This document is a Task Assignment (TA) entered into between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT) pursuant to underlying Contract Number HW682. The TA, numbered DC015A, is effective as of June 6, 2023, with a completion date of December 30, 2023. The assignment authorizes work at the Loretto Cleaners facility located at 11701-1 San Jose Boulevard, Jacksonville, Duval County, Florida (ERIC_4628). Department Project Manager Ginger Shirah (850-245-8899) and Contractor Project Manager Mark A. Culbreth (813-289-9338) are identified as the primary contacts for this engagement.
The Task Assignment authorizes ECT to perform groundwater confirmation sampling and Modified Air Gas Sampling (MAGS) testing at the Loretto Cleaners site. The scope of work consists of three subtasks: (1) Project Management calculated at 13 percent of direct labor costs; (2) Groundwater Sampling and MAGS testing including labor, travel, analytical costs, and equipment for sampling three monitor wells (MW001, MW004, MW007) analyzed via EPA Method 8260 for volatile organic halogens, plus MAGS testing to evaluate residual solvents in the vadose zone; and (3) Disposal of investigation-derived waste (IDW) through transportation and disposal coordination. The total Task Assignment value is $11,314.60 on a fixed unit rate basis, with payment contingent upon FDEP approval of deliverables. Deliverables include a Groundwater/Confirmation Sampling Report due August 3, 2023 ($10,255.86), and an IDW Manifest with Project Management documentation due September 9, 2023 ($1,058.74). The cost estimate encompasses 71 labor hours, vehicle rental ($600), per diem and hotel ($424), laboratory analytical costs ($1,881), field equipment and expendables ($1,516.50), and IDW transportation and disposal ($121).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW682
DC015A Completion December 30, 2023
This Task Assignment authorizes ECT to perform groundwater confirmation sampling and MAGS testing in accordance with the attached Scope of Work and Cost Estimate.
Ginger Shirah 850-245-8899 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Environmental Consulting and Technology, Inc. (ECT)
Environmental Consulting and Technology, Inc. (ECT)
Mark A. Culbreth 813-289-9338
ERIC_4628
11701-1 San Jose Boulevard, Jacksonville, Duval County
Loretto Cleaners
✔ $ 11,314.60
$ 11,314.60
Scope of Work
Mark A. Culbreth
Contract Manager
6/6/2023
Digitally signed by Mark Culbreth Date: 2023.06.06 14:17:45-04'00'Mark Culbreth Kelly Crain Digitally signed by Kelly Crain
Date: 2023.06.06 12:49:25 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater/Confirmation Sampling Report 08/03/2023
IDW Manifest; Project Management 09/09/2023
Upon Submittal and FDEP approval of Groundwater/Confirmation Sampling Report $ 10,255.86
Upon Submittal and FDEP approval of IDW Manifest; Project Management $ 1,058.74
$ 11,314.60
HW682
DC015A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Shawn Hamilton Secretary
To:
From:
Date:
HW682 Contract Negotiation File Loretto Cleaners Jacksonville, Duval County
ERIC_4628
Ginger Shirah, Project Manager June 1, 2023
Subject: Negotiation Summary
HW682 DC015A
This Task Assignment authorizes ECT to conduct groundwater sampling activities in accordance with the May 11, 2023, Scope of Work and Cost Estimate.
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtask 2: Groundwater Sampling/MAGS This subtask includes labor, travel, analytical and equipment costs associated with the groundwater sampling activities at the site. Monitor wells MW001, MW004 and MW007 will be sampled and analyzed for VOHs via EPA Method 8260. Additionally, to evaluate whether there is a residual mass of chlorinated solvents in the vadose zone, a MAGS test will be performed according to the Scope of Work attached. The groundwater and MAGS analytical data, as well as recommendations on a path forward, will be presented in the Confirmation Sampling Report
Subtask 3: IDW This subtask includes labor and subcontractor costs associated with IDW transportation and disposal.
A site access agreement has been executed for this site and is located in the site file.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment. The final cost for this Task Assignment is $11,314.60 with 71 labor hours.
FDEP COST ESTIMATE
Contractor: Environmental Consulting & Technology, Inc.
Date: 27-Apr-29
Task #: SubTask 1 Project Management
Site: Loretto Cleaners SubTask 2 Groundwater Montoring Report
Activity/Phase: SubTask 3 PFAS Screening
Project Manager: Mark Culbreth SubTask 4
SubTask 5
Totals 1 2 3
Labor Rate Category
$80.12 Project Manager 3.24 3.24 $80.12 Senior Principal Scientist (MC) 2 2.0 0.0
$52.89 Senior Engineer / Scientist (GS) 12 11.0 1.0
$26.54 GIS Analyst / Graphics (JV) 3 3.0 0.0
$21.54 Associate Engineer / Scientist (JP) 21 21.0 0.0
$20.00 Associate Engineer / Scientist (BM) 0 0.0 0.0
$22.44 Technician (BC) 29 28.5 0.0 $31.45 Administrative (BJ) 1 1.0 0.0
Total Hours 71 3.24 66.5 1.0
Direct Labor $2,257.59 $259.72 $1,944.98 $52.89
Overhead 125.30% $2,828.76 $325.43 $2,437.06 $66.27
Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00
Fringe 47.40% $1,070.10 $123.11 $921.92 $25.07
Total Labor $6,156.45 $708.26 $5,303.96 $144.23
Travel
Vehicle Rental $600.00 $600.00 $0.00
Per diem + Hotel $424.00 $424.00 $0.00
Total Travel $1,024.00 $1,024.00 $0.00
Subcontractor (Equipment Procurement)
Subcontractor Subtotal $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
IDW $110.00 $0.00 $110.00
Subcontractor Subtotal $110.00 $0.00 $110.00
Handling Fee $11.00 $0.00 $11.00
Total Subcontractor Cost $121.00 $0.00 $121.00
Laboratory
Analytical Costs $1,619.00 $1,619.00 $0.00
Sample Shipping $262.00 $262.00 $0.00
Total Laboratory $1,881.00 $1,881.00 $0.00
Field Expenses
Expendables $120.00 $120.00 $0.00
Equipment (Shallow Groundwater Sampling K $290.00 $290.00 $0.00
Equipment (Metal Detector) $0.00 $0.00 $0.00
Equipment (IDW Drum) $100.00 $100.00 $0.00
Equipment (Ice) $6.50 $6.50 $0.00
MAGS Investigation Kit $1,000.00 $0.00
Total Field Expenses $1,516.50 $1,516.50 $0.00
Subtotal $10,698.95 $708.26 $9,725.46 $265.23
Completion Fee $615.65 $70.83 $530.40 $14.42
Total Estimated Cost $11,314.60 $779.09 $10,255.86 $279.65
Groundwater Sampling & MAGS
REV: 08/22 PRAC ECT Page 1
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Loretto Cleaners SUBTASK: 2 (Groundwater Monitoring Report)
DATE: 4/27/2029
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations to prepare final Groundwater Monitoring Report 2
Total Hours 2
G. Sattler Senior Engineer Verification of property ownership, notify RPO of field activities 1
Guidance for field crew during the MAGS event 2
Draft the Groundwater Monitoring Report 8
Total Hours 11
J. Von Borstel GIS Analyst Recreate Figures 3
Total Hours 3
B. Carrick Technician Prep for field work and pickup DOT 55 gallon Drum 1
Round trip Mobilization from Orlando to the site for the annual groundwater 5
Open Well and collect DTW at 5 wells, opening an closing equipment calibrations 1
Annual groundwater sampling 3 wells 3
Locate and verify MAGS Wells will be functional 1.5
Round trip Mobilization from Orlando to the site for MAGS 5
MAGS Test 12
Total Hours 28.5
J Penia Scientist Round trip Mobilization from Orlando to the site for the MAGS Test 9
MAGS Test 12
Total Hours 21
B. Jarvis Administrative Update tables and report production 1
Total Hours 1
TOTAL LABOR 66.5
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck BC $120.00 day 3 $360.00
Rental Truck JP $120.00 day 2 $240.00
TOTAL VEHICLE $600.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem BC $36.00 day 2 $72.00
Hotel BC $140.00 day 1 $140.00
Per Diem JP $36.00 day 2 $72.00
Hotel JP $140.00 day 1 $140.00
TOTAL PER DIEM $424.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIITS
0 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNITS
USEPA Method 8260 for VOHs $73.00 3 $219.00
TO-15 $200.00 7 $1,400.00
Shipping Samples $52.00 1 $52.00
Shipping Samples $70.00 3 $210.00
TOTAL LAB $1,881.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Event 3 $120.00
Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00
DOT 55 gallon drum $100.00 each 1 $100.00
Ice $6.50 each 1 $6.50
MAGS Investigation Kit $500.00 Day 2 $1,000.00
$1,516.50TOTAL EQUIPMENT
04/27/23
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Loretto Cleaners
SUBTASK:3 (IDW T&D)
DATE: 4/27/2029
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
G. Sattler Senior Engineer Coordinate the T&D of the IDW drums and submit the waste manifest 1 to the FDEP, Total Hours 1
TOTAL LABOR 1
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE UNIT COST UNITS
Erwin Remediation IDW T&D $110.00 1 $110.00
TOTAL $110.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC Units
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
$0.00TOTAL EQUIPMENT
04/27/23
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Gregory Sattler
Environmental Consulting & Technology, Inc.
3751 Maguire Boulevard, Suite 234
Orlando, Florida 32803
August 26, 2022
Re: Non-Hazardous Drum Disposal – State of Florida
Mr. Sattler:
The price for the transportation and disposal (T&D) of drums of non-hazardous soil, mud and water located in the State of Florida is listed below.
Non-Hazardous Drums:
Description Rate Unit
False Mobilization (No drum found) $ 70.00 Per Stop
T&D - Non-Haz Soil, Mud or Water $ 110.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida
Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
A single False Mobilization fee will apply if our driver is not able to locate any drum on site.
This quote is valid for 180 days.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
[)ate 6/08/22
PRICESERVICES# OF
UNITS
ANNUAL
COST
SVCPRODUCT CODE/DESCRIPTION PER PERFREQUENCY YEAR SERVICE
PRODUCT
CODE
r SERVICE/DESCRIPTION U of M UNIT PRICEQUANTITY
Non Haz Ground Water Drum $256.811040A 55 Gal 1 Energy Surcharge174 1 $36.11Unit
These prices are based on information provided by the customer. This quotation will remain in effect for 30 days. For waste disposal services, final pricing is subject to HCC's Waste Approval review of SDS’s and lab analytical results.
Crystal Clean Representative Signature
Customer Signature
02003 Rev.3/18 Printed inUSA FORM 20345
CUSTOMER
Contact Greg Sattler State FL Zip
CUSTOMER QUOTATION
American Drive-In Claners
Customer Environmental Consulting & Technology Inc. Phone 321-245-2124
Address 11700-1 San Jose BLVD
City Jacksonville
$1,430.00/LoadWaste Transportation (est. 1) $140.00/DrumNon-Hazardous Drum Disposal (est. 2)
Estimated Project Total $1,710.00
June 7, 2022
Gregory Sattler, P.E.
Environmental Consulting & Technology, Inc.
3751 Maguire BLD. Suite 234 Orlando, Florida, 32803
Re: Non-Hazardous Drum Disposal Services 11700-1 San Jose BLVD, Jacksonville, FL Lewis Proposal No. 220468LA
Dear Mr. Sattler:
Lewis Environmental (Lewis) is pleased to present this proposal to Environmental Consulting & Technology, Inc. (ECT) for waste transportation and disposal services for 2 drums of IDW purge water. The following is offered for your review and consideration.
Scope of Work:
Lewis will provide a transport vehicle, CDL driver, drum dolly, and miscellaneous tools to complete the tasks as outlined below:
Lewis will provide a waste profile for approval and signature by the generator.
Lewis will arrive on-site and use a drum dolly to load the drum into a rack truck. The drum will be loaded into rack truck, secured, and hauled off site for disposal.
Lewis will supply a shipping document to generator for signature prior to transportation of waste off-site.
The waste will be taken to an approved disposal facility.
Lewis will provide signed waste manifests and disposal documentation to ETC.
Pricing:
Drum Waste Transportation and Disposal
1408 North Westshore Blvd, Ste 115, Tampa, FL 33607 ectinc.com 813.289.9338
May 11, 2023
ECT No. P23RA-0068
Ms. Ginger Shirah
Florida Department of Environmental Protection
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Re: Proposal for Loretto Cleaners
Groundwater Monitoring Report
11701-1 San Jose Boulevard
Jacksonville, Florida
ERIC_4269
Contract No. HW682
Dear Ms. Shirah:
On April 14, 2023 Environmental Consulting & Technology, Inc. (ECT) submitted to the Florida
Department of Environmental Protection (FDEP), the Annual Natural Attenuation Monitoring (NAM)
Report for Loretto Cleaners. The results documented that only one sample, i.e. the sample collected from monitoring well MW007, contained a detectable concentration of solvents. However, at 2.9 ug/L, the concentration detected did not exceed its groundwater cleanup target level (GCTL). None of the other chlorinated solvents were detected in the sample collected from monitoring well MW007, nor did any of the other samples contain detectable concentrations of the chlorinated solvents.
Given the recent and historical groundwater data, ECT recommended conducting another round of groundwater sampling to confirm that groundwater quality meets the No Further Action criteria for closure under Risk Management Option I in Chapter 62-780.680(1). In addition, ECT proposed conducting a Modified Air Gas Sampling (MAGS) test to evaluate whether residual solvents may exist in the vadose zone at the site.
ECT has prepared this scope of work to perform the confirmation groundwater sampling and MAGS test. Should these data confirm that the groundwater quality data meet the no further action criteria, and the MAGs test results indicate that there is not a residual mass of chlorinated solvents in the vadose zone, ECT will prepare a Confirmation Sampling Report including a No Further Action Proposal recommending closure under RMO I. Should the data not support closure under RMO I, the
Confirmation Sampling Report will recommend continued NAM.
SubTask 1 Project Management
This Sub Task consists of calculated project management labor, based upon 13% of the direct labor costs in this proposal, and includes fringe, overhead, other direct costs (ODCs) and completion fees.
Ms. Ginger Shirah FDEP
Loretto Cleaners ectinc.com
SubTask 2 Scope of Work
Based on the recommendation in the April 14, 2023, Natural Attenuation Monitoring Report, ECT proposes to conduct the following tasks to evaluate whether the site meets the No Further Action criteria under RMO I.
ECT proposes collecting depth-to-water (DTW) measurements at monitoring wells MW001, MW002, MW004, MW005, MW007, and MW008 and collecting groundwater samples from monitoring wells
MW001, MW004 and MW007. All groundwater samples will be analyzed by United States
Environmental Protection Agency (USEPA) Method 8260 for the volatile organic halogens (VOHs). The scope of work is detailed in the attached Level of Effort Worksheet.
Additionally, to evaluate whether there is a residual mass of chlorinated solvents in the vadose zone a MAGS test will be performed. A comment letter dated October 10, 2014, indicated that 7 MAGS wells were utilized during the initial MAGS survey. The comment letter also provided some the MAGS operating parameter that will be used in the proposed MAGS Test which were as follows:
Applied vacuum range of 20 to 49 inches of water column.
Air flow rate range of 14 to 40 standard cubic feet per minute.
Operation at MAGS wells varied from 30 to 60 minutes. ECT used 60 minutes for each well in this proposal. The field parameter will be utilized to determine whether less than 60 minutes will be required.
Since documentation on the FDEP database Oculus for the Site was limited, the locations of the MAGS wells are not known. ECT proposes that during the groundwater sampling event, time be included to locate the MAGS wells and verify that they are viable for testing. It was documented that four MAGS wells were located inside the facility and three MAGS wells were in the parking lot, southeast of the facility.
The groundwater and MAGS analytical data will be presented in the Confirmation Sampling Report and include recommendations for further actions based on the new data. A summary of SubTask 2 activities is included in Table 1.
Table 1. SubTask 2 Activities Summary
Employee/Resource Activity Time
Sr. Principal Scientist
Develop conclusions and recommendations for the
Confirmation Sampling Report 2 hours
Sr. Engineer Notify RPO of field activities 1 hour
Sr. Engineer Guidance for MAGS Field Crew 2 hours
Sr. Engineer Prepare draft Groundwater Monitoring Report 8 hours
GIS Analyst Update and Create figures 3 hours
Technician Prep for field work and obtain an IDW Drum 1 hour
Technician Round Trip Mob Orlando to Jacksonville 5 hours
Technician Locate, open, collect DTW at 5 wells, & Eq Cal 1 hour
Technician Groundwater Sampling 3 hours
Technician Locate MAGS Wells 1.5 hours
Technician Round Trip Mob Orlando to Jacksonville 5 hours
Technician MAGS testing 12 hours
Technician Truck for Groundwater Sampling & MAGS Events 3 days
Technician Per Diem 2 days
Technician Hotel 1 day
Scientist Round Trip Mob Orlando to Jacksonville 9 hours
Scientist MAGS testing 12 hours
Scientist Truck for MAGS Event 2 days
Scientist Per Diem 2 days
Scientist Hotel 1 day
Administrative Update tables 1 hours
SubTask 3 Scope of Work
The scope of work for SubTask 3 consists of transportation and disposal (T&D) disposal of IDW. ECT proposes that the waste manifest be submitted as the SubTask 3 deliverable. Quotes for T&D of the
IDW are summarized as follows. ECT has included 1-hour of a senior engineer rate to coordinate the
T&D of the IDW drum and provided the manifest to the FDEP. The IDW contractor quotes are included in Attachment 1.
Subcontractor Cost
Erwin Remediation $110.00
Crystal Clean $292.92
Lewis Environmental $1,710.00
Deliverable
A summary of cost and deliverable due dates with each SubTask is provided in Table 2.
Table 3. Deliverable and Invoice Schedule
SubTasks Deliverable Deliverable Date Invoice Amount
2 Groundwater Monitoring Report 3 August 2023 $10,255.86
3 IDW Manifest 9 September 2023 $279.65
1 Project Management Final Invoicing 9 September 2023 $779.09
Total $11,314.60
Please let us know if you have any questions regarding this proposal.
Sincerely, ENVIRONMENTAL CONSULTING & TECHNOLOGY, INC.
Gregory L. Sattler, P.E. Mark A. Culbreth, P.G
Senior Engineer Principal Scientist
GLS:MAC/baj
Attachment:
| DC010B Annual GW Monitoring proposal - ERIC_4553.pdf |
| Figures 4-8.pdf |
| Sheets and Views |
| 1 SITE LOCATION MAP |
| 2 POTENTIOMETRIC MAP OF THE INTERMEDIATE ZONE |
| 3 POT MAP OF THE DEEP ZONE OF THE SURFICIAL AQUIFER |
| 4 GW CHARACTERIZATION SHALLOW ZONE SURFICIAL AQUIFER |
| 5 GW CHARACTERIZATION INTERMEDIATE ZONE SURFICIAL AQUIFER |
| 6 GW CHARACTERIZATION DEEP ZONE SURFICIAL AQUIFER |
| 7 GW CHARACTERIZATION ROCK ZONE SURFICIAL AQUIFER |
| 8 GROUNDWATER CHARACTERIZATION TPOC WELLS |
| PLOT |
File details come from the government source that posted it. Updated .