AF Form 3052 (Blank) 14 May 20.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
Site Support for AMARG Tension Fabric #3-6 Federal contract opportunity
Solicitation number
FA487720Q0015
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Site Support for AMARG Tension Fabric #3-6, newest first.
File Type Posted
Solicitation Amendment FA487720Q00150001 SF 30 (3).pdf PDF
Signin sheet.pdf PDF
11 - Solicitation Notes.docx DOCX document
Solicitation - FA487720Q0015.pdf PDF
09 - GFP Rock Stockpiles Photos.pdf PDF
04 - Schedule of Items (Blank).docx DOCX document
08 - Tension Fabric Shelter New Site Photos.pdf PDF
03 - WD AZ20200018.docx DOCX document
06 - AF Form 3052 (Blank).xlsx XLSX spreadsheet
12 - Utilities Map.pdf PDF
10 - Canvas storage bldg.pdf PDF
02 - Project Specifications.pdf PDF
05 - GFP Rock piles.pdf PDF
07 - Tension Fabric Shelter Existing Photos.pdf PDF
01 - Project Drawings.pdf PDF
06 - New Shelter Site(s) Aerial.png PNG image
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR(WORK TO BE PERFORMED)Site Support for AMARG Tension Fabric Structures #3 - 6PROPOSED TOTAL CONTRACT PRICE0
PURCHASE REQUEST NUMBERPROJECT NUMBERFBNV 20-0009WORK LOCATIONDAVIS-MONTHAN AFB, AZ 85707
LINEUNIT OFMATERIAL COSTLABOR COSTDIRECTLINE
NO.ITEMMEASUREQUANTITYUNITTOTALMANHOURSRATETOTALCOSTSTOTAL
SUMMARY
1SUBTOTAL DIVISION 01 GENERAL CONDITIONS (Construction)0.000.000.000.000.00
2SUBTOTAL DIVISION 03 CONCRETE (Construction)0.000.000.000.000.00
3SUBTOTAL DIVISION 31 EARTHWORK (Construction)0.000.000.000.000.00
4SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS (Construction)0.000.000.000.000.00
LINE TOTALS CONSTRUCTION0.000.000.000.000.00
OVERHEAD TOTAL CONSTRUCTION (___%)0.00
SUBTOTAL CONSTRUCTION W/ OVERHEAD0.00
PROFIT TOTAL CONSTRUCTION (___%)0.00
SUBTOTAL CONSTRUCTION W/ OVERHEAD AND PROFIT0.00
TAX CONSTRUCTION ____%0.00
BOND CONSTRUCTION (___%)0.00
TOTAL CONSTRUCTION PROJECT PRICE0.00
1SUBTOTAL DIVISION 01 GENERAL CONDITIONS (Repair)0.000.000.000.000.00
2SUBTOTAL DIVISION 31 EARTHWORK (Construction)0.000.000.000.000.00
LINE TOTALS REPAIR0.000.000.000.000.00
OVERHEAD TOTAL REPAIR (___%)0.00
SUBTOTAL REPAIR W/ OVERHEAD0.00
PROFIT TOTAL REPAIR (___%)0.00
SUBTOTAL REPAIR W/ OVERHEAD AND PROFIT0.00
TAX REPAIR ____%0.00
BOND REPAIR (___%)0.00
TOTAL REPAIR PROJECT PRICE0.00

TOTAL OVERALL PROJECT PRICE 0.00

DATE:FIRM NAME:
TITLE:PROJECT MANAGERBY:
DIVISION 01 GENERAL CONDITIONS (Construction)
1Swan Gate Search RequirementsLS
2Project ManagerWk
3SuperintendentWk
4PermitsLS
5Testing, Concrete CylindersEA
6Testing, Density & ClassificationEA
7Testing, Soil Density, Sand Cone MethodEA
8Testing, Moisture ContentEA
9Proctor Compaction, 6" Modified Mold, ASTM D 698EA
10Testing Technician for earthworkEA
11Testing Technician for concreteEA
12Moilization/Demobilization - Small EquipmentEA
13Mobilization/Demobilization - Equipment hauled on 20-ton capacity towed trailerEA
14Mobilization/Demobilization - Equipment hauled on 40-ton capacity towed trailerEA
15Water TruckWk
16Surveyor, 2 person crewDay
17Surveyor Stakes, 2" x 2" x 18" longC
18Jobsite cleanupLS
SUBTOTAL DIVISION 01 GENERAL CONDITIONS (Construction)0.000.000.000.000.00
DIVISION 03 CONCRETE (Construction)
1Concrete FormsLF
2Joint FillerLF
3Reinforcing Bar SupportsC
4Tie Wire, 16 GageCWT
5#5 Rebar, Special JointEA
6Welded Wire Fabric (WWF) 4 x 4 - W1.4 x W1.4 (10x10)CSF
7Concrete, 4000 psiCY
8Concrete Curing CompoundCSF
SUBTOTAL DIVISION 03 CONCRETE (Construction)0.000.000.000.000.00
DIVISION 31 EARTHWORK (Construction)
1Topsoil, Remove and Stockpile on siteCY
2Rough Grading, open sitesEA
3Finish Grading, Foundation "Pads"SY
4Grade SubgradeSY
5Excavating, ExcavatorBCY
6Excavating, Front End LoaderBCY
7Excavation, ScraperBCY
8Spread fill, from stockpileLCY
9Hauling, 12 CY Truck, 30 MPH avg, cycle 6 milesLCY
10Compaction, Vibrating rollerECY
SUBTOTAL DIVISION 31 EARTHWORK (Construction)0.000.000.000.000.00
DIVISION 32 EXTERIOR IMPROVEMENTS (Construction)
1Aggregate Base Course (ABC), Compacted, 6" deepSY
SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS (Construction)0.000.000.000.000.00
DIVISION 01 GENERAL CONDITIONS (Repair)
1Swan Gate Search RequirementsLS
2Project ManagerWk
3SuperintendentWk
4Mobilization/Demobilization - Equipment hauled on 3-ton capacity towed trailerEA
5Jobsite cleanupLS
SUBTOTAL DIVISION 01 GENERAL CONDITIONS (Repair)0.000.000.000.000.00
DIVISION 31 EARTHWORK (Repair)
1Spread fill, from stockpileLCY
2Hauling, 12 CY Truck, 30 MPH avg, cycle 6 milesLCY
3Dumped, RiprapTon
SUBTOTAL DIVISION 31 EARTHWORK (Repair)0.000.000.000.000.00