ERRATA 6 SERM-507-22 VINDICATOR.pdf
PDF 135 KB Posted
- Attached to
- Conversion of an Offshore Support Vessel into a U. S. Navy Training Support Vessel, USNS VINDICATOR (TSV 5)
- Solicitation number
- N40027-22-R-0004
About this file
This document contains two Request for Proposal (RFP) specifications for the conversion and overhaul of USNS VINDICATOR (TSV 5). Specification 623-21-001 involves fabricating, fitting, and installing a new accommodation ladder including upper and lower platforms and fenders. It requires static load testing, verification of proper fit, and painting. Specification 631-21-001 requires preserving the superstructure by removing and installing new ship name and number markings, welding, preservation painting, and installing VINDICATOR and hull number markings on the port side, starboard side and stern.
The related federal contract opportunity is solicitation N40027-22-R-0004 issued by the Department of the Navy Naval Sea Systems Command for the FY22 Regular Overhaul of VINDICATOR (TSV 5). The RFP involves drydocking, pier-side overhaul, maintenance, repairs and alterations requiring ABS certification. Typical systems may include propulsion, power, command/control, steering, fuel, electrical, communication, hull and structural upgrades. The NAICS code is 336611 and inquiries should be directed to the listed contracting officer and contract specialist.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS PERMANENT CHANGE UPDATES THE SPECIFICATION BID PACKAGE.
SHIP: COMMANDER CARRIER STRIKE GROUP FOUR (CNRMC 9577)
SERM-507-22
ERRATA NUMBER:
SPECIFICATION NUMBER:
THE FOLLOWING ITEMS ARE REPLACED:
623-21-001
631-21-001
DATED: 8/26/2022 12:24:43PMPage 1 of 1
SHIP: COMMANDER CARRIER STRIKE GROUP
FOUR (CNRMC 9577)
ITEM NO: 623-21-001 (E6)
COAR: 12 PCN: TSV5-0025
CSWT FILE NO: 623-012 (CG 47) CMP: NONE
REVISED: 12 OCT 2021 PLANNER: See Attachment A
SSP: SERM-507-22 1 of 3 ITEM NO: 623-21-001
ERRATA NO. 6
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Accommodation Ladder, Fabricate, Fit, and Install; accomplish
(OPTION ITEM)
1.2 Location of Work:
1.2.1 01 Level, Weather, Frame 65, Port
1.3 Identification:
1.3.1 Quantity (One AY), Accommodation Ladder
2. REFERENCES:
2.1 LAR 87mNS-2218, Accommodation Ladder Details (E6)
2.2 805-1749049 Rev J, Gangway Aluminum (E6)
2.3 804-2255404, Accommodation Ladder Upper Platform Types A, B, and C (E6)
2.4 805-1749040, Accommodation Ladder Arrangement Handling and Stowage Fixed or Feathering Thread
(E6)
2.5 601-5113194, 87mNS1401 Vindicator (TSV 5) General Arrangement (E6)
2.6 American Bureau of Shipping (ABS), Part 7, Rules For Survey After Construction
(E6)
2.7 American Bureau of Shipping (ABS), Part 2, Rules for Materials and Welding
(E6)
2.8 LAR 87mNS-2217, Accommodation Ladder (E6)
2.9 PM 390-563 Rev A, SERMC, Vindicator TSV-5 Paint Schedule (E6)
3. REQUIREMENTS:
3.1 Provide the service of an American Bureau of Shipping (ABS) certified Surveyor.
3.2 Accomplish the requirements of 2.2 1 through 2.4,5 and 2.8, using
2.5 6 through , 2.7 and 2.8 9 for guidance.
(E6)
3.2.1 Fabricate, fit and install new accommodation ladder, including the upper and lower platform and fender assembly. The yoke guide will be mounted onto a Type 316L corrosion resistant steel reinforcement plate welded to ships support structure, listed in 1.3, and located in 1.2.
3.2.2 Remove existing and install new a total of 10 square feet of damaged or deteriorated plating and associated support structure.
3.2.3 Accomplish the requirements of Chapter 4 of 2.7 for welding.
SSP: SERM-507-22 2 of 3 ITEM NO: 623-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
(I)(G) "STATIC LOAD TEST"
3.3 Accomplish a static load test of each accommodation ladder assembly in accordance with General Note 3 of 2.2. Accept/Reject Criteria: No visible evidence of damage or permanent deformation. None.
(V)(G) "PROPER FIT"
3.4 Verify proper fit of the accommodation ladder, with no binding between equipment and each stowage rack. Ensure each quick release pin and toggle pin with lanyard are secured to stowage structure and equipment, using 2.2 and 2.4 for guidance.
3.5 Accomplish painting requirements for each new and disturbed surface,surface in accordance with 2.9, as approved by Operator, Owner's Specifications, American ABS Bureau of Shipping (ABS) certified Surveyor and in accordance with the paint manufacturer's recommendation recommendation.and using 2.7 for guidance.
(E1)
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 1 KT Vang Staples 2.3 (E3)
2. 1 KT
Rigging Hardware
ACCOM 2.3 (E3)
3. 1 EA
Rotating Upper Platform N/A 2.5 N/A 3.3 (E3)
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SSP: SERM-507-22 3 of 3 ITEM NO: 623-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Attachment A
Planners
CORNWELL, RICHARD
BENNETT, KEITH
BRIDGER, WRAY
BROWN, DERRICK
DUNCAN, CHRISTOPHER
MILLION, GARY
SHIP: COMMANDER CARRIER STRIKE GROUP
FOUR (CNRMC 9577)
ITEM NO: 631-21-001 (E6)
COAR: 12 PCN: TSV5-0052
CSWT FILE NO: 631-021 (DDG 51) CMP: NONE
REVISED: 13 OCT 2021 PLANNER: BUNTING, ANTHONY
BENNETT, KEITH
MILLION, GARY
SSP: SERM-507-22 1 of 2 ITEM NO: 631-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Superstructure; preserve
1.2 Location of Work:
1.2.1 02 Level, Frame 20 to 25, Port and Starboard, Weather and stern
(E6)
1.2.2 Exterior Side of Superstructure, including the Freeboard to the Top of Main Mast, Aft Stacks, Transverse and Longitudinal Bulkhead, Vertical and Near Vertical Surface from Main Deck to 05 Wheelhouse Top Deck, including all Piping, Lifeboat Cradle, Appendages and Underside of each Platform, including support structure, Port and Starboard, Frame -5 to 45
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 155-602-001, Hull Markings
2.2 American Bureau of Shipping, ABS Rules for Material and Welding, Part 2
2.3 074-5113191, 87mNS1401 Vindicator (TSV 5) Construction Weld Details and Notes
2.4 PM 390-563,390-563 Rev A, SERMC, Exterior Vindicator TSV-5 Paint Schedule- "VINDICATOR (TSV 5)"
(E1)
2.5 155-100-002 Rev 7, Shell Expansion (AS-Built)
3. REQUIREMENTS:
3.1 Remove existing and install new ship name and hull number in the location listed in 1.2.1, using 2.1 for guidance.
3.1.1 Chip and grind each surface flush in way of each repair.
3.1.2 Template exact size, configuration, and location from existing shipboard condition.
3.2 Accomplish the requirements of Chapter 4 of 2.2 for welding, using
2.3 for guidance.
3.3 Accomplish preservation of each location listed in 1.2, using 2.4 and 2.5 for guidance.
3.4 Accomplish painting requirements for each new and disturbed surface using in accordance with 2.4 4,for guidance, as approved by Operator, Owner's Specifications, American Bureau of Shipping (ABS) ABS certified
(E1)
SSP: SERM-507-22 2 of 2 ITEM NO: 631-21-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Surveyor and in accordance with the paint manufacturer's recommendation.
4. NOTES:
4.1 None.Ship’s name will appear as TSV5 VINDICATOR
Name will be on port side, starboard side, and stern.
Hull registry number 87MNS1401 will be placed under the Ship’s name on the stern only.
(E6)
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
File details come from the government source that posted it. Updated .