This document is an Electrical Demolition Plan (E-102) for the Design Wing Relocation in Building 1005 at Marine Corps Base Camp Lejeune. The plan details comprehensive electrical demolition requirements, including the removal of receptacles, communication outlets, luminaires, switches, emergency lighting, exit signs, and electrical components associated with HVAC systems. Key demolition specifications include:

Specific requirements include preserving the existing fiber optic line in the 300 Wing, safely storing mass notification system speakers, demolishing panelboards L1, L2, and M, and rerouting circuits passing through the work area. The contractor must coordinate power outages with the government, obtain permission at least 5 days before disabling any systems, and maintain access to active electrical installations. The plan emphasizes field verification of all circuits, wiring, conduit, and dimensions, with routing to be determined by the contractor while adhering to industry standards and avoiding interference with existing utility systems.

View the file

Other files

File Type Posted
N4008524R2785 Amendment 0007.pdf PDF
A-202.pdf PDF
E-106.pdf PDF
M802.pdf PDF
23 73 33_Amendment 2.pdf PDF
E-103.pdf PDF
E-104.pdf PDF
E-107.pdf PDF
M601.pdf PDF
N4008524R2785 Amendment 0006.pdf PDF
VMR- uncapped.jpg JPG image
E-101.pdf PDF
E-105.pdf PDF
M103.pdf PDF
M104.pdf PDF
M602.pdf PDF
VMR- capped.jpg JPG image
N4008524R2785 Amendment 0005.pdf PDF
N4008524R2785 Amendment 0004.pdf PDF
Attachment Q - Revised Drawings.pdf PDF
23 09 23.13 20 Attachment 5.pdf PDF
01 32 16.00 20.pdf PDF
22 00 00.pdf PDF
23 09 23.13 20 Attachment 2.pdf PDF
23 09 00.pdf PDF
23 09 23.13 20 Attachment 4.pdf PDF
23 09 13.pdf PDF
23 09 23.02.pdf PDF
Attachment M - Specifications TOC.pdf PDF
Attachment N - Revised Eletrical-Telecomm Sheets.pdf PDF
Attachment O - Revised Specs pg3.pdf PDF
N4008524R2785 Amendment 0003.pdf PDF
Attachment P - Site Visit Log.pdf PDF
N4008524R2785 Amendment 0002.pdf PDF
Attachment I - Site Visit Information REVISED.pdf PDF
Attachment J - Site Visit Participant Log.xlsx XLSX spreadsheet
Attachment L - Electrical Room.pdf PDF
Attachment I - Site Visit Information.pdf PDF
N4008524R2785 Amendment 0001.pdf PDF
Attachment K - Asbestos Inspection Report.pdf PDF
N4008524R2785 Small Business Marine Corps MACC for General Construction.pdf PDF
Attachment A - PPI LOG TEMPLATE.xlsx XLSX spreadsheet
Attachment B - CONSTRUCTION AND DESIGN EXPERIENCE PROJECT DATA.docx DOCX document
Attachment E - B1005 Drawings.pdf PDF
Attachment F - B1005 Specifications.pdf PDF
Attachment H - PIEE VENDOR ACCESS INSTRUCTIONS.pdf PDF
N4008524R2785 Small Business Marine Corps MACC for General Construction.pdf PDF
Attachment C- PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
Attachment D - B1005 Price Proposal Form.docx DOCX document
Attachment G - B1005 Statement of Work.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X X

X X

AREA OF WORK

AREA OF WORK

S

S S

S S

S S

S S

SS

S

S

S

SS

S

S

S S

S

S S

S S

S

S S

S

S S

S

S

S S

S

S S

S

S

S S

S

S S

CONST. CONTR. NO.

REVISION 1.2 E-102

K. BROWN

K. BROWN

K. BROWN

K. ROOT

F. ORR

DESIGN WING RELOCATION

BUILDING 1005

DEMOLITION PLAN

60036662 21-0019

NOTED NA 15 36

TR

UE

NORTH

PL

AN

N O

R

TH

0 10' 20' 40'5'

GENERAL NOTES

1. THE CONTRACTOR MUST REVIEW THE ELECTRICAL DRAWINGS AND SPECIFICATIONS AND CARRY OUT HIS WORK IN A COMPATIBLE AND

COMPLEMENTARY MANNER. SURVEY THE AFFECTED AREAS AS ALL EXISTING CONDITIONS ARE NOT COMPLETELY DEPICTED ON THE

DRAWINGS AND SOME UNUSUAL CONDITIONS EXIST.

2. EXISTING ELECTRICAL EQUIPMENT AND DEVICES MUST REMAIN UNLESS SPECIFICALLY NOTED TO BE REMOVED.

3. COORDINATE POWER OUTAGES WITH THE GOVERNMENT. MAINTAIN EXISTING ELECTRICAL SYSTEMS IN SERVICE. DISABLE SYSTEMS ONLY

TO MAKE SWITCHOVERS AND CONNECTIONS. OBTAIN PERMISSION FROM THE CONTRACTING OFFICER AT LEAST 5 DAYS BEFORE PARTIALLY

OR COMPLETELY DISABLING SYSTEM. MINIMIZE OUTAGE DURATION.

4. WHERE THE DURATION OF A PROPOSED OUTAGE CANNOT BE TOLERATED BY THE GOVERNMENT, PROVIDE TEMPORARY CONNECTIONS AS

REQUIRED TO MAINTAIN SERVICE.

5. MAINTAIN ACCESS TO EXISTING ELECTRICAL INSTALLATIONS WHICH REMAIN ACTIVE.

6. THE CONTRACTOR MUST FIELD VERIFY ALL CIRCUITS, WIRING, CONDUIT, DIMENSIONS, POINTS OF ACCESS AND ALL FIELD CONDITIONS

AFFECTING HIS WORK. BEGINNING WORK MEANS THE CONTRACTOR ACCEPTS EXISTING CONDITIONS.

7. PLAN IS A GENERAL REPRESENTATION OF EXISTING CONDITIONS. PLAN DOES NOT REFLECT ALL COMPONENTS OR CONFIGURATIONS. WORK

DESCRIBED HERE-IN SHALL BE APPLIED TO ACTUAL FIELD CONDITIONS. DRAWINGS, AS A REPRESENTATION FOR EXISTING CONDITIONS, HAVE

BEEN SIMPLIFIED FOR CLARITY.

8. ROUTING OF CONDUIT AND CIRCUITS ARE AT THE DISCRETION OF THE CONTRACTOR. ROUTING SHALL ALIGN WITH GENERALLY ACCEPTED

GOOD PRACTICE AND INDUSTRY STANDARDS.

9. CONDUIT AND CIRCUITS ROUTING SHALL BE PROVIDED TO AVOID INTERFERENCE WITH EXISTING UTILITY SYSTEMS.

10. DO NOT SCALE ELECTRICAL DRAWINGS.

KEYED NOTES

ELECTRICAL DEMOLITION PLAN

DEMOLITION NOTES

1. RECEPTACLES: DEMOLISH RECEPTACLES, COMPLETE. (UNO)

2. COMMUNICATION OUTLETS: DEMOLISH OUTLETS, COMPLETE. (UNO). COMMUNICATION OUTLET HOMERUNS ARE IN CONDUIT TO THE 300 WING

TELECOM CLOSET OR THE MAIN TELECOM CLOSET. DEMOLISH HOMERUNS BACK TO COMMUNICATION ROOMS, COMPLETE. NOTE: MAIN

TELECOM ROOM IS LOCATED ON THE DRAWINGS OUTSIDE THE MAIN AREA OF WORK.

3. LUMINAIRES AND SWITCHING: DEMOLISH LUMINAIRES & SWITCHES, COMPLETE. (UNO). DEMOLISH EMERGENCY LIGHTING AND EXIT SIGNS.

4. OTHER: DEMOLISH UNUSED BACKBOXES, LEGACY DEVICES, BASEBOARD HEATING CONNECTIONS. DEMOLISH ELECTRICAL IN THE AREA OF

WORK THAT WILL NO LONGER BE UTILIZED AFTER RENOVATION.

5. HVAC: REMOVE DISCONNECTS, CIRCUITS, CONDUITS, AND RELATED ELECTRICAL SERVING HVAC IDENTIFIED TO BE REMOVED, COMPLETE.

SEE MECHANICAL SHEETS FOR LOCATIONS AND DETAILS.

6. MASS NOTICATION SYSTEM: REMOVE, PRESERVE,AND SAFELY STORE MASS NOTIFICATION SYSTEM SPEAKERS & CONNECTIONS FOR

REINSTALL.

7. DEMOLISH PANELBOARDS L1, L2, AND M. DEMOLISH FEEDERS SERVING L1, L2, AND M. PROTECT CIRCUITS AND FEEDERS ORIGINATING FROM

PANELS L1, L2, AND M THAT SERVE LOADS & SUBPANELS OUTSIDE OF THE AREA OF WORK. THESE CIRCUITS & FEEDERS MUST BE RE-FED

FROM NEW PANELBOARD(S) LA, LB, AND LC.

8. CIRCUITS PASSING THROUGH THE AREA OF WORK MUST BE MAINTAINED. REROUTE WHERE NECESSARY.

9. DEMOLISH COMMUNICATION BACKBOARD(S) IN 300 WING COMM. ROOM.

10. EXISTING FIBER OPTIC LINE IN THE 300 WING MUST BE PRESERVED. PULL FIBER BACK OUT OF THE WORK ZONE AREA SUCH THAT IT CAN BE

RE-EXTENDED TO NEW 300 WING COMM. PRESERVE AND PROTECT FIBER FOR REUSE.

11. DEMOLISH WATER HEATER CONNECTION.

RAISE THE MOUNTING HEIGHT OF EXISTING RECEPTACLES, COMM OUTLETS, CONDUITS, JUNCTION BOXES TO A MINIMUM HEIGHT OF 55" A.F.F. TO ACCOMODATE WALL MOUNTED FURNITURE. SEE ARCHITECTURAL SHEETS FOR ADDITIONAL DETAILS.

DO NOT DEMOLISH ANY ELECTRICAL IN THIS SPACE.

DEMOLISH ELECTRICAL CONNECTIONS TO MECHANICAL/HVAC EQUIPMENT SCHEDULED FOR DEMO. SEE MECHANICAL SHEETS FOR DETAILS.

RELOCATE, REPOSITION, OR RECONFIGURE ELECTRICAL IN THIS SPACE TO ACCOMMODATE NEW MECHANICAL EQUIPMENT AND SPACE REQUIREMENTS. EXISTING GENERAL ELECTRICAL IN THIS SPACE IS TO REMAIN AND BE REUTILIZED.

"L2"

EXISTING

PANELBOARD

"L1"

EXISTING

PANELBOARD

"M"

EXISTING

PANELBOARD

EXISTING 300 WING

COMM. ROOM

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text 80091

AutoCAD SHX Text E1

AutoCAD SHX Text

MARINE CORPS BASE

AutoCAD SHX Text

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND

AutoCAD SHX Text

CAMP LEJEUNE, NORTH CAROLINA

AutoCAD SHX Text

DESIGN DIR.

AutoCAD SHX Text

SUBMITTED BY:

AutoCAD SHX Text

NAVFAC DRAWING NO.

AutoCAD SHX Text

CODE IDENT. NO

AutoCAD SHX Text

SIZE

AutoCAD SHX Text

SPEC.

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

SATISFACTORY TO:

AutoCAD SHX Text

APPROVED: PWO OR OICC:

AutoCAD SHX Text

DR.

AutoCAD SHX Text

DES.

AutoCAD SHX Text

CHK.

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

OF

File details come from the government source that posted it. Updated .