror include hazmat abatement only in the areas indicated in attachment K and on Sheet A-101 (wall to wall in locations hazmat is present)?
No, assume all existing flooring contains asbestos.
107 3/16/2025 not specified
While the fire alarm system not on, is the offeror required to provide fire watch personnel?
Yes, provide fire watch personnel.
108 3/16/2025 415 / 1219 Specification 05 52 00
The specification is for metal railings though the drawings do not indicate any metal railings.
Where are metal railings required, if applicable?
Metal railings are not required. This spec section can be omitted.
109 3/16/2025 Site visit
There are many rooms in the building with existing furniture (chairs, desks, tables, etc.).
Is the offeror responsible for disposing these items?
Yes, contractor shall dispose of existing items. See Demolition General Note #9 on A101.
110 3/16/2025 A-501 Drawings Detail 10
Will the Navy provide a detail for the duct penetrations through the 1-hour rated ceiling?
Yes, see updated architectural and mechanical drawings with assembly
111 3/16/2025 M-501 Drawings Detail 3
Does this duct penetration detail meet the 1-hour fire rating requirements?
See updated architectural and mechanical drawings with assembly
112 3/16/2025 A-202 Drawings Detail 5
Will the Navy consider allowing a frame to not wrap the CMU for existing openings. It's typical to have each side of the jamb and head sit on the CMU to provide a sturdy connection. Further, Door Schedule Note #1 states “All H.M. frames to be welded.” Installing a welded hollow metal frame into an existing opening and still wrap the CMU wouldn't be possible. Please see image below
Only door 335 is installed in a CMU wall. It has a steel frame, and the contractor will need to cut a new opening for the installation of the door.
113 3/16/2025 A-202 Drawings Door
Schedule
Door #302C Remarks state “See room finish schedule for hardware.”
The Room Finish Schedule on Drawing Sheet A-105 does not indicate any hardware.
What are the door hardware requirements?
HDW-1 in finish legend on A105 should be utilized for Door 302C (kitchen closet)
114 3/16/2025 A-202 Drawings Door
Schedule
Drawing Sheet A-202, Door Schedule, Door #302C indicates a wood frame. Wood frames are not common for 1-3/4” thick wood doors.
Could the Navy provide a basis of design for the wood frame?
See updated sheet A202.
115 3/16/2025 A-202 Drawings Door
Schedule
Door #335 indicates hardware set HW-3. The threshold listed in HW- 3 states “1 ea. Threshold J32130 AL.” J32130 is an aluminum, flat saddle, fluted surface, barrier free.
AL typically means aluminum.
Detail #9 states “Stainless steel threshold.)
What type of threshold is required?
See updated sheet A202.
116 3/16/2025 544 / 1219 Specifications Keying System
Specification Section 08 71 00,
2.3.4 states to provide an extension of an existing keying system.
What is the keying system requiring extension?
Contractor to coordinate with ROICC during construction
117 3/17/2025 Please confirm that there is no FF&E or HAR for the contractor on this project?
Confirmed there is no FF&E on this project or HAR on this project.
118 3/17/2025 Please confirm that no SCIF walls need to be penetrated to complete construction?
Confirmed there is no SCIF in this project
119 3/17/2025
Please confirm that no exterior painting is required?
Exterior touch up paint can be expected with the installation of the new windows.
120 3/17/2025 Are the digital controls proprietary?
If so, who is the contractor?
See 23 09 0 specification.
121 3/17/2025
Is the fire alarm equipment proprietary?
Existing fire alarm control panel is Simplex 4010 Fire Alarm Control. New NAC will need to be compatible with that system. See FP101
122 3/17/2025 General/ Site
Visit
Will the government be responsible for removing all the existing furniture in each room that is to be renovated? If the contractor is to remove the furniture, are we to dispose of the furniture or turn them over to the government?
Yes, contractor shall dispose of existing items. See Demolition General Note #9 on A101.
123 3/17/2025 2 01 30 00 1.7.1
Can the site superintendent dual hat as the QC Manager per spec section 01 30 00, para 1.7.1? And confirm that a separate SSHO will have to be provided for this project.
Confirmed, the superintendent can dual hat as QC Manager.
Confirmed that a separate SSHO will be provided.
124 3/17/2025 4 01 32 17.00
1.9
Can the contractors certified scheduler provide monthly updates via teleconference, or will they have to be onsite each month for the updates?
Contractor's certified scheduler shall be onsite each month for updates.
125 3/17/2025 4 01 30 00 1.10.1
Is there a location where the government would prefer the formal and follow up partnering meetings to be held?
No preference for location of the initial "off base" partnering session location.
Future follow-on partnering sessions will be held at the Contractor's construction trailer
126 3/17/2025 A-101
1. A101 Demolition general note #9 “Assume any locations with existing floor material and the sinks in the area of work have asbestos”.
Should we assume all existing flooring has asbestos? Attachment K the asbestos inspection report shows only rooms 300, 301, 305, 306, 307, 308, 309, and 310 having asbestos flooring materials.
Yes, assume all existing flooring contains asbestos.
127 Page 1 01 11 00 1.2
“Within the overall project schedule, commence and complete the work in phases as described in the attached project description”.
Please provide phasing information.
No phasing is required for this project.
128 02 42 41 Will existing carpets need to be reclaimed as described in this spec?
No, the existing carpets will not be reclaimed.
129 Page 8 02 41 00 3.1.10
Will lumber, millwork, and finished boards need to be sorted by type and size for salvage?
No, existing lumber, millwork, and finished boards will not need to be sorted by type and size for salvage
130 Page 8 02 41 00 3.1.12
Will acoustical ceiling tiles need to be neatly stacked for salvage?
No, the existing acoustical ceiling tiles will not need to be neatly stacked for salvage
131 Page 9 02 41 00 3.1.17
If mechanical equipment is to be turned over to government, where will it need to be delivered to?
Government shall have first right of refusal for all DDC equipment.
132 A-101 Notes 18 &
Will an engineered shoring plan be required? Engineered shoring plan will need to be provided by the government.
Engineered shoring plan is not required.
133 A-102 Note 16
All VMRs covers shall be removed.
Please confirm what is VMR? Is this going to be removed by the Government or the Contractor?
See provided pictures.
VMR is the location where the Vapor Intrusion Mitigation System (VIMS) can be tested. Environmental Department comes out monthly, removes the caps, and uses equipment to test the flow of vapors.
Which walls are fire rated? See walls identified on
LS101.
Why are 20min doors called for in 1hr fire rated walls?
Because the door is part of a corridor separation
136 3/17/2025 01 33 00 1.2.1
Please confirm that compliance with UFC 1-200-02 HPSB Guiding Principles is required for this project. The submittal list requires the HPSB Guiding Principles Checklist, and the Executive Order requiring Guiding Principles sustainability requirements is listed in the specifications document.
This is not required.
137 3/17/2025 01 33 00 1.2.1
Please confirm whether Third Party Certification for HPSB Guiding Principles is required, as the project building exceeds the 10,000-sf eligibility threshold in Table 1-1 of
UFC 1-200-02.
This is not required.
138 3/17/2025 01 33 00 1.2.1
Section 01 33 29 Sustainability Reporting is referenced several times in the specifications, however, there is no section 01 33 29 provided. Please confirm if this section will be provided, or alternatively, if there are no sustainability reporting requirements.
This is not required.
139 3/17/2025
Please confirm that the Electrical and Telecommunication QC specialist is only required to be on-site while electrical and telecommunication work is being performed.
Confirmed
140 3/12/2025 Att. F Division 8 The window/glazing spec is missing, please provide.
New windows shall match existing.
141 3/12/2025 Plans Division 8 Please provide exterior elevations. Exterior elevations will not be provided.
142 3/12/2025 Plans Division 8
Per bid documents, Demolition Plan (Reference Sheet number A-101) and Renovation Plan (Reference Sheet number A-102) mismatch, As Doors are shown existing on demolition plan but as per door schedule (Reference Sheet number A-202) they have asked for new doors. Please provide the updated information.
Existing door will be demoed and replaced with new doors.
143 3/17/2025 02 82 16
Listed in Demolition General Notes on Drawing A-101: #9 states, “Properly abate and dispose of all lead and asbestos material in project area. Assume any locations with existing floor material and the sinks in the area of work have asbestos.
Removal and disposal of asbestos materials should be in compliance with spec section 02 82 16”. Is there an available asbestos survey or report to see results and what areas were tested? Does existing Floor Material include Tile and Mastic? Did anything come back positive for Lead? In areas with carpet, does the VCT run underneath it, and is that positive for asbestos?
"21-0019 Asbestos Inspection Report" has been provided.
144 3/17/2025 Bid Form
On the bid form, it has line items for additional asbestos at 3,000 SF and lead at 1,000 SF but doesn't identify what kind. Flooring is cheaper than fireproofing, for example.
"21-0019 Asbestos Inspection Report" has been provided.
145 3/17/2025
The bid documents have a line item that says to include 3000 sqft of asbestos and lead at 1000s sqft.
Need clarification on what TYPE of asbestos.
"21-0019 Asbestos Inspection Report" has been provided.
146 3/17/2025 Fp-101
Drawing FP-101 doesn’t show a smoke detector at the new NAC panel. Should a smoke detector be provided at the NAC panel per 2022
NFPA 72 §10.4.5?
Per FP101 Fire protection keynote #2 "Modify existing slc circuit to connect all addressable devices in the renovated area including door holders relay modules, smoke detectors, and pull stations."
147 3/17/2025 E-104
Work note #7 on drawing E-104 requires 24V power for new electromagnetic door holders. Spec 28 31 70 §2.15.2 requires door holders to operate on 120VAC.
Please clarify electrical requirements for door holders.
Electromagnetic door holders shall be 24V.
148 3/17/2025 A-1101
Fire alarm demolition note on drawing A-101 requires existing fire alarm system to be tested “before proceeding with any work related to this project”. Please clarify required scope of this preliminary testing.
Testing a Simplex 4010 Fire Alarm System requires following proper procedures to ensure safety and compliance with NFPA 72 standards. Here’s a step-by-step guide to performing a basic system test:
1. Notify Authorities & Building Occupants:
Inform the monitoring station and local fire department (if system is monitored) to avoid false alarms. Notify building occupants of the test to prevent panic.
2. Access the Simplex 4010 Control Panel:
Open the fire alarm control panel (FACP) using the access key.
Enter the authorized user password if prompted.
3. Initiate the Test Mode: Navigate to System Test Mode in the menu. This mode prevents alarms from triggering external monitoring stations but still allows system function testing.
4. Test Notification Appliances (Alarms & Strobes): Activate a manual pull station to verify proper alarm activation. Check that strobes flash and horns/speakers sound correctly. Reset the pull station after activation.
5. Test Smoke & Heat Detectors: Use a canned smoke tester for smoke detectors. Use a heat gun (not an open flame) for heat detectors.
Confirm that each detector triggers the alarm and is displayed on the panel.
6. Verify System Communication & Signals: Check that the panel receives and displays each alarm signal correctly. If connected to a monitoring station, confirm the signal was received.
7. Reset the System:
Once testing is complete, reset each activated device (e.g., smoke detectors, pull stations): On the 4010 panel, press the “System Reset” button to clear alarms and restore normal operation.
8. Log the Test & Restore Normal Operation: Record the test results, including device activations and any issues found.
Notify the monitoring station and building personnel that the system is back in normal operation.
149 3/17/2025 E-101
General note #1 on drawing E-101 requires compliance with the North Carolina State Building Code. Other drawings reference IBC. Please specify governing building code and extent to which state/local codes apply.
Governing code shall be IBC.
4. Incorporate Revised Specifications and Drawings
In support of the PPI responses providd above, the following revised specifications and drawings are attached:
32 72 33 Amendment 2 25 05 11.00 A-105 A-202 A-501
E-101 E-102 E-103 E-104 E-105 E-106 E-107 M101 M103 M104 M501 M601 M602 M802 T-1 VMR capped VMR uncapped
5. Update Applicable Clauses and Provisions
Updated clauses and provisions have been incorporated into the appropriate sections below.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 03-Apr-2025 02:00 PM to 09-Apr-2025 02:00 PM.
SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS
The following have been added by full text:
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2025-O0003/ DEVIATION
2025-O0004) (MAR 2025)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is [insert NAICS code].
(2) The small business size standard is [insert size standard].
(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition--
(i) Is set aside for small business and has a value above the simplified acquisition threshold;
(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or
(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph
(d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
[ ] Paragraph (d) applies.
[ ] Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(vi) 52.204-26, Covered Telecommunications Equipment or Services--Representation. This provision applies to all solicitations.
(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations--Representation.
(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.
(x) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.
(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).
(xiv) [Reserved]
(xv) [Reserved]
(xvi) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial products or commercial services.
(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of biobased products in USDA-designated product categories; or include the clause at 52.223-2, Reporting of Biobased Products Under Service and Construction Contracts.
(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.
(xix) [Reserved]
(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xxi) 52.225-4, Buy American-Free Trade Agreements-Israeli Trade Act Certificate. (Basic, Alternates II and III.)
This provision applies to solicitations containing the clause at 52.225-3.
(A) If the acquisition value is less than $50,000, the basic provision applies.
(B) If the acquisition value is $50,000 or more but is less than $100,000, the provision with its Alternate II applies.
(C) If the acquisition value is $100,000 or more but is less than $102,280, the provision with its Alternate III applies.
(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.
(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.
(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.
(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.
(2) The following representations or certifications are applicable as indicated by the Contracting Officer:
[Contracting Officer check as appropriate.]
(i) 52.204-17, Ownership or Control of Offeror.
(ii) 52.204-20, Predecessor of Offeror.
(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
(iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.
(v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.
(vi) 52.227-6, Royalty Information.
(A) Basic.
(B) Alternate I.
(vii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.
(d) The Offeror has completed the annual representations and certifications electronically in SAM accessed through https://www.sam.gov. After reviewing the SAM information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [ offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR Clause Title Date Change
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.
(End of provision)
The following have been deleted:
52.204-8 Annual Representations and Certifications MAY 2024
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been added by reference:
52.212-3 (Dev)(RMBO)
Offeror Representations and Certifications - Commercial Products and Commercial Services (DEVIATION 2025-
O0003/ DEVIATION 2025-O0004)
MAR 2025
52.212-5 (Dev)(RMBO)
Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Products and Commercial Services (Deviation 2025-O0003/ Deviation 2025-O0004)
MAR 2025
52.213-4 (Dev) Terms and Conditions--Simplified Acquisitions (Other Than Commercial Products and Commercial Services)
(DEVIATION 2025-O0003 /DEVIATION 2025-O0004)
MAR 2025
52.222-9 (Dev) Apprentices and Trainees (DEVIATION 2025-O0003) MAR 2025 52.223-10 (Dev) Waste Reduction Program (DEVIATION 2025-O0004) MAR 2025 52.223-23 (Dev) Sustainable Products and Services (DEVIATION 2025-
O0004)
MAR 2025
52.244-6 (Dev) Subcontracts for Commercial Products and Commercial Services (DEVIATION 2025-O0003)
MAR 2025
The following have been deleted:
52.222-9 Apprentices and Trainees JUL 2005 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-23 Notice of Requirement for Affirmative Action to Ensure
Equal Employment Opportunity for Construction
FEB 1999
52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for
Construction
APR 2015
52.223-19 Compliance with Environmental Management Systems MAY 2011 52.223-23 Sustainable Products and Services. MAY 2024 52.244-6 Subcontracts for Commercial Products and Commercial