ATTACH_9_-_(A00004)GFM_Instruc-HSBP1014R0058.docx

DOCX document 14 KB Posted

Attached to
CTIMR Area 4 Modification A0005 Federal contract opportunity
Solicitation number
HSBP1014R0058
Issued by
Department of Homeland Security Customs and Border Protection

About this file

GFM Instructions

View the file

Other files for this federal contract opportunity

Other files attached to CTIMR Area 4 Modification A0005, newest first.
File Type Posted
ATTACH_5-_(A00006)Proposal_Cost_Template_HSBP1014R0058_12-22-14_R3.xlsx XLSX spreadsheet
CTIMR_Area_4_QA_Responses_Amendment_A00006.docx DOCX document
WA4_RFP_1014R0058_Amendment_06.pdf PDF
CTIMR_Q_ _A_Reference.docx DOCX document
Copy_of_ATTACH_5-_(A00005)Proposal_Cost_Template_HSBP1014R0058_140806_R1.xlsx XLSX spreadsheet
ATTACH_3-_(A00005)Sample_Work_Plan_Request_CTIMR_WA4_Final_12-11-14.docx DOCX document
CTIMR_Area_4_QA_Responses_Amendment_A00005.pdf PDF
CTIMR_Area_4_Amendment_5.pdf PDF
CTIMR_AREA_4_Site_Visit_Attendee_List.xlsx XLSX spreadsheet
UPDATEDREVISION_WA4_Site_Visit_Sechedule_and_Detailed_Sites_Nov_17_14_.doc.docx DOCX document
Updated_WA4_Site_Visit_Sechedule_and_Detailed_Sites_Info_Nov_17_14_.docx DOCX document
WA4_RFP_1014R0058_Amendment_03.pdf PDF
SF30_1014R0058_A0002.pdf PDF
REVISED_CTIMR_Area_4_Site_Visit_Schedule_and_Detailed_Sites_Nov_17_to_21_REV_2.docx DOCX document
REVISED_CTIMR_Area_4_Site_Visit_Schedule_and_Detailed_Sites_Nov_17_to_21_REV_2.docx DOCX document
ATTACH_14-_Appendix_A_Road_Maintenance_Technique_Definitions_.docx DOCX document
CTIMR_Area_4_Proposal_Cost_Template_HSBP1014R0058.xlsx XLSX spreadsheet
Instructions_for_Proposal_Cost_Template_HSBP1014R0058.docx DOCX document
CTIMR_Area_4_Amendment_Questions_and_Answers.pdf PDF
CTIMR_Area_4_Amendment_A00001_Changes.pdf PDF
CTIMR_Area_4_Site_Visit_Sechedule_and_Detailed_Sites_Nov_3_to_7_.docx DOCX document
WA4_RFP_FINAL_8282014.docx DOCX document
ATTACH_7-_(A00001)Consent_Letter_(3).docx DOCX document
ATTACH_4-_(A00004)Instructions_for_Proposal_Cost_Template_HSBP1014R0058_140806.docx DOCX document
ATTACH_1-_(A00004)TX_TIMR_BMPs.pdf PDF
ATTACH_12-_(A00004)Pre-Award_LTR_to_Contractor.docx DOCX document
ATTACH_2-(A00004)Notice_Regarding_Landlord-HSBP1013R0017.docx DOCX document
ATTACH_3-_(A00004)Sample_Work_Plan_Request_CTIMR_WA4_Final_3_07-24-14.doc DOC document
ATTACH_13-_(A00004)Pre-Award_Survey-SF-1408.docx DOCX document
ATTACH_11-(A00004)TI_Design_Standards_v1_Sept_2012.zip ZIP file
ATTACH_8-_(A00004)Client_Authorization_Letter_HSBP1014R0058.docx DOCX document
ATTACH_10-_CTIMR_WA4_Wage_Determinations_Combined..pdf PDF
ATTACH_5-_(A00004)Proposal_Cost_Template_HSBP1014R0058_140806.xlsx XLSX spreadsheet
ATTACH_6-_(A00004)_Past_Perf.Questionaire__HSBP1014R0058.docx DOCX document
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 8

Instructions for Completing Government Furnished Materials (GFM) Order Form

1. The form is prepared in Excel 2003 for Microsoft Office 2003.

1. There is one workbook with four worksheets. The worksheet labeled data has no fields for CTIMR contractor to input and is for workbook references only.

1. Contractor to provide data in the fields shaded in Yellow. NOTE: Contractor should begin with worksheet labeled “Truck Calculation” as many fields on this worksheet populate fields in worksheet “Truck Schedule Request”.

1. Contractor provides CTIMR Region, Contract #, Task Order #, Contractor’s Name, Address, and Point of Contact’s Name, Phone Number and Email Address. Pickup location is defaulted to El Paso, TX. (TI SCM may direct material from another location; however this will be coordinated with CTIMR contract in advance).

1. Contractor enters Order Date, i.e., the date that the form is submitted.

1. Contractor enters Order Number. Order numbers will be sequential beginning at 1. If an existing order needs revision, the order number should be maintained but revision number should be added, i.e. 1-Rev. 1, 1-Rev.-2. If Order Number will be used as tracking number for submissions.

1. Contractor goes to bill of material area and enters number of bundles requested for each type of material (default is 0). All material will be provided in whole bundles. The spreadsheet will calculate estimated number of trucks required based on trucks capable of 46,000 lb loads.

1. Contractor goes to worksheet labeled “Truck Schedule Request”, enters the date for the first day of requested material pickup (cell B7). The first day requested should be in accordance with the GFM Procedure. Requests are limited to Monday through Friday.

1. Contractor enters the number of bundles of each material requested for pickup on Distribution Day #1 (cells B9 to B28). The request may exceed one truckload and be up to the maximum permitted per the GFM Procedure instructions. The spreadsheet will calculate total weight and estimated trucks based on 46,000 lb truckload capacity. NOTE: If CTIMR contractor intends to use multiple storage locations and wants loads specifically tailored to each location, they should submit separate orders for each location. Contractor enters different requested loads for each day until they have completed entered sufficient trucks to pick up requested material.

1. Contractor goes to worksheet labeled “Mesh Schedule Request”, and follows the same procedures from number 8 and 9 above for MESH.

1. Revisions to the original submittal form can be made by changing the order number by adding “Revision-X” as required. Please highlight all changes with red font.

File details come from the government source that posted it. Updated .