CN-370000-HW682-DC03CCO3.pdf

PDF 5 MB Posted

Attached to
Master Agreement FL|HW682|8fccc28dda898687f0dd3c309f3a996b
Contract number
HW682
Issued by
Florida

About this file

This document comprises Task Assignment Change Order (TACO) No. 3 issued by the State of Florida Department of Environmental Protection (FDEP) for Contract HW682 with Environmental Consulting and Technology, Inc. (ECT). The change order amends Task Assignment DC003C for environmental consulting services related to the Jolie Cleaners & Laundry site (ERIC_4763). The project manager on behalf of FDEP is Karlee Fowler, while ECT's contract manager is Mark A. Culbreth. The change order was executed on July 10, 2024, and represents a cost reduction modification to the original task assignment agreement.

The task assignment authorizes an initial site assessment at the Jolie Cleaners & Laundry facility and includes five subtasks: project management, well installation and sampling, IDW management, professional land survey (PLS), and site assessment report (SAR) preparation. Following a decrease in the number of samples analyzed, the amended total contract value is $23,307.51 for 104 labor hours, down from the prior value of $23,822.51, representing a reduction of $515.00 in analytical costs. The task completion date remains August 30, 2024. The invoice schedule allocates costs as follows: Subtask 2 ($13,986.90), Subtask 1 & 5 ($5,565.78), Subtask 4 ($3,424.86), and Subtask 3 ($329.97). The cost estimate reflects direct labor, overhead at 125.30%, fringe benefits at 47.40%, travel, subcontractor services including well installation and professional survey work, laboratory analysis, and field equipment expenses.

View the file

Other files

File Type Posted
CN-370000-GC914-T9CO2 (1).pdf PDF
CN-370000-HW682-DC001B.pdf PDF
CN-370000-HW682-DC001F.pdf PDF
CN-370000-HW682-DC002A.pdf PDF
CN-370000-HW682-DC005A.pdf PDF
CN-370000-HW682-DC005B.pdf PDF
CN-370000-HW682-DC007B.pdf PDF
CN-370000-HW682-DC008B.pdf PDF
CN-370000-HW682-DC008D.pdf PDF
CN-370000-HW682-DC010A.pdf PDF
CN-370000-HW682-DC013A.pdf PDF
CN-370000-HW682-DC014B.pdf PDF
CN-370000-HW682-DC015B.pdf PDF
CN-370000-HW682-DC016C.pdf PDF
CN-370000-HW682-DC019A.pdf PDF
CN-370000-HW682-DC01FCO1.pdf PDF
CN-370000-HW682-DC024A.pdf PDF
CN-370000-HW682-DC025A.pdf PDF
CN-370000-HW682-DC026A.pdf PDF
CN-370000-HW682-DC028A.pdf PDF
CN-370000-HW682-DC029A.pdf PDF
CN-370000-HW682-DC02ACO1.pdf PDF
CN-370000-HW682-DC04BCO7.pdf PDF
CN-370000-HW682-DC07BCO1.pdf PDF
CN-370000-HW682-DC07CC01.pdf PDF
CN-370000-HW682-DC08BCO2.pdf PDF
CN-370000-HW682-DC08CCO1.pdf PDF
CN-370000-HW682-DC09ACO1.pdf PDF
CN-370000-HW682-DC09ACO5.pdf PDF
CN-370000-HW682-DC09ACO6.pdf PDF
CN-370000-HW682-DC10BCO3.pdf PDF
CN-370000-HW682-DC11AC13.pdf PDF
CN-370000-HW682-DC11ACO1.pdf PDF
CN-370000-HW682-DC11ACO3.pdf PDF
CN-370000-HW682-DC13BCO3.pdf PDF
CN-370000-HW682-DC13BCO4.pdf PDF
CN-370000-HW682-DC14BCO1.pdf PDF
CN-370000-HW682-DC14BCO2.pdf PDF
CN-370000-HW682-DC16ACO1.pdf PDF
CN-370000-HW682-DC16ACO3.pdf PDF
CN-370000-HW682-DC18BCO1.pdf PDF
CN-370000-HW682-DC21ACO3.pdf PDF
CN-370000-HW682-DC21BCO2.pdf PDF
CN-370000-HW682-FIL5.pdf PDF
CN-370000-HW682-HW002A.pdf PDF
CN-370000-HW682-HW009B.pdf PDF
CN-370000-HW682-HW014A.pdf PDF
CN-370000-HW682-DC001C.pdf PDF
CN-370000-HW682-DC003A.pdf PDF
CN-370000-HW682-DC003B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number) Project Name:

4. ☐ There are no changes to the TA compensation.

☐ The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO ☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. ☐ There are no changes to the TA Expiration Date.

☐ The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. ☐ There are no changes to the Attachments.

☐ Attachment ___ is replaced with Attachment -____.

7. ☐ No Additional Changes.

☐ Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

DC003C 3 HW682

Karlee Fowler 850-245-8944 Contractor Contractor

Contractor Contractor

Contractor

Environmental Consulting and Technology, Inc. (ECT) Mark A. Culbreth 813-289-9338

ERIC_4763

Jolie Cleaners & Laundry

✔ $ 23,307.51 $ 23,822.51

$ 23,307.51 $ 23,822.51 ✔ Completion

Completion 08/30/2024 08/30/2024 0

✔ 1 1 3

Environmental Consulting& Technology

Mark A. Culbreth

Contract Manager

7/10/2024

Digitally signed by Mark Culbreth Date: 2024.07.10 17:17:44-04'00'Mark Culbreth

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2024.07.10 16:15:45 -04'00'

This change order authorizes a cost reduction due to a decrease in the number of samples analyzed.

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01_18

Contract Number:

Task Assignment #:

Change Order #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW682

DC003C

$ 23,307.51

Subtask 2: Email deliverable for Well Install, Field Notes

Subtask 3: Email deliverable IDW Manifest

Subtask 4: Email deliverable for PLS & Field Notes

Subtask 1 & 5: Project Management, Site Assessment Report

Subtask 2: FDEP Approval of Email deliverable for Well Install, Field Notes

Subtask 4: FDEP Approval of Email deliverable for PLS & Field Notes

Subtask 1 & 5: FDEP Approval of Project Management, Site Assessment Report

Subtask 3: FDEP Approval of Email deliverable IDW Manifest

12/01/2023

02/01/2024

02/01/2024

07/26/2024

$ 329.97

$ 13,986.90

$ 3,424.86

$ 5,565.78

FFLORIDAA DEPARTMENTT OF

EEnvironmentall Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ronn DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawnn Hamilton Secretary

Memorandum

TO:

FROM:

SUBJECT:

DATE:

HW682 Contract File Jolie Cleaners & Laundry

ERIC_4763

Karlee Fowler, Project Manager Negotiation Summary Task Assignment DC-003C June 11, 2024

This Task Assignment Change Order authorizes a cost reduction due to a decrease in the number of samples analyzed.

The Task Assignment total is now $23,307.51 for 104 labor hours, task end date remains August 30, 2024. The project manager agrees to the scope of work and associated costs. ECT may invoice according to the attached schedule.

FDEP COST ESTIMATE

Contractor: Environmental Consulting & Technology, Inc.

Date: 5/5/2024

Task #: DC003C SubTask 1 Project Management

Site: Jolie Cleaners & Laundry SubTask 2 Well Installation & Sampling

Activity/Phase: Initial Site Assessment SubTask 3 IDW Management

Project Manager: Mark Culbreth SubTask 4 PLS

SubTask 5 SAR Preparation

Totals 1 2 3 4 5

Labor Rate Category

$80.12 Project Manager 5.2 5.2 $80.12 Senior Principal Scientist (MC) 2 0.0 0.0 0.0 2.0

$69.75 Principal Scientist (JP) 0 0.0 0.0 0.0 0.0

$52.89 Senior Engineer / Scientist (GS) 2 0.0 0.0 0.0 2.0

$55.00 Senior Engineer / Scientist (DP) 3 0.0 2.0 1.0 0.0

$37.13 Staff Engineer / Scientist (LL) 0 0.0 0.0 0.0 0.0

$34.02 Sr. Associate Engineer / Scientist (KM) 63 34.5 0.0 0.0 28.0

$26.54 GIS Analyst / Graphics (JV) 8 0.0 0.0 0.0 8.0

$21.54 Associate Engineer / Scientist (JP) 20 10.5 0.0 5.5 4.0

$31.45 Administrative (BJ) 1 1.0 0.0 0.0 0.0

Total Hours 104 5.2 46.0 2.0 6.5 44.0

Direct Labor $3,570.23 $418.28 $1,431.31 $110.00 $173.47 $1,437.17

Overhead 125.30% $4,473.49 $524.10 $1,793.43 $137.83 $217.36 $1,800.77

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 47.40% $1,692.28 $198.26 $678.44 $52.14 $82.22 $681.22

Total Labor $9,736.00 $1,140.64 $3,903.18 $299.97 $473.05 $3,919.16

Travel

Vehicle Rental $600.00 $480.00 $0.00 $120.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $600.00 $480.00 $0.00 $120.00 $0.00

Subcontractor (Equipment Procurement)

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Groundwater Protection $6,414.00 $6,414.00 $0.00 $0.00 $0.00

Erwin Remediation $0.00 $0.00 $0.00 $0.00 $0.00

SurvTech Solutions $2,495.00 $0.00 $0.00 $2,495.00 $0.00

Subcontractor Subtotal $8,909.00 $6,414.00 $0.00 $2,495.00 $0.00

Handling Fee $890.90 $641.40 $0.00 $249.50 $0.00

Total Subcontractor Cost $9,799.90 $7,055.40 $0.00 $2,744.50 $0.00

Laboratory

Analytical Costs $567.00 $567.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $140.00 $140.00 $0.00 $0.00 $0.00

Total Laboratory $707.00 $707.00 $0.00 $0.00 $0.00

Field Expenses

Expendables $200.00 $160.00 $0.00 $40.00 $0.00

Ice $26.00 $26.00 $0.00 $0.00 $0.00

Monitoring well installation kit $975.00 $975.00 $0.00 $0.00 $0.00

Shallow groundwater sampling kit $290.00 $290.00 $0.00 $0.00 $0.00

Total Field Expenses $1,491.00 $1,451.00 $0.00 $40.00 $0.00

Subtotal $22,333.90 $1,140.64 $13,596.58 $299.97 $3,377.55 $3,919.16

Completion Fee $973.61 $114.06 $390.32 $30.00 $47.31 $391.92

Total Estimated Cost $23,307.51 $1,254.70 $13,986.90 $329.97 $3,424.86 $4,311.08

Cost from Prior CEF: $23,822.51 Manual Entry

Cost from taco CEF; ($515.00) Manual Entry

Cost (Prior + taco): $23,307.51 Auto-Calculated

Rounding Error: $0.00 Auto-Calculated

Final Total Cost: $23,307.51 Auto-Calculated

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Jolie Cleaners & Laundry SUBTASK 2: Well Installation & Sampling

DATE: 5/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

K. Morrison Sr. Associate Scientist Round-trip mobilization from Tampa office to the site 4.5 Oversight for well installations 30

Total Hours 34.5 J. Penia Associate Scientist Round-trip mobilization from Tampa office to the site 1.5

Open well and collected DTW at 5 wells 1 Groundwater sampling (5 wells) 8

Total Hours 10.5 B. Jarvis Administrative 1

Total Hours 1

TOTAL LABOR 46

VEHICLE TYPE RATE UNIT USEAGE

Truck - K. Morrison $120.00 day 3 $360.00 Truck- J. Penia $120.00 week 1 $120.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection Well installation $6,414.00 $6,414.00

TOTAL $6,414.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Shipping $70.00 2 $140.00 IDW USEPA Method 8260 VOHs Soil $73.00 1 $73.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals $56.00 1 $56.00 USEPA 8260 for VOHs Groundwater MWs (IDW) $73.00 1 $73.00 USEPA 8260 for VOHs Groundwater MWs $110.00 0 $0.00 USEPA 8260 for VOHs Groundwater MWs $73.00 5 $365.00

TOTAL LAB $707.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 4 $160.00 Ice $6.50 each 4 $26.00 Monitoring well installation kit $325.00 day 3 $975.00 Shallow groundwater sampling kit $290.00 day 1 $290.00

TOTAL EQUIPMENT $1,451.00

FINAL --7/24/96

SUBTASK 3: IDW Management

DATE: 1/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D Phillips Sr. Scientist Characterization and waste profile for transportation and disposal of IDW drums 1 Schedule IDW transport and disposal 1

Total Hours 2

TOTAL LABOR 2

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW T&D $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

SUBTASK 4: PLS

DATE: 11/12/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D Phillips Sr. Scientist Verification professional land survey for completeness & accuracy 1

Total Hours 1

J. Penia Associate Scientist Round trip mobilize from Tampa office to the site 1.5

PLS oversite 4

Total Hours 5.5

TOTAL LABOR 6.5

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

SurvTech Solutions Professional Land Survey $2,495.00 $2,495.00

TOTAL $2,495.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 1 $40.00

TOTAL EQUIPMENT $40.00

SUBTASK 5: SAR Preparation

DATE: 11/12/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations and prepare final Assessment Report 2

Total Hours 2

G. Sattler Sr. Engineer Develop conclusions and recommendations and prepare for the MAGS section 2

Total Hours 2

K. Morrison Sr. Associate Scientist Prepare the draft SAR 28

Total Hours 28

J. Von Borstel GIS Analyst/Graphics Create and update figures 8

Total Hours 8

J. Penia Associate Scientist Create and update tables 4

Total Hours 4

TOTAL LABOR 44

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

RATE UNIT

Date: 5/5/2024

Task #: DC003C SubTask 1 Project Management

Site: Jolie Cleaners & Laundry SubTask 2 Well Installation & Sampling

Activity/Phase: Initial Site Assessment SubTask 3 IDW Management

Project Manager: Mark Culbreth SubTask 4 PLS

SubTask 5 SAR Preparation

Totals 1 2 3 4 5

Labor Rate Category

$80.12 Project Manager 0 0.0 $80.12 Senior Principal Scientist (MC) 0 0.0 0.0 0.0 0.0

$52.89 Senior Engineer / Scientist (GS) 0 0.0 0.0 0.0 0.0

$55.00 Senior Engineer / Scientist (DP) 0 0.0 0.0 0.0 0.0

$34.02 Sr. Associate Engineer / Scientist (KM) 0 0.0 0.0 0.0 0.0

$26.54 GIS Analyst / Graphics (JV) 0 0.0 0.0 0.0 0.0

$21.54 Associate Engineer / Scientist (JP) 0 0.0 0.0 0.0 0.0

$31.45 Administrative (BJ) 0 0.0 0.0 0.0 0.0

Total Hours 0 0.0 0.0 0.0 0.0 0.0

Direct Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 125.30% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 47.40% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel

Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Groundwater Protection $0.00 $0.00 $0.00 $0.00 $0.00

Erwin Remediation $0.00 $0.00 $0.00 $0.00 $0.00

SurvTech Solutions $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs ($515.00) ($515.00) $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00

Total Laboratory ($515.00) ($515.00) $0.00 $0.00 $0.00

Field Expenses

Expendables $0.00 $0.00 $0.00 $0.00 $0.00

Ice $0.00 $0.00 $0.00 $0.00 $0.00

Monitoring well installation kit $0.00 $0.00 $0.00 $0.00 $0.00

Shallow groundwater sampling kit $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal ($515.00) $0.00 ($515.00) $0.00 $0.00 $0.00

Completion Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost ($515.00) $0.00 ($515.00) $0.00 $0.00 $0.00

Cost from Delta CEF; Manual Entry

Cost (Prior + Delta): $0.00 Auto-Calculated

Rounding Error: $0.00 Auto-Calculated

Final Total Cost: $0.00 Auto-Calculated

SUBTASK 2: Well Installation & Sampling

DATE: 5/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

K. Morrison Sr. Associate Scientist Round-trip mobilization from Tampa office to the site 0 Oversight for well installations 0

Total Hours 0 J. Penia Associate Scientist Round-trip mobilization from Tampa office to the site 0

Open well and collected DTW at 8 wells 0 Groundwater sampling (8 wells) 0

Total Hours 0 B. Jarvis Administrative Update tables 0

Total Hours 0

TOTAL LABOR 0

VEHICLE TYPE RATE UNIT USEAGE

Truck - K. Morrison $120.00 day $0.00 Truck- J. Penia $120.00 week $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection Well installation $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Shipping $70.00 0 $0.00 IDW USEPA Method 8260 VOHs Soil $73.00 0 $0.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals $56.00 0 $0.00 USEPA 8260 for VOHs Groundwater MWs (IDW) $73.00 0 $0.00 USEPA 8260 for VOHs Groundwater MWs $110.00 -8 ($880.00) USEPA 8260 for VOHs Groundwater MWs $73.00 5 $365.00

TOTAL LAB ($515.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event $0.00 Ice $6.50 each $0.00 Monitoring well installation kit $325.00 day $0.00 Shallow groundwater sampling kit $290.00 day $0.00

TOTAL EQUIPMENT $0.00

Date: 1/5/2024

Task #: DC003C SubTask 1 Project Management

Site: Jolie Cleaners & Laundry SubTask 2 Well Installation & Sampling

Activity/Phase: Initial Site Assessment SubTask 3 IDW Management

Project Manager: Mark Culbreth SubTask 4 PLS

SubTask 5 SAR Preparation

Totals 1 2 3 4 5

Labor Rate Category

$80.12 Project Manager 5.2 5.2 $80.12 Senior Principal Scientist (MC) 2 0.0 0.0 0.0 2.0

$69.75 Principal Scientist (JP) 0 0.0 0.0 0.0 0.0

$52.89 Senior Engineer / Scientist (GS) 2 0.0 0.0 0.0 2.0

$55.00 Senior Engineer / Scientist (DP) 3 0.0 2.0 1.0 0.0

$37.13 Staff Engineer / Scientist (LL) 0 0.0 0.0 0.0 0.0

$34.02 Sr. Associate Engineer / Scientist (KM) 63 34.5 0.0 0.0 28.0

$26.54 GIS Analyst / Graphics (JV) 8 0.0 0.0 0.0 8.0

$21.54 Associate Engineer / Scientist (JP) 20 10.5 0.0 5.5 4.0

$31.45 Administrative (BJ) 1 1.0 0.0 0.0 0.0

Total Hours 104 5.2 46.0 2.0 6.5 44.0

Direct Labor $3,570.23 $418.28 $1,431.31 $110.00 $173.47 $1,437.17

Overhead 125.30% $4,473.49 $524.10 $1,793.43 $137.83 $217.36 $1,800.77

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 47.40% $1,692.28 $198.26 $678.44 $52.14 $82.22 $681.22

Total Labor $9,736.00 $1,140.64 $3,903.18 $299.97 $473.05 $3,919.16

Travel

Vehicle Rental $600.00 $480.00 $0.00 $120.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00

Total Travel $600.00 $480.00 $0.00 $120.00 $0.00

Subcontractor (Equipment Procurement)

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Groundwater Protection $6,414.00 $6,414.00 $0.00 $0.00 $0.00

Erwin Remediation $0.00 $0.00 $0.00 $0.00 $0.00

SurvTech Solutions $2,495.00 $0.00 $0.00 $2,495.00 $0.00

Subcontractor Subtotal $8,909.00 $6,414.00 $0.00 $2,495.00 $0.00

Handling Fee $890.90 $641.40 $0.00 $249.50 $0.00

Total Subcontractor Cost $9,799.90 $7,055.40 $0.00 $2,744.50 $0.00

Laboratory

Analytical Costs $1,082.00 $1,082.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $140.00 $140.00 $0.00 $0.00 $0.00

Total Laboratory $1,222.00 $1,222.00 $0.00 $0.00 $0.00

Field Expenses

Expendables $200.00 $160.00 $0.00 $40.00 $0.00

Ice $26.00 $26.00 $0.00 $0.00 $0.00

Monitoring well installation kit $975.00 $975.00 $0.00 $0.00 $0.00

Shallow groundwater sampling kit $290.00 $290.00 $0.00 $0.00 $0.00

Total Field Expenses $1,491.00 $1,451.00 $0.00 $40.00 $0.00

Subtotal $22,848.90 $1,140.64 $14,111.58 $299.97 $3,377.55 $3,919.16

Completion Fee $973.61 $114.06 $390.32 $30.00 $47.31 $391.92

Total Estimated Cost $23,822.51 $1,254.70 $14,501.90 $329.97 $3,424.86 $4,311.08

Cost from Prior CEF: $28,950.71 Manual Entry

Cost from taco CEF; ($5,128.20) Manual Entry

Cost (Prior + taco): $23,822.51 Auto-Calculated

Rounding Error: $0.00 Auto-Calculated

Final Total Cost: $23,822.51 Auto-Calculated

SUBTASK 2: Well Installation & Sampling

DATE: 1/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

K. Morrison Sr. Associate Scientist Round-trip mobilization from Tampa office to the site 4.5 Oversight for well installations 30

Total Hours 34.5 J. Penia Associate Scientist Round-trip mobilization from Tampa office to the site 1.5

Open well and collected DTW at 5 wells 1 Groundwater sampling (5 wells) 8

Total Hours 10.5 B. Jarvis Administrative 1

Total Hours 1

TOTAL LABOR 46

VEHICLE TYPE RATE UNIT USEAGE

Truck - K. Morrison $120.00 day 3 $360.00 Truck- J. Penia $120.00 week 1 $120.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Groundwater Protection Well installation $6,414.00 $6,414.00

TOTAL $6,414.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Shipping $70.00 2 $140.00 IDW USEPA Method 8260 VOHs Soil $73.00 1 $73.00 IDW USEPA Method 6020 or 6010 for RCRA 4 Metals $56.00 1 $56.00 USEPA 8260 for VOHs Groundwater MWs (IDW) $73.00 1 $73.00 USEPA 8260 for VOHs Groundwater MWs $110.00 8 $880.00

TOTAL LAB $1,222.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 4 $160.00 Ice $6.50 each 4 $26.00 Monitoring well installation kit $325.00 day 3 $975.00 Shallow groundwater sampling kit $290.00 day 1 $290.00

TOTAL EQUIPMENT $1,451.00

SUBTASK 3: IDW Management

DATE: 1/5/2024

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D Phillips Sr. Scientist Characterization and waste profile for transportation and disposal of IDW drums 1 Schedule IDW transport and disposal 1

Total Hours 2

TOTAL LABOR 2

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW T&D $0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

SUBTASK 4: PLS

DATE: 11/12/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D Phillips Sr. Scientist Verification professional land survey for completeness & accuracy 1

Total Hours 1

J. Penia Associate Scientist Round trip mobilize from Tampa office to the site 1.5

PLS oversite 4

Total Hours 5.5

TOTAL LABOR 6.5

VEHICLE TYPE RATE UNIT USEAGE

Truck $120.00 day 1 $120.00

TOTAL VEHICLE $120.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

SurvTech Solutions Professional Land Survey $2,495.00 $2,495.00

TOTAL $2,495.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Event 1 $40.00

TOTAL EQUIPMENT $40.00

SUBTASK 5: SAR Preparation

DATE: 11/12/2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations and prepare final Assessment Report 2

Total Hours 2

G. Sattler Sr. Engineer Develop conclusions and recommendations and prepare for the MAGS section 2

Total Hours 2

K. Morrison Sr. Associate Scientist Prepare the draft SAR 28

Total Hours 28

J. Von Borstel GIS Analyst/Graphics Create and update figures 8

Total Hours 8

J. Penia Associate Scientist Create and update tables 4

Total Hours 4

TOTAL LABOR 44

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

RATE UNIT

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

DC003C 2 HW682

Karlee Fowler 850-245-8944 Environmental Consulting and Technology, Inc. (ECT)

Mark A. Culbreth 813-289-9338

ERIC_4763

Jolie Cleaners & Laundry

$ 23,822.51 $ 23,822.51

$ 23,822.51 $ 23,822.51

04/26/2024 08/30/2024 126

1 1 2

Mark Culbreth

Contract Manager

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2024.04.26 09:49:04 -04'00'

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

File details come from the government source that posted it. Updated .