ATTACH_13-_(A00004)Pre-Award_Survey-SF-1408.docx

Standard Form DOCX document 23 KB Posted

Attached to
CTIMR Area 4 Modification A0005
Solicitation number
HSBP1014R0058
Issued by

About this file

Pre-Award Survey

View the file

Other versions and copies of SF 1408

File Revision Posted Attached to
B08 - Attachment 0006 - Preaward Survey of Prospective KTR Accounting Sys (SF 1408) - 11SEP2025.pdf Sep 11, 2025 EAGLE Fort Irwin, CA W519TC-25-R-0009
B08 Attachment 0006 Preaward Survey of Prospective KTR Accounting Sys (SF 1408).pdf Revision not stated EAGLE Fort Riley KS W519TC-26-R-A054
Standard Form 1408 - Pre-Award Survey.pdf Revision not stated Next Generation Ammunition & Munitions Equipment (NGAME) for MMHE RFP/Solicitation
Attachment 10-SF1408-14f.pdf Revision not stated Mid-Atlantic Regional Maintenance Center (MARMC) Technical and Professional Services
Attachment 11 - SF1408-14f.pdf Revision not stated Submarine Peculiar Special and Support Equipment (PSSE) Support Services for the Mid-Atlantic Regional Maintenance Center
47QFHA25R0017_T10_08_PRISM MATOC Attachment 4_Modified Preaward Survey (SF 1408).pdf Revision not stated Personnel & Readiness Infrastructure Support Management Services (PRISM) MDoDS Pool Small Business On-Ramp
B08 - Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Picatinny Arsenal, NJ W519TC-25-R-0023
Attachment 7 Pre-Award Survey (SF1408).pdf Revision not stated Joint Safety Health Institutional Facilities Team (JSHIFT) 80LARC25R7001
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Dugway Proving Ground, UT: W519TC-25-R-0008
Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System (SF 1408).pdf Revision not stated EAGLE Ft. Bliss, TX, W519TC-25-R-0007
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Fort Huachuca, AZ W519TC-24-R-0027
1305M325R0002 - Attachment 6 - SF1408-14f.pdf Revision not stated Phased Array Radar (PAR) Test Article
SF1408-14e.pdf Revision not stated PNW Regional Planning Facilitator
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Fort McCoy, WI - W519TC-23-R-0119
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Fort Knox, KY W519TC-23-R-0088
Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System (SF 1408).pdf Revision not stated EAGLE Fort Jackson, SC W519TC-24-R-0026
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Fort Cavazos, TX W519TC-23-R-0102
Attach 4a - SF 1408.pdf Revision not stated USSOCOM Intelligence Support Services -- DRAFT RFP (H92402-24-R-0001)
J.1.b.3 - SF1408-14e.pdf Revision not stated NASA Ames Research Center - Request for Proposal - Aerospace Research Technology and Simulations (ARTS)
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Presidio of Monterey, CA, W519TC-23-R-0104
Show all 20

Who attaches SF 1408

Other files

File Type Posted
ATTACH_5-_(A00006)Proposal_Cost_Template_HSBP1014R0058_12-22-14_R3.xlsx XLSX spreadsheet
CTIMR_Area_4_QA_Responses_Amendment_A00006.docx DOCX document
WA4_RFP_1014R0058_Amendment_06.pdf PDF
CTIMR_Q_ _A_Reference.docx DOCX document
Copy_of_ATTACH_5-_(A00005)Proposal_Cost_Template_HSBP1014R0058_140806_R1.xlsx XLSX spreadsheet
ATTACH_3-_(A00005)Sample_Work_Plan_Request_CTIMR_WA4_Final_12-11-14.docx DOCX document
CTIMR_Area_4_QA_Responses_Amendment_A00005.pdf PDF
CTIMR_Area_4_Amendment_5.pdf PDF
CTIMR_AREA_4_Site_Visit_Attendee_List.xlsx XLSX spreadsheet
UPDATEDREVISION_WA4_Site_Visit_Sechedule_and_Detailed_Sites_Nov_17_14_.doc.docx DOCX document
Updated_WA4_Site_Visit_Sechedule_and_Detailed_Sites_Info_Nov_17_14_.docx DOCX document
WA4_RFP_1014R0058_Amendment_03.pdf PDF
SF30_1014R0058_A0002.pdf PDF
REVISED_CTIMR_Area_4_Site_Visit_Schedule_and_Detailed_Sites_Nov_17_to_21_REV_2.docx DOCX document
REVISED_CTIMR_Area_4_Site_Visit_Schedule_and_Detailed_Sites_Nov_17_to_21_REV_2.docx DOCX document
ATTACH_14-_Appendix_A_Road_Maintenance_Technique_Definitions_.docx DOCX document
CTIMR_Area_4_Proposal_Cost_Template_HSBP1014R0058.xlsx XLSX spreadsheet
Instructions_for_Proposal_Cost_Template_HSBP1014R0058.docx DOCX document
CTIMR_Area_4_Amendment_Questions_and_Answers.pdf PDF
CTIMR_Area_4_Amendment_A00001_Changes.pdf PDF
CTIMR_Area_4_Site_Visit_Sechedule_and_Detailed_Sites_Nov_3_to_7_.docx DOCX document
WA4_RFP_FINAL_8282014.docx DOCX document
ATTACH_3-_(A00004)Sample_Work_Plan_Request_CTIMR_WA4_Final_3_07-24-14.doc DOC document
ATTACH_12-_(A00004)Pre-Award_LTR_to_Contractor.docx DOCX document
ATTACH_9_-_(A00004)GFM_Instruc-HSBP1014R0058.docx DOCX document
ATTACH_7-_(A00001)Consent_Letter_(3).docx DOCX document
ATTACH_4-_(A00004)Instructions_for_Proposal_Cost_Template_HSBP1014R0058_140806.docx DOCX document
ATTACH_1-_(A00004)TX_TIMR_BMPs.pdf PDF
ATTACH_11-(A00004)TI_Design_Standards_v1_Sept_2012.zip ZIP file
ATTACH_8-_(A00004)Client_Authorization_Letter_HSBP1014R0058.docx DOCX document
ATTACH_2-(A00004)Notice_Regarding_Landlord-HSBP1013R0017.docx DOCX document
ATTACH_5-_(A00004)Proposal_Cost_Template_HSBP1014R0058_140806.xlsx XLSX spreadsheet
ATTACH_6-_(A00004)_Past_Perf.Questionaire__HSBP1014R0058.docx DOCX document
ATTACH_10-_CTIMR_WA4_Wage_Determinations_Combined..pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 12

Preaward Survey of Prospective Contractor Accounting System Checklist – SF-1408

Instructions:

1. Mark “X” in the appropriate column.

2. On Page 2 provide a narrative describing how the current accounting system supports your response to each item.

Contractor Name:

Point of Contact:

CAGE Code:

DUNS Code:

Yes
No
N/A
Note

1. Is the accounting system in accord with generally accepted accounting principles?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. Accounting system provides financial information:

a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16).

b. Required to support requests for progress payments.

4. Is the accounting system designed, and are the records maintained in such a manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?

5. Is the accounting system currently in full operation? (If not, describe in Page 2 narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.)

Instruction: Use this section to explain how the current accounting system supports your response to each item. If a response is N/A provide further explanation. Use as much space as needed. Provide references to current policies and procedures if applicable.

Note
Narrative

File details come from the government source that posted it. Updated .