About this file

This is Amendment 0001 to solicitation N4008524R2785 for an Indefinite-Delivery Indefinite-Quantity Small Business Multiple Award Construction Contract for general construction projects at Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point. The amendment provides site visit information (scheduled for March 6, 2025 at 1300 EST at Building 1005, Camp Lejeune), incorporates PPI responses clarifying that the contracts will be for Design-Bid-Build projects only (no Design-Build), and includes an Asbestos Inspection Report and Electrical Room drawing.

The amendment also revises Factor 1 Corporate Experience language to specify that at least one relevant project (either new construction or renovation) must demonstrate experience with a final construction cost of at least $10 million, and modifies Factor 4 Past Performance language regarding CPARS evaluations and PPQ requirements. Additional clarifications include: no contractor-provided commissioning agent is required though contractors must submit necessary reports, no hazmat survey is required for the seed project, and a Telecommunication QC Specialist will be required. The solicitation remains a total small business set-aside.

View the file

Other files

File Type Posted
N4008524R2785 Amendment 0007.pdf PDF
A-202.pdf PDF
E-106.pdf PDF
M802.pdf PDF
N4008524R2785 Amendment 0006.pdf PDF
VMR- uncapped.jpg JPG image
E-101.pdf PDF
E-105.pdf PDF
M103.pdf PDF
M104.pdf PDF
M602.pdf PDF
23 73 33_Amendment 2.pdf PDF
E-103.pdf PDF
E-104.pdf PDF
E-107.pdf PDF
M601.pdf PDF
VMR- capped.jpg JPG image
T-1.pdf PDF
N4008524R2785 Amendment 0005.pdf PDF
N4008524R2785 Amendment 0004.pdf PDF
Attachment Q - Revised Drawings.pdf PDF
23 09 23.13 20 Attachment 5.pdf PDF
23 09 00.pdf PDF
23 09 23.13 20 Attachment 4.pdf PDF
01 32 16.00 20.pdf PDF
22 00 00.pdf PDF
23 09 23.13 20 Attachment 2.pdf PDF
23 09 13.pdf PDF
23 09 23.02.pdf PDF
Attachment N - Revised Eletrical-Telecomm Sheets.pdf PDF
Attachment O - Revised Specs pg3.pdf PDF
Attachment M - Specifications TOC.pdf PDF
N4008524R2785 Amendment 0003.pdf PDF
Attachment P - Site Visit Log.pdf PDF
N4008524R2785 Amendment 0002.pdf PDF
Attachment I - Site Visit Information REVISED.pdf PDF
Attachment I - Site Visit Information.pdf PDF
Attachment J - Site Visit Participant Log.xlsx XLSX spreadsheet
Attachment L - Electrical Room.pdf PDF
Attachment K - Asbestos Inspection Report.pdf PDF
N4008524R2785 Small Business Marine Corps MACC for General Construction.pdf PDF
Attachment A - PPI LOG TEMPLATE.xlsx XLSX spreadsheet
Attachment B - CONSTRUCTION AND DESIGN EXPERIENCE PROJECT DATA.docx DOCX document
Attachment E - B1005 Drawings.pdf PDF
Attachment F - B1005 Specifications.pdf PDF
Attachment H - PIEE VENDOR ACCESS INSTRUCTIONS.pdf PDF
N4008524R2785 Small Business Marine Corps MACC for General Construction.pdf PDF
Attachment C- PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
Attachment D - B1005 Price Proposal Form.docx DOCX document
Attachment G - B1005 Statement of Work.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Indefinite-Delivery Indefinite-Quantity Small Business Multiple Aw ard Construction Contract for General Construction Projects Primarily aboard Marine Corps Base Camp Lejeune and Marine Corps Air Station Cherry Point in the NAVFAC MIDLANT Marine Corps Installation East Area of Responsibility

This procurement is being solicited as a total small business set-aside.

All correspondence regarding this solicitation shall be directed via email to Jonathan Durham at jonathan.m.durham.civ@us.navy.mil

See Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Feb-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008524R2785

X 9B. DATED (SEE ITEM 11)

11-Feb-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Feb-2025

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008524R2785

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0001

The purpose of this amendment is to:

1. Provide Site Visit Information

2. Incorporate PPI Responses

3. Incorporate the Asbestos Inspection Report

4. Incorporate the Electrical Room drawing

5. Revise Factor 1 Language

6. Revise Factor 4 Language

1. Provide Site Visit Information

Site Visit Date: 06 March 2025 Site Visit Time: 1300 EST Site Visit Location: Building 1005, Michael Road, Camp Lejeune, NC

Please see “Attachment I - Site Visit Information” for more information.

2. Incorporate PPI Responses Number LEAVE

BLANK

Reference Question Response

Page Section Paragraph

1 1.3.1 There is no mention of Design- Build (DB), only DBB, while your NAICS code of 236220 is for both DB and DBB. Additionally, the pre-solicitation indicated a mix of DB and DBB. Can you clarify if there will be a Design-Build aspect of this contract or if it is solely Design-Bid-Build?

The solicitation and resultant contracts will be for DBB projects only.

2 6 of 87 1. General 4 This section states that the Evaluation Factors for Award under Factor 3 include a Management Approach and Schedule, however, detailed instructions for Factor 3 on page 14 of 87 do not mention any requirement for a Schedule. Please confirm that a schedule IS NOT required for the Technical Proposal.

Schedule is not required as part of the technical proposal.

3 14 of 87 1. General 4.3.b. The instructions for Factor 4 Past Performance state: "...the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1 for both construction and design experience."

"Design Experience" is not a requirement under Factor 1, Corporate Experience. Please confirm that design experience is NOT required under Factor 1 and Factor 4.

Design Experience is not required for Factor 1 and Factor 4.

4 9 of 87 1. General 4.3.b. Will the government consider projects that are substantially complete but still underway in the evaluation for Factor 1, Corporate Experience, or must all projects be 100% complete?

No. All projects must be 100% complete.

5 E104 Note 10 Indicates EC is to provide new conduit for communication fiber them tells to match the sizing of existing comm room conduit. I checked the communication riser detail on E107 and there is no indication of current size of existing communication conduit.

Also looked in specs and no indication there. Please let us know the existing conduit size and where is conduit is loctated that is going into the communication room.

4" Conduit.

6 Drawings/Plans The plans do not show the large electrical room, they just indicate on E104 Note 4 that is it centrally located in the building. Need to know where this room is located exactly to run my feeders from new panels. Please advise.

A drawing is attached (Attachment L) to show the location of the main electrical room.

7 If commissioning required for this task order, please provide specifications.

Contractors are not required to provide his own commissioning agent. However, contractors must submit all necessary reports (DALT, TAB, PVT, etc.) for approval and government verification.

8 Does the Contractor need to provide hazmat survey or simply provide unit prices for hazmat removal?

Hazmat Survey is not required for the seed project.

9 Key note #15 A-102 states to seal cracks in floor, can the Government give a length for bid purposes?

Existing flooring is covering the concrete slab, so crack lengths are unable to be obtained.

10 General notes #20 A101, Can the Government provide a detailed scope and purpose this work?

Contractors shall support existing structure while replacing exterior studs where indicated on the drawings.

11 Specs 1.5.1.2 Qualifications Will this Telecommunication QC specialist be required?

Yes, the Telecommunication QC Specialist will be required.

3. Incorporate the Asbestos Inspection Report

The Asbestos Inspection Report is included separately as “Attachment K - Asbestos Inspection Report”

4. Incorporate the Electrical Room Drawing

The Electrical Room drawing provided in response to PPI #6 is included separately as “Attachment L - Electrical Room”

5. Revise Factor 1, Corporate Experience Language

From:

Size: A final construction cost of at least $5,000,000. (At least one project must demonstrate with a final construction cost of at least $10,000,000.)

To:

Size: A final construction cost of at least $5,000,000. (At least one Relevant project for New Construction or at least one Relevant project for Renovation (as defined below) must demonstrate experience with a final construction cost of at least $10,000,000.)

6. Revise Factor 4, Past Performance Language

From:

If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 1. The offeror shall include all completed CPARS (interim and final) for a project. If there is not a completed CPARS evaluation, the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1 for both construction and design experience. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A

COMPLETED CPARS IS AVAILABLE.

To:

If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 1. The offeror shall include all completed CPARS (interim and final) for a project. If there is not a completed CPARS evaluation, the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1 for construction experience. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS

IS AVAILABLE.

Attachments included in this Amendment are:

Attachment I - Site Visit Information Attachment J - Site Visit Participant Log Attachment K - Asbestos Inspection Report

Attachment L - Electrical Room

(End of Summary of Changes)

File details come from the government source that posted it. Updated .