About this file

This announcement solicits proposals for the conversion of an offshore support vessel into a U.S. Navy training support vessel. Key details include:

  • The solicitation number is N40027-22-R-0004 and seeks performance of dry-docking, pier-side overhaul, maintenance, repairs and alterations to certify the vessel with the American Bureau of Shipping.

  • Typical systems that may require work include propulsion, power, command and control, steering, fuel, electrical, communication, hull, structural, towing, anchoring and outfitting. Equipment upgrades, alterations and modernization will also be conducted.

  • The work includes a regular overhaul of Vindicator (TSV 5) and inquiries can be directed to the points of contact listed from the Southeast Regional Maintenance Center, Code 400.

  • The full solicitation is attached and any amendments will appear on the website. The NAICS code is 336611 and the solicitation is being issued as full and open competition.

View the file

Other files

File Type Posted
N4002722R00040010 CONFORMED.pdf PDF
ERRATA 6 SERM-507-22 VINDICATOR.pdf PDF
ERRATA 7 SERM-507-22 VINDICATOR.pdf PDF
N40027-22-R-0004-0010.pdf PDF
N40027-22-R-0004-0009.pdf PDF
S-2 Price Data Breakdown SERM-507-22(Rev 4).xlsx XLSX spreadsheet
N4002722R00040008.pdf PDF
N4002722R00040008 CONFORMED.pdf PDF
ERRATA 5 SERM-507-22 VINDICATOR.pdf PDF
ERRATA 4 SERM-507-22 VINDICATOR.pdf PDF
N4002722R00040008.pdf PDF
N4002722R00040008 CONFORMED.pdf PDF
J-2 EXECUTION MILESTONES AND KEY EVENTS (Rev 1).xlsx XLSX spreadsheet
S-2 Price Data Breakdown SERM-507-22(Rev 3).xlsx XLSX spreadsheet
J-7 Vindicator Tank Soundings 7-26-22.xlsx XLSX spreadsheet
ADDENDUM 1 SERM-507-22 VINDICATOR.pdf PDF
N4002722R00040007.pdf PDF
N4002722R00040006.pdf PDF
S-2 Price Data Breakdown SERM-507-22(Rev 2).xlsx XLSX spreadsheet
J-2 EXECUTION MILESTONES AND KEY EVENTS (Rev 1).xlsx XLSX spreadsheet
ERRATA 3 SERM-507-22 VINDICATOR.pdf PDF
Attachment J-6 RMC Office Space.docx DOCX document
N4002722R00040005.pdf PDF
ERRATA 2 SERM-507-22 VINDICATOR.pdf PDF
N4002722R00040003.pdf PDF
S-2 Price Data Breakdown SERM-507-22(Rev 1).xlsx XLSX spreadsheet
N4002722R00040002.pdf PDF
J-5 Past Performance Questionnaire.docx DOCX document
ERRATA 1 SERM-507-22 VINDICATOR.pdf PDF
N4002722R00040001.pdf PDF
J-2 EXECUTION MILESTONES AND KEY EVENTS.xlsx XLSX spreadsheet
J-4 HEAVY WEATHER PLAN.docx DOCX document
Exhibits A and B Contract Data Requirements List (CDRL) DD Form 1423.pdf PDF
S-1 Request for Specification Clarification.docx DOCX document
S-2 Cost Data Break Down Vindicator SERM-507-22.xlsx XLSX spreadsheet
J-3 Small Business Subcontracting Plan.doc DOC document
N40027-22-R-0004.pdf PDF
J-1 SERM-507-22 COMPOSITE WORK PACKAGE.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VINDICATOR2022

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

VINDICATOR (TSV 5) SSP SERM-507-22 RFP N4002722R0004 AMENDMENT 0004

SEE SECTION SF30 - BLOCK 14 CONTINUATION PAGE FOR SUMMARY OF CHANGES.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Jul-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4002722R0004

X 9B. DATED (SEE ITEM 11)

01-Jul-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Jul-2022

CODE

COMMANDER SOUTHEAST REGIONAL MAINTENANCE

BUILDING 1488

MASSEY AVE.

MAYPORT FL 32228

N40027 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4002722R0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0004

The purpose of this amendment is to clarify specifications, to incorporate Errata 2 and to update

Section J.

QUESTION 032 Work Item 243-11-001 :

Paragraph 3.4 direct contractor to crate and ship Z drive to Schottel Inc. for the disassembly, inspection, and reassembly of the Z – drive. After consulting with Schottel Inc, they only requires the Z-drive without the propellers or electric motors. Current work items do not require the servicing/repairs of the E motor or propellers. Since the Propellers and E motor are not required to be shipped with the Z drives. Will the government require the servicing/repairs of the

Z-drive Propellers and E motors?

ANSWER 032 Work Item 243-11-001:

Yes, the Government will require the servicing/repairs of the Z-drive Propellers and E motors as required in Errata 2.

QUESTION 033 Work Item 568-11-001:

Paragraph 3.4 direct contractor to crate and ship Tunnel Thruster to Schottel Inc. for the disassembly, inspection, and reassembly. After consulting with Schottel Inc, they only requires the Tunnel Thruster without the propellers or electric motors. Current work items do not require the servicing/repairs of the Tunnel Thruster E motor or propellers. Since the Propellers and E motor are not required to be shipped with the Tunnel Thruster. Will the government require the servicing/repairs of the Tunnel Thruster Propellers and E motors?

ANSWER 033 Work Item 568-11-001:

Yes, electric motors and propellers repairs are added to the work item and this change is incorporated under Errata 2.

QUESTION 034 Work Item 992-11-002:

Paragraph 3.2 directs contractor to Accomplish each requirement of Section 3 of 2.1, as designated by the SUPERVISOR. Was the vessel placed into lay-up under an approved ABS

Lay-Up Plan If so, does the vessel have an updated lay-up maintenance plan record? Was the vessel placed in a Warm or Cold Stacked lay-up Has ABS performed a periodical lay-up survey? Is there an ABS approved reactivation plan?

ANSWER 034 Work Item 992-11-002:

No, the vessel was not laid up per ABS guidelines at its time of deactivation.

Yes, the vessel underwent an ABS pre-condition survey from January 27-28, 2021, and was found acceptable for readmission to ABS class. Reactivation plan is referenced in the work specification.

QUESTION 038 CDRLs:

Please provide the information of requiring office SUPSHIP Code 200, 300, 500 and 600 per

Exhibit A and Exhibit B Contract Data Requirements List (CDRL) DD Form 1423.

ANSWER 038 CDRLs:

DD Form 1423 is to be submitted to SERMC Code 400 who will disseminate to SRMC Codes

200, 300, 500, and/or 600 as required.

QUESTION 039 CDRLs:

CDRL A0009 does not have title of data item. Please provide what is the requirement under

A0009?

ANSWER 039 CDRLs:

CDRL A0009 is intentionally left blank and has no requirement.

QUESTION 040 CDRLs:

CDRL B0002 does not have information such as Frequency and Date of submissions. Please provide complete requirement for B0002.

ANSWER 040 CDRLs:

Information required in CDRL B0002 (provide logistic and technical data for all GFM and CFM equipment or components installed or permanently removed. Provide weight and moment changes resulting from work accomplished) will be submitted one time when requested by the

SUPERVISOR.

QUESTION 041 Section C:

Section C invokes substantial work requirements that are not in the work specification package.

Examples: 1.Delivery The Contractor shall be responsible for the transport of the vessel from its current location in Beaumont, Texas to the contractor’s facilities. 2. The Contractor shall ensure that all equipment is properly maintained during periods of inactivity. 3. The Contractor shall protect machine parts, both interior and exterior, against corrosion and deterioration during the interval between contract execution and ship delivery. 4. Deck machinery, and equipment installed and bolted to their respective foundations on the ship in the weather or stowed on deck in the weather shall have weather proof covers installed and have all non-CRES parts preserved against corrosion. 5. The Contractor shall thoroughly clean, flush, and verify all vents, ducts, pipes, and tanks are free of contaminants and industrial and foreign material prior to use. 6. The ship systems shall be in operating condition at delivery of the vessel. Equipment having periodic certification and/or calibration requirements shall have a minimum of eleven (11) months remaining of the certification and/or calibration period at delivery of the vessel. Inter-compartment cables not connected to equipment shall be removed. Non-consumable items with shelf life or service life limitations shall have a minimum of nine (9) months of their useful life remaining at delivery. 7. The Contractor shall be responsible for the condition of the boat until receipt inspection and final acceptance is completed. While the vessel is at the Contractor's plant, the Contractor shall provide assistance to protect and service the vessel, and shall effect any correction of defects or performance of uncompleted work, to the extent permitted or required by the Government. The ship and its systems as delivered shall comply with all the applicable laws of the United States and the requirements of the ABS, in issue at the time of the proposal due date, and as identified in the Contract. The Contractor shall obtain and provide all necessary certifications or documents that cover the Regulatory Body approvals and indicate additional compliance. Will the Government provide work specifications that define details of contractor responsibility that can be reasonably estimated? If these requirements are not going to be defined in work specifications, where should the contractor apply the costs for this work on the

S-2 cost data?

ANSWER 041 Section C:

No, the Government will not provide a work requirement to tow the vessel. The Contractor shall include the cost of towing the vessel from its current location in Beaumont, Texas to the contractor’s facilities as stated in the solicitation. Pricing for this cost can be included in Work

Item 000-00-001 listed on the S-2. Remaining requirements that the contractor will be responsible for are listed in the individual work items and pricing shall be attached to those specific work items listed on the S-2.

QUESTION 042 Section C:

For 992-11-002 Reference 2.1 ABS, American Bureau of Shipping:, Lay-up and Reactivation of

Offshore Support Vessels KTRs were not present at the initial lay-up, or any subsequent Annual surveys- the scope of work required by this work item is contingent on the status of the lay-up

Will the GOVT provide a copy of the Initial lay-up survey and completed annual surveys as part of the shipcheck? Will the GOVT confirm that the requirements of Section 2 were completed in full with record comment Laid Up Cold Stacked? Will the GOVT provide a copy of the procedures submitted to ABS IAW Section 2/1 of reference 2.1 as part of the shipcheck? Per reference 2.1 Reactivation is to address all equipment degradation and deferred maintenance that was recorded in the vessel’s records. Will the GOVT provide a copy of the degraded equipment and deferred maintenance form the vessel records so the work can be reasonably estimated?

ANSWER 042 Section C:

No, there is no known list of degraded equipment other than the equipment listed in the individual work specifications.

The vessel was not laid-up per ABS guidelines at its time of deactivation but the vessel has been under a dehumidification system at MARAD facility since it’s repossession in 2019.

The vessel underwent an ABS pre-condition survey in January 27-28, 2021 and was found acceptable for readmission to ABS class.

QUESTION 044 Section C:

Will the government provide a detailed work specification regarding towing the vessel from

Beaumont, Texas to our facility? Will the government provide a crew to operate the vessel’s systems and equipment during the accomplishment of Sea Trials? Is the Contractor to provide a

Licensed Crew to operate the vessel’s systems and equipment for Sea Trials? Will the government provide a crew to operate the vessel’s systems and equipment during the

Reactivation? Will the government provide the above actions to assist contractor in reasonably estimating this work?

ANSWER 044 Section C:

No, the Government will not provide a detailed work specification for towing the vessel (see response to Bidder’s Question #041). Contractor is to accomplish towing of the vessel from current location to contractors facility.

Yes, the Government will provide a crew to operate the vessel’s systems and equipment during the accomplishment of Sea Trials.

No, the contractor is not required to provide a licensed crew to operate the vessel’s systems and equipment for Sea Trials.

Yes, the Government will have ship’s crew available to operate the vessel’s systems and equipment during reactivation and testing.

QUESTION 045 Section C:

ABS has asked if we had the vessel's ABS number. We do not, nor is it in any references we have. We did provide former name, IMO number, builder, builder's hull number and delivery date of Sept 9, 2015. (First 5 year special survey would be in 2020. Already in Lay Up?). Now the question is what is its ABS classification status. ABS has requested the original ABS Class number for the vessel in order to respond to our request for proposal. Please provide the ABS

Class number for original certificates. Has the government informed ABS of where Vessel is? Is the vessel due for its 5 year special survey, and if so is that a part of the work scope. Will the government please provide contractor with all ABS classification numbers and surveys associated with the vessel in order to reasonably estimate this work?

ANSWER 045 Section C:

BravanteVIII, Eastern Shipbuilding Hull 158.

ABS ID # YY238711, ABS ID 14238711, IMO 9645645

Vessel has been under a dehumidification system at MARAD facility since it’s repossession in

2019.

The vessel underwent an ABS pre condition survey in January 27-28, 2021 and was found acceptable for readmission to ABS class.

There are no records of degraded equipment or deferred maintenance.

QUESTION 051 Work Item 581-11-001:

This BQ is a follow up to the previously submitted JSR bidder questions, Amendment 2 answers

008, 009.

Contractor acknowledge the release of ref 2.5 PM 390-563 however, this paint schedule (ref) makes no mention to the anchor chain and anchors preservation as guided in paragraph 3.4.

Furthermore, the answer related to question about New and Disturbed areas throughout the package: “Minimum surface preparation (touch-up) is defined for new and disturbed surfaces as less than 4 square feet.” Is open to various interpretations.

Would the government please properly address the anchor chain/ anchors preservation in the

Paint Schedule in order to obtain a quote from the correct Paint Manufacturer?

In addition, will the government please specify which is the minimum surface preparation standard acceptable for the less than 4 FT2 New and disturbed areas?

ANSWER 051 Work Item 581-11-001:

Yes, PM 390-563 Rev-A refers to minimum surface preparation standard acceptable for new and disturbed areas. PM390-563 Rev-A has been added to all work items in Errata 1 where preservation for each new and disturbed surface is required.

QUESTION 052 Section L:

SERMC Technical Library is unable to provide Reference 2.1(14319447-1, Service Manual).

This reference is critical during the estimating process and for the accomplishment of the tunnel thruster repair.

Can The government provide a working copy of Ref 2.1 (14319447-1, Service Manual)?

ANSWER 052 Section L:

No, Ref 2.1 (14319447-1, Service Manual) is classified confidential and is not authorized for issue. Ref 2.1 (14319447-1, Service Manual) is authorized to be viewed via the SERMC

Technical Library.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

EXHIBIT AND ATTACHMENTS

The following document(s), exhibit(s), and other attachment(s) form a part of this solicitation:

Attachment S-1 Request for Specification Clarification, 1page

Attachment S-2 Cost Data Break Down (Rev 1), 1 page

The following document(s), exhibit(s), and other attachment(s) also form a part of this solicitation and will form a part of the contract resulting from this solicitation:

Attachment J-1 Specification Package SSP SERM-507-22 (120 pages), ERRATA 1 (93 pages), ERRATA 2 (24 pages)

Attachment J-2 Execution Milestones and Key Event Dates, 1page

Attachment J-3 Small Business Subcontracting Plan (Large Business Only) 2 pages

Attachment J-4 Heavy Weather Plan, 3 pages

Attachment J-5 Past Performance Questionnaire, 5 pages

Exhibit A Contract Data Requirements List (CDRL) DD Form 1423, A001-A010, 5 pages

Exhibit B Contract Data Requirements List (CDRL) DD Form 1423, B001-B002, 1 page

(End of Summary of Changes)