UPDATEDREVISION_WA4_Site_Visit_Sechedule_and_Detailed_Sites_Nov_17_14_.doc.docx

DOCX document 1 MB Posted

Attached to
CTIMR Area 4 Modification A0005
Solicitation number
HSBP1014R0058
Issued by

About this file

REVISED UPDATED CTIMR AREA 4 SITE VISIT INFORMATION

View the file

Other files

File Type Posted
ATTACH_5-_(A00006)Proposal_Cost_Template_HSBP1014R0058_12-22-14_R3.xlsx XLSX spreadsheet
CTIMR_Area_4_QA_Responses_Amendment_A00006.docx DOCX document
WA4_RFP_1014R0058_Amendment_06.pdf PDF
CTIMR_Q_ _A_Reference.docx DOCX document
Copy_of_ATTACH_5-_(A00005)Proposal_Cost_Template_HSBP1014R0058_140806_R1.xlsx XLSX spreadsheet
ATTACH_3-_(A00005)Sample_Work_Plan_Request_CTIMR_WA4_Final_12-11-14.docx DOCX document
CTIMR_Area_4_QA_Responses_Amendment_A00005.pdf PDF
CTIMR_Area_4_Amendment_5.pdf PDF
CTIMR_AREA_4_Site_Visit_Attendee_List.xlsx XLSX spreadsheet
Updated_WA4_Site_Visit_Sechedule_and_Detailed_Sites_Info_Nov_17_14_.docx DOCX document
WA4_RFP_1014R0058_Amendment_03.pdf PDF
SF30_1014R0058_A0002.pdf PDF
REVISED_CTIMR_Area_4_Site_Visit_Schedule_and_Detailed_Sites_Nov_17_to_21_REV_2.docx DOCX document
REVISED_CTIMR_Area_4_Site_Visit_Schedule_and_Detailed_Sites_Nov_17_to_21_REV_2.docx DOCX document
ATTACH_14-_Appendix_A_Road_Maintenance_Technique_Definitions_.docx DOCX document
CTIMR_Area_4_Proposal_Cost_Template_HSBP1014R0058.xlsx XLSX spreadsheet
Instructions_for_Proposal_Cost_Template_HSBP1014R0058.docx DOCX document
CTIMR_Area_4_Amendment_Questions_and_Answers.pdf PDF
CTIMR_Area_4_Amendment_A00001_Changes.pdf PDF
CTIMR_Area_4_Site_Visit_Sechedule_and_Detailed_Sites_Nov_3_to_7_.docx DOCX document
WA4_RFP_FINAL_8282014.docx DOCX document
ATTACH_3-_(A00004)Sample_Work_Plan_Request_CTIMR_WA4_Final_3_07-24-14.doc DOC document
ATTACH_12-_(A00004)Pre-Award_LTR_to_Contractor.docx DOCX document
ATTACH_13-_(A00004)Pre-Award_Survey-SF-1408.docx DOCX document
ATTACH_9_-_(A00004)GFM_Instruc-HSBP1014R0058.docx DOCX document
ATTACH_7-_(A00001)Consent_Letter_(3).docx DOCX document
ATTACH_4-_(A00004)Instructions_for_Proposal_Cost_Template_HSBP1014R0058_140806.docx DOCX document
ATTACH_1-_(A00004)TX_TIMR_BMPs.pdf PDF
ATTACH_11-(A00004)TI_Design_Standards_v1_Sept_2012.zip ZIP file
ATTACH_8-_(A00004)Client_Authorization_Letter_HSBP1014R0058.docx DOCX document
ATTACH_2-(A00004)Notice_Regarding_Landlord-HSBP1013R0017.docx DOCX document
ATTACH_5-_(A00004)Proposal_Cost_Template_HSBP1014R0058_140806.xlsx XLSX spreadsheet
ATTACH_6-_(A00004)_Past_Perf.Questionaire__HSBP1014R0058.docx DOCX document
ATTACH_10-_CTIMR_WA4_Wage_Determinations_Combined..pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSBP1014R0058

Comprehensive Tactical Infrastructure Maintenance & Repair (CTIMR) Tactical Infrastructure (TI) Site Visit Agenda All TI Site Visits will require Border Patrol escorts

SCHEDULE:

Day One - Monday, Nov 17, 2014

Travel to Rio Grande Valley, McAllen Miller Airport, McAllen Texas (MFE).

No meetings will be held on Monday October 6, 2014.

Various hotels are available in the area. The airport is a 15 minute drive time to first meeting location.

Day Two – Tuesday, Nov 18, 2014

Meeting Time: 9:00 AM - NOON

Action: Work Area 4 Contract Review and Tactical Infrastructure (TI) Overview

Location: RGV Border Patrol Headquarters 4400 South Expressway 281 Edinburg, TX 78542

Contact: (956) 289-4000 (Front Desk) Directions only

Lunch Break: NOON – 1:00 PM

Meeting Time: 1:00 PM – 4:00 PM

Location: RGV Border Patrol Headquarters 4400 South Expressway 281 Edinburg, TX 78542 First parking lot to the right after entrance. Border Patrol escort will lead and trail to the TI areas below.

LOCATION
CLIN ID
COMMENTS
0-12
F&G

R&B D&G L&E V&D Cameron County, dirt levee, gates, FC-3 graded earth TI roads, FC-2 aggregate/caliche access road, automated grate system, lighting and electrical, vegetation and debris on both North and South road.

0-6

F&G R&B D&G L&E V&D Hidalgo County, wall levee, gates, FC-2 aggregate/caliche TI and access roads, drainage control area, lighting and electrical, vegetation and debris removal at upper guardrails and South road.

Day Three – Wednesday, Nov 19, 2014

Meeting Time: 11:00 AM – 1:00 PM

Action: Laredo TI Site Visit

Location: Laredo Boat ramp under International bridge I

Contact: 956- 236-1717 Roberto Ramos

LOCATION
CLIN ID
COMMENTS
Rio Bravo
F&G

R&B V&D FC-2 aggregate roads, gates, and vegetation.

Laredo South
F&G

R&B D&G L&E

Boat Ramp, Fencing, FC-2 aggregate river road, bridge and culverts, post and cable, electrical, lighting, and vegetation.

Meeting Time: 4:00 PM – 5:00 PM

Action: Eagle Pass TI Site Visit

Location: Point of Entry - POE Piedras Negras 160 Garrison St.

Eagle Pass, TX 78852

Contact: 830-752-3300 (Front Desk) Directions only

LOCATION
CLIN ID
COMMENTS
Eagle Pass
F&G

R&B D&G

Fencing, gates, FC-3 graded earth roads, bridges, culverts, vegetation.

Day Four– Thursday, Nov 20, 2014

Meeting Time: 8:00 AM – NOON

Action: Del Rio TI Site Visit

Location: Del Rio Border Patrol Station 2401 Dodson Ave.

Del Rio, TX 78840

Contact: 830-752-3150 (Front Desk) Direction only

LOCATION
CLIN ID
COMMENTS
M1
F&G

R&B D&G

Fencing, FC-3 graded earth roads, boat ramps, drainage, and vegetation.

Day Five - Friday, Nov 21, 2014 Travel from Del Rio to San Antonio Airport is approximately 3 - 4 hour drive time.

image1.png image2.png

File details come from the government source that posted it. Updated .