This document comprises a Task Assignment (TA) and Task Assignment Change Order (TACO) between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT). The primary contract number is HW682, with the task assignment numbered DC028A. The work is being performed at the Handcraft Cleaners facility located in Fort Lauderdale, Broward County, Florida, under project number ERIC_4056. The Department's Project Manager is Benjamin Aoki, and ECT's Project Manager is Daniel Phillips.

The task assignment authorizes ECT to perform annual Natural Attenuation Monitoring (NAM) services, including collection and analysis of groundwater samples from five monitoring wells, generation of a NAM Report, and transport and disposal of investigative-derived waste (IDW). TACO 1, dated October 23, 2025, reduces the total task assignment cost by $759.64, from the original amount of $10,234.18 to $9,474.54. The cost reduction applies specifically to Subtask 2 (Annual NAM Report) and reflects a reduction in sampling hours and elimination of certain equipment costs (PID and Encore Sampler). The deliverables include an Annual NAM Report, Waste Manifest, and PFAS Screening deliverable, all due on September 26, 2025. Invoice payments are structured as $7,221.71 for FDEP approval of the Annual NAM Report, $684.68 for FDEP approval of the Waste Manifest, and $1,568.15 for FDEP approval of project management and PFAS deliverables. The task assignment completion date is December 12, 2025.

View the file

Other files

File Type Posted
CN-370000-HW682-DC001C.pdf PDF
CN-370000-HW682-DC003A.pdf PDF
CN-370000-HW682-DC003B.pdf PDF
CN-370000-HW682-DC006B.pdf PDF
CN-370000-HW682-DC007C.pdf PDF
CN-370000-HW682-DC007D.pdf PDF
CN-370000-HW682-DC008C.pdf PDF
CN-370000-HW682-DC010B.pdf PDF
CN-370000-HW682-DC010C.pdf PDF
CN-370000-HW682-DC015A.pdf PDF
CN-370000-HW682-DC016A.pdf PDF
CN-370000-HW682-DC016B.pdf PDF
CN-370000-HW682-DC021A.pdf PDF
CN-370000-HW682-DC027A.pdf PDF
CN-370000-HW682-DC03CCO2.pdf PDF
CN-370000-HW682-DC03CCO3.pdf PDF
CN-370000-HW682-DC04BCO2.pdf PDF
CN-370000-HW682-DC04BCO3.pdf PDF
CN-370000-HW682-DC04BCO5.pdf PDF
CN-370000-HW682-DC05BCO6.pdf PDF
CN-370000-HW682-DC05BCO8.pdf PDF
CN-370000-HW682-DC06BCO1.pdf PDF
CN-370000-HW682-DC06BCO2.pdf PDF
CN-370000-HW682-DC08DCO1.pdf PDF
CN-370000-HW682-DC09ACO2.pdf PDF
CN-370000-HW682-DC09ACO3.pdf PDF
CN-370000-HW682-DC10BCO1.pdf PDF
CN-370000-HW682-DC11ACO4.pdf PDF
CN-370000-HW682-DC11ACO6.pdf PDF
CN-370000-HW682-DC13ACO1.pdf PDF
CN-370000-HW682-DC13BCO1.pdf PDF
CN-370000-HW682-DC13BCO7.pdf PDF
CN-370000-HW682-DC16ACO2.pdf PDF
CN-370000-HW682-DC18ACO2.pdf PDF
CN-370000-HW682-DC18ACO3.pdf PDF
CN-370000-HW682-DC20ACO1.pdf PDF
CN-370000-HW682-DC21ACO1.pdf PDF
CN-370000-HW682-DC21BCO1.pdf PDF
CN-370000-HW682-DC22ACO2.pdf PDF
CN-370000-HW682-DC24ACO1.pdf PDF
CN-370000-HW682-DC26ACO3.pdf PDF
CN-370000-HW682-DC27ACO1.pdf PDF
CN-370000-HW682-FIL2.pdf PDF
CN-370000-HW682-FIL6.pdf PDF
CN-370000-HW682-HW001A.pdf PDF
CN-370000-HW682-HW004A.pdf PDF
CN-370000-HW682-HW006A.pdf PDF
CN-370000-HW682-HW007A.pdf PDF
CN-370000-HW682-HW011A.pdf PDF
CN-370000-HW682-HW016A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/17/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:

1. TA Number: TACO Number: Contract Number:

TACO Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department’s Project Manager: Department’s Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Name:

4. There are no changes to the TA compensation.

The compensation of the TA is changed to the amounts indicated below:

Amended Price Price Prior to TACO

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

There are no changes to the TA Expiration Date.

The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).

6. There are no changes to the Attachments.

Attachment ___ is replaced with Attachment -____.

7. No Additional Changes.

Additional Changes:

8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.

IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

DC028A 1 HW682

Benjamin Aoki 850-245-7527 Environmental Consulting and Technology, Inc. (ECT)

Daniel Phillips 407-509-7684

ERIC_4056

Handcraft Cleaners

$ 9,474.54 $ 10,234.18

$ 9,474.54 $ 10,234.18

12/12/2025 12/12/2025 0

1 1 1

Environmental Consulting and Technology, Inc.

Dirk Mammen

ECT Contract Manager

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.11.07 14:55:20 -05'00'

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

FLORIDA DEPARTMENT OF

Environmental Protection

Ron DeSantis

Alexis A. Lambert

Memorandum

TO:

FROM:

SUBJECT:

DATE:

FDEP COST ESTI MATEContractor: Environmental Consulting & Technology

Date: 10/23/2025

Task #: SubTask 1 Project Management

SubTask 2 Annual NAM Report

SubTask 3 IDW Management

SubTask 4 PFAS Screening

SubTask 5

Totals 1 2 3 4

Labor Rate Category

$84.17 Project Manager 3.40 3.40 $84.17 Senior Principal Scientist (MC) 5 5.0 0

$55.00 Senior Engineer / Scientist (DP) 18.00 12.0 3.00 3.0

$28.44 GIS Analyst / Graphics (JV) 3 2.0 0 1.0

$30.07 Technician (DF) 20 20.0 0 0.0

$34.81 Administrative (BJ) 3 2.0 0 1.0

Total Hours 52.40 3.40 41.0 3.00 5.0

Direct Labor $2,488.26 $286.26 $1,808.75 $165.00 $228.25

Overhead 125.30% $3,117.79 $358.68 $2,266.36 $206.75 $286.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 47.40% $1,179.44 $135.69 $857.35 $78.21 $108.19

Total Labor $6,785.49 $780.63 $4,932.46 $449.96 $622.44

Travel

Vehicle Rental $240.00 $240.00 $0.00 $0.00

Per diem + Hotel $222.00 $222.00 $0.00 $0.00

Total Travel $462.00 $462.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

IDW $195.00 $0.00 $195.00 $0.00

Subcontractor Subtotal $195.00 $0.00 $195.00 $0.00

Handling Fee $19.50 $0.00 $19.50 $0.00

Total Subcontractor Cost $214.50 $0.00 $214.50 $0.00

Laboratory

Analytical Costs $438.00 $438.00 $0.00 $0.00

Sample Shipping $70.00 $70.00 $0.00 $0.00

Total Laboratory $508.00 $508.00 $0.00 $0.00

Field Expenses

Expendables $80.00 $80.00 $0.00 $0.00 Shallow Groundwater Sampling Kit $580.00 $580.00 $0.00 $0.00

Metal Detector $40.00 $40.00 $0.00 $0.00

DOT 55 gallon drum $100.00 $100.00 $0.00 $0.00

Ice $26.00 $26.00 $0.00 $0.00

PID $0.00 $0.00 $0.00

Encore Sampler $0.00 $0.00 $0.00

Total Field Expenses $826.00 $826.00 $0.00 $0.00

Subtotal $8,795.99 $780.63 $6,728.46 $664.46 $622.44

Completion Fee $678.55 $78.06 $493.25 $45.00 $62.24

Total Estimated Cost $9,474.54 $858.69 $7,221.71 $709.46 $684.68

Cost from Prior CEF:

Cost from Delta CEF;

Cost (Prior + Delta): $0.00

Rounding Error: $9,474.54

Final Total Cost: $9,474.54

Site: Handcraft Custom Cleaners

Activity/Phase: Annual NAM - TACO 1 Delta

Project Manager:

Page 1Page 1

SITE : Handcraft Custom Cleaners SUBTASK 2: Annual NAM Report

DATE: 10/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations and prepare final Annual NAM Report 5

Total 5

D. Phillips Senior Scientist Verification of property ownership, notify RPO of field activities 1 Prepare draft Annual NAM report 11

Total 12

J. Von Borstel GIS Analyst 2 Total 2

D. Flake Technician Prep for field event and obtain groundwater IDW drum 2 Round trip mobilization from Tampa to Ft Lauderdale 10 Open Well and collect DTW at 5 wells 1 Annual groundwater sampling 5 wells and IDW storage 5 Containerize purge water and secure the drum onsite 1 Locate, open the hair trap/cleanout, and sample 1

Total 20

B. Jarvis Administrative Update Tables 2 Total 2

TOTAL LABOR 41

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck D. Flake $120.00 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem D. Flake $36.00 day 2 $72.00 Hotel D. Flake $150.00 day 1 $150.00

TOTAL PER DIEM $222.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIITS

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC UNIITS

Groundwater USEPA Method 8260 for VOHs $73.00 5 $365.00 Cleanout Water USEPA Method 8260 for VOHs $73.00 1 $73.00 IDW USEPA Method 8260 for VOHs $73.00 0 $0.00 Sediment USEPA Method 8260 for VOHs $73.00 0 $0.00 Shipping Samples $70.00 1 $70.00

TOTAL LAB $508.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 2 $80.00 Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00 Metal Detector $40.00 Day 1 $40.00 DOT 55 gallon drum $100.00 each 1 $100.00 Ice $6.50 each 4 $26.00 PID $88.00 each 0 $0.00 Encore Sampler $16.00 each 0 $0.00

TOTAL EQUIPMENT $826.00

Update Figures

Page 2Page 2

SUBTASK 3: IDW Management

DATE: 10/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Senior Scientist 3 Total 3.0

TOTAL LABOR 3

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW T&D $195.00 1 $195.00

TOTAL $195.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Coordinate T&D and complete the SubTask 3 deliverable

Page 3Page 3

SUBTASK 4: PFAS Screening

DATE: 10/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

D. Phillips Senior Scientist 3.0 Total 3.0

J. Von Borstel GIS Analyst 1.0 Total 1.0

B. Jarvis Administrative 1.0 Total 1.0

TOTAL LABOR 5

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

Prepare PFAS table

Prepare PFAS figure

Review lab report, prepare PFAS email deliverable.

Page 4Page 4

Task #: SubTask 1 Project Management

SubTask 2 Annual NAM Report

SubTask 3 IDW Management

SubTask 4 PFAS Screening

SubTask 5

Totals 1 2 3 4

Labor Rate Category

$84.17 Project Manager -0.23 -0.23 $84.17 Senior Principal Scientist (MC) 0 0.0 0

$55.00 Senior Engineer / Scientist (DP) 0.00 0.0 0.00 0.0

$28.44 GIS Analyst / Graphics (JV) 0 0.0 0 0.0

$30.07 Technician (DF) -5 -5.0 0 0.0

$34.81 Administrative (BJ) 0 0.0 0 0.0

Total Hours -5.23 -0.23 -5.0 0.00 0.0

Direct Labor ($169.90) ($19.55) ($150.35) $0.00 $0.00

Overhead 125.30% ($212.89) ($24.50) ($188.39) $0.00 $0.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 47.40% ($80.54) ($9.27) ($71.27) $0.00 $0.00

Total Labor ($463.33) ($53.32) ($410.01) $0.00 $0.00

Travel

Vehicle Rental $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $0.00 $0.00 $0.00 $0.00

Total Travel $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

IDW $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00

Handling Fee $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00

Laboratory

Analytical Costs ($146.00) ($146.00) $0.00 $0.00

Sample Shipping $0.00 $0.00 $0.00 $0.00

Total Laboratory ($146.00) ($146.00) $0.00 $0.00

Field Expenses

Expendables $0.00 $0.00 $0.00 $0.00 Shallow Groundwater Sampling Kit $0.00 $0.00 $0.00 $0.00

Metal Detector $0.00 $0.00 $0.00 $0.00

DOT 55 gallon drum $0.00 $0.00 $0.00 $0.00

Ice $0.00 $0.00 $0.00 $0.00

PID ($88.00) $0.00 $0.00

Encore Sampler ($16.00) $0.00 $0.00

Total Field Expenses ($104.00) ($104.00) $0.00 $0.00

Subtotal ($713.33) ($53.32) ($660.01) $0.00 $0.00

Completion Fee ($46.33) ($5.33) ($41.00) $0.00 $0.00

Total Estimated Cost ($759.66) ($58.65) ($701.01) $0.00 $0.00

Site: Handcraft Custom Cleaners

Activity/Phase: Annual NAM - TACO 1 Delta

Page 1Page 1Page 1Page 1

SUBTASK 2: Annual NAM Report

DATE: 10/23/2025

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations and prepare final Annual NAM Report 0

Total 0

D. Phillips Senior Scientist Verification of property ownership, notify RPO of field activities 0 Prepare draft Annual NAM report 0

Total 0

J. Von Borstel GIS Analyst 0 Total 0

D. Flake Technician Prep for field event and obtain groundwater IDW drum 0 Round trip mobilization from Tampa to Ft Lauderdale 0 Open Well and collect DTW at 5 wells -1 Annual groundwater sampling 5 wells and IDW storage -3 Containerize purge water and secure the drum onsite 0 Locate, open the hair trap/cleanout, and sample -1

Total -5

B. Jarvis Administrative Update Tables 0 Total 0

TOTAL LABOR -5

VEHICLE TYPE RATE UNIT USEAGE

Rental Truck D. Flake $120.00 day 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

Per Diem D. Flake $36.00 day 0 $0.00 Hotel D. Flake $150.00 day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIITS

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC UNIITS

Groundwater USEPA Method 8260 for VOHs $73.00 0 $0.00 Cleanout Water USEPA Method 8260 for VOHs $73.00 0 $0.00 IDW USEPA Method 8260 for VOHs $73.00 -1 ($73.00) Sediment USEPA Method 8260 for VOHs $73.00 -1 ($73.00) Shipping Samples $70.00 0 $0.00

TOTAL LAB ($146.00)

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $40.00 Day 0 $0.00 Shallow Groundwater Sampling Kit $290.00 Day 0 $0.00 Metal Detector $40.00 Day 0 $0.00 DOT 55 gallon drum $100.00 each 0 $0.00 Ice $6.50 each 0 $0.00 PID $88.00 each -1 ($88.00) Encore Sampler $16.00 each -1 ($16.00)

TOTAL EQUIPMENT ($104.00)

Update Figures

Page 2Page 2Page 2Page 2

Task #: SubTask 1 Project Management

SubTask 2 Annual NAM Report

SubTask 3 IDW Management

SubTask 4 PFAS Screening

SubTask 5

Totals 1 2 3 4

Labor Rate Category

$84.17 Project Manager 3.63 3.63

$84.17 Senior Principal Scientist (MC) 5 5.0 0

$55.00 Senior Engineer / Scientist (DP) 18.00 12.0 3.00 3.0

$28.44 GIS Analyst / Graphics (JV) 3 2.0 0 1.0

$30.07 Technician (DF) 25 25.0 0 0.0

$34.81 Administrative (BJ) 3 2.0 0 1.0

Total Hours 57.63 3.63 46.0 3.00 5.0

Direct Labor $2,658.16 $305.81 $1,959.10 $165.00 $228.25

Overhead 125.30% $3,330.68 $383.18 $2,454.75 $206.75 $286.00

Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00

Fringe 47.40% $1,259.96 $144.95 $928.61 $78.21 $108.19

Total Labor $7,248.80 $833.94 $5,342.46 $449.96 $622.44

Travel

Vehicle Rental $240.00 $240.00 $0.00 $0.00

Per diem + Hotel $222.00 $222.00 $0.00 $0.00

Total Travel $462.00 $462.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

IDW $195.00 $0.00 $195.00 $0.00

Subcontractor Subtotal $195.00 $0.00 $195.00 $0.00

Handling Fee $19.50 $0.00 $19.50 $0.00

Total Subcontractor Cost $214.50 $0.00 $214.50 $0.00

Laboratory

Analytical Costs $584.00 $584.00 $0.00 $0.00

Sample Shipping $70.00 $70.00 $0.00 $0.00

Total Laboratory $654.00 $654.00 $0.00 $0.00

Field Expenses

Expendables $80.00 $80.00 $0.00 $0.00

Shallow Groundwater Sampling Kit $580.00 $580.00 $0.00 $0.00

Metal Detector $40.00 $40.00 $0.00 $0.00

DOT 55 gallon drum $100.00 $100.00 $0.00 $0.00

Ice $26.00 $26.00 $0.00 $0.00

PID $88.00 $0.00 $0.00

Encore Sampler $16.00 $0.00 $0.00

Total Field Expenses $930.00 $930.00 $0.00 $0.00

Subtotal $9,509.30 $833.94 $7,388.46 $664.46 $622.44

Completion Fee $724.88 $83.39 $534.25 $45.00 $62.24

Total Estimated Cost $10,234.18 $917.33 $7,922.71 $709.46 $684.68

Site: Handcraft Custom Cleaners

Activity/Phase: Annual NAM - Original

Page 1Page 1Page 1Page 1

From: Fowler, Karlee To: Aoki, Benjamin Subject: FW: Handcraft Cleaners (ERIC_4056) - TACO 1 Submittal Date: Thursday, October 23, 2025 11:21:41 AM Attachments: Outlook-mntcq4zv.png

Outlook-vgd5utlh.png Outlook-s1rwn2w2.png Outlook-ylsd33bq.png Outlook-eokyhkc1.png Handcraft Cleaners ERIC_5013 NAM LOECEF Original +TACO 1.xlsx Handcraft Cleaners ERIC_5013 NAM LOECEF Original.xlsx Handcraft Cleaners ERIC_5013 NAM LOECEF TACO 1 Delta.xlsx Handcraft Cleaners ERIC_5013 NAM LOECEF TACO 1.pdf HW682_DC028A_.pdf

Hey Benjamin, one more TACO for ECT. If you have a lot on your plate just let me know and I can do this one. I’ve attached the original TA above. Thanks!

From: Daniel S. Phillips <dphillips@ectinc.com> Sent: Wednesday, October 22, 2025 4:01 PM To: Fowler, Karlee <Karlee.Fowler@FloridaDEP.gov> Cc: Leif Layton <llayton@ectinc.com>; Courtney Wranosky <cwranosky@ectinc.com>; Dirk Mammen <dmammen@ectinc.com> Subject: Handcraft Cleaners (ERIC_4056) - TACO 1 Submittal

EXTERNAL MESSAGE

This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.

Karlee:

Here is TACO 1 that reconciles costs in ST2 only.

As always, let me know if you have any questions.

Daniel S. Phillips, P.G.

Sr. Scientist | Site Assessment & Remediation

3751 Maguire Boulevard, Suite 234, Orlando, FL 32803

C: 407.509.7684

Funding Information:

Org. Code E.O.

Object Code

Budget Entity Appropriation

Category Grant # Project # Year Amount

Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor�st �s Project Manager: ontractor�s t�s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

Fixed Price:

Fixed Unit Rate: (Extended Price)

Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department

Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature)

Date:

Additional signatures attached on separate page.

HW682

DC028A Completion December 12, 2025

This Task Assignment authorizes ECT to perform annual Natural Attenuation Monitoring (NAM) at Handcraft Cleaners in Fort Lauderdale, FL. ECT will collect and analyze groundwater samples from five monitoring wells, generate a NAM Report, and transport and dispose of IDW.

Karlee Fowler 850 245-8944 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor

Contractor Mark A. Culbreth Contractor 813-289-9338

ERIC_4056

Fort Lauderdale, Broward County, Florida

Handcraft Cleaners

Contractor Contractor

$ 10,234.18

$ 10,234.18

Scope of Work

Environmental Consulting and Technology, Inc. (ECT Contractor

Mark A. Culbreth

Contract Manager

Digitally signed by Mark Culbreth Date: 2025.06.12 16:15:46-04'00'Mark Culbreth

Mubeen Darji

Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.

Date: 2025.06.12 08:52:41 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WC TAFORM

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Annual NAM Report (Subtask 2) 09/26/2025

Waste Manifest (Subtask 4) 09/26/2025

Project Management, PFAS Deliverable (Subtask 1 & Subtask 3) 09/26/2025

FDEP Approval of Annual NAM Report (Subtask 2) $ 7,922.71

FDEP Approval of Waste Manifest (Subtask 4) $ 709.46

FDEP Approval of Project Management, PFAS Deliverable (Subtask 1 & Subtask 3) $ 1,602.01

$ 10,234.18