ADDENDUM 1 SERM-507-22 VINDICATOR.pdf

PDF 55 KB Posted

Attached to
Conversion of an Offshore Support Vessel into a U. S. Navy Training Support Vessel, USNS VINDICATOR (TSV 5)
Solicitation number
N40027-22-R-0004
Issued by

About this file

This addendum provides additional requirements for a ship towing services contract opportunity. The contractor will be required to tow USS Vindicator (TSV-5) from Galveston, Texas to the contractor's facility, maintaining the ship in a seaworthy condition during towing according to the Navy Towing Manual and Navigation Rules. The contractor must prepare the ship for towing by submitting a completed tow rigging checklist and conducting welding inspections and repairs. Upon arrival, the contractor will secure the ship to the pier, install fenders, and repaint areas as specified by the operator and ABS standards. The related solicitation is for the fiscal year 2022 regular overhaul of TSV-5, including drydocking, pier-side maintenance, repairs and alterations certified by ABS. Systems slated for potential repair include propulsion, power, command and control, steering, fuel, electrical, communication, hull and structural components. Equipment upgrades and modernization will also be conducted. The solicitation was issued by the Department of the Navy Naval Sea Systems Command as a full and open competition under NAICS code 336611.

View the file

Other files

File Type Posted
N4002722R00040010 CONFORMED.pdf PDF
ERRATA 6 SERM-507-22 VINDICATOR.pdf PDF
ERRATA 7 SERM-507-22 VINDICATOR.pdf PDF
N40027-22-R-0004-0010.pdf PDF
N40027-22-R-0004-0009.pdf PDF
S-2 Price Data Breakdown SERM-507-22(Rev 4).xlsx XLSX spreadsheet
N4002722R00040008.pdf PDF
N4002722R00040008 CONFORMED.pdf PDF
ERRATA 5 SERM-507-22 VINDICATOR.pdf PDF
ERRATA 4 SERM-507-22 VINDICATOR.pdf PDF
N4002722R00040008.pdf PDF
N4002722R00040008 CONFORMED.pdf PDF
J-2 EXECUTION MILESTONES AND KEY EVENTS (Rev 1).xlsx XLSX spreadsheet
S-2 Price Data Breakdown SERM-507-22(Rev 3).xlsx XLSX spreadsheet
J-7 Vindicator Tank Soundings 7-26-22.xlsx XLSX spreadsheet
N4002722R00040007.pdf PDF
N4002722R00040006.pdf PDF
S-2 Price Data Breakdown SERM-507-22(Rev 2).xlsx XLSX spreadsheet
J-2 EXECUTION MILESTONES AND KEY EVENTS (Rev 1).xlsx XLSX spreadsheet
ERRATA 3 SERM-507-22 VINDICATOR.pdf PDF
Attachment J-6 RMC Office Space.docx DOCX document
N4002722R00040005.pdf PDF
ERRATA 2 SERM-507-22 VINDICATOR.pdf PDF
N4002722R00040004.pdf PDF
N4002722R00040003.pdf PDF
S-2 Price Data Breakdown SERM-507-22(Rev 1).xlsx XLSX spreadsheet
N4002722R00040002.pdf PDF
J-5 Past Performance Questionnaire.docx DOCX document
ERRATA 1 SERM-507-22 VINDICATOR.pdf PDF
N4002722R00040001.pdf PDF
J-2 EXECUTION MILESTONES AND KEY EVENTS.xlsx XLSX spreadsheet
J-4 HEAVY WEATHER PLAN.docx DOCX document
Exhibits A and B Contract Data Requirements List (CDRL) DD Form 1423.pdf PDF
S-1 Request for Specification Clarification.docx DOCX document
S-2 Cost Data Break Down Vindicator SERM-507-22.xlsx XLSX spreadsheet
J-3 Small Business Subcontracting Plan.doc DOC document
N40027-22-R-0004.pdf PDF
J-1 SERM-507-22 COMPOSITE WORK PACKAGE.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHIP: COMMANDER CARRIER STRIKE GROUP FOUR

INDEX

ADDENDUM NO One

SSP#: SERM-507-22

TITLEITEM NO

992-11-004 Ship Towing Service; provide

SHIP: COMMANDER CARRIER STRIKE GROUP

FOUR (CNRMC 9577)

ITEM NO: 992-11-004 (A1)

COAR: 26 PCN: TSV5-L001

SWT FILE NO: 992-045 CMP: NONE

REVISED: 13 OCT 2021 PLANNER: BENNETT, KEITH

SSP: SERM-507-22 1 of 2 ITEM NO: 992-11-004 ADDENDUM NO. One

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Ship Towing Service; provide

1.2 Location of Work:

1.2.1 Contractor's Facility

1.3 Identification:

1.3.1 USS Vindicator (TSV-5)

2. REFERENCES:

2.1 SL740-AA-MAN-010 Rev 3, U.S. Navy Towing Manual

2.2 CG NRHB 20180126, Navigation Rules and Regulation Handbook

2.3 American Bureau of Shipping (ABS), Part 2, Rules for Materials and Welding

2.4 PM 390-563 Rev A, SERMC, Vindicator TSV-5 Paint Schedule

3. REQUIREMENTS:

3.1 Provide tug service, licensed pilot, towing bridle, and towboat service to tow the ship from Galveston, Texas to Contractor facility, in accordance with 2.1 and 2.2, when directed by the SUPERVISOR.

3.1.1 Accomplish pick-up of the ship between the hours of 0800 and 1500, Monday through Friday.

3.2 Maintain the ship in a seaworthy condition during towing in accordance with 2.1 and 2.2.

3.3 Accomplish each preparation to make the ship suitable for open ocean towing in accordance with 2.1, where applicable for towing of each surface ship.

3.3.1 Submit one legible copy, in hard copy or approved

transferrable media, of a completed Appendix H of 2.1, Check-off List for Preparing and Rigging a Tow, to the SUPERVISOR.

3.4 Accomplish the requirements of Chapter 4 of 2.3 for welding.

3.5 Accomplish a pre-inspection of the ship tow in accordance with 2.1.

3.5.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing result of each requirement of 3.4 to the SUPERVISOR.

3.6 Remove equipment installed for tow upon completion of the tow, and return ship to condition received prior to tow.

3.6.1 Remove each cover installed to secure each hatch, door and

SHIP: COMMANDER CARRIER STRIKE GROUP FOUR (CNRMC 9577)

SSP: SERM-507-22 2 of 2 ITEM NO: 992-11-004 ADDENDUM NO. One

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

opening.

3.7 Install each ship mooring line and secure the ship to the pier at the contractor's plant and install each fender between the ship and the pier in accordance with 2.1.

3.8 Accomplish painting requirements for each new and disturbed surface in accordance with 2.4, as approved by Operator, Owner's Specifications, ABS certified Surveyor and in accordance with the paint manufacturer's recommendation.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.