B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf

Standard Form PDF 737 KB Posted

Attached to
EAGLE Fort Huachuca, AZ W519TC-24-R-0027
Solicitation number
W519TC24R0027
Issued by

About this file

This is Standard Form (SF) 1408, a Preaward Survey of Prospective Contractor Accounting System form, which is used to evaluate whether a prospective contractor's accounting system is adequate for award of a federal contract. The form contains two main sections: Section I for the overall recommendation (with options for "Yes," "No," or "Yes with follow-on review"), and Section II consisting of a detailed evaluation checklist that assesses the contractor's accounting system against specific criteria.

The evaluation checklist examines whether the accounting system complies with Generally Accepted Accounting Principles and includes key capabilities such as segregation of direct/indirect costs, cost identification by contract, labor distribution systems, timekeeping systems, proper cost allocation methods, and financial reporting capabilities required by contract clauses. The form (OMB Control Number 9000-0011) is valid through October 31, 2026 and is part of solicitation W519TC24R0027 for maintenance, supply, and transportation services at Fort Huachuca, AZ, being conducted by the Army Contracting Command-Rock Island.

View the file

Other versions and copies of SF 1408

File Revision Posted Attached to
B08 - Attachment 0006 - Preaward Survey of Prospective KTR Accounting Sys (SF 1408) - 11SEP2025.pdf Sep 11, 2025 EAGLE Fort Irwin, CA W519TC-25-R-0009
B08 Attachment 0006 Preaward Survey of Prospective KTR Accounting Sys (SF 1408).pdf Revision not stated EAGLE Fort Riley KS W519TC-26-R-A054
Standard Form 1408 - Pre-Award Survey.pdf Revision not stated Next Generation Ammunition & Munitions Equipment (NGAME) for MMHE RFP/Solicitation
Attachment 10-SF1408-14f.pdf Revision not stated Mid-Atlantic Regional Maintenance Center (MARMC) Technical and Professional Services
Attachment 11 - SF1408-14f.pdf Same revision and size as this file Revision not stated Submarine Peculiar Special and Support Equipment (PSSE) Support Services for the Mid-Atlantic Regional Maintenance Center
47QFHA25R0017_T10_08_PRISM MATOC Attachment 4_Modified Preaward Survey (SF 1408).pdf Revision not stated Personnel & Readiness Infrastructure Support Management Services (PRISM) MDoDS Pool Small Business On-Ramp
B08 - Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Picatinny Arsenal, NJ W519TC-25-R-0023
Attachment 7 Pre-Award Survey (SF1408).pdf Revision not stated Joint Safety Health Institutional Facilities Team (JSHIFT) 80LARC25R7001
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Same revision and size as this file Revision not stated EAGLE Dugway Proving Ground, UT: W519TC-25-R-0008
Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System (SF 1408).pdf Revision not stated EAGLE Ft. Bliss, TX, W519TC-25-R-0007
1305M325R0002 - Attachment 6 - SF1408-14f.pdf Same revision and size as this file Revision not stated Phased Array Radar (PAR) Test Article
SF1408-14e.pdf Revision not stated PNW Regional Planning Facilitator
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Fort McCoy, WI - W519TC-23-R-0119
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Fort Knox, KY W519TC-23-R-0088
Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System (SF 1408).pdf Revision not stated EAGLE Fort Jackson, SC W519TC-24-R-0026
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Fort Cavazos, TX W519TC-23-R-0102
Attach 4a - SF 1408.pdf Revision not stated USSOCOM Intelligence Support Services -- DRAFT RFP (H92402-24-R-0001)
J.1.b.3 - SF1408-14e.pdf Revision not stated NASA Ames Research Center - Request for Proposal - Aerospace Research Technology and Simulations (ARTS)
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Presidio of Monterey, CA, W519TC-23-R-0104
Attachment 0006 - SF1408 Preaward Survey of Prospective Contractor Accounting System.pdf Revision not stated EAGLE Detroit, MI W519TC-24-R-0006
Show all 20

Who attaches SF 1408

Other files

File Type Posted
B08 Attachment 0038 - FHAZ Q and A Responses Round 2.xlsx XLSX spreadsheet
B08 Attachment 0005 - Cost Price Matrix-FHAZ-V4.xlsx XLSX spreadsheet
B08 Attachment 0007 - Wage Determination 15-5719 REV 24.pdf PDF
B08 - W519TC24R0027-0004.pdf PDF
B08 Attachment 0005 - Cost Price Matrix-FHAZ-V3.xlsx XLSX spreadsheet
W519TC24R0027-0003.pdf PDF
B08 Attachment 0024 - PWS Appendix B - Non-ASC Direct Funded Customer USAICoE 111th V2.pdf PDF
B08 - Exhibit B - Contract Data Requirements List Listing V2.xlsx XLSX spreadsheet
B08 Attachment 0037 - FHAZ Q and A Responses Round 1.xlsx XLSX spreadsheet
B08 - W519TC24R0027-0002.pdf PDF
B08 Attachment 0005 - Cost Price Matrix-FHAZ-V2.xlsx XLSX spreadsheet
B08 - W519TC24R0027-0001.pdf PDF
B08 Attachment 0021 - PWS Annex E - Definitions_Acronyms_ Abbreviations.pdf PDF
B08 Attachment 0005 - Cost Price Matrix-FHAZ.xlsx XLSX spreadsheet
B08 Attachment 0010 - Blocked File Extensions-with updated DoDAAC.pdf PDF
B08 - Exhibit B - Contract Data Requirements List Listing.xlsx XLSX spreadsheet
B08 Attachment 0011 - Contract References Spreadsheet_FHAZ.xlsx XLSX spreadsheet
B08 Attachment 0017 - PWS Annex A - Maintenance PRS.pdf PDF
B08 Attachment 0024 - PWS Appendix B - Non-ASC Direct Funded Customer USAICoE 111th.pdf PDF
B08 Attachment 0020 - PWS Annex D - Environmental Requirements.pdf PDF
B08 Attachment 0001 - Performance Work Statement (PWS).pdf PDF
B08 Attachment 0009 - Purchasing Invoicing Guide (PIG) FHAZ.pdf PDF
B08 Attachment 0033 - FHAZ Industry Question Template.xlsx XLSX spreadsheet
B08 Attachment 0007 - Wage Determination 15-5719 REV 23.pdf PDF
B08 - Exhibit J - PM-12 KTR Accident Reporting Format.xlsx XLSX spreadsheet
B08 Attachment 0023 - PWS Appendix A - Non-ASC Direct Funded Customer IMCOM.pdf PDF
B08 - Exhibit D - ITD-01 Transportation Report Format.xlsx XLSX spreadsheet
B08 Attachment 0003 - Performance Questionnaire-FHAZ.pdf PDF
B08 Attachment 0013 - NOT APPLICABLE.pdf PDF
B08 - Exhibit G - PM-08 Scheduled Government Furnished Property Format.xlsx XLSX spreadsheet
W519TC24R0027.pdf PDF
B08 Attachment 0015 - Subcontractor Cost Information Submission.pdf PDF
B08 - Exhibit H - PM-09 Performance Management Review Format (version 5-01-23).pptx PPTX presentation
B08 Attachment 0002 - Staffing and Labor Mix.xlsx XLSX spreadsheet
B08 Attachment 0018 - PWS Annex B - Supply PRS.pdf PDF
B08 - Exhibit K - SS-01 Supply and Services Report Format.xlsx XLSX spreadsheet
B08 - Exhibit E - MMD-01 Maintenance Report Format.xlsx XLSX spreadsheet
B08 - Exhibit A - DD Form 1423-1 Contract Data Requirements List.pdf PDF
B08 Attachment 0014 - NOT APPLICABLE.pdf PDF
B08 Attachment 0004 - Letter of Consent-FHAZ.pdf PDF
B08 Attachment 0025 - PWS Appendix C - Non-ASC Direct Funded Customer EPG.pdf PDF
B08 - Exhibit F - PM-01 Contractor Employee Information Format.xlsx XLSX spreadsheet
B08 Attachment 0019 - PWS Annex C - Transportation PRS.pdf PDF
B08 Attachment 0022 - PWS Annex F - Publications and Forms.pdf PDF
B08 - Exhibit C - CD-02 Burn Rate Report Format.xlsx XLSX spreadsheet
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION I - RECOMMENDATION

YES

YES, WITH A RECOMMENDATION THAT A FOLLOW ON ACCOUNTING SYSTEM REVIEW BE PERFORMED AFTER CONTRACT AWARD (Explain in 2. NARRATIVE)

NO (Explain in 2. NARRATIVE)

PREAWARD SURVEY OF

PROSPECTIVE CONTRACTOR

(ACCOUNTING SYSTEM)

SERIAL NUMBER (For surveying activity use)

PROSPECTIVE CONTRACTOR

OMB Control Number: 9000-0011 Expiration Date: 10/31/2026

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0011. We estimate that it will take 24 hours to read the instructions, gather the facts, and answer the questions.

Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S.

General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT

2. NARRATIVE (Clarification of deficiencies and other pertinent comments. If additional space is required, continue on plain sheets of paper.)

IF CONTINUATION SHEETS

ATTACHED - MARK HERE

b. TELEPHONE NUMBER (include area code)

b. TELEPHONE NUMBER (include area code)

c. DATE SIGNED

c. DATE REVIEWED

3. SURVEY

MADE BY

4. SURVEY

REVIEWING

OFFICIAL

a. SIGNATURE AND OFFICE (Include typed or printed name)

a. SIGNATURE AND OFFICE (Include typed or printed name)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is NOT usable

STANDARD FORM 1408 (REV. 1/2014)

Prescribed by GSA - FAR (48 CFR) 53.209 -1(f)

SECTION II - EVALUATION CHECKLIST

MARK "X" IN THE APPROPRIATE COLUMN (Explain any deficiencies in SECTION I NARRATIVE) YES NO

NOT

APPLI-

CABLE

1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH

GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. ACCOUNTING SYSTEM PROVIDES FINANCIAL INFORMATION:

a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments

(FAR 52.216-16).

b. Required to support requests for progress payments.

4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS?

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION?

(If not, describe in Section I Narrative which portions are

(1) in operation, (2) set up, but not yet in operation,

(3) anticipated, or (4) nonexistent.)

STANDARD FORM 1408 (REV. 1/2014) BACK

SECTION I - RECOMMENDATION

YES

YES, WITH A RECOMMENDATION THAT A FOLLOW ON ACCOUNTING SYSTEM REVIEW BE PERFORMED AFTER CONTRACT AWARD (Explain in 2. NARRATIVE) NO (Explain in 2. NARRATIVE)

PREAWARD SURVEY OF

PROSPECTIVE CONTRACTOR

(ACCOUNTING SYSTEM)

SERIAL NUMBER (For surveying activity use)

PROSPECTIVE CONTRACTOR

OMB Control Number: 9000-0011 Expiration Date: 10/31/2026 Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0011. We estimate that it will take 24 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT

2. NARRATIVE (Clarification of deficiencies and other pertinent comments. If additional space is required, continue on plain sheets of paper.)

IF CONTINUATION SHEETS

ATTACHED - MARK HERE

b. TELEPHONE NUMBER (include area code)

b. TELEPHONE NUMBER (include area code)

c. DATE SIGNED

c. DATE REVIEWED

3. SURVEY MADE BY

4. SURVEY REVIEWING OFFICIAL

a. SIGNATURE AND OFFICE (Include typed or printed name)

a. SIGNATURE AND OFFICE (Include typed or printed name)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is NOT usable

STANDARD FORM 1408 (REV. 1/2014)

Prescribed by GSA - FAR (48 CFR) 53.209 -1(f)

SECTION II - EVALUATION CHECKLIST

MARK "X" IN THE APPROPRIATE COLUMN (Explain any deficiencies in SECTION I NARRATIVE)

YES

NO

NOT APPLI-CABLE

1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. ACCOUNTING SYSTEM PROVIDES FINANCIAL INFORMATION:

a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16).

b. Required to support requests for progress payments.

4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS?

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION?(If not, describe in Section I Narrative which portions are

(1) in operation, (2) set up, but not yet in operation,

(3) anticipated, or (4) nonexistent.)

STANDARD FORM 1408 (REV. 1/2014) BACK

8.2.1.3144.1.471865.466429 Standard Form 1408 - Pre-Award Survey of Prospective Contractor (Accounting System)

PROSPECTIVE CONTRACTOR:
IF CONTINUATION SHEETS ATTACHED - MARK HERE: 0
1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT. YES: 0
1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT. YES, WITH A RECOMMENDATION THAT A FOLLOW ON ACCOUNTING SYSTEM REVIEW BE PERFORMED AFTER CONTRACT AWARD (Explain in 2. NARRATIVE): 0
1. PROSPECTIVE CONTRACTOR'S ACCOUNTING SYSTEM IS ACCEPTABLE FOR AWARD OF PROSPECTIVE CONTRACT. NO (Explain in 2. NARRATIVE): 0
SERIAL NUMBER (For surveying activity use):
2. NARRATIVE (Clarification of deficiencies, and other pertinent comments,. If additional space is required, continue on plain sheets of paper.):
4. SURVEY REVIEWING OFFICIAL. a. SIGNATURE AND OFFICE (include, typed or printed name) (Typed name):
3. SURVEY MADE BY. a. SIGNATURE AND OFFICE (include, typed or printed name) (Typed name):
c. DATE REVIEWED. Enter 2 digit month, 2 digit day and 4 digit year.:
c. DATE SIGNED. Enter 2 digit month, 2 digit day and 4 digit year.:
b. TELEPHONE NUMBER (include area code):
b. TELEPHONE NUMBER (include area code):
4. Survey Reviewing Official. (a) Signature and Office. Sign here if you are the Survey Reviewing Official.:
1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES? YES.: 0
a. Proper segregation of direct costs from indirect costs. YES.: 0
b. Identification and accumulation of direct costs by contract. YES.: 0
c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.) YES.: 0
1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES? NO.: 0
a. Proper segregation of direct costs from indirect costs. NO.: 0
b. Identification and accumulation of direct costs by contract. NO.: 0
c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.) NO.: 0
1. EXCEPT AS STATED IN SECTION I NARRATIVE, IS THE ACCOUNTING SYSTEM IN ACCORD WITH GENERALLY ACCEPTED ACCOUNTING PRINCIPLES APPLICABLE IN THE CIRCUMSTANCES? NOT APPLICABLE.: 0
a. Proper segregation of direct costs from indirect costs. NOT APPLICABLE.: 0
b. Identification and accumulation of direct costs by contract. NOT APPLICABLE. : 0
c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.) NOT APPLICABLE. : 0
d. Accumulation of costs under general ledger control. YES.: 0
e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives. NOT APPLICABLE.: 0
f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives. YES.: 0
g. Interim (at least monthly) determination of cost charged to a contract through routine posting of books of account. NOT APPLICABLE.: 0
h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions. YES.: 0
i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract. NOT APPLICABLE.: 0
j. Segregation of preproduction costs from production costs. YES.: 0
a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16). NOT APPLICABLE.: 0
b. Required to support request for progress payments. YES : 0
4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS? NOT APPLICABLE.:
5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION? YES

(If not, describe in Section I Narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.): 0

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION? NO

(If not, describe in Section I Narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.) : 0

5. IS THE ACCOUNTING SYSTEM CURRENTLY IN FULL OPERATION? NOT APPLICABLE

(If not, describe in Section I Narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.) : 0

4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS? NO.: 0
4. IS THE ACCOUNTING SYSTEM DESIGNED, AND ARE THE RECORDS MAINTAINED IN SUCH A MANNER THAT ADEQUATE, RELIABLE DATA ARE DEVELOPED FOR USE IN PRICING FOLLOW-ON ACQUISITIONS? YES: 0
b. Required to support request for progress payments. NO.: 0
b. Required to support request for progress payments. NOT APPLICABLE.: 0
a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16). NO.: 0
a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16). YES.: 0
j. Segregation of preproduction costs from production costs. NO.: 0
j. Segregation of preproduction costs from production costs. NOT APPLICABLE.: 0
i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract. NO.: 0
i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract. YES.: 0
h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions. NO.: 0
h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions. NOT APPLICABLE.: 0
g. Interim (at least monthly) determination of cost charged to a contract through routine posting of books of account. NO. : 0
g. Interim (at least monthly) determination of cost charged to a contract through routine posting of books of account. YES.: 0
f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives. NO.: 0
f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives. NOT APPLICABLE.: 0
e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives. NO.: 0
e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives. YES.: 0
d. Accumulation of costs under general ledger control. NO.: 0
d. Accumulation of costs under general ledger control. NOT APPLICABLE. : 0

File details come from the government source that posted it. Updated .