This document comprises a Task Assignment (TA) and Task Assignment Change Order (TACO) between the State of Florida Department of Environmental Protection (FDEP) and Environmental Consulting and Technology, Inc. (ECT). The primary contract number is HW682, with the task assignment numbered DC028A. The work is being performed at the Handcraft Cleaners facility located in Fort Lauderdale, Broward County, Florida, under project number ERIC_4056. The Department's Project Manager is Benjamin Aoki, and ECT's Project Manager is Daniel Phillips.
The task assignment authorizes ECT to perform annual Natural Attenuation Monitoring (NAM) services, including collection and analysis of groundwater samples from five monitoring wells, generation of a NAM Report, and transport and disposal of investigative-derived waste (IDW). TACO 1, dated October 23, 2025, reduces the total task assignment cost by $759.64, from the original amount of $10,234.18 to $9,474.54. The cost reduction applies specifically to Subtask 2 (Annual NAM Report) and reflects a reduction in sampling hours and elimination of certain equipment costs (PID and Encore Sampler). The deliverables include an Annual NAM Report, Waste Manifest, and PFAS Screening deliverable, all due on September 26, 2025. Invoice payments are structured as $7,221.71 for FDEP approval of the Annual NAM Report, $684.68 for FDEP approval of the Waste Manifest, and $1,568.15 for FDEP approval of project management and PFAS deliverables. The task assignment completion date is December 12, 2025.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
DC028A 1 HW682
Benjamin Aoki 850-245-7527 Environmental Consulting and Technology, Inc. (ECT)
Daniel Phillips 407-509-7684
ERIC_4056
Handcraft Cleaners
$ 9,474.54 $ 10,234.18
$ 9,474.54 $ 10,234.18
12/12/2025 12/12/2025 0
1 1 1
Environmental Consulting and Technology, Inc.
Dirk Mammen
ECT Contract Manager
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.11.07 14:55:20 -05'00'
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
FLORIDA DEPARTMENT OF
Environmental Protection
Ron DeSantis
Alexis A. Lambert
Memorandum
TO:
FROM:
SUBJECT:
DATE:
FDEP COST ESTI MATEContractor: Environmental Consulting & Technology
Date: 10/23/2025
Task #: SubTask 1 Project Management
SubTask 2 Annual NAM Report
SubTask 3 IDW Management
SubTask 4 PFAS Screening
SubTask 5
Totals 1 2 3 4
Labor Rate Category
$84.17 Project Manager 3.40 3.40 $84.17 Senior Principal Scientist (MC) 5 5.0 0
$55.00 Senior Engineer / Scientist (DP) 18.00 12.0 3.00 3.0
$28.44 GIS Analyst / Graphics (JV) 3 2.0 0 1.0
$30.07 Technician (DF) 20 20.0 0 0.0
$34.81 Administrative (BJ) 3 2.0 0 1.0
Total Hours 52.40 3.40 41.0 3.00 5.0
Direct Labor $2,488.26 $286.26 $1,808.75 $165.00 $228.25
Overhead 125.30% $3,117.79 $358.68 $2,266.36 $206.75 $286.00
Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 47.40% $1,179.44 $135.69 $857.35 $78.21 $108.19
Total Labor $6,785.49 $780.63 $4,932.46 $449.96 $622.44
Travel
Vehicle Rental $240.00 $240.00 $0.00 $0.00
Per diem + Hotel $222.00 $222.00 $0.00 $0.00
Total Travel $462.00 $462.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
IDW $195.00 $0.00 $195.00 $0.00
Subcontractor Subtotal $195.00 $0.00 $195.00 $0.00
Handling Fee $19.50 $0.00 $19.50 $0.00
Total Subcontractor Cost $214.50 $0.00 $214.50 $0.00
Laboratory
Analytical Costs $438.00 $438.00 $0.00 $0.00
Sample Shipping $70.00 $70.00 $0.00 $0.00
Total Laboratory $508.00 $508.00 $0.00 $0.00
Field Expenses
Expendables $80.00 $80.00 $0.00 $0.00 Shallow Groundwater Sampling Kit $580.00 $580.00 $0.00 $0.00
Metal Detector $40.00 $40.00 $0.00 $0.00
DOT 55 gallon drum $100.00 $100.00 $0.00 $0.00
Ice $26.00 $26.00 $0.00 $0.00
PID $0.00 $0.00 $0.00
Encore Sampler $0.00 $0.00 $0.00
Total Field Expenses $826.00 $826.00 $0.00 $0.00
Subtotal $8,795.99 $780.63 $6,728.46 $664.46 $622.44
Completion Fee $678.55 $78.06 $493.25 $45.00 $62.24
Total Estimated Cost $9,474.54 $858.69 $7,221.71 $709.46 $684.68
Cost from Prior CEF:
Cost from Delta CEF;
Cost (Prior + Delta): $0.00
Rounding Error: $9,474.54
Final Total Cost: $9,474.54
Site: Handcraft Custom Cleaners
Activity/Phase: Annual NAM - TACO 1 Delta
Project Manager:
Page 1Page 1
SITE : Handcraft Custom Cleaners SUBTASK 2: Annual NAM Report
DATE: 10/23/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations and prepare final Annual NAM Report 5
Total 5
D. Phillips Senior Scientist Verification of property ownership, notify RPO of field activities 1 Prepare draft Annual NAM report 11
Total 12
J. Von Borstel GIS Analyst 2 Total 2
D. Flake Technician Prep for field event and obtain groundwater IDW drum 2 Round trip mobilization from Tampa to Ft Lauderdale 10 Open Well and collect DTW at 5 wells 1 Annual groundwater sampling 5 wells and IDW storage 5 Containerize purge water and secure the drum onsite 1 Locate, open the hair trap/cleanout, and sample 1
Total 20
B. Jarvis Administrative Update Tables 2 Total 2
TOTAL LABOR 41
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck D. Flake $120.00 day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem D. Flake $36.00 day 2 $72.00 Hotel D. Flake $150.00 day 1 $150.00
TOTAL PER DIEM $222.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIITS
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNIITS
Groundwater USEPA Method 8260 for VOHs $73.00 5 $365.00 Cleanout Water USEPA Method 8260 for VOHs $73.00 1 $73.00 IDW USEPA Method 8260 for VOHs $73.00 0 $0.00 Sediment USEPA Method 8260 for VOHs $73.00 0 $0.00 Shipping Samples $70.00 1 $70.00
TOTAL LAB $508.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 2 $80.00 Shallow Groundwater Sampling Kit $290.00 Day 2 $580.00 Metal Detector $40.00 Day 1 $40.00 DOT 55 gallon drum $100.00 each 1 $100.00 Ice $6.50 each 4 $26.00 PID $88.00 each 0 $0.00 Encore Sampler $16.00 each 0 $0.00
TOTAL EQUIPMENT $826.00
Update Figures
Page 2Page 2
SUBTASK 3: IDW Management
DATE: 10/23/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D. Phillips Senior Scientist 3 Total 3.0
TOTAL LABOR 3
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW T&D $195.00 1 $195.00
TOTAL $195.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Coordinate T&D and complete the SubTask 3 deliverable
Page 3Page 3
SUBTASK 4: PFAS Screening
DATE: 10/23/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
D. Phillips Senior Scientist 3.0 Total 3.0
J. Von Borstel GIS Analyst 1.0 Total 1.0
B. Jarvis Administrative 1.0 Total 1.0
TOTAL LABOR 5
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Prepare PFAS table
Prepare PFAS figure
Review lab report, prepare PFAS email deliverable.
Page 4Page 4
Task #: SubTask 1 Project Management
SubTask 2 Annual NAM Report
SubTask 3 IDW Management
SubTask 4 PFAS Screening
SubTask 5
Totals 1 2 3 4
Labor Rate Category
$84.17 Project Manager -0.23 -0.23 $84.17 Senior Principal Scientist (MC) 0 0.0 0
$55.00 Senior Engineer / Scientist (DP) 0.00 0.0 0.00 0.0
$28.44 GIS Analyst / Graphics (JV) 0 0.0 0 0.0
$30.07 Technician (DF) -5 -5.0 0 0.0
$34.81 Administrative (BJ) 0 0.0 0 0.0
Total Hours -5.23 -0.23 -5.0 0.00 0.0
Direct Labor ($169.90) ($19.55) ($150.35) $0.00 $0.00
Overhead 125.30% ($212.89) ($24.50) ($188.39) $0.00 $0.00
Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 47.40% ($80.54) ($9.27) ($71.27) $0.00 $0.00
Total Labor ($463.33) ($53.32) ($410.01) $0.00 $0.00
Travel
Vehicle Rental $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00
Total Travel $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
IDW $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00
Handling Fee $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00
Laboratory
Analytical Costs ($146.00) ($146.00) $0.00 $0.00
Sample Shipping $0.00 $0.00 $0.00 $0.00
Total Laboratory ($146.00) ($146.00) $0.00 $0.00
Field Expenses
Expendables $0.00 $0.00 $0.00 $0.00 Shallow Groundwater Sampling Kit $0.00 $0.00 $0.00 $0.00
Metal Detector $0.00 $0.00 $0.00 $0.00
DOT 55 gallon drum $0.00 $0.00 $0.00 $0.00
Ice $0.00 $0.00 $0.00 $0.00
PID ($88.00) $0.00 $0.00
Encore Sampler ($16.00) $0.00 $0.00
Total Field Expenses ($104.00) ($104.00) $0.00 $0.00
Subtotal ($713.33) ($53.32) ($660.01) $0.00 $0.00
Completion Fee ($46.33) ($5.33) ($41.00) $0.00 $0.00
Total Estimated Cost ($759.66) ($58.65) ($701.01) $0.00 $0.00
Site: Handcraft Custom Cleaners
Activity/Phase: Annual NAM - TACO 1 Delta
Page 1Page 1Page 1Page 1
SUBTASK 2: Annual NAM Report
DATE: 10/23/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
M. Culbreth Sr. Principal Scientist Develop conclusions and recommendations and prepare final Annual NAM Report 0
Total 0
D. Phillips Senior Scientist Verification of property ownership, notify RPO of field activities 0 Prepare draft Annual NAM report 0
Total 0
J. Von Borstel GIS Analyst 0 Total 0
D. Flake Technician Prep for field event and obtain groundwater IDW drum 0 Round trip mobilization from Tampa to Ft Lauderdale 0 Open Well and collect DTW at 5 wells -1 Annual groundwater sampling 5 wells and IDW storage -3 Containerize purge water and secure the drum onsite 0 Locate, open the hair trap/cleanout, and sample -1
Total -5
B. Jarvis Administrative Update Tables 0 Total 0
TOTAL LABOR -5
VEHICLE TYPE RATE UNIT USEAGE
Rental Truck D. Flake $120.00 day 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem D. Flake $36.00 day 0 $0.00 Hotel D. Flake $150.00 day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST UNIITS
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC UNIITS
Groundwater USEPA Method 8260 for VOHs $73.00 0 $0.00 Cleanout Water USEPA Method 8260 for VOHs $73.00 0 $0.00 IDW USEPA Method 8260 for VOHs $73.00 -1 ($73.00) Sediment USEPA Method 8260 for VOHs $73.00 -1 ($73.00) Shipping Samples $70.00 0 $0.00
TOTAL LAB ($146.00)
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00 Shallow Groundwater Sampling Kit $290.00 Day 0 $0.00 Metal Detector $40.00 Day 0 $0.00 DOT 55 gallon drum $100.00 each 0 $0.00 Ice $6.50 each 0 $0.00 PID $88.00 each -1 ($88.00) Encore Sampler $16.00 each -1 ($16.00)
TOTAL EQUIPMENT ($104.00)
Update Figures
Page 2Page 2Page 2Page 2
Task #: SubTask 1 Project Management
SubTask 2 Annual NAM Report
SubTask 3 IDW Management
SubTask 4 PFAS Screening
SubTask 5
Totals 1 2 3 4
Labor Rate Category
$84.17 Project Manager 3.63 3.63
$84.17 Senior Principal Scientist (MC) 5 5.0 0
$55.00 Senior Engineer / Scientist (DP) 18.00 12.0 3.00 3.0
$28.44 GIS Analyst / Graphics (JV) 3 2.0 0 1.0
$30.07 Technician (DF) 25 25.0 0 0.0
$34.81 Administrative (BJ) 3 2.0 0 1.0
Total Hours 57.63 3.63 46.0 3.00 5.0
Direct Labor $2,658.16 $305.81 $1,959.10 $165.00 $228.25
Overhead 125.30% $3,330.68 $383.18 $2,454.75 $206.75 $286.00
Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00
Fringe 47.40% $1,259.96 $144.95 $928.61 $78.21 $108.19
Total Labor $7,248.80 $833.94 $5,342.46 $449.96 $622.44
Travel
Vehicle Rental $240.00 $240.00 $0.00 $0.00
Per diem + Hotel $222.00 $222.00 $0.00 $0.00
Total Travel $462.00 $462.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
IDW $195.00 $0.00 $195.00 $0.00
Subcontractor Subtotal $195.00 $0.00 $195.00 $0.00
Handling Fee $19.50 $0.00 $19.50 $0.00
Total Subcontractor Cost $214.50 $0.00 $214.50 $0.00
Laboratory
Analytical Costs $584.00 $584.00 $0.00 $0.00
Sample Shipping $70.00 $70.00 $0.00 $0.00
Total Laboratory $654.00 $654.00 $0.00 $0.00
Field Expenses
Expendables $80.00 $80.00 $0.00 $0.00
Shallow Groundwater Sampling Kit $580.00 $580.00 $0.00 $0.00
Metal Detector $40.00 $40.00 $0.00 $0.00
DOT 55 gallon drum $100.00 $100.00 $0.00 $0.00
Ice $26.00 $26.00 $0.00 $0.00
PID $88.00 $0.00 $0.00
Encore Sampler $16.00 $0.00 $0.00
Total Field Expenses $930.00 $930.00 $0.00 $0.00
Subtotal $9,509.30 $833.94 $7,388.46 $664.46 $622.44
Completion Fee $724.88 $83.39 $534.25 $45.00 $62.24
Total Estimated Cost $10,234.18 $917.33 $7,922.71 $709.46 $684.68
Site: Handcraft Custom Cleaners
Activity/Phase: Annual NAM - Original
Page 1Page 1Page 1Page 1
From: Fowler, Karlee To: Aoki, Benjamin Subject: FW: Handcraft Cleaners (ERIC_4056) - TACO 1 Submittal Date: Thursday, October 23, 2025 11:21:41 AM Attachments: Outlook-mntcq4zv.png
Outlook-vgd5utlh.png Outlook-s1rwn2w2.png Outlook-ylsd33bq.png Outlook-eokyhkc1.png Handcraft Cleaners ERIC_5013 NAM LOECEF Original +TACO 1.xlsx Handcraft Cleaners ERIC_5013 NAM LOECEF Original.xlsx Handcraft Cleaners ERIC_5013 NAM LOECEF TACO 1 Delta.xlsx Handcraft Cleaners ERIC_5013 NAM LOECEF TACO 1.pdf HW682_DC028A_.pdf
Hey Benjamin, one more TACO for ECT. If you have a lot on your plate just let me know and I can do this one. I’ve attached the original TA above. Thanks!
From: Daniel S. Phillips <dphillips@ectinc.com> Sent: Wednesday, October 22, 2025 4:01 PM To: Fowler, Karlee <Karlee.Fowler@FloridaDEP.gov> Cc: Leif Layton <llayton@ectinc.com>; Courtney Wranosky <cwranosky@ectinc.com>; Dirk Mammen <dmammen@ectinc.com> Subject: Handcraft Cleaners (ERIC_4056) - TACO 1 Submittal
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Karlee:
Here is TACO 1 that reconciles costs in ST2 only.
As always, let me know if you have any questions.
Daniel S. Phillips, P.G.
Sr. Scientist | Site Assessment & Remediation
3751 Maguire Boulevard, Suite 234, Orlando, FL 32803
C: 407.509.7684
Funding Information:
Org. Code E.O.
Object Code
Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor�st �s Project Manager: ontractor�s t�s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department
Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature)
Date:
Additional signatures attached on separate page.
HW682
DC028A Completion December 12, 2025
This Task Assignment authorizes ECT to perform annual Natural Attenuation Monitoring (NAM) at Handcraft Cleaners in Fort Lauderdale, FL. ECT will collect and analyze groundwater samples from five monitoring wells, generate a NAM Report, and transport and dispose of IDW.
Karlee Fowler 850 245-8944 Contractor Environmental Consulting and Technology, Inc. (ECT) Contractor
Contractor Mark A. Culbreth Contractor 813-289-9338
ERIC_4056
Fort Lauderdale, Broward County, Florida
Handcraft Cleaners
Contractor Contractor
$ 10,234.18
$ 10,234.18
Scope of Work
Environmental Consulting and Technology, Inc. (ECT Contractor
Mark A. Culbreth
Contract Manager
Digitally signed by Mark Culbreth Date: 2025.06.12 16:15:46-04'00'Mark Culbreth
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.06.12 08:52:41 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Annual NAM Report (Subtask 2) 09/26/2025
Waste Manifest (Subtask 4) 09/26/2025
Project Management, PFAS Deliverable (Subtask 1 & Subtask 3) 09/26/2025
FDEP Approval of Annual NAM Report (Subtask 2) $ 7,922.71
FDEP Approval of Waste Manifest (Subtask 4) $ 709.46
FDEP Approval of Project Management, PFAS Deliverable (Subtask 1 & Subtask 3) $ 1,602.01
$ 10,234.18