N4008524R2785 Amendment 0007.pdf
PDF 148 KB Posted
- Solicitation number
- N4008524R2785
About this file
This document is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for an Indefinite-Delivery Indefinite-Quantity (IDIQ) Small Business Multiple Award Construction Contract for general construction projects primarily at Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point in the NAVFAC MIDLANT Marine Corps Installation East Area of Responsibility. The procurement is a total small business set-aside, and Amendment 0007 serves two primary purposes: 1) incorporating Preliminary Price Information (PPI) Responses and 2) incorporating a Revised Specification M101.
The amendment addresses specific Request for Information (RFI) clarifications, including questions about fire suppression specification for a pre-engineered wet chemical fire hood system and lead abatement provisions. Additionally, the amendment confirms that the project superintendent can dual hat as the Quality Control (QC) Manager, with a separate Site Safety and Health Officer (SSHO) to be provided. The government has provided responses to contractors' questions regarding project staffing, specification interpretations, and scope details, with the full revised specification M101 to be attached separately.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Indefinite-Delivery Indefinite-Quantity Small Business Multiple Aw ard Construction Contract for General Construction Projects Primarily aboard Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point in the NAVFAC MIDLANT Marine Corps Installation East Area of Responsibility
This procurement is being solicited as a total small business set-aside.
All correspondence regarding this solicitation shall be directed via email to Jonathan Durham at jonathan.m.durham.civ@us.navy.mil
See Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Apr-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008524R2785
X 9B. DATED (SEE ITEM 11)
11-Feb-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Apr-2025
CODE
NAVFACSYSCOM MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008524R2785
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0007
The purpose of this amendment is to:
1. Incorporate PPI Responses
2. Incorporate Revised Spec M101
1. Incorporate PPI Reponses
Date Submitted
Reference
Question Page Section Paragraph
04/02/25 RFI 97
Per RFI #97, it states that a fire suppression specification was provided in amendment 06, but this has not been provided per the comments in the drawings for a pre-engineered wet chemical fire hood suppression system. Please provide the specification for this scope.
See range hood specification in 23 73 33
04/02/25 RFI 144
Per RFI# 144 it states that lead abatement should be provided per the attachment K Asbestos report per Amendment 01. There was no lead testing or quantities stated in the Asbestos report. Therefore, lead abatement can't be priced without a testing report and quantities provided.
Additionaly, per the bid schedule, it states we are to give a price for 1000SF of lead abatement. Please also provide additional details of what the 1000SF of lead abatement should include.
The building has already been abated for lead, so there is no report. The bid item for the 1000SF of lead abatement covers any unforeseen lead that may be discovered during construction.
N4008524R2785
04/02/25
Amendment 0006, 01 45 10 and 01
35 29
Question from Amendment 0006: Can the site superintendent dual hat as the QC Manager per spec section 01 30 00, para 1.7.1? And confirm that a separate SSHO will have to be provided for this project.
Government response: Confirmed, the superintendent can dual hat as QC Manager. Confirmed that a separate SSHO will be provided. From the Specifications and Description of Work: One person may fill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer, if duly qualified for all three positions as defined in the project specification.
Specification 01 45 10, paragraph 1.5.1.1 (Duties) states, "In addition to managing and implementing the QC program, the QC Manager may perform the duties of project superintendent." The government offers (2) specifications for an SSHO with 01 35 29, stating the SSHO is required to be a Level 2, which has minimal requirements for Site Safety and Health.
Paragraph 1.7.2.1, further states Site Safety and Health Officer (SSHO)/Superintendent (combined).
Please review and confirm the required field staff.
The superintendent can dual hat as QC Manager and a separate SSHO will be provided
2. Incorporate Revised Specification M101
Revised Specification M101 is attached separately.
(End of Summary of Changes)