AF Form 3052 (Blank) 14 May 20.xlsx

Air Force Form May 14, 2020 XLSX spreadsheet 32 KB Posted

Attached to
Site Support for AMARG Tension Fabric #3-6
Solicitation number
FA487720Q0015
Issued by

View the file

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx Revision not stated Maxwell AFB - Airfield Repairs - Amendment 0006
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
B6 AF Form 3052 - Construction Cost Estimate.pdf Revision not stated Emergent Requirements Construction IDIQ (Single-Award)
AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx Revision not stated FBNV240026 Replace Cathodic Protection Test Points DMAFB
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
5. AF Form 3052-BLANK.xlsx Revision not stated Replace Swamp Cooler B5045
Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Battery Room - Maxwell AFB, AL (Solicitation)
Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx Revision not stated PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
Show all 20

Who attaches AF Form 3052

Other files

File Type Posted
Solicitation Amendment FA487720Q00150001 SF 30 (3).pdf PDF
Signin sheet.pdf PDF
12 - Utilities Map.pdf PDF
11 - Solicitation Notes.docx DOCX document
06 - AF Form 3052 (Blank).xlsx XLSX spreadsheet
02 - Project Specifications.pdf PDF
Solicitation - FA487720Q0015.pdf PDF
09 - GFP Rock Stockpiles Photos.pdf PDF
03 - WD AZ20200018.docx DOCX document
04 - Schedule of Items (Blank).docx DOCX document
08 - Tension Fabric Shelter New Site Photos.pdf PDF
10 - Canvas storage bldg.pdf PDF
06 - New Shelter Site(s) Aerial.png PNG image
07 - Tension Fabric Shelter Existing Photos.pdf PDF
01 - Project Drawings.pdf PDF
05 - GFP Rock piles.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR(WORK TO BE PERFORMED)Site Support for AMARG Tension Fabric Structures #3 - 6PROPOSED TOTAL CONTRACT PRICE0
PURCHASE REQUEST NUMBERPROJECT NUMBERFBNV 20-0009WORK LOCATIONDAVIS-MONTHAN AFB, AZ 85707
LINEUNIT OFMATERIAL COSTLABOR COSTDIRECTLINE
NO.ITEMMEASUREQUANTITYUNITTOTALMANHOURSRATETOTALCOSTSTOTAL
SUMMARY
1SUBTOTAL DIVISION 01 GENERAL CONDITIONS (Construction)0.000.000.000.000.00
2SUBTOTAL DIVISION 03 CONCRETE (Construction)0.000.000.000.000.00
3SUBTOTAL DIVISION 31 EARTHWORK (Construction)0.000.000.000.000.00
4SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS (Construction)0.000.000.000.000.00
LINE TOTALS CONSTRUCTION0.000.000.000.000.00
OVERHEAD TOTAL CONSTRUCTION (___%)0.00
SUBTOTAL CONSTRUCTION W/ OVERHEAD0.00
PROFIT TOTAL CONSTRUCTION (___%)0.00
SUBTOTAL CONSTRUCTION W/ OVERHEAD AND PROFIT0.00
TAX CONSTRUCTION ____%0.00
BOND CONSTRUCTION (___%)0.00
TOTAL CONSTRUCTION PROJECT PRICE0.00
1SUBTOTAL DIVISION 01 GENERAL CONDITIONS (Repair)0.000.000.000.000.00
2SUBTOTAL DIVISION 31 EARTHWORK (Construction)0.000.000.000.000.00
LINE TOTALS REPAIR0.000.000.000.000.00
OVERHEAD TOTAL REPAIR (___%)0.00
SUBTOTAL REPAIR W/ OVERHEAD0.00
PROFIT TOTAL REPAIR (___%)0.00
SUBTOTAL REPAIR W/ OVERHEAD AND PROFIT0.00
TAX REPAIR ____%0.00
BOND REPAIR (___%)0.00
TOTAL REPAIR PROJECT PRICE0.00

TOTAL OVERALL PROJECT PRICE 0.00

DATE:FIRM NAME:
TITLE:PROJECT MANAGERBY:
DIVISION 01 GENERAL CONDITIONS (Construction)
1Swan Gate Search RequirementsLS
2Project ManagerWk
3SuperintendentWk
4PermitsLS
5Testing, Concrete CylindersEA
6Testing, Density & ClassificationEA
7Testing, Soil Density, Sand Cone MethodEA
8Testing, Moisture ContentEA
9Proctor Compaction, 6" Modified Mold, ASTM D 698EA
10Testing Technician for earthworkEA
11Testing Technician for concreteEA
12Moilization/Demobilization - Small EquipmentEA
13Mobilization/Demobilization - Equipment hauled on 20-ton capacity towed trailerEA
14Mobilization/Demobilization - Equipment hauled on 40-ton capacity towed trailerEA
15Water TruckWk
16Surveyor, 2 person crewDay
17Surveyor Stakes, 2" x 2" x 18" longC
18Jobsite cleanupLS
SUBTOTAL DIVISION 01 GENERAL CONDITIONS (Construction)0.000.000.000.000.00
DIVISION 03 CONCRETE (Construction)
1Concrete FormsLF
2Joint FillerLF
3Reinforcing Bar SupportsC
4Tie Wire, 16 GageCWT
5#5 Rebar, Special JointEA
6Welded Wire Fabric (WWF) 4 x 4 - W1.4 x W1.4 (10x10)CSF
7Concrete, 4000 psiCY
8Concrete Curing CompoundCSF
SUBTOTAL DIVISION 03 CONCRETE (Construction)0.000.000.000.000.00
DIVISION 31 EARTHWORK (Construction)
1Topsoil, Remove and Stockpile on siteCY
2Rough Grading, open sitesEA
3Finish Grading, Foundation "Pads"SY
4Grade SubgradeSY
5Excavating, ExcavatorBCY
6Excavating, Front End LoaderBCY
7Excavation, ScraperBCY
8Spread fill, from stockpileLCY
9Hauling, 12 CY Truck, 30 MPH avg, cycle 6 milesLCY
10Compaction, Vibrating rollerECY
SUBTOTAL DIVISION 31 EARTHWORK (Construction)0.000.000.000.000.00
DIVISION 32 EXTERIOR IMPROVEMENTS (Construction)
1Aggregate Base Course (ABC), Compacted, 6" deepSY
SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS (Construction)0.000.000.000.000.00
DIVISION 01 GENERAL CONDITIONS (Repair)
1Swan Gate Search RequirementsLS
2Project ManagerWk
3SuperintendentWk
4Mobilization/Demobilization - Equipment hauled on 3-ton capacity towed trailerEA
5Jobsite cleanupLS
SUBTOTAL DIVISION 01 GENERAL CONDITIONS (Repair)0.000.000.000.000.00
DIVISION 31 EARTHWORK (Repair)
1Spread fill, from stockpileLCY
2Hauling, 12 CY Truck, 30 MPH avg, cycle 6 milesLCY
3Dumped, RiprapTon
SUBTOTAL DIVISION 31 EARTHWORK (Repair)0.000.000.000.000.00