This document comprises a Task Assignment Change Order (TACO) and associated work modifications between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT), a contractor based in Orlando, Florida. The project involves environmental site assessment services at Custom Care Cleaners in Gainesville, Alachua County, Florida (Site ID: ERIC_3980). The primary contract is identified as HW682, with the task assignment numbered DC025A. FDEP's project manager is Karlee Fowler, while ECT's project manager is Mark A. Culbreth.

The services include a comprehensive initial site assessment comprising eight subtasks: project management, health and safety planning with utility clearance, soil sampling using direct push technology (DPT) and groundwater sampling, well installation and groundwater sampling, mobile acoustic geophysical surveying (MAGS), professional land surveying, site assessment report preparation, and PFAS screening. The original contract value was $137,763.34; however, TACO 3 reduces this amount to $131,958.91, reflecting scope reductions in subtasks 3 and 4 offset by increased drilling costs. The contract duration extends to March 6, 2026, with 261 total labor hours budgeted. Deliverables include email-based technical submissions and a final site assessment report, with invoicing contingent upon FDEP approval at each phase. The drilling subcontractor, Preferred Drilling Solutions, Inc., quoted $44,500.00 for expanded well installation scope involving 14 monitoring wells at depths up to 70 feet.

View the file

Other files

File Type Posted
CN-370000-HW682-DC001C.pdf PDF
CN-370000-HW682-DC003A.pdf PDF
CN-370000-HW682-DC003B.pdf PDF
CN-370000-HW682-DC006B.pdf PDF
CN-370000-HW682-DC007C.pdf PDF
CN-370000-HW682-DC007D.pdf PDF
CN-370000-HW682-DC008C.pdf PDF
CN-370000-HW682-DC010B.pdf PDF
CN-370000-HW682-DC010C.pdf PDF
CN-370000-HW682-DC015A.pdf PDF
CN-370000-HW682-DC016A.pdf PDF
CN-370000-HW682-DC016B.pdf PDF
CN-370000-HW682-DC021A.pdf PDF
CN-370000-HW682-DC027A.pdf PDF
CN-370000-HW682-DC03CCO2.pdf PDF
CN-370000-HW682-DC03CCO3.pdf PDF
CN-370000-HW682-DC04BCO2.pdf PDF
CN-370000-HW682-DC04BCO3.pdf PDF
CN-370000-HW682-DC04BCO5.pdf PDF
CN-370000-HW682-DC05BCO6.pdf PDF
CN-370000-HW682-DC05BCO8.pdf PDF
CN-370000-HW682-DC06BCO1.pdf PDF
CN-370000-HW682-DC06BCO2.pdf PDF
CN-370000-HW682-DC08DCO1.pdf PDF
CN-370000-HW682-DC09ACO2.pdf PDF
CN-370000-HW682-DC09ACO3.pdf PDF
CN-370000-HW682-DC10BCO1.pdf PDF
CN-370000-HW682-DC11ACO4.pdf PDF
CN-370000-HW682-DC11ACO6.pdf PDF
CN-370000-HW682-DC13ACO1.pdf PDF
CN-370000-HW682-DC13BCO1.pdf PDF
CN-370000-HW682-DC13BCO7.pdf PDF
CN-370000-HW682-DC16ACO2.pdf PDF
CN-370000-HW682-DC18ACO2.pdf PDF
CN-370000-HW682-DC18ACO3.pdf PDF
CN-370000-HW682-DC20ACO1.pdf PDF
CN-370000-HW682-DC21ACO1.pdf PDF
CN-370000-HW682-DC21BCO1.pdf PDF
CN-370000-HW682-DC22ACO2.pdf PDF
CN-370000-HW682-DC24ACO1.pdf PDF
CN-370000-HW682-DC26ACO3.pdf PDF
CN-370000-HW682-DC27ACO1.pdf PDF
CN-370000-HW682-DC28ACO1.pdf PDF
CN-370000-HW682-FIL2.pdf PDF
CN-370000-HW682-FIL6.pdf PDF
CN-370000-HW682-HW001A.pdf PDF
CN-370000-HW682-HW004A.pdf PDF
CN-370000-HW682-HW006A.pdf PDF
CN-370000-HW682-HW007A.pdf PDF
CN-370000-HW682-HW011A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC025A 3 HW682

Karlee Fowler 850-245-8944 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor

Contractor Mark A. Culbreth Contractor 813-289-9338

ERIC_3980

Custom Care Cleaners

✔ $ 131,958.91 $ 137,763.34

$ 131,958.91 $ 137,763.34 ✔ Completion

Completion 03/06/2026 03/06/2026 0

✔ 1 1 3

Environmental Consulting& Technology, Inc Contractor Mark A. Cubreth

Contract Manager

8/28/2025

Digitally signed by Mark Culbreth Date: 2025.08.28 14:38:13-04'00'Mark Culbreth Tim Bahr Digitally signed by Tim Bahr

Date: 2025.08.28 13:55:37 -04'00'

This change order reconciles an overall cost reduction caused by scope changes in Subtask 4, along with an increase in drilling costs as described in WCD-2.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW682

DC025A

$ 131,958.91

Email Deliverable for GPR & Field Notes (Subtask 2)

Email Deliverable for DPT, Soil Field Notes, & IDW Manifest (Subtask 3)

Email Deliverable for Well Install, Field Notes, Well Permits, and IDW Manifest (Subtask 4)

Email Deliverable for MAGS, PLS (Subtasks 5 & 6)

Email Deliverable for PFAS Screening (Subtask 8)

Project Management, Site Assessment Report (Subtask 1 & 7)

FDEP Approval of Email Deliverable for GPR & Field Notes (Subtask 2)

FDEP Approval of Email Deliverable for Well Install, Field Notes, Well Permits, and IDW Manifest (Subtask 4)

FDEP Approval of Email Deliverable for MAGS, PLS (Subtasks 5 & 6)

FDEP Approval of Project Management, Site Assessment Report (Subtask 1 & 7)

FDEP Approval of Email Deliverable for PFAS Screening (Subtask 8)

FDEP Approval of Email Deliverable for DPT, Soil Field Notes, & IDW Manifest (Subtask 3)

01/31/2025

05/16/2025

07/25/2025

10/03/2025

12/05/2025

10/03/2025

$ 40,967.66

$ 2,981.07

$ 63,578.03

$ 10,850.67

$ 519.70

$ 13,061.78

TO:

FROM:

SUBJECT:

DATE:

HW682 Contract Negotiation Fil Cleaners

, County

ERIC_

Karlee Fowler, Project Manager Negotiation Summary HW682 August 20, 20 5

F D E P

C O S T

E S T I M A T E

C on tra ct or

En vir on m en ta l C on su ltin g

Te ch no lo gy , I nc at e:

7/

/2

Ta sk

Su bT as k

Pr oj ec t M an ag em en t Su bT as k

Pr of es sio na l L an d

Su rv ey

Si te

C us to m C ar e

C le an er s as k

H

AS

P

U til ity

C le ar an ce Su bT as k

SA

R

P re pa ra tio n

Ac tiv ity /P ha se

In itia l S ite A ss es sm en t ( O rig in al

T

AC

O s

1- 3)

Su bT as k

So il S am pl in g w ith D

PT

G ro un dw at er

S am pl in g Su bT as k

PF

AS

R ep or t

Pr oj ec t M an ag er

M ar k C ul br et h as k

W el l I ns ta lla tio n

G ro un dw at er S am pl in g

Su bT as k

Su bT as k

M

AG

S

Su bT as k

To ta ls

La bo r R at e

C at eg or y $8

4.

Pr oj ec t M an ag

.9

.9

$8 4.

Se ni or

P rin ci pa l S ci en tis t ( M

C

7.

0.

2.

$5

4.

Se ni or E ng in ee r /

S ci en tis t ( R

P)

.0 0.

0.

0.

$5

5.

Se ni or E ng in ee r /

S ci en tis t ( D

P)

6.

.0

.0

.0

$2 8.

G

IS

A na lys t / G ra ph ic s

(J V)

.0

0.

$2 4.

As so ci at e

En gi ne er

Sc ie nt ist (J

P)

.0

.0

$2

3.

Te ch ni ci an (M

W

.0

$3

4.

Ad m in ist ra tiv e (B

J)

.0

To ta l H ou rs

0.

.9

.5

.5

.0

.0

9.

.0

4.

D ire ct L ab or

$1

3, 4.

$1 ,5

.5

$6

.0

$3

,3

.0

$3 ,4

.1

$9

.2

$2

.4

$2

,8

.8

$1

.2

O ve rh ea d

5.

$1

6, 8.

$1 ,8

.4

$8

.8

$4

,1

.2

$4 ,3

.7

$1

,2

.2

$3

.3

$3 ,5

.5

$2

.0

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fr in ge

.4

0% $6

,3

.7

$7

.5

$3

.7

$1 ,5

.5

$1

,6

.3

$4

.1

$1

.7

$1 ,3

.4

$8

2.

To ta l L

$3 6, 5.

$4

,1

.5

$1 ,7

.6

$9

,0

.8

$9 ,3

.1

$2

,6

.6

$6

.5

$7 ,7

.7

$4

.4

Tr av el Ve hi cl e R en ta l $1

,6

.0

$1

.0

$4

.0

$7

.0

$2

.0

$1

.0

$0 .0

$0

.0

Pe r d ie m

H ot el

$2 ,0

.0

$0

.0

$7

.0

$7

.0

$4

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $3

,6

.0

$1

.0

$1 ,2

.0

$1

,5

.0

$6

.0

$1

.0

$0 .0

$0

.0

Su bc on tr ac to r (E qu ip m en t P ro cu re m en t) bc on tra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pr oc ur em en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tr ac to r (S er vi ce s

Pr oc ur em t) ril lin g (C on ve nt io na l)

$5 6, 2.

$0

.0

$1 6, 5.

$4

0, 7.

$0 .0

$0

.0

$0 .0

$0

.0

Su rv ey in g $3

,9

.7

$0 .0

$0

.0

$0 .0

$0

.0

$3 ,9

.7

$0

.0

$0 .0

ID

W $3

,1

.0

$0 .0

$0

.0

$3 ,1

.0

$0

.0

$0 .0

$0

.0

$0 .0

G

PR

$8

.0

$8

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Su bc on tra ct or S ub to ta l

$6 4, 4.

$8

.0

$1

6, 5.

$4 3, 7.

$0

.0

$3 ,9

.7

$0

.0

$0 .0

H an dl in g

Fe e

$6 ,4

.4

$8

0.

$1 ,6

.5

$4

,3

.7

$0 .0

$3

.1

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $7

0, 8.

$8

.0

$1 7, 6.

$4

7, 8.

$0 .0

$4

,3

.9

$0 .0

$0

.0

La bo ra to ry

An al yt ic al C os ts

$1 2, 2.

$0

.0

$9 ,6

.0

$1

,5

.0

$1 ,2

.0

$0

.0

$0 .0

$0

.0

Sa m pl e

Sh ip pi ng

$5

.0

$0 .0

$3

.0

$7

0.

$1

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or at or y $1

2, 2.

$0 .0

$1

0, 2.

$1 ,6

.0

$1

,3

.0

$0 .0

$0

.0

$0 .0

Fi el d

Ex pe ns es

Ex pe nd ab le s $5

.0

$4

0.

$2

.0

$2

.0

$4 0.

$4

0.

$0 .0

$0

.0

So il A ss es sm en t K it

$7

.0

$0 .0

$7

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M on ito rin g w el l I ns ta ll K it

$1 ,9

.0

$0

.0

$6

.0

$1 ,3

.0

$0

.0

$0 .0

$0

.0

$0 .0

Sh al lo w G ro un dw at er S am pl in g

Ki t

$8

.0

$0 .0

$2

.0

$5

.0

$0

.0

$0 .0

$0

.0

$0 .0

Ic e $9

1.

$0 .0

$6

5.

$2 6.

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ur ve y St at io n $1

.0

$0

.0

$5 0.

$5

0.

$0 .0

$0

.0

$0 .0

$0

.0

D ee p G ro un dw at er S am pl in g

Ki t

$4

.0

$0 .0

$0

.0

$4

.0

$0 .0

$0

.0

$0 .0

$0

.0

M

AG

S K it $5

.0

$0

.0

$0 .0

$0

.0

$5

.0

$0 .0

$0

.0

$0 .0

Ai r S am pl in g C an ist er s

$2

.0

$0 .0

$0

.0

$7 0.

$1

.0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$5 ,4

.0

$4

0.

$1 ,9

.0

$2

,6

.0

$7

.0

$4 0.

$0

.0

$0 .0

Su bt ot al

$1

,8

.0

$4 ,1

.5

$2

,8

.6

$4 0, 6.

$6

2, 1.

$5 ,3

.6

$5

,1

.4

$7 ,7

.7

$4

.4

C om pl et io n Fe e $3

,6

.5

$4

.6

$1

.4

$9

.2

$9

.2

$2

.8

$6 7.

$7

.7

$4

7.

To ta l E st im at ed C os t

$1

,9

.9

$4 ,5

.2

$2

,9

.0

$4 0, 7.

$6

3, 8.

$5 ,6

.4

$5

,2

.1

$8 ,5

.5

$5

.7

Pa ge

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Custom Care Cleaners SUBTASK 2: HASP & Utility Clearance

DATE: 7/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Senior Principal Review Health and Safety Plan 0.5 Scientist

Total Hours 0.5 D. Phillips Senior Scientist Prepare Health and Safety Plan 2

Verification of property ownership, notify RPO of field activities 1 Obtain off-site access - 1 property 3 Mobilizationfrom Gainesville to Orlando 3.5 Utility clearance 1.5

Total Hours 11

TOTAL LABOR 11.5

VEHICLE TYPE RATE UNIT USAGE

Rental Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

Site Lines, LLC Private Utility Location $800.00 1 $800.00

TOTAL $800.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Expendables $40.00 Event 1 $40.00

TOTAL EQUIPMENT $40.00

FINAL --7/24/96

SUBTASK 3: Soil Sampling with DPT & Groundwater Sampling

DATE: 7/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Senior Principal SPLP evaluation 1

Scientist Develop conceptual site model based on review of lithologic data and water levels 1.5 Total Hours 2.5

D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Gainesville 6 Soil Borings and DPT Sampling 45 DTW measurements & grab groundwater sampling at 5 wells 4 Characterization of waste to profile soil & water IDW drums for transportation and disposal 0 Work with Erwin Remediation to have IDW picked up, transported, and disposed of. 0

Total Hours 55 B. Jarvis Administrative Create tables and data entry 2

Total Hours 2

TOTAL LABOR 59.5

VEHICLE TYPE RATE UNIT USAGE

Rental Truck $480.00 week 1 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USAGE

Hotel D Phillips $150.00 day 4 $600.00 Per Diem D Phillips $36.00 day 5 $180.00

TOTAL PER DIEM $780.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection DPT Soil & Groundwater Sampling $16,215.00 1 $16,215.00 Erwin Remediation IDW T&D Soil $150.00 0 $0.00 Erwin Remediation IDW T&D Water $125.00 0 $0.00

TOTAL $16,215.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC UNITS

USEPA Method 8260 Full list Soil SBs $110.00 51 $5,610.00 SPLP Extractions $45.00 2 $90.00 USEPA Method 8260 for Full list Groundwater DPT $110.00 22 $2,420.00 USEPA Method 8260 Full list Grab samples for 5 MWs $110.00 3 $330.00 USEPA Method 8260 for SPLP $110.00 2 $220.00 Encore Samplers $16.00 51 $816.00 IDW USEPA Method 8260 for Full list Soil $110.00 0 $0.00 IDW Encore Samplers $16.00 0 $0.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals $56.00 1 $56.00 IDW USEPA Method 8260 for Full list Purge water $110.00 1 $110.00 Shipping Samples $70.00 5 $350.00

TOTAL LAB $10,002.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Expendables $40.00 Day 5 $200.00 Soil Assessment Kit $700.00 Week 1 $700.00 Monitoring well Install Kit $325.00 Day 2 $650.00 Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00 Ice $6.50 each 10 $65.00 Total Survey Station $50.00 day 1 $50.00

TOTAL EQUIPMENT $1,955.00

SUBTASK 4: Well Installation & Groundwater Sampling

DATE: 7/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Gainesville 6 Oversight of well installation 47

Characterization of waste to profile soil & water IDW drums for transportation and disposal 1 Work with Erwin Remediation to have IDW picked up, transported, and disposed of. 1

Total Hours 55 J. Penia 0

DTW measurement & Sampling Wells (9 shallow, 4 intermediate & 1 deep), containerize water 14 Total Hours 14

B. Jarvis Administrative Create tables and data entry 2

Total Hours 2

TOTAL LABOR 71

VEHICLE TYPE RATE UNIT USAGE

Rental Truck DP $480.00 week 1 $480.00 Rental Truck JP $120.00 day 2 $240.00

TOTAL VEHICLE $720.00

PER DIEM STAFF RATE UNIT USAGE

Hotel D Phillips $150.00 day 4 $600.00 Per Diem D Phillips $36.00 day 5 $180.00

Hotel J. Penia $150.00 day 0 $0.00 Per Diem J. Penia $36.00 day 0 $0.00

TOTAL PER DIEM $780.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNITS

Preferred Drilling Solutions Well install 1 $40,017.85 Erwin Remediation PFAS Profile Fee $350.00 1 $350.00 Erwin Remediation IDW T&D Soil $195.00 0 $0.00 Erwin Remediation IDW T&D Soil $110.00 8 $880.00 Erwin Remediation IDW T&D Water $195.00 3 $585.00 Erwin Remediation IDW T&D Water $125.00 11 $1,375.00

TOTAL $43,207.85

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units IDW USEPA Method 8260 for Full list Soil $110.00 0 $0.00 IDW Encore Samplers $16.00 0 $0.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals $56.00 0 $0.00 IDW USEPA Method 8260 for Full list Purge water $110.00 0 $0.00 USEPA Method 8260 Full list samples from MW's $110.00 14 $1,540.00 Shipping Samples $70.00 1 $70.00

TOTAL LAB $1,610.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Expendables $40.00 Day 5 $200.00 Monitoring well Install Kit $1,300.00 Week 1 $1,300.00 Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00 Ice $6.50 each 4 $26.00 Total Survey Station $50.00 day 1 $50.00 Deep Groundwater Sampling Kit $415.00 Day 1 $415.00 Generator $70.00 Day 1 $70.00

TOTAL EQUIPMENT $2,641.00

$40,017.85

Associate Scientist

Round trip Mobilization from Tampa to the site in Gainesville

SUBTASK 5: MAGS

DATE: 7/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

R. Powell Senior Engineer P.E. oversight of MGAS events (Provide SOW, guidance, and answer field question) 3 Check MAGS data. 3

Total Hours 6 J. Penia Round trip Mobilization from Tampa to the site in Gainesville 4

Perform MAGS Testing 8 Total Hours 12

M. Wiss Technician Round trip Mobilization from Jacksonville to the site in Ocala 4 Perform MAGS Testing 8

Total Hours 12 B. Jarvis Administrative Update tables 2

Total 2

TOTAL LABOR 32

VEHICLE TYPE RATE UNIT USAGE

Rental Truck J. Penia $120.00 day 2 $240.00 Rental Truck B. Carrick $120.00 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USAGE

Hotel J. Penia $150.00 day 1 $150.00 Per Diem J. Penia $36.00 day 2 $72.00

Hotel M. Wiss $150.00 day 1 $150.00 Per Diem M. Wiss $36.00 day 2 $72.00

TOTAL PER DIEM $444.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC Units

USEPA Method TO-15 for VOHs $200.00 6 $1,200.00 Sampling Shipping Overnight $70.00 2 $140.00

TOTAL LAB $1,340.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Expendables $40.00 Day 1 $40.00 MAGS Kit $500.00 Day 1 $500.00 Air Sampling Canisters $33.00 Day 6 $198.00

TOTAL EQUIPMENT $738.00

Associate

SUBTASK 6: Professional Land Survey

DATE: 7/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Senior Scientist Coordinate and schedule with Surveyor 1 Total Hours 1

J. Penia Technician Round trip Mobilize from Tampa to the site in Gainesville 4 PLS Oversight and aid in location of wells 4

Total Hours 8

TOTAL LABOR 9

VEHICLE TYPE RATE UNIT USAGE

Rental Truck J. Penia $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Southeastern Professional Land Survey $3,911.75 1 $3,911.75

TOTAL $3,911.75

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

Expendables $40.00 Event 1 $40.00

TOTAL EQUIPMENT $40.00

SUBTASK 7: SAR Preparation

DATE: 7/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Senior Principal Develop conclusions, recommendations, and prepare final Assessment Report 4

Scientist Total 4

R. Powell Senior Engineer Prepare the draft SAR MAGS section 6 Total 6

D. Phillips Senior Scientist Prepare draft SAR lithological section, create draft figures to be submitted for AutoCAD generatio 30 QA/QC of analytical data 2

J. Von Borstel GIS Analyst Revise and Update Figures 10

Total 10 B. Jarvis Administrative Update tables, Document Preparation & Publishing 4

Total 4

TOTAL LABOR 56

VEHICLE TYPE RATE UNIT USAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

TOTAL EQUIPMENT $0.00

SUBTASK 8: PFAS Report

DATE: 7/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Senior Scientist Prepare PFAS Deliverable 2

J. Von Borstel GIS Analyst Prepare PFAS Figure 1 Total 1

B. Jarvis Administrative Update tables, Document Preparation & Publishing 1 Total 1

TOTAL LABOR 4

VEHICLE TYPE RATE UNIT USAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

TOTAL EQUIPMENT $0.00

E P

C O S T

E S T I M A T E

C on tra ct or

En vir on m en ta l C on su ltin g

Te ch no lo gy , I

/2 sk as k

Pr oj ec t M an ag em en t Su bT as k

Pr of es sio na l L an d

Su rv ey

Si te

C us to m C ar e

C le an as k

H

AS

P

U til ity

C le ar an ce Su bT as k

SA

R

P re pa ra tio n

Ac tiv ity /P ha se

In itia l S ite A ss es sm en t ( O rig in al

T

AC

O s

1- 3)

Su bT as k

So il S am pl in g w ith D

PT

G ro un dw at er

S am pl in g Su bT as k

PF

AS

R ep or t

Pr oj ec t M an ag er

M ar k C ul br as k

W el l I ns ta lla tio n

G ro un dw at er S am pl in g

Su bT as k

Su bT as k

M

AG

S

Su bT as k

To ta ls

La bo r R at e

C at eg or y $8

4.

Pr oj ec t M an

-0 .5

-0 .5

$8 4.

Se ni or

P rin ci pa l S ci en tis t ( M

C

0.

0.

0.

$5

4.

Se ni or E ng in ee r /

S ci en tis t ( R

P) 0.

0.

0.

0.

$5

5.

Se ni or E ng in ee r /

S ci en tis t ( D

P) -3

.0 0.

0.

-3

.0

$2

8.

G

IS

A na lys t /

G ra ph ic s (J

V) 0.

0.

$2

4.

As so ci at e En gi ne er

Sc ie nt ist

(J P)

-6 .0

-6 .0

$2 3.

Te ch ni ci an

(M W

0.

$3 4.

Ad m in ist ra tiv e

(B J)

0.

To ta l H ou rs

-9 .5

-0 .5

0.

0.

-9 .0

0.

0.

0.

0.

D ire ct L

0.

.3 1)

$0 .0

$0

.0

0.

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

5.

9.

.5 1)

$0 .0

$0

.0

8.

$0

.0

$0 .0

$0

.0

$0 .0

G en

A dm in 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fr in ge

.4

0%

6.

.1 1)

$0 .0

$0

.0

6.

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L

.5 v

9.

$0

.0

$0 .0

5.

$0 .0

$0

.0

$0 .0

$0

.0

Tr aS el Ve hi cl e R en ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Pe r d ie m

H ot el

2.

$0 .0

$0

.0

2.

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l v

$0 .0

$0

.0

2.

$0

.0

$0 .0

$0

.0

$0 .0

Eu bc on tr ac to r

$q iu pm en t P ro cu re tv bc on tra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Pr oc ur em en t F ee $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l E ub co nt ra ct or

C os t

0(

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eu bc on tr ac to r

$E er

Sp ce s Pr oc ur e) tv lin g

(C on ve nt io na

l) $4

2.

$0 .0

$0

.0

$4 2.

$0

.0

$0 .0

$0

.0

$0 .0

Su rv ey in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

2, 5.

$0 .0

$0

.0

2, 5.

$0 .0

$0

.0

$0 .0

$0

.0

G

PR

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Su bc on tra ct or

S ub to ta l

2, 2.

$0

.0

$0 .0

2, 2.

$0

.0

$0 .0

$0

.0

$0 .0

H an dl in g

Fe e

7.

$0

.0

$0 .0

7.

$0 .0

$0

.0

$0 .0

$0

.0

To ta l E ub co nt ra ct or C os t

(4 .0 v

$0 .0

$0

.0

3, 9.

$0 .0

$0

.0

$0 .0

$0

.0

La bo ra

An yt ic al C os ts

1, 2.

$0 .0

$0

.0

1, 2.

$0 .0

$0

.0

$0 .0

$0

.0

Sa m pl e

Sh ip pi ng

0.

$0

.0

$0 .0

0.

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y v

$0 .0

$0

.0

1, 2.

$0 .0

$0

.0

$0 .0

$0

.0

Fp el d qx me

Ex pe nd ab le s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

So il A ss es sm en t K it

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M on ito rin g w el l I ns ta ll K it

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Sh al lo w

G ro un dw at er

S am pl in g Ki t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Ic e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ur ve y St at io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ee p

G ro un dw at er

S am pl in g Ki t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M

AG

S

K it

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Ai r S am pl in g

C an ist er s $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l F pe ld q xm en se s

0(

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Eu bt ot al

5, 8.

9.

$0

.0

$0 .0

5, 8.

$0

.0

$0 .0

$0

.0

$0 .0

C

o) ml et po n Fe e

.5

5)

.9

9) $0

.0

$0 .0

.5

6) $0

.0

$0 .0

$0

.0

$0 .0

To ta l q st

p) at ed C os t

8( v

(0 .2 v

0(

0( v

0(

0(

0(

0(

Pa

SUBTASK 2: HASP & Utility Clearance

DATE: 7/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

ETAFF-TITLq WORK DqECRIPTION HOURE

M. Culbreth Senior Principal Review Health and Safety Plan 0 Scientist

Total Hours 0 D. Phillips Senior Scientist Prepare Health and Safety Plan 0

Verification of property ownership, notify RPO of field activities 0 Obtain off-site access - 1 property 0 Mobilizationfrom Gainesville to Orlando 0 Utility clearance 0

Total Hours 0

TOTAL LABOR 0

VEHICLE TYPq RATq UNIT UEAGq Rental Truck $120.00 day 0 $0.00

TOTAL VqHICLq $0.00 PER DIEM ETAFF RATq UNIT UEAGq

TOTAL PqR DIqM $0.00

SUBCONTRACTOR COSTS

NAMq PURPOEq COET UNITE Site Lines, LLC Private Utility Location $800.00 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMqTqR RATq # EAMPLqE #QAQC

TOTAL LAB $0.00

EQUIPMENT ITqM RATq COETING UNIT UEAGq TOTALE Expendables $40.00 Event 0 $0.00

TOTAL qQUIPMqNT $0.00

SUBTASK 3: Soil Sampling with DPT & Groundwater Sampling

DATE: 7/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

ETAFF-TITLq WORK DqECRIPTION HOURE M. Culbreth Senior Principal SPLP evaluation 0

Scientist Develop conceptual site model based on review of lithologic data and water levels 0 Total Hours 0

D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Gainesville 0 Soil Borings and DPT Sampling 0 DTW measurements & grab groundwater sampling at 5 wells 0 Characterization of waste to profile soil & water IDW drums for transportation and disposal 0 Work with Erwin Remediation to have IDW picked up, transported, and disposed of. 0

Total Hours 0 B. Jarvis Administrative Create tables and data entry 0

Total Hours 0

TOTAL LABOR 0

VEHICLE TYPq RATq UNIT UEAGq

Rental Truck $480.00 week 0 $0.00

TOTAL VqHICLq $0.00 PER DIEM ETAFF RATq UNIT UEAGq

Hotel D Phillips $150.00 day 0 $0.00 Per Diem D Phillips $36.00 day 0 $0.00

TOTAL PqR DIqM $0.00

SUBCONTRACTOR COSTS

NAMq PURPOEq COET Groundwater Protection DPT Soil & Groundwater Sampling $16,215.00 0 $0.00 Erwin Remediation IDW T&D Soil $150.00 0 $0.00 Erwin Remediation IDW T&D Water $125.00 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMqTqR RATq # EAMPLqE #QAQC UNITE USEPA Method 8260 Full list Soil SBs $110.00 0 $0.00 SPLP Extractions $45.00 0 $0.00 USEPA Method 8260 for Full list Groundwater DPT $110.00 0 $0.00 USEPA Method 8260 Full list Grab samples for 5 MWs $110.00 0 $0.00 USEPA Method 8260 for SPLP $110.00 0 $0.00 Encore Samplers $16.00 0 $0.00 IDW USEPA Method 8260 for Full list Soil $110.00 0 $0.00 IDW Encore Samplers $16.00 0 $0.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals $56.00 0 $0.00 IDW USEPA Method 8260 for Full list Purge water $110.00 0 $0.00 Shipping Samples $70.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITqM RATq COETING UNIT UEAGq TOTALE

Expendables $40.00 Day 0 $0.00 Soil Assessment Kit $700.00 Week 0 $0.00 Monitoring well Install Kit $325.00 Day 0 $0.00 Shallow Groundwater Sampling Kit $290.00 Day 0 $0.00 Ice $6.50 each 0 $0.00 Total Survey Station $50.00 day 0 $0.00

TOTAL qQUIPMqNT $0.00

SUBTASK 4: Well Installation & Groundwater Sampling

DATE: 7/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

ETAFF-TITLq WORK DqECRIPTION HOURE

D Phillips Senior Scientist Round trip Mobilization from Orlando to the site in Gainesville 0 Oversight of well installation -3

Characterization of waste to profile soil & water IDW drums for transportation and disposal 0 Work with Erwin Remediation to have IDW picked up, transported, and disposed of. 0

Total Hours -3 J. Penia -4

DTW measurement & Sampling Wells (9 shallow, 4 intermediate & 1 deep), containerize water -2 Total Hours -6

B. Jarvis Administrative Create tables and data entry 0

Total Hours 0

TOTAL LABOR -9

VEHICLE TYPq RATq UNIT UEAGq Rental Truck DP $480.00 week 0 $0.00 Rental Truck JP $120.00 day 0 $0.00

TOTAL VqHICLq $0.00 PER DIEM ETAFF RATq UNIT UEAGq

Hotel D Phillips $150.00 day 0 $0.00 Per Diem D Phillips $36.00 day 0 $0.00

Hotel J. Penia $150.00 day -1 ($150.00) Per Diem J. Penia $36.00 day -2 ($72.00)

TOTAL PqR DIqM ($222.00)

SUBCONTRACTOR COSTS

NAMq PURPOEq COET UNITE Preferred Drilling Solutions Well install 1 $42.85 Erwin Remediation PFAS Profile Fee $350.00 0 $0.00 Erwin Remediation IDW T&D Soil $195.00 -20 ($3,900.00) Erwin Remediation IDW T&D Soil $110.00 8 $880.00 Erwin Remediation IDW T&D Water $195.00 -6 ($1,170.00) Erwin Remediation IDW T&D Water $125.00 11 $1,375.00

TOTAL ($2,772.15)

LABORATORY COSTS

PARAMqTqR RATq # EAMPLqE #QAQC Unpts IDW USEPA Method 8260 for Full list Soil $110.00 -6 ($660.00) IDW Encore Samplers $16.00 -6 ($96.00) IDW USEPA Method 6020 or 6010 for RCRA 4 Metals $56.00 -6 ($336.00) IDW USEPA Method 8260 for Full list Purge water $110.00 -1 ($110.00) USEPA Method 8260 Full list samples from MW's $110.00 0 $0.00 Shipping Samples $70.00 -4 ($280.00)

TOTAL LAB ($1,482.00)

EQUIPMENT ITqM RATq COETING UNIT UEAGq TOTALE

Expendables $40.00 Day 0 $0.00 Monitoring well Install Kit $1,300.00 Week 0 $0.00 Shallow Groundwater Sampling Kit $290.00 Day 0 $0.00 Ice $6.50 each 0 $0.00 Total Survey Station $50.00 day 0 $0.00 Deep Groundwater Sampling Kit $415.00 Day 0 $0.00 Generator $70.00 Day 0 $0.00

TOTAL qQUIPMqNT $0.00

$42.85

Associate

Round trip Mobilization from Tampa to the site in Gainesville

SUBTASK 5: MAGS

DATE: 7/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

ETAFF-TITLq WORK DqECRIPTION HOURE

R. Powell Senior Engineer P.E. oversight of MGAS events (Provide SOW, guidance, and answer field question) 0 Check MAGS data. 0

Total Hours 0 J. Penia Round trip Mobilization from Tampa to the site in Gainesville 0

Perform MAGS Testing 0 Total Hours 0

M. Wiss Technician Round trip Mobilization from Jacksonville to the site in Ocala 0 Perform MAGS Testing 0

Total Hours 0 B. Jarvis Administrative Update tables 0

Total 0

TOTAL LABOR 0

VEHICLE TYPq RATq UNIT UEAGq Rental Truck J. Penia $120.00 day 0 $0.00 Rental Truck B. Carrick $120.00 day 0 $0.00

TOTAL VqHICLq $0.00 PER DIEM ETAFF RATq UNIT UEAGq

Hotel J. Penia $150.00 day 0 $0.00 Per Diem J. Penia $36.00 day 0 $0.00

Hotel M. Wiss $150.00 day 0 $0.00 Per Diem M. Wiss $36.00 day 0 $0.00

TOTAL PqR DIqM $0.00

SUBCONTRACTOR COSTS

NAMq PURPOEq COET

TOTAL $0.00

LABORATORY COSTS

PARAMqTqR RATq # EAMPLqE #QAQC Unpts

USEPA Method TO-15 for VOHs $200.00 0 $0.00 Sampling Shipping Overnight $70.00 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITqM RATq COETING UNIT UEAGq TOTALE

Expendables $40.00 Day 0 $0.00 MAGS Kit $500.00 Day 0 $0.00 Air Sampling Canisters $33.00 Day 0 $0.00

TOTAL qQUIPMqNT $0.00

Associate

SUBTASK 6: Professional Land Survey

DATE: 7/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

ETAFF-TITLq WORK DqECRIPTION HOURE

D. Phillips Senior Scientist Coordinate and schedule with Surveyor 0 Total Hours 0

J. Penia Technician Round trip Mobilize from Tampa to the site in Gainesville 0 PLS Oversight and aid in location of wells 0

Total Hours 0

TOTAL LABOR 0

VEHICLE TYPq RATq UNIT UEAGq Rental Truck J. Penia $120.00 day 0 $0.00

TOTAL VqHICLq $0.00 PER DIEM ETAFF RATq UNIT UEAGq

TOTAL PqR DIqM $0.00

SUBCONTRACTOR COSTS

NAMq PURPOEq COET Southeastern Professional Land Survey $3,911.75 0 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMqTqR RATq # EAMPLqE #QAQC

TOTAL LAB $0.00

EQUIPMENT ITqM RATq COETING UNIT UEAGq TOTALE Expendables $40.00 Event 0 $0.00

SUBTASK 7: SAR Preparation

DATE: 7/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

ETAFF-TITLq WORK DqECRIPTION HOURE M. Culbreth Senior Principal Develop conclusions, recommendations, and prepare final Assessment Report 0

Scientist Total 0

R. Powell Senior Engineer Prepare the draft SAR MAGS section 0 Total 0

D. Phillips Senior Scientist Prepare draft SAR lithological section, create draft figures to be submitted for AutoCAD generatio 0 QA/QC of analytical data 0

J. Von Borstel GIS Analyst Revise and Update Figures 0

Total 0 B. Jarvis Administrative Update tables, Document Preparation & Publishing 0

Total 0

TOTAL LABOR 0

VEHICLE TYPq RATq UNIT UEAGq

TOTAL VqHICLq $0.00 PER DIEM ETAFF RATq UNIT UEAGq

TOTAL PqR DIqM $0.00

SUBCONTRACTOR COSTS

NAMq PURPOEq COET $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMqTqR RATq # EAMPLqE #QAQC

TOTAL LAB $0.00

EQUIPMENT ITqM RATq COETING UNIT UEAGq TOTALE

SUBTASK 8: PFAS Report

DATE: 7/30/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

ETAFF-TITLq WORK DqECRIPTION HOURE

D. Phillips Senior Scientist Prepare PFAS Deliverable 0

J. Von Borstel GIS Analyst Prepare PFAS Figure 0 Total 0

B. Jarvis Administrative Update tables, Document Preparation & Publishing 0 Total 0

TOTAL LABOR 0

VEHICLE TYPq RATq UNIT UEAGq

TOTAL VqHICLq $0.00 PER DIEM ETAFF RATq UNIT UEAGq

TOTAL PqR DIqM $0.00

SUBCONTRACTOR COSTS

NAMq PURPOEq COET

TOTAL $0.00

LABORATORY COSTS

PARAMqTqR RATq # EAMPLqE #QAQC

TOTAL LAB $0.00

EQUIPMENT ITqM RATq COETING UNIT UEAGq TOTALE

E P

C O S T

E S T I M A T E

C on tra ct or

En vir on m en ta l C on su ltin g

Te ch no lo gy , I

3/ s5 k

#u

ST

as b

1r oP ec t j an ag em en t #u

ST

as

1r oM es sio na l 6 an f

#u rv ey

#i te

C us to m C ar e

C le an as

L d#

H til ity

C le ar an ce #u

ST

as

A

#d U re

Ra ra tio n dc tiv ity /1 ha se

In itia l # ite d ss es sm en t p rig in al O

T dC s bO 0+

#u

ST

as

#o il # am

Rl in g ith D

1T w ro un f) at er am

Rl in g #u

ST

as

G d#

U eR or t

1r oP ec t j an ag er j ar

C ul Sr as

F el l I ns ta lla tio n w ro un

f) at er am Rl in g

#u

ST

as

W

#u

ST

as j dw

#u

ST

as b2

To ta ls

La bo r R at e

C at eg or y 9G

F.

bA

Pr oj ec t M an bG .F bG .F

9G F.

bA #e ni or rin ci Ra l # ci en tis t p j

C

A.

2.

0.

F

F.

2G

#e ni or E ng in ee r / ci en tis t p U

1+ b0

.2 2.

2.

2.

3.

#e ni or E ng in ee r / ci en tis t p D

1+ b3

W.

bb .2

.2

3G .2 b

-0

G.

FF

w

I# d na lys t / w ra Rh ic s p$ J+ bb .2

2.

b2 b

F.

bG ds so ci at e

En gi ne er

#c ie nt ist p$

1+ F2

.2

.2 b0

G

Te ch ni ci an pj b0 .2 b0

9-

F.

Gb df m in ist ra tiv e pV bb

.2

F b

To ta l H ou rs 0A

2.

F bG .F bb .3

3W .3

G2 .2

-0 .2

W.

.2

F.

D ire ct aS

9b

7F

3.

0-

9b ,3

FW

.G

A

FA

.2

W 9-

.2

9- ,A

F- .0

9W

.0

FG

.F

F

,G

FF

.G

9b A-

.0 ve rh ea f b0

3.

-2

B 9b

A, 2W

A.

FA

9b ,W

Fb .W

W 9G b2 .G

9F

,b Fb

.0

9F ,7

W2 .0

9b

,0 2-

.0 b

9-bb

9- ,3

7F .3 bA .2

G w en d fm in 2.

B

.2

.2

.2

.2

.2

.2

.2

.2

.2

8r in ge

FA

.F

2B

,F 7A

.G F

9A -F

.7 F

9-

.A

9b ,3

.3

W 9b

,A

AF

.0 W

9F

.b

9b bA

.A

9b

FG

.F

F 9G

0.

b0

To ta l L

$3 7, .0

9F

,0

.3

9b ,A

7F .7 b 9W

,2 b0

.G A

9b 2, A.

A7

,7 bG

.7

AA

.3

9A ,A

3A .A

A 9F

A0 .F

Tr av el Je hi cl e U en ta l 9b

,7 G2

.2

9b

.2

9F G2

.2

9A

.2

F2

.2

9b

.2

.2

.2

1e r f ie m

O L ot el

,0

.2

.2

9A G2

.2

9b ,2

.2

9F

FF

.2

.2

.2

.2

To ta l T ra ve l

$3 ,S

.6 0.

9b

.2

9b

,0

.2

9b ,A

.2

GF

.2

9b

.2

.2

.2

(u bc on tr ac to r

Eq iu pm en t P ro cu re t9

Sc on tra ct or uS to ta l

.2

.2

.2

.2

.2

.2

.2

.2

1r oc ur em en t 8 ee

.2

.2

.2

.2

.2

.2

.2

.2

To ta l ( ub co nt ra ct or

C os t

0.

.2

.2

.2

.2

.2

.2

.2

(u bc on tr ac to r

E( er vp ce s Pr oc ur e) t9 lin g pC on ve nt io na l+

7, bW

2.

.2

9b

7, 0b

3.

9- W, W A 3.

.2

.2

.2

.2

#u rv ey in g

9- ,W bb .A

.2

.2

.2

.2

9-

,W bb

.A

.2

.2

ID

,2

.2

.2

.2

,2

.2

.2

.2

.2

.2 w 1U

9G

.2

9G

.2

.2

.2

.2

.2

.2

.2

#u Sc on tra ct or uS to ta l

7, W2

7.

A3

9G

.2

9b 7, 0b 3.

9F

3, WG

2.

.2

9-

,W bb

.A

.2

.2

L an fl in g 8e e

,7 W2

.7 G

9G 2.

9b

,7 0b

.3

9F ,3

WG

.2

.2

9- Wb

.b G

.2

.2

To ta l ( ub co nt ra ct or C os t

$7 3, 5S

9G

G2 .2

9b

A, G-

7.

2, 3A G.

.2

9F

.W

.2

.2

La bo ra dn yt ic al

C os ts 9b

3W

F.

.2

9W

,7

.2

,A

F0 .2

9b

,0

.2

.2

.2

.2

#a m Rl e #h iR Ri ng 9G

F2 .2

.2

9-

.2

9-

.2

9b F2

.2

.2

.2

.2

To ta l L ab or at or y $1

4, .2

9b

2, 0.

9- ,2

W0 .2

9b

F2

.2

.2

.2

.2

Fp el d qx me

E%

Re nf aS le s

.2

9F

2.

.2

.2

9F 2.

9F

2.

.2

.2

#o il d ss es sm en t x it

9A

.2

.2

9A

.2

.2

.2

.2

.2

.2 j on ito rin g el l I ns ta ll x it

9b ,W

.2

.2

.2

9b

.2

.2

.2

.2

.2

#h al lo w ro un

f) at er am Rl in g xi t

9G A2

.2

.2

W2 .2

G2 .2

.2

.2

.2

.2

Ic e 9W b.

.2

3.

7.

.2

.2

.2

.2

To ta l # ur ve y #t at io n 9b

.2

.2

2.

2.

.2

.2

.2

.2

D ee

R w ro un

f) at er am Rl in g xi t

9F b3

.2

.2

.2

9F b3

.2

.2

.2

.2

.2 j dw x it

.2

.2

.2

.2

.2

.2

.2

.2 di r # am

Rl in g C an ist er s

7G

.2

.2

.2

9A 2.

9b

WG

.2

.2

.2

.2

To ta l F pe ld q xm en se s

$5 ,4

0.

9F

2.

9b ,W

.2

,7 Fb

.2

9A -G

.2

9F 2.

.2

.2

(u bt ot al

9b -F

,3 7b

.W A

9F ,0

.3

,G 2F

.7 b

9F 2, 7.

-A

G, 0F

2.

A7

G2 .7

,b F2

.F

9A ,A

3A .A

A 9F

A0 .F

C

o) ml et po n Fe e 9-

,A 0b

.2 A

9F

.7

9b A7

.F

9W 2b

.0 W

9b ,2

.A

G

7b .G

A.

A3

9A A3

.A G

9F A.

To ta l q st

p) at ed C os t

$1

,7

$4 ,6

4S

$2

,S

0.

$4

S6

$6

S, $5 ,6

S $5

,2 .8

$8 ,5

$5

1S

Pa

#ITE : Custom Care Cleaners #HVTd#x 0: L d#1 & Htility Clearance DdTE: 7/3/0203

6dV( U CdTEw( UK Y1U( J IDE TIj E UE* HIUED 8( U EdCL 1EU#( Q ( TAFF-TITLq WORK Dq( CRIPTION HOUR( j . CulSreth #enior 1rinciRal Uevie) L ealth anf #aMety 1 lan 2.3 #cientist

Total L ours 2.3 D. 1hilliRs #enior #cientist 1reRare L ealth anf #aMety 1 lan 0

J eriMication oM RroRerty o) nershiR, notiMy U1( oM Mielf activities b ( Stain oMMNsite access N b RroRerty -j oSilizationMrom wainesville to ( rlanf o - .3 Htility clearance b.3

Total L ours bb TOTAL LABOR bb.3

J EL IC6E TYPq RATq UNIT U( AGq Uental Truc5 9b02.22 f ay b 9b02.22

TOTAL VqHICLq 9b02.22 1EU DIEj ( TAFF RATq UNIT U( AGq

TOTAL PqR DIqM 92.22 #HVC( QTUdCT( U C( #T#

NAMq PURPO( q CO( T UNIT( #ite 6ines, 66C 1rivate Htility 6ocation 9G22.22 b 9G22.22

TOTAL 9G22.22

6dV( UdT( UK C( #T#

PARAMqTqR RATq # ( AMPLq( #QAQC

TOTAL LAB 92.22

E* HI1 j EQT ITqM RATq CO( TING UNIT U( AGq TOTAL( E%Renf aSles 9F2.22 Event b 9F2.22

TOTAL qQUIPMqNT 9F2.22

#HVTd#x - : #oil #amRling ) ith D1T & wrounf ) ater #amRling DdTE: 7/3/0203

6dV( U CdTEw( UK Y1U( J IDE TIj E UE* HIUED 8( U EdCL 1EU#( Q ( TAFF-TITLq WORK Dq( CRIPTION HOUR( j . CulSreth #enior 1rinciRal #161 evaluation b

#cientist DeveloR conceRtual site mof el Sasef on revie) oM lithologic f ata anf ) ater levels b.3 Total L ours 0.3

D 1hilliRs #enior #cientist Uounf triR j oSilization Mrom ( rlanf o to the site in wainesville 7 #oil Vorings anf D1T #amRling F3 DT4 measurements & graS grounf ) ater samRling at 3 ) ells F Characterization oM ) aste to RroMile soil & ) ater ID4 f rums Mor transRortation anf f isRosal 2 4 or5 ) ith Er) in Uemef iation to have ID4 Ric5ef uR, transRortef , anf f isRosef oM. 2

Total L ours 33 V. $arvis df ministrative Create taSles anf f ata entry 0

Total L ours 0

TOTAL LABOR 3W.3

J EL IC6E TYPq RATq UNIT U( AGq

Uental Truc5 9FG2.22 ) ee5 b 9FG2.22

TOTAL VqHICLq 9FG2.22 1EU DIEj ( TAFF RATq UNIT U( AGq

L otel D 1hilliRs 9b32.22 f ay F 9722.22 1er Diem D 1hilliRs 9- 7.22 f ay 3 9bG2.22

TOTAL PqR DIqM 9AG2.22 #HVC( QTUdCT( U C( #T#

NAMq PURPO( q CO( T wrounf ) ater 1rotection D1T #oil & wrounf ) ater #amRling 9b7,0b3.22 b 9b7,0b3.22 Er) in Uemef iation ID4 T&D #oil 9b32.22 2 92.22 Er) in Uemef iation ID4 T&D 4 ater 9b03.22 2 92.22

TOTAL 9b7,0b3.22 6dV( UdT( UK C( #T#

PARAMqTqR RATq # ( AMPLq( #QAQC UNIT( H#E1d j ethof G072 8ull list #oil #Vs 9bb2.22 3b 93,7b2.22 #161 E%tractions 9F3.22 0 9W2.22 H#E1d j ethof G072 Mor 8ull list wrounf ) ater D1T 9bb2.22 00 90,F02.22 H#E1d j ethof G072 8ull list wraS samRles Mor 3 j 4 s 9bb2.22 - 9- - 2.22 H#E1d j ethof G072 Mor #161 9bb2.22 0 9002.22 Encore #amRlers 9b7.22 3b 9Gb7.22 ID4 H#E1d j ethof G072 Mor 8ull list #oil 9bb2.22 2 92.22 ID4 Encore #amRlers 9b7.22 2 92.22 ID4 H#E1d j ethof 7202 or 72b2 Mor UCUd F j etals 937.22 b 937.22 ID4 H#E1d j ethof G072 Mor 8ull list 1urge ) ater 9bb2.22 b 9bb2.22 #hiRRing #amRles 9A2.22 3 9- 32.22

TOTAL LAB 9b2,220.22 E* HI1 j EQT ITqM RATq CO( TING UNIT U( AGq TOTAL(

E%Renf aSles 9F2.22 Day 3 9022.22 #oil dssessment x it 9A22.22 4 ee5 b 9A22.22 j onitoring ) ell Install x it 9- 03.22 Day 0 9732.22 #hallo) wrounf ) ater #amRling x it 90W2.22 Day b 90W2.22 Ice 97.32 each b2 973.22 Total #urvey #tation 932.22 f ay b 932.22

TOTAL qQUIPMqNT 9b,W33.22

#HVTd#x F: 4 ell Installation & wrounf ) ater #amRling DdTE: 7/3/0203

6dV( U CdTEw( UK Y1U( J IDE TIj E UE* HIUED 8( U EdCL 1EU#( Q ( TAFF-TITLq WORK Dq( CRIPTION HOUR(

D 1hilliRs #enior #cientist Uounf triR j oSilization Mrom ( rlanf o to the site in wainesville 7 ( versight oM ) ell installation 32

Characterization oM ) aste to RroMile soil & ) ater ID4 f rums Mor transRortation anf f isRosal b 4 or5 ) ith Er) in Uemef iation to have ID4 Ric5ef uR, transRortef , anf f isRosef oM. b

Total L ours 3G $. 1enia F

DT4 measurement & #amRling 4 ells pW shallo) , F intermef iate & b f eeR+, containerize ) ater b7 Total L ours 02

V. $arvis df ministrative Create taSles anf f ata entry 0

Total L ours 0

TOTAL LABOR G2

J EL IC6E TYPq RATq UNIT U( AGq Uental Truc5 D1 9FG2.22 ) ee5 b 9FG2.22 Uental Truc5 $1 9b02.22 f ay 0 90F2.22

TOTAL VqHICLq 9A02.22 1EU DIEj ( TAFF RATq UNIT U( AGq

L otel D 1hilliRs 9b32.22 f ay F 9722.22 1er Diem D 1hilliRs 9- 7.22 f ay 3 9bG2.22

L otel $. 1enia 9b32.22 f ay b 9b32.22 1er Diem $. 1enia 9- 7.22 f ay 0 9A0.22

TOTAL PqR DIqM 9b,220.22 #HVC( QTUdCT( U C( #T#

NAMq PURPO( q CO( T UNIT( 1reMerref Drilling #olutions 4 ell install b 9- W,WA3.22 Er) in Uemef iation 18d# 1roMile 8ee 9- 32.22 b 9- 32.22 Er) in Uemef iation ID4 T&D #oil 9bW3.22 02 9- ,W22.22 Er) in Uemef iation ID4 T&D 4 ater 9bW3.22 W 9b,A33.22

TOTAL 9F3,WG2.22

6dV( UdT( UK C( #T#

PARAMqTqR RATq # ( AMPLq( #QAQC Unpts ID4 H#E1d j ethof G072 Mor 8ull list #oil 9bb2.22 7 9772.22 ID4 Encore #amRlers 9b7.22 7 9W7.22 ID4 H#E1d j ethof 7202 or 72b2 Mor UCUd F j etals 937.22 7 9- - 7.22 ID4 H#E1d j ethof G072 Mor 8ull list 1urge ) ater 9bb2.22 b 9bb2.22 H#E1d j ethof G072 8ull list samRles Mrom j 4 's 9bb2.22 bF 9b,3F2.22 #hiRRing #amRles 9A2.22 3 9- 32.22

TOTAL LAB 9- ,2W0.22

E* HI1 j EQT ITqM RATq CO( TING UNIT U( AGq TOTAL(

E%Renf aSles 9F2.22 Day 3 9022.22 j onitoring ) ell Install x it 9b,- 22.22 4 ee5 b 9b,- 22.22 #hallo) wrounf ) ater #amRling x it 90W2.22 Day 0 93G2.22 Ice 97.32 each F 907.22 Total #urvey #tation 932.22 f ay b 932.22 DeeR wrounf ) ater #amRling x it 9Fb3.22 Day b 9Fb3.22 wenerator 9A2.22 Day b 9A2.22

TOTAL qQUIPMqNT 90,7Fb.22

9- W,WA3.22

dssociate #cientist

Uounf triR j oSilization Mrom TamRa to the site in wainesville

#HVTd#x 3: j dw# DdTE: 7/3/0203

6dV( U CdTEw( UK Y1U( J IDE TIj E UE* HIUED 8( U EdCL 1EU#( Q ( TAFF-TITLq WORK Dq( CRIPTION HOUR(

U. 1o) ell #enior Engineer 1.E. oversight oM j wd# events p1rovif e #( 4 , guif ance, anf ans) er Mielf question+ - Chec5 j dw# f ata. -

Total L ours 7 $. 1enia Uounf triR j oSilization Mrom TamRa to the site in wainesville F

1erMorm j dw# Testing G Total L ours b0 j . 4 iss Technician Uounf triR j oSilization Mrom $ac5sonville to the site in ( cala F 1erMorm j dw# Testing G

Total L ours b0 V. $arvis df ministrative HRf ate taSles 0

Total 0

TOTAL LABOR - 0

J EL IC6E TYPq RATq UNIT U( AGq Uental Truc5 $. 1enia 9b02.22 f ay 0 90F2.22 Uental Truc5 V. Carric5 9b02.22 f ay 0 90F2.22

TOTAL VqHICLq 90F2.22 1EU DIEj ( TAFF RATq UNIT U( AGq

L otel $. 1enia 9b32.22 f ay b 9b32.22 1er Diem $. 1enia 9- 7.22 f ay 0 9A0.22

L otel j . 4 iss 9b32.22 f ay b 9b32.22 1er Diem j . 4 iss 9- 7.22 f ay 0 9A0.22

TOTAL PqR DIqM 9FFF.22 #HVC( QTUdCT( U C( #T#

NAMq PURPO( q CO( T

TOTAL 92.22

6dV( UdT( UK C( #T# PARAMqTqR RATq # ( AMPLq( #QAQC Unpts

H#E1d j ethof T( Nb3 Mor J ( L s 9022.22 7 9b,022.22 #amRling #hiRRing ( vernight 9A2.22 0 9bF2.22

TOTAL LAB 9b,- F2.22 E* HI1 j EQT ITqM RATq CO( TING UNIT U( AGq TOTAL(

E%Renf aSles 9F2.22 Day b 9F2.22 j dw# x it 9322.22 Day b 9322.22 dir #amRling Canisters 9- - .22 Day 7 9bWG.22

TOTAL qQUIPMqNT 9A- G.22 dssociate #cientist

#HVTd#x 7: 1roMessional 6anf #urvey DdTE: 7/3/0203

6dV( U CdTEw( UK Y1U( J IDE TIj E UE* HIUED 8( U EdCL 1EU#( Q ( TAFF-TITLq WORK Dq( CRIPTION HOUR(

D. 1hilliRs #enior #cientist Coorf inate anf schef ule ) ith #urveyor b Total L ours b

$. 1enia Technician Uounf triR j oSilize Mrom TamRa to the site in wainesville F 16# ( versight anf aif in location oM ) ells F

Total L ours G

TOTAL LABOR W

J EL IC6E TYPq RATq UNIT U( AGq Uental Truc5 $. 1enia 9b02.22 f ay b 9b02.22

TOTAL VqHICLq 9b02.22 1EU DIEj ( TAFF RATq UNIT U( AGq

TOTAL PqR DIqM 92.22 #HVC( QTUdCT( U C( #T#

NAMq PURPO( q CO( T #outheastern 1roMessional 6anf #urvey 9- ,Wbb.A3 b 9- ,Wbb.A3

TOTAL 9- ,Wbb.A3 6dV( UdT( UK C( #T#

PARAMqTqR RATq # ( AMPLq( #QAQC

TOTAL LAB 92.22

E* HI1 j EQT ITqM RATq CO( TING UNIT U( AGq TOTAL( E%Renf aSles 9F2.22 Event b 9F2.22

TOTAL qQUIPMqNT 9F2.22

#HVTd#x A: #dU 1reRaration DdTE: 7/3/0203

6dV( U CdTEw( UK Y1U( J IDE TIj E UE* HIUED 8( U EdCL 1EU#( Q ( TAFF-TITLq WORK Dq( CRIPTION HOUR( j . CulSreth #enior 1rinciRal DeveloR conclusions, recommenf ations, anf RreRare Minal dssessment UeRort F

#cientist Total F

U. 1o) ell #enior Engineer 1reRare the f raMt #dU j dw# section 7 Total 7

D. 1hilliRs #enior #cientist 1reRare f raMt #dU lithological section, create f raMt Migures to Se suSmittef Mor dutoCdD generatio - 2

* d/* C oM analytical f ata 0

- 0 $. J on Vorstel wI# dnalyst Uevise anf HRf ate 8igures b2

Total b2 V. $arvis df ministrative HRf ate taSles, Document 1reRaration & 1uSlishing F

Total F

TOTAL LABOR 37

J EL IC6E TYPq RATq UNIT U( AGq

TOTAL VqHICLq 92.22 1EU DIEj ( TAFF RATq UNIT U( AGq

TOTAL PqR DIqM 92.22 #HVC( QTUdCT( U C( #T#

NAMq PURPO( q CO( T 92.22 92.22

TOTAL 92.22

6dV( UdT( UK C( #T#

PARAMqTqR RATq # ( AMPLq( #QAQC

TOTAL LAB 92.22

E* HI1 j EQT ITqM RATq CO( TING UNIT U( AGq TOTAL( TOTAL qQUIPMqNT 92.22

#HVTd#x G: 18d# UeRort DdTE: 7/3/0203

6dV( U CdTEw( UK Y1U( J IDE TIj E UE* HIUED 8( U EdCL 1EU#( Q ( TAFF-TITLq WORK Dq( CRIPTION HOUR(

D. 1hilliRs #enior #cientist 1reRare 18d# DeliveraSle 0

$. J on Vorstel wI# dnalyst 1reRare 18d# 8igure b Total b

V. $arvis df ministrative HRf ate taSles, Document 1reRaration & 1uSlishing b Total b

TOTAL LABOR F

J EL IC6E TYPq RATq UNIT U( AGq

TOTAL VqHICLq 92.22 1EU DIEj ( TAFF RATq UNIT U( AGq

TOTAL PqR DIqM 92.22 #HVC( QTUdCT( U C( #T#

NAMq PURPO( q CO( T

TOTAL 92.22

6dV( UdT( UK C( #T# PARAMqTqR RATq # ( AMPLq( #QAQC

TOTAL LAB 92.22

E* HI1 j EQT ITqM RATq CO( TING UNIT U( AGq TOTAL(

TOTAL qQUIPMqNT 92.22

Contract No. HW685

Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Work Change DirectiveForm

ATTACHMENT 6

Site Name: Site ID #:

Contract #:

Task Assignment #:

Contractor:

Work Change Directive #:

Reason for Work Change Directive :

Description of Work Change Directive :

Attachments (if applicable, listdocuments supportingchange):

Costs (if negotiated unitcosts, provide information below):

Maximum Estimated Increase in Task Amount:

AuthorizedContractorSignature:

AuthorizedFDEPSignature:

FDEP SupervisorApproval:

(if applicable)

Preferred Drilling Solutions, Inc.

8820 66th St, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

SONIC DRILLING TECHNOLOGY QUOTE FORM

Date: 6/18/24 FAC ID#:

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Unit Unit Rate Number of Units Extended Price per day $4,500.00 $ , 00.00 per day $3,500.00 $ per foot $18.00 -$ per foot $25.00 390 9,750.00$ per foot $35.00 -$ each $150.00 -$ per well $150.00 9 1,350.00$ roundtrip $950.00 1 950.00$ per crew / per night $600.00 $ , 00.00 each $75.00 29 2,175.00$ each $75.00 2 150.00$ lump sum $400.00 1 400.00$ per day $75.00 4 300.00$ lump sum $2,800.00 -$

TOTAL QUOTE PRICE $3 , 75.00

Notes: 1. Includes caps, plugs, tubing, saw cuts, development, standby time, and decon.

Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477

Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782

Signature and Title of Person Submitting Quote: ___________________________________Kevin Bonacum, Vice President of Operations

Steam Cleaner

PFAS Free Water (if needed)

Project No.:Days to Complete Scope of Work: 5

Mobilization Per Diem (4 Men)

DOT Approved 55-gal Drum

Permits (quantity is estimated)

Decon pad

Consultant Name: ECT

Site Name and Location: Custom Care Cleaners 3735 W University Ave, Gainesville, Marion County, FL

PROPOSED SCOPE OF WORK:

Equipment Type: Geoprobe 8150LS, Terrasonic 150CC

SONIC DRILLING TECHNOLOGY

MISCELLANEOUS

(4) 2" x 30' MW's with 15' .010 screen, soil cores 5'-30', drum cuttings, pad and 8" manhole

(4) 2" x 50' MW's with 5' .010 screen, 8" x 40' temp override casing, soil cores 5'-50', drum cuttings, pad and 8" manhole

(1) 2" x 70' MW with 5' .010 screen, 8" x 60' temp override casing, soil cores 5'-70', drum cuttings, pad and 8" manhole

Develop wells, drum development water

Decon pad, decon between well locations

Sonic Daily Rate & Crew (up to 10 hours on site)

Sonic Half Day Rate & Crew (up to 5 hours on site)

1" PVC Well Installation (includes all materials)

2" PVC Well Installation (includes all materials) 4" PVC Well Installation (includes all materials)

Pre-Packed Well Screen (includes all materials) ID 2" 5' Length

Well Completion (includes MH w/ cover, concrete pad, and locking well cap)

Preferred Drilling Solutions, Inc.

8820 66th St, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

SONIC DRILLING TECHNOLOGY QUOTE FORM

Date: 6/18/25 FAC ID#:

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Unit Unit Rate Number of Units Extended Price per day $4,500.00 5 22,500.00$ per day $3,500.00 -$ per foot $18.00 -$ per foot $25.00 520 13,000.00$ per foot $35.00 -$ each $150.00 -$ per well $150.00 14 2,100.00$ roundtrip $950.00 1 950.00$ per crew / per night $600.00 4 2,400.00$ each $75.00 35 2,625.00$ each $75.00 2 150.00$ lump sum $400.00 1 400.00$ per day $75.00 5 375.00$ lump sum $2,800.00 -$

TOTAL QUOTE PRICE $44,500.00

Notes: 1. Includes caps, plugs, tubing, saw cuts, development, standby time, and decon.

Project No.:

Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477

Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782

Signature and Title of Person Submitting Quote: Chad Campbell, Director of Business Development

MISCELLANEOUS

(5) 2" x 30' MW's with 15' .010 screen, soil cores 5'-30', drum cuttings, pad and 8" manhole

(7) 2" x 50' MW's with 5' .010 screen, 8" x 40' temp override casing, soil cores 5'-50', drum cuttings, pad and 8" manhole

(2) 2" X 10' VE Wells with 8' .010 screen by hand auger

Develop wells, drum development water construct decon pad and decon between each well.

Sonic Daily Rate & Crew (up to 10 hours on site)

Sonic Half Day Rate & Crew (up to 5 hours on site)

1" PVC Well Installation (includes all materials)

2" PVC Well Installation (includes all materials) 4" PVC Well Installation (includes all materials)

Pre-Packed Well Screen (includes all materials) ID 2" 5' Length

Well Completion (includes MH w/ cover, concrete pad, and locking well cap)

Consultant Name: ECT

Site Name and Location: Custom Care Cleaners 3735 W University Ave, Gainesville, Marion County, FL

PROPOSED SCOPE OF WORK:

Equipment Type: Geoprobe 8150LS, Terrasonic 150CC

SONIC DRILLING TECHNOLOGY

Steam Cleaner

PFAS Free Water (if needed)

Days to Complete Scope of Work: 5

Mobilization Per Diem (4 Men)

DOT Approved 55-gal Drum

Permits (quantity is estimated)

Decon pad

Invoice Invoice #

36817

Bill To

ECT

Attn: Accounts Payable 3751 Maguire Blvd Suite 234 Orlando, FL 32803

Job Location/Information

Custom Care Cleaners PM - Daniel Phillips Project #240292 3735 West University Avenue Gainesville, FL

PDS Job # 33-2025-9576

Terms

Net 30

Invoice Date

6/2/2025

Total

59-3757298

Please Remit To:

Preferred Drilling Solutions, Inc.

8820 66th Street North Pinellas Park, FL 33782 Fed ID Number

Please note change to "Remit To" address

DescriptionQuantity Rate Amount

(5) 2" x 30' MWs

(6) 2" x 50' MWs

(2) 2" x 10' VEWs

Sonic Daily Rate & Crew3 4,500.00 13,500.00 Sonic Half Day Rate & Crew2 3,500.00 7,000.00 2" Well Installation470 25.00 11,750.00 Well Completion13 150.00 1,950.00 Mobilization1 950.00 950.00 Per Diem4 600.00 2,400.00 Drums20 75.00 1,500.00 Decon Pad1 400.00 400.00 Steam Cleaner5 75.00 375.00 Pea Gravel29 6.65 192.85

$40,017.85

Mark

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

Additional signatures attached on separate page.

DC025A 2 HW682

This Change Order authorizes an overall cost decrease caused by scope changes to Subtasks 3 (DPT, soil sampling & IDW) & Subtask 4 (Well installation, groundwater sampling & IDW), along with approving costs associated with adding PFAS screening to the scope and update the drilling rates as described and approved in WCD-1.

Karlee Fowler 850-245-8944 Environmental Consulting and Technology, Inc. (ECT)

Mark A. Culbreth 813-289-9338

ERIC_3980

Custom Care Cleaners

$ 137,763.34 $ 145,660.20

$ 137,763.34 $ 145,660.20

03/06/2026 03/06/2026 0

1 1 2

Environmental Consulting & Technology, Inc.

Mark A. Culbreth

Contract Manager

Tim Bahr Digitally signed by Tim Bahr Date: 2025.06.12 15:26:19 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST