| CONSTRUCTION COST ESTIMATE BREAKDOWN | | | | | | | | | | |
| CONTRACTOR | | | | | ADDRESS | | | | | |
| CONTRACT FOR(WORK TO BE PERFORMED) | | Site Support for AMARG Tension Fabric Structures #3 - 6 | | | | | PROPOSED TOTAL CONTRACT PRICE | | | 0 |
| PURCHASE REQUEST NUMBER | | | | PROJECT NUMBER | FBNV 20-0009 | | WORK LOCATION | DAVIS-MONTHAN AFB, AZ 85707 | | |
| LINE | | UNIT OF | | MATERIAL COST | | | LABOR COST | | DIRECT | LINE |
| NO. | ITEM | MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS | RATE | TOTAL | COSTS | TOTAL |
| SUMMARY | | | | | | | | | |
| 1 | SUBTOTAL DIVISION 01 GENERAL CONDITIONS (Construction) | | | | 0.00 | 0.00 | | 0.00 | 0.00 | 0.00 |
| 2 | SUBTOTAL DIVISION 03 CONCRETE (Construction) | | | | 0.00 | 0.00 | | 0.00 | 0.00 | 0.00 |
| 3 | SUBTOTAL DIVISION 31 EARTHWORK (Construction) | | | | 0.00 | 0.00 | | 0.00 | 0.00 | 0.00 |
| 4 | SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS (Construction) | | | | 0.00 | 0.00 | | 0.00 | 0.00 | 0.00 |
| LINE TOTALS CONSTRUCTION | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| OVERHEAD TOTAL CONSTRUCTION (___%) | | | | | 0.00 |
| SUBTOTAL CONSTRUCTION W/ OVERHEAD | | | | | 0.00 |
| PROFIT TOTAL CONSTRUCTION (___%) | | | | | 0.00 |
| SUBTOTAL CONSTRUCTION W/ OVERHEAD AND PROFIT | | | | | 0.00 |
| TAX CONSTRUCTION ____% | | | | | 0.00 |
| BOND CONSTRUCTION (___%) | | | | | 0.00 |
| TOTAL CONSTRUCTION PROJECT PRICE | | | | | 0.00 |
| 1 | SUBTOTAL DIVISION 01 GENERAL CONDITIONS (Repair) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| 2 | SUBTOTAL DIVISION 31 EARTHWORK (Construction) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| LINE TOTALS REPAIR | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| OVERHEAD TOTAL REPAIR (___%) | | | | | 0.00 |
| SUBTOTAL REPAIR W/ OVERHEAD | | | | | 0.00 |
| PROFIT TOTAL REPAIR (___%) | | | | | 0.00 |
| SUBTOTAL REPAIR W/ OVERHEAD AND PROFIT | | | | | 0.00 |
| TAX REPAIR ____% | | | | | 0.00 |
| BOND REPAIR (___%) | | | | | 0.00 |
| TOTAL REPAIR PROJECT PRICE | | | | | 0.00 |
TOTAL OVERALL PROJECT PRICE 0.00
| DATE: | | FIRM NAME: |
| TITLE: | PROJECT MANAGER | BY: |
| DIVISION 01 GENERAL CONDITIONS (Construction) | | | | | | |
| 1 | Swan Gate Search Requirements | LS | | | | | |
| 2 | Project Manager | Wk | | | | | |
| 3 | Superintendent | Wk | | | | | |
| 4 | Permits | LS | | | | | |
| 5 | Testing, Concrete Cylinders | EA | | | | | |
| 6 | Testing, Density & Classification | EA | | | | | |
| 7 | Testing, Soil Density, Sand Cone Method | EA | | | | | |
| 8 | Testing, Moisture Content | EA | | | | | |
| 9 | Proctor Compaction, 6" Modified Mold, ASTM D 698 | EA | | | | | |
| 10 | Testing Technician for earthwork | EA | | | | | |
| 11 | Testing Technician for concrete | EA | | | | | |
| 12 | Moilization/Demobilization - Small Equipment | EA | | | | | |
| 13 | Mobilization/Demobilization - Equipment hauled on 20-ton capacity towed trailer | EA | | | | | |
| 14 | Mobilization/Demobilization - Equipment hauled on 40-ton capacity towed trailer | EA | | | | | |
| 15 | Water Truck | Wk | | | | | |
| 16 | Surveyor, 2 person crew | Day | | | | | |
| 17 | Surveyor Stakes, 2" x 2" x 18" long | C | | | | | |
| 18 | Jobsite cleanup | LS | | | | | |
| SUBTOTAL DIVISION 01 GENERAL CONDITIONS (Construction) | | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| DIVISION 03 CONCRETE (Construction) | | | | | | |
| 1 | Concrete Forms | LF | | | | | |
| 2 | Joint Filler | LF | | | | | |
| 3 | Reinforcing Bar Supports | C | | | | | |
| 4 | Tie Wire, 16 Gage | CWT | | | | | |
| 5 | #5 Rebar, Special Joint | EA | | | | | |
| 6 | Welded Wire Fabric (WWF) 4 x 4 - W1.4 x W1.4 (10x10) | CSF | | | | | |
| 7 | Concrete, 4000 psi | CY | | | | | |
| 8 | Concrete Curing Compound | CSF | | | | | |
| SUBTOTAL DIVISION 03 CONCRETE (Construction) | | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| DIVISION 31 EARTHWORK (Construction) | | | | | | |
| 1 | Topsoil, Remove and Stockpile on site | CY | | | | | |
| 2 | Rough Grading, open sites | EA | | | | | |
| 3 | Finish Grading, Foundation "Pads" | SY | | | | | |
| 4 | Grade Subgrade | SY | | | | | |
| 5 | Excavating, Excavator | BCY | | | | | |
| 6 | Excavating, Front End Loader | BCY | | | | | |
| 7 | Excavation, Scraper | BCY | | | | | |
| 8 | Spread fill, from stockpile | LCY | | | | | |
| 9 | Hauling, 12 CY Truck, 30 MPH avg, cycle 6 miles | LCY | | | | | |
| 10 | Compaction, Vibrating roller | ECY | | | | | |
| SUBTOTAL DIVISION 31 EARTHWORK (Construction) | | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| DIVISION 32 EXTERIOR IMPROVEMENTS (Construction) | | | | | | |
| 1 | Aggregate Base Course (ABC), Compacted, 6" deep | SY | | | | | |
| SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS (Construction) | | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| DIVISION 01 GENERAL CONDITIONS (Repair) | | | | | | |
| 1 | Swan Gate Search Requirements | LS | | | | | |
| 2 | Project Manager | Wk | | | | | |
| 3 | Superintendent | Wk | | | | | |
| 4 | Mobilization/Demobilization - Equipment hauled on 3-ton capacity towed trailer | EA | | | | | |
| 5 | Jobsite cleanup | LS | | | | | |
| SUBTOTAL DIVISION 01 GENERAL CONDITIONS (Repair) | | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| DIVISION 31 EARTHWORK (Repair) | | | | | | |
| 1 | Spread fill, from stockpile | LCY | | | | | |
| 2 | Hauling, 12 CY Truck, 30 MPH avg, cycle 6 miles | LCY | | | | | |
| 3 | Dumped, Riprap | Ton | | | | | |
| SUBTOTAL DIVISION 31 EARTHWORK (Repair) | | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |